56.03 Methoden im Bauingenieurwesen
Refine
Document Type
- Article (143) (remove)
Institute
Keywords
- Bautechnik (21)
- Produktmodell (20)
- Simulation (20)
- Finite-Elemente-Methode (17)
- Lernendes System (15)
- Mehragentensystem (14)
- Modellierung (13)
- Physikalisches Verfahren (11)
- Bauwerk (9)
- CAD (8)
An architecture of a distributed planning system for the building industry has been developed. The emphasis is on highly collaborative environments in steelwork, timber construction etc. where designers concurrently handle 3D models. The overall system connects local design systems by the so-called Design Framework DFW. This framework consists of the definition of distributed components and protocols which make the collaborative design work. The process of collaborative design has been formalized on an abstract level. This paper describes how this has been done. A sample is given to illustrate the mapping of concrete scenarios of the ‘real design world’ to an abstract scenario level. This work is funded by the Deutsche Forschungsgemeinschaft DFG as part of the project SPP1103 (Meißner et al. 2003).
The complexity of the relationships between the actors of a building project requires high efficiency in communication. Among other things, data sharing is crucial. The exchange of data is made possible by interfaces between expert programs, which rely on product models. The latter are neutral standards with formal definitions of building objects and their attributes. This paper deals with the state of the art and the research activities concerning product models in the steel construction domain and the advantages provided by this technology for the sector.
Der englische Physiker und Mathematiker Roger Penrose hat eine mathematische Pflasterung entdeckt, deren Formenreichtum neue Impulse in der Architektur setzen kann. In der Gemeinde Bütgenbach im Hohen Venn, Belgien, wurde das Verwaltungszentrum durch den Essener Architekten Ernst Burghartz mit mehrereren Penrose-Pflasterungen versehen. Diese beruhen auf einem Computer-Programm, welches der Vortragende zusammen mit Dr. Frank Martini entwickelt hat. Herr Burghartz hat jedoch diesen Vorentwurf nach seinen künstlerischen Vorstellungen abgewandelt.
Der Entwurf einfacher Konstruktionen stellt für den Tragwerksplaner zumeist eine Routineaufgabe dar. Üblicherweise werden Statik, Zeichnungen sowie Elementelisten separat voneinander erstellt. Das Programmsystem ICAD bietet die Möglichkeit, diese Arbeiten in einer Bearbeitungsstufe durchzuführen. Die Programmierung der Bemessung, Darstellung und Auswertung von Bauteilen wird mit dem Editor Emacs vorgenommen, die grafische Umsetzung des compilierten Quelltextes erfolgt im ICAD-Browser. Innerhalb dieser Benutzeroberfläche steht eine Reihe von Werkzeugen für die Eingabe und Visualisierung von Daten zur Verfügung. Betrachtet man die zu bearbeitenden Bauteile und Anschlüsse als bekannte Konstruktionen des Ingenieurholzbaus, für die es eine festgelegte Anzahl von Abmessungen und Kennwerten gibt, so läßt sich jede dieser Konstruktionen als eigenständiger Modul programmieren. Der Tragwerksplaner ist somit in der Lage, aus einem Katalog an Bauteilen und Anschlüssen die Gesamtkonstruktion zusammenzustellen. Allgemeingültige Kennwerte, Berechnungsverfahren und häufig verwendete Unterprogramme stehen modular als Wissensbasis zur Verfügung und werden von den einzelnen Tragelementen bedarfsgerecht eingebunden. Eine weitere Möglichkeit der wissensbasierten Tragwerksplanung stellt die sogenannte Multi-Criteria-Analyse dar. Bei diesem Verfahren nimmt das Programm selbständig eine Entscheidungsfindung für eine oder mehrere günstige Konstruktionslösungen vor. Dazu sind lediglich Wichtungen verschiedener Randbedingungen durch den Anwender erforderlich.
The paper introduced the research and application of the highway construction management information integrated system. Explained the development and application of highway survey applet run on mobile telephone supporting Java and the technique of transmitting engineering data by GPRS wireless network technology. And expounded the development and application of highway engineering construction field data collecting software run on Pocket-PC. Recommended the technique of engineering long distance data transmitting based on C/S structure adopting VPN (Virtual Private Networks) technology. Especially expatiated on the research on the platform of highway construction management information integrated system adopting geography information system (GIS) technique, database technique and network technique. And said all to subsystem about bid manage, contract management, engineering design drawing, engineering survey calculation, measure and pay, data processing on engineering experiment, quantity assessing, project plan and progress, engineering document management etc. Besides? proposed highway construction project visual analysis and inquiry system based on Web-GIS; Explained the research and application of highway engineering construction OA based on B/S structure; real-time workflow and information processing such as the management of administration, business and procedure of authorization and information distribution. At last, the author described the prospect of the application of C/S and B/S structure in trade software development in the highway construction management.
We consider the standardization problem (SP) which can be formulated as follows. It is known demand bi in each type i in {1, 2, ..., n} of items. Production of yi items of the ith type brings a profit fi (yi), where fi is a nondecreasing concave function for each i in {1, 2, ..., n}.It is necessary to satisfy the demand and to maximize the total profit provided that there exist >standardization possibilities< . These possibilities means that some types of items can be replaced by some another types. We introduce generalized standardization problem (GSP) in which titems demand is given as the set of admissible demand vectors. We show that GSP and SP are special cases of the resource allocation problem over a network polymatroid. Ibasing on this observation we propose a polynomial time solution algorithm for GSP and SP.
In this research project we intend to transfer the whole AEC-Bidding process to an agent-based virtual marketplace. Hereby, the existing legal regulations have to be considered. Important aspects in developing the virtual marketplace are to provide the possibility to realize an agentbased bidding consortium as well as to integrate subcontractors.
Physically Based Modeling and Multi-Physical Simulation System for Wood Structure Fire Performance
(2004)
This research is devoted to promoting the performance-based engineering in wood structure fire. It looks into the characteristic of the material, structural composing and collapse detecting to find out the main factors in the wood structure collapse in fire. The aim of the research is to provide an automatic simulation platform for the complicated circulation. A physically based model for slim member for beams and columns and a frame of multi-physical simulation are provided to implement the system. The physically based model contains material model, structural mechanics model, material mechanics model, as well as geometry model for the compositive simulation. The multi-physical simulation is built on the model and has the capacity to carry out a simulation combining structural, fire (thermal, CFD) and material degradation simulation. The structural and fire simulation rely on two sophisticated software respectively, ANSYS (an FEA software) and FDS (with a core of CFD). Researchers of the paper develop system by themselves to combine the two existing ones. The system has the capability to calculate the wood char to find out the loss of cross-section and to detect the collapse caused in different ways. The paper gives a sample of Chinese traditional house to show how this simulation system works.
Thin elastic plates are the basic constructional elements and are very often subjected to dynamic effects especially in the machine-building structures. Their saving design of resonance conditions of operation is an extremely complicated task which cannot be solved analytically. In the present report an efficient and sufficiently general method for optimal design of thin plates is worked out on the basis of energy resonance method of Wilder, the method of the finite elements for dynamic research and the methods of parameter optimization. By means of these methods various limitations and requirements put by the designer to the plates can be taken into account. A programme module for numerical investigation of the weight variation of the plate depending on the taken variable of the designed thickness at different supporting conditions is developed. The reasons for the considerable quantity and quality difference between the obtained optimal designs are also analysed.
The influence of vortex-induces vibrations on vertical tie rods has been proved as a determinant load factor in the lifetime-oriented dimensioning of arched steel bridges. Particularly, the welded connection plates between the suspenders and the arches often exhibit cracks induced primarily rods. In this context, the synchronization of the vortex-shedding to the rod motion in a critical wind velocity range, the so-called lock-in effect, is of essential interest.
Increasing complexity of today's buildings requires a high level of integration in the planning process. Common planning strategies, where individual project partners cooperate mainly to exchange results, are not suitable to jointly develop project goals and objectives. Integrated planning, a more holistic approach to deal with complex problems, is based on a high degree of communication amoung team members and leads to a goal oriented cooperation. Current approaches in the reasearch area of Computer Supported Cooperative Work (CSCW) poorly meet the requirements in planning. A planning process model, based on the principles of integrated planning will be introduced, aimed to provide the background for the implementation of a CSCW-platform.
There is an increasing need for 3D building extraction from aerial images for various applications such astown planning, environmental- and property-related studies. Aerial images usually reveal on one hand a certain amount of information not relevant for the given task of building extraction like vegetation, cars etc. On the other hand there is a loss of relevant information due to occlusions, low contrasts or disadvantageous perspectives. Therefore a promising concept for automated building reconstruction must incorporate a suffciantly complete model of the objects of interest. We propose a model-based approach to 3D building extraction from aerial images which reveals a tight coupling between a generic 3D object model and an explicit 2D image model. The generic object model employes domain specific volumetric primitives (i. e. building part models) and combination schemes. To cover the gap between 3D object models and 2D image data the image model is employed to predict the projective building appearences in aerial images. We present a strategy for a model-based building extraction based on the recognition-by-components principle and show first experimental results derived from international test sets
The Priority Programme ‘Network Based Co-operation in Structural Engineering’ of the ‘German Research Foundation’ (DFG) has been established in the year 2000. This paper describes and discusses the main research directions and first results of the workgroup ‘Distributed Product Models’. The five projects of the workgroup have developed completely different solutions for specific application domains. Each solution concept deals with a consistent product modeling and knowledge processing in a distributed environment in the planning process. The individual solution approaches of the projects are described and the underlying basic assumptions are discussed. A unified system architecture is described for all projects of the workgroup. Two different approaches (object-oriented and graph-based models) have been introduced for product and knowledge modeling. The common structure of these models will be explained to fully understand the differences of these modeling approaches. Finally the concepts for co-operative work and conflict management in a distributed environment are described: The solution approaches will be distinguished by classifying the supported co-operation according to time. A final scientific summary describes the state-of-the-art in network based co-operation in structural engineering: The role of research directions like knowledge modeling, standard product modeling and versioning in the distributed planning process will be explained.
A wide variety of behavioural models exist in microscopic traffic simulation. Commercial programms often use closed-source policies and are confined to their respective simulation platforms. Open-source approaches mainly focus on distinctive, highly specialized traffic situations. In the scope of this paper, an open-source framework for developing modular, objectoriented simulation systems is presented, capable of simultaneously accommodating different driving models and enabling the user to modify and extend the catalogue of driving behaviours. The existing driving behaviours and the computational implementation of the simulation are being described.
This work was partially supported by DAAD, Fundamental Researches Foundation of Belarus and International Soros Science Education Program We consider a vector discrete optimization problem on a system of non- empty subsets (trajectories) of a finite set. The vector criterion of the pro- blem consists partial criterias of the kinds MINSUM, MINMAX and MIN- MIN. The stability of eficient (Pareto optimal, Slater optimal and Smale op- timal) trajectories to perturbations of vector criterion parameters has been investigated. Suficient and necessary conditions of eficient trajectories local stability have been obtained. Lower evaluations of eficient trajectories sta- bility radii, and formulas in several cases, have been found for the case when l(inf) -norm is defined in the space of vector criterion parameters.
A Multi-objective Model for Optimizing Construction Planning of Repetitive Infrastructure Projects
(2004)
This paper presents the development of a model for optimizing resource utilization in repetitive infrastructure projects. The model provides the capability of simultaneous minimization of both project duration and work interruptions for construction crews. The model provides in a single run, a set of nondominated solutions that represent the tradeoff between these two objectives. The model incorporates a multiobjective genetic algorithm and scheduling algorithm. The model initially generates a randomly selected set of solutions that evolves to a near optimal set of tradeoff solutions in subsequent generations. Each solution represents a unique scheduling solution that is associated with certain project duration and a number of interruption days for utilized construction crews. As such, the model provides project planners with alternative schedules along with their expected duration and resource utilization efficiency.
O-D Matrix sind die wichtigste Informationsquelle, die den Bedarf an Transport in der Stadt betrifft. Sie dienen den richtigen Bildung von Straßennetz und Öffentlichen Personen Verkehrslinien. Anhand diesen Grundlagen gerechnet man Verkehrsstärken, die zur Dimensionierung der Verkehrsinfrastruktur benutzt werden. Im Verkehrsplannung zur Rechnung O-D Matrix wird Vier - Stufen - Methode angewendet. In dieser Methode verwendet man die Angaben aus den Haushaltsumfragen und aus den Kordonumfragen. Diese Methode fordert einen großen Arbeitsaufwand und Kosten. Hier wird die andere Methode dargestellt. Bei Schätzung der O-D Matrix verwendet man die Verkehrsstärken, die in den Straßenquerschnitten gemessen werden. Wir brauchen gemessene Verkehrsstärken auch für andere Ziele (z. B. für Signalsteuerung, für Beobachtung des Motorisierungstrendes). Darum ist diese Methode billiger als das traditionelle Verfahren. In diesen Methode haben wir zwei Möglichkeiten. Die erste - von Verkehrsstärkemessungen kann man O-D Matrix direkt schätzen. Und zweite Möglichkeit - zuerst rechnen wir die Verkehrserzeugungen und später O-D Matrix. Das zweite Verfahren hat einen wesentlichen Vorteil und zwar, anhand der Verkehrserzeugungen ist es möglich alle Elemente O-D Matrix zu rechnen. Bei der Schätzung der O-D Matrix unmittelbar von den Messungen (das erste Verfahren) bekommt man nur diese Elemente, die in den beobachtenen Straßenquerschnitten auftreten.
In diese Veröffentlichung werden die Kennziffern dargestellt, die zur Beurteilung der Struktur von Verkehrsnetzen behilflich sein können. Zu diesem Zweck wurde die Graphentheorie angewendet. Eine erste Gruppe von Bewertungen stützt sich auf die Anzahl der Knoten und Bögen des Netzes. Detailliertere Informationen über Engpässe oder Schwachstellen im Verkehrsnetz erhält man durch die Analyse der Kantenzusammenhangs. Die Unabhängigkeit der einzelnen Verkehrsarten , ihre Bewertung und Maßnahmen, sie zu verbessern werden vorgeschlagen und diskutiert. Weiteren Untersuchungen werden angeregt.
Die Zielstellung der ModalSplitBetrachtungen läuft darauf hinaus, Entscheidungs-kriterien zu erarbeiten, nach denen die einzelnen Personen ihre Verkehrsmittel auswählen. In dieser Veröffentlichung wurden alle drei Gruppen der Modelle (klassische, verhaltensorientierte und der Analyse) der Verkehrsaufteilung kurz charakterisiert. Dann wurden vier ausgewählte Modelle genauer beschrieben. Zum Schluß wird das Modell der Verkehrsmittelwahl dargestellt , das für die Untersuchung der Verkehrsaufteilung in Krakau verwendet wurde .
Der Beitrag beschreibt die Entwicklung eines Softwaresystems zur strukturierten Erfassung und Verwaltung bestehender Gebäude in der Architektur. Die Erfassung erfolgt durch die Aufnahme von geometrischen Daten und Sachdaten in unterschiedlichen Abstraktionsstufen unter Einbeziehung einer vorangehenden Dekomposition. Basis für die Entwicklung eines solchen Systems ist die Analyse und Systematik der Erfassungstechniken, -abläufe und der Gegenstand der architektonischen Bestandsaufnahme. Parallel hierzu erfolgt die Bewertung und Nutzung aktueller Techniken und Werkzeuge der applikativen Informatik. Schwerpunkte der Forschungsarbeit sind die Ableitung einer allgemeinen Gebäude- und Bauteilstruktur, die Einbeziehung aktueller informationstechnischer Verfahren und Werkzeuge und die Entwicklung eines entsprechenden Experimentalsystems. Auf eine Auswahl softwaretechnischer Entwicklungen wird näher eingegangen (objektspezifische Eigenschaften, flexible Geometrieerfassung und Benutzeroberflächen).
This paper presents an agent-based software, Virtual Administrator System (VAS) for the smallscale maintenance of school buildings. VAS is capable of handling a heavy load of routine, lowtech maintenance jobs. It assigns a different priority to each job application according to its significance and urgency, and automatically adjusts schedules for maintenance engineers when on-site supervision is needed. The system can help ease off the burden of routine small-scale maintenance work, making it more cost-effective and efficient in the overall management of school building maintenance. VAS posts jobs on the Web in a multi-media format and classified all applications into four categories: the on-call maintenance contract, the term maintenance contract, the guaranty maintenance contract, and the regular maintenance contract. It then estimates their urgency level and passes the information to maintenance engineers who will decide whether on-site inspection is needed. Based on the engineers’ feedback, VAS automatically implements the scheduling for inspection as well as sends out real-time or batch notifications to contractors. All these activities are recorded in a database to allow continuous research and data mining and the analysis and diagnosis of specific jobs for followup maintenance plans.
The paper summarizes a part of research carried out in ICCI project and provides a current review of ICT infrastructures supporting collaboration. It covers taxonomies, protocols, standards, components, typical subsystems as well as future trends and recommendation for two most important technologies with applications in AEC: (1) EIP (Enterprise information portal) – a single gateway to a company's information, knowledge base, and applications for all actors; (2) RTC (Real-Time Communication and Collaboration technologies) that provide means for asynchronous communication between geographically dislocated people using ICT. Proposed future developments are: orientation towards web services - with building information models, business intelligence, personalization, AEC information retrieval, p2p workspaces and grids.
The aim of this talk is to show that the methods used by Métivier and Lapidus to study the eigenvalue distribution of elliptic operators (e.g., of the Dirichlet Laplacian) can be adapted to the study of the similar problem for the Stokes operator. In this way we get asymptotic formulae for the eigenvalues of the latter operator even in the case when the underlying domain has an extremely irregular (fractal) boundary. In the case the boundary is not that irregular (e.g., when it is Lipschitz) the estimates we obtain are much better than the ones we can find in the current literature.
SLang - the Structural Language : Solving Nonlinear and Stochastic Problems in Structural Mechanics
(1997)
Recent developments in structural mechanics indicate an increasing need of numerical methods to deal with stochasticity. This process started with the modeling of loading uncertainties. More recently, also system uncertainty, such as physical or geometrical imperfections are modeled in probabilistic terms. Clearly, this task requires close connenction of structural modeling with probabilistic modeling. Nonlinear effects are essential for a realistic description of the structural behavior. Since modern structural analysis relies quite heavily on the Finite Element Method, it seems to be quite reasonable to base stochastic structural analysis on this method. Commercially available software packages can cover deterministic structural analysis in a very wide range. However, the applicability of these packages to stochastic problems is rather limited. On the other hand, there is a number of highly specialized programs for probabilistic or reliability problems which can be used only in connection with rather simplistic structural models. In principle, there is the possibility to combine both kinds of software in order to achieve the goal. The major difficulty which then arises in practical computation is to define the most suitable way of transferring data between the programs. In order to circumvent these problems, the software package SLang (Structural Language) has been developed. SLang is a command interpreter which acts on a set of relatively complex commands. Each command takes input from and gives output to simple data structures (data objects), such as vectors and matrices. All commands communicate via these data objects which are stored in memory or on disk. The paper will show applications to structural engineering problems, in particular failure analysis of frames and shell structures with random loads and random imperfections. Both geometrical and physical nonlinearities are taken into account.
Authors' own research in applied unicriterial and multicriterial optimisation of bar structures, and also an analysis of accessible bibliography on structural synthesis allows to present herein an attempt to define a general algorithm for proceeding in formulation of a structural optimisation problem. A practical aspect of such an algorithm consists, in author's opinion, in enabling a designer a correct creation of a mathematical model of synthesis problems, independently of known mathematical methods employed to looking for an unconditional extremum of function of several variables. A proposed algorithm is not a ready-for-use tool for solving all the optimisation problems, but it constitutes an easy-to-expand theoretical basis. This basis should allow a designer to create a proper set of compromises on the way to construct a mathematical model of a specific optimisation problem. The algorithm, presented in the paper, is constructed as a sequence of the one-after-another problem questions, on which the designer answers: yes or no, and a set of selections from the knowledge base consisting of the elements of an optimisation problem components. The order of making questions adopted by the authors in the algorithm is subjective, however it is supported by their experience, both in applied optimisation and in designing of structures like trusses or frames.
Für eine Abschätzung des Heizwärmebedarfs von Gebäuden und Quartieren können thermisch-energetische Simulationen eingesetzt werden. Grundlage dieser Simulationen sind geometrische und physikalische Gebäudemodelle. Die Erstellung des geometrischen Modells erfolgt in der Regel auf Basis von Bauplänen oder Vor-Ort-Begehungen, was mit einem großen Recherche- und Modellierungsaufwand verbunden ist. Spätere bauliche Veränderungen des Gebäudes müssen häufig manuell in das Modell eingearbeitet werden, was den Arbeitsaufwand zusätzlich erhöht. Das physikalische Modell stellt die Menge an Parametern und Randbedingungen dar, welche durch Materialeigenschaften, Lage und Umgebungs-einflüsse gegeben sind. Die Verknüpfung beider Modelle wird innerhalb der entsprechenden Simulations-software realisiert und ist meist nicht in andere Softwareprodukte überführbar. Mithilfe des Building Information Modeling (BIM) können Simulationsdaten sowohl konsistent gespeichert als auch über Schnittstellen mit entsprechenden Anwendungen ausgetauscht werden. Hierfür wird eine Methode vorgestellt, die thermisch-energetische Simulationen auf Basis des standardisierten Übergabe-formats Industry Foundation Classes (IFC) inklusive anschließender Auswertungen ermöglicht. Dabei werden geometrische und physikalische Parameter direkt aus einem über den gesamten Lebenszyklus aktuellen Gebäudemodell extrahiert und an die Simulation übergeben. Dies beschleunigt den Simulations-prozess hinsichtlich der Gebäudemodellierung und nach späteren baulichen Veränderungen. Die erarbeite-te Methode beruht hierbei auf einfachen Modellierungskonventionen bei der Erstellung des Bauwerksinformationsmodells und stellt eine vollständige Übertragbarkeit der Eingangs- und Ausgangswerte sicher.
Thermal building simulation based on BIM-models. Thermal energetic simulations are used for the estimation of the heating demand of buildings and districts. These simulations are based on building models containing geometrical and physical information. The creation of geometrical models is usually based on existing construction plans or in situ assessments which demand a comparatively big effort of investigation and modeling. Alterations, which are later applied to the structure, request manual changes of the related model, which increases the effort additionally. The physical model represents the total amount of parameters and boundary conditions that are influenced by material properties, location and environmental influences on the building. The link between both models is realized within the correspondent simulation soft-ware and is usually not transferable to other software products. By Applying Building Information Modeling (BIM) simulation data is stored consistently and an exchange to other software is enabled. Therefore, a method which allows a thermal energetic simulation based on the exchange format Industry Foundation Classes (IFC) including an evaluation is presented. All geometrical and physical information are extracted directly from the building model that is kept up-to-date during its life cycle and transferred to the simulation. This accelerates the simulation process regarding the geometrical modeling and adjustments after later changes of the building. The developed method is based on simple conventions for the creation of the building model and ensures a complete transfer of all simulation data.
Für eine Abschätzung des Heizwärmebedarfs von Gebäuden und Quartieren können thermisch-energetische Simulationen eingesetzt werden. Grundlage dieser Simulationen sind geometrische und physikalische Gebäudemodelle. Die Erstellung des geometrischen Modells erfolgt in der Regel auf Basis von Bauplänen oder Vor-Ort-Begehungen, was mit einem großen Recherche- und Modellierungsaufwand verbunden ist. Spätere bauliche Veränderungen des Gebäudes müssen häufig manuell in das Modell eingearbeitet werden, was den Arbeitsaufwand zusätzlich erhöht. Das physikalische Modell stellt die Menge an Parametern und Randbedingungen dar, welche durch Materialeigenschaften, Lage und Umgebungs-einflüsse gegeben sind. Die Verknüpfung beider Modelle wird innerhalb der entsprechenden Simulations-software realisiert und ist meist nicht in andere Softwareprodukte überführbar.
Mithilfe des Building Information Modeling (BIM) können Simulationsdaten sowohl konsistent gespeichert als auch über Schnittstellen mit entsprechenden Anwendungen ausgetauscht werden. Hierfür wird eine Methode vorgestellt, die thermisch-energetische Simulationen auf Basis des standardisierten Übergabe-formats Industry Foundation Classes (IFC) inklusive anschließender Auswertungen ermöglicht. Dabei werden geometrische und physikalische Parameter direkt aus einem über den gesamten Lebenszyklus aktuellen Gebäudemodell extrahiert und an die Simulation übergeben. Dies beschleunigt den Simulations-prozess hinsichtlich der Gebäudemodellierung und nach späteren baulichen Veränderungen. Die erarbeite-te Methode beruht hierbei auf einfachen Modellierungskonventionen bei der Erstellung des Bauwerksinformationsmodells und stellt eine vollständige Übertragbarkeit der Eingangs- und Ausgangswerte sicher.
Thermal building simulation based on BIM-models. Thermal energetic simulations are used for the estimation of the heating demand of buildings and districts. These simulations are based on building models containing geometrical and physical information. The creation of geometrical models is usually based on existing construction plans or in situ assessments which demand a comparatively big effort of investigation and modeling. Alterations, which are later applied to the structure, request manual changes of the related model, which increases the effort additionally. The physical model represents the total amount of parameters and boundary conditions that are influenced by material properties, location and environmental influences on the building. The link between both models is realized within the correspondent simulation soft-ware and is usually not transferable to other software products.
By Applying Building Information Modeling (BIM) simulation data is stored consistently and an exchange to other software is enabled. Therefore, a method which allows a thermal energetic simulation based on the exchange format Industry Foundation Classes (IFC) including an evaluation is presented. All geometrical and physical information are extracted directly from the building model that is kept up-to-date during its life cycle and transferred to the simulation. This accelerates the simulation process regarding the geometrical modeling and adjustments after later changes of the building. The developed method is based on simple conventions for the creation of the building model and ensures a complete transfer of all simulation data.
The synchronous distributed processing of common source code in the software development process is supported by well proven methods. The planning process has similarities with the software development process. However, there are no consistent and similarly successful methods for applications in construction projects. A new approach is proposed in this contribution.
Der Einsatz von CAD-Applikationen hat die Planungsarbeit im Bauwesen entscheidend verändert. In der Entwurfsplanung sind die Änderungen bereits deutlich erkennbar. Seit der Anwendung von dreidimensionalen Planungswerkzeugen kann der Bauherr das Bauwerk in seiner virtuellen Gesamtheit am Computer betrachten und bewerten. Dies bietet viele Vorteile. So ist der Planer gezwungen alle wesentlichen Details a priori exakt zu planen, wodurch viele Fehler vermieden werden können. Dies bietet insbesondere für Planungen in Baubetrieben, z.B. im Rahmen der Arbeitsvorbereitung, neue Einsatzmöglichkeiten.
The development of 3D technologies during the last decades in many different areas, leads us towards the complete 3D representation of planet earth on a high level of detail. On the lowest level we have geographical information systems (GIS) representing the outer layer of our planet as a 3D model. In the meantime these systems do not only give a geographical model but also present additional information like ownership, infrastructure and others that might be of interest for the construction business. In future these systems will serve as basis for virtual environments for planning and simulation of construction sites. In addition to this work is done on the integration of GIS systems with 3D city models in the area of urban planning and thus integration of different levels of detail. This article presents research work on the use of 3D models in construction on the next level of detail below the level of urban planning. The 3D city model is taken as basis for the 3D model of the construction site. In this virtual nD-world a contractor can organize and plan his resources, simulate different variants of construction processes and thus find out the most effective solution for the consideration of costs and time. On the basis of former researches the authors present a new approach for cost estimation and simulation using development technologies from game software.
The paper analyses the application of 3D gaming technologies in the simulation of processes associated with human resources and machinery on construction sites in order to determine process costs. It addresses the problem of detailing in process simulation. The authors outline special boundary conditions for the simulation of cost-relevant resource processes on virtual construction sites. The approach considers different needs for detailing in process simulation during the planning and building phase. For simulation of process costs on a construction site (contractors view) the level of detail has to be set to high. A prototype for determination of process durations (and hereby process costs) developed at the Bauhaus University Weimar is presented as a result of ongoing researches on detailing in process simulation. It shows the method of process cost determination on a high level of detail (game between excavator and truck) through interaction with the virtual environment of the site.
Building Information Modeling is a powerful tool for the design and for a consistent set of data in a virtual storage. For the application in the phases of realization and on site it needs further development. The paper describes main challenges and main features, which will help the development of software to better service the needs of construction site managers
A multicriterial statement of the above mentioned problem is presented. It differes from the classical statement of Spanning Tree problem. The quality of solution is estimated by vector objective function which contains weight criteria as well as topological criteria (degree and diameter of tree). Many real processes are not determined yet. And that is why the investigation of the stability is very important. Many errors are connected with calculations. The stability analysis of vector combinatorial problems allows to discover the value of changes in the initial data for which the optimal solution is not changed. Furthermore, the investigation of the stability allows to construct the class of the problems on base of the one problem by means of the parameter variations. Analysis of the problems with belong to this class allows to obtaine axact and adecuate discription of model
Current disaster management procedures rely primarily on heuristics which result in their strategies being very cautious and sub-optimum in terms of saving life, minimising damage and returning the building to its normal function. Also effective disaster management demands decentralized, dynamic, flexible, short term and across domain resource sharing, which is not well supported by existing distributing computing infrastructres. The paper proposes a conceptual framework for emergency management in the built environment, using Semantic Grid as an integrating platform for different technologies. The framework supports a distributed network of specialists in built environment, including structural engineers, building technologists, decision analysts etc. It brings together the necessary technology threads, including the Semantic Web (to provide a framework for shared definitions of terms, resources and relationships), Web Services (to provide dynamic discovery and integration) and Grid Computing (for enhanced computational power, high speed access, collaboration and security control) to support rapid formation of virtual teams for disaster management. The proposed framework also make an extensive use of modelling and simulation (both numerical and using visualisations), data mining (to find resources in legacy data sets) and visualisation. It also include a variety of hardware instruments with access to real time data. Furthermore the whole framework is centred on collaborative working by the virtual team. Although focus of this paper is on disaster management, many aspects of the discussed Grid and Visualisation technologies will be useful for any other forms of collaboration. Conclusions are drawn about the possible future impact on the built environment.
The node moving and multistage node enrichment adaptive refinement procedures are extended in mixed discrete least squares meshless (MDLSM) method for efficient analysis of elasticity problems. In the formulation of MDLSM method, mixed formulation is accepted to avoid second-order differentiation of shape functions and to obtain displacements and stresses simultaneously. In the refinement procedures, a robust error estimator based on the value of the least square residuals functional of the governing differential equations and its boundaries at nodal points is used which is inherently available from the MDLSM formulation and can efficiently identify the zones with higher numerical errors. The results are compared with the refinement procedures in the irreducible formulation of discrete least squares meshless (DLSM) method and show the accuracy and efficiency of the proposed procedures. Also, the comparison of the error norms and convergence rate show the fidelity of the proposed adaptive refinement procedures in the MDLSM method.
Electric trains are considered one of the most eco-friendly and safest means of transportation. Catenary poles are used worldwide to support overhead power lines for electric trains. The performance of the catenary poles has an extensive influence on the integrity of the train systems and, consequently, the connected human services. It became a must nowadays to develop SHM systems that provide the instantaneous status of catenary poles in- service, making the decision-making processes to keep or repair the damaged poles more feasible. This study develops a data-driven, model-free approach for status monitoring of cantilever structures, focusing on pre-stressed, spun-cast ultrahigh-strength concrete catenary poles installed along high-speed train tracks. The pro-posed approach evaluates multiple damage features in an unfied damage index, which leads to straightforward interpretation and comparison of the output. Besides, it distinguishes between multiple damage scenarios of the poles, either the ones caused by material degradation of the concrete or by the cracks that can be propagated during the life span of the given structure. Moreover, using a logistic function to classify the integrity of structure avoids the expensive learning step in the existing damage detection approaches, namely, using the modern machine and deep learning methods. The findings of this study look very promising when applied to other types of cantilever structures, such as the poles that support the power transmission lines, antenna masts, chimneys, and wind turbines.
This study proposes an efficient Bayesian, frequency-based damage identification approach to identify damages in cantilever structures with an acceptable error rate, even at high noise levels. The catenary poles of electric high-speed train systems were selected as a realistic case study to cover the objectives of this study. Compared to other frequency-based damage detection approaches described in the literature, the proposed approach is efficiently able to detect damages in cantilever structures to higher levels of damage detection, namely identifying both the damage location and severity using a low-cost structural health monitoring (SHM) system with a limited number of sensors; for example, accelerometers. The integration of Bayesian inference, as a stochastic framework, in the proposed approach, makes it possible to utilize the benefit of data fusion in merging the informative data from multiple damage features, which increases the quality and accuracy of the results. The findings provide the decision-maker with the information required to manage the maintenance, repair, or replacement procedures.
Expert systems integrating fuzzy reasoning techniques represent a powerful tool to support practicing engineers during the early stages of structural design. In this context fuzzy models have proved themselves to be very suitable for the representation of complex design knowledge. However their definition is a laborious task. This paper introduces an approach for the design and the optimization of fuzzy systems based upon Genetic Programming. To keep the emerging fuzzy systems transparent a new framework for the definition of linguistic variables is also introduced.
Different types of data provide different type of information. The present research analyzes the error on prediction obtained under different data type availability for calibration. The contribution of different measurement types to model calibration and prognosis are evaluated. A coupled 2D hydro-mechanical model of a water retaining dam is taken as an example. Here, the mean effective stress in the porous skeleton is reduced due to an increase in pore water pressure under drawdown conditions. Relevant model parameters are identified by scaled sensitivities. Then, Particle Swarm Optimization is applied to determine the optimal parameter values and finally, the error in prognosis is determined. We compare the predictions of the optimized models with results from a forward run of the reference model to obtain the actual prediction errors. The analyses presented here were performed calibrating the hydro-mechanical model to 31 data sets of 100 observations of varying data types. The prognosis results improve when using diversified information for calibration. However, when using several types of information, the number of observations has to be increased to be able to cover a representative part of the model domain. For an analysis with constant number of observations, a compromise between data type availability and domain coverage proves to be the best solution. Which type of calibration information contributes to the best prognoses could not be determined in advance. The error in model prognosis does not depend on the error in calibration, but on the parameter error, which unfortunately cannot be determined in inverse problems since we do not know its real value. The best prognoses were obtained independent of calibration fit. However, excellent calibration fits led to an increase in prognosis error variation. In the case of excellent fits; parameters' values came near the limits of reasonable physical values more often. To improve the prognoses reliability, the expected value of the parameters should be considered as prior information on the optimization algorithm.
The fire resistance of concrete members is controlled by the temperature distribution of the considered cross section. The thermal analysis can be performed with the advanced temperature dependent physical properties provided by 5EN6 1992-1-2. But the recalculation of laboratory tests on columns from 5TU6 Braunschweig shows, that there are deviations between the calculated and measured temperatures. Therefore it can be assumed, that the mathematical formulation of these thermal properties could be improved. A sensitivity analysis is performed to identify the governing parameters of the temperature calculation and a nonlinear optimization method is used to enhance the formulation of the thermal properties. The proposed simplified properties are partly validated by the recalculation of measured temperatures of concrete columns. These first results show, that the scatter of the differences from the calculated to the measured temperatures can be reduced by the proposed simple model for the thermal analysis of concrete.
Identification of modal parameters of a space frame structure is a complex assignment due to a large number of degrees of freedom, close natural frequencies, and different vibrating mechanisms. Research has been carried out on the modal identification of rather simple truss structures. So far, less attention has been given to complex three-dimensional truss structures. This work develops a vibration-based methodology for determining modal information of three-dimensional space truss structures. The method uses a relatively complex space truss structure for its verification. Numerical modelling of the system gives modal information about the expected vibration behaviour. The identification process involves closely spaced modes that are characterised by local and global vibration mechanisms. To distinguish between local and global vibrations of the system, modal strain energies are used as an indicator. The experimental validation, which incorporated a modal analysis employing the stochastic subspace identification method, has confirmed that considering relatively high model orders is required to identify specific mode shapes. Especially in the case of the determination of local deformation modes of space truss members, higher model orders have to be taken into account than in the modal identification of most other types of structures.
Integrated structural engineering system usually consists of large number of design objects that may be distributed across different platforms. These design objects need to communicate data and information among each other. For efficient communication among design objects a common communication protocol need to be defined. This paper presents the elements of a communication protocol that uses a mediator agent to facilitate communication among design objects. This protocol is termed the Mediative Communication Protocol (MCP). The protocol uses certain design communication performatives and the semantics of an Agent Communication language (ACL) mainly the Knowledge and Query Manipulation Language (KQML) to implement its steps. Details of a Mediator Agent, that will facilitate the communication among design objects, is presented. The Unified Modeling Language (UML) is used to present the Meditative protocol and show how the mediator agent can be use to execute the steps of the meditative communication protocol. An example from structural engineering application is presented to demonstrate and validate the protocol. It is concluded that the meditative protocol is a viable protocol to facilitate object-to-object communication and also has potential to facilitate communication among the different project participants at the higher level of integrated structural engineering systems.