Refine
Institute
- In Zusammenarbeit mit der Bauhaus-Universität Weimar (78)
- Graduiertenkolleg 1462 (8)
- Institut für Strukturmechanik (ISM) (7)
- Professur Angewandte Mathematik (2)
- Institut für Bauinformatik, Mathematik und Bauphysik (IBMB) (1)
- Institut für Konstruktiven Ingenieurbau (IKI) (1)
- Professur Bodenmechanik (1)
- Professur Tragwerkslehre (1)
Keywords
- Architektur <Informatik> (99) (remove)
Practical examples show that the improvement in cost flow and total amount of money spend in construction and further use may be cut significantly. The calculation is based on spreadsheets calculation, very easy to develop on most PC´s now a days. Construction works, are a field where the evaluation of Cash Flow can be and should be applied. Decisions about cash flow in construction are decisions with long-term impact and long-term memory. Mistakes from the distant past have a massive impact on situations in the present and into the far economic future of economic activities. Two approaches exist. The Just-in-Time (JIT) approach and life cycle costs (LCC) approach. The calculation example shows the dynamic results for the production speed in opposition to stable flow of production in duration of activities. More sophisticated rescheduling in optimal solution might bring in return extra profit. In the technologies and organizational processes for industrial buildings, railways and road reconstruction, public utilities and housing developments there are assembly procedures that are very appropriate for the given purpose, complicated research-, development-, innovation-projects are all very good aspects of these kinds of applications. The investors of large investments and all public invested money may be spent more efficiently if an optimisation speed-strategy can be calculated.
In this study we introduce a concept of discrete Laplacian on the plane lattice and consider its iteration dynamical system. At first we discuss some basic properties on the dynamical system to be proved. Next making their computer simulations, we show that we can realize the following phenomena quite well:(1) The crystal of waters (2) The designs of carpets, embroideries (3) The time change of the numbers of families of extinct animals, and (4) The echo systems of life things. Hence we may expect that we can understand the evolutions and self organizations by use of the dynamical systems. Here we want to make a stress on the following fact: Although several well known chaotic dynamical systems can describe chaotic phenomena, they have difficulties in the descriptions of the evolutions and self organizations.
CRITICAL STRESS ASSESSMENT IN ANGLE TO GUSSET PLATE BOLTED CONNECTION BY SIMPLIFIED FEM MODELLING
(2010)
Simplified modelling of friction grip bolted connections of steel member – to – gusset plate is often applied in engineering practise. The paper deals with the simplification of pre-tensioned bolt model and simplification of load transfer within connection. Influence on normal strain (and thus stress) distribution at critical cross-section is investigated. Laboratory testing of single-angle or double-angle members – to – gusset plates bolted connections were taken as basis for numerical analysis. FE models were created using 1D and 2D elements. Angles and gusset plates were modelled with shell elements. Two methods of modelling of friction grip bolting were considered: bolt-regarding approach with 1D element systems modelling bolts and two variants of bolt-disregarding approach with special constraints over some part of member and gusset plate surfaces in contact: a) constraints over whole area of contact, b) constraints over the area around each bolt shank (“partially tied”). Modelling of friction grip bolted connections using simplified bolt modelling may be effective, especially in the case of analysis concerning elastic range only. In such a case disregarding bolts and replacing them with “partially tied” modelling seems to be more attractive. It is less time-consuming and provides results of similar accuracy in comparison to analysis utilizing simplified bolt modelling.
The uncertainty existing in the construction industry is bigger than in other industries. Consequently, most construction projects do not go totally as planned. The project management plan needs therefore to be adapted repeatedly within the project lifecycle to suit the actual project conditions. Generally, the risks of change in the project management plan are difficult to be identified in advance, especially if these risks are caused by unexpected events such as human errors or changes in the client preferences. The knowledge acquired from different resources is essential to identify the probable deviations as well as to find proper solutions to the faced change risks. Hence, it is necessary to have a knowledge base that contains known solutions for the common exceptional cases that may cause changes in each construction domain. The ongoing research work presented in this paper uses the process modeling technique of Event-driven Process Chains to describe different patterns of structure changes in the schedule networks. This results in several so called “change templates”. Under each template different types of change risk/ response pairs can be categorized and stored in a knowledge base. This knowledge base is described as an ontology model populated with reference construction process data. The implementation of the developed approach can be seen as an iterative scheduling cycle that will be repeated within the project lifecycle as new change risks surface. This can help to check the availability of ready solutions in the knowledge base for the situation at hand. Moreover, if the solution is adopted, CPSP, “Change Project Schedule Plan „a prototype developed for the purpose of this research work, will be used to make the needed structure changes of the schedule network automatically based on the change template. What-If scenarios can be implemented using the CPSP prototype in the planning phase to study the effect of specific situations without endangering the success of the project objectives. Hence, better designed and more maintainable project schedules can be achieved.
This paper deals with the modelling and the analysis of masonry vaults. Numerical FEM analyses are performed using LUSAS code. Two vault typologies are analysed (barrel and cross-ribbed vaults) parametrically varying geometrical proportions and constraints. The proposed model and the developed numerical procedure are implemented in a computer analysis. Numerical applications are developed to assess the model effectiveness and the efficiency of the numerical procedure. The main object of the present paper is the development of a computational procedure which allows to define 3D structural behaviour of masonry vaults. For each investigated example, the homogenized limit analysis approach has been employed to predict ultimate load and failure mechanisms. Finally, both a mesh dependence study and a sensitivity analysis are reported. Sensitivity analysis is conducted varying in a wide range mortar tensile strength and mortar friction angle with the aim of investigating the influence of the mechanical properties of joints on collapse load and failure mechanisms. The proposed computer model is validated by a comparison with experimental results available in the literature.
Nodal integration of finite elements has been investigated recently. Compared with full integration it shows better convergence when applied to incompressible media, allows easier remeshing and highly reduces the number of material evaluation points thus improving efficiency. Furthermore, understanding it may help to create new integration schemes in meshless methods as well. The new integration technique requires a nodally averaged deformation gradient. For the tetrahedral element it is possible to formulate a nodal strain which passes the patch test. On the downside, it introduces non-physical low energy modes. Most of these "spurious modes" are local deformation maps of neighbouring elements. Present stabilization schemes rely on adding a stabilizing potential to the strain energy. The stabilization is discussed within this article. Its drawbacks are easily identified within numerical experiments: Nonlinear material laws are not well represented. Plastic strains may often be underestimated. Geometrically nonlinear stabilization greatly reduces computational efficiency. The article reinterpretes nodal integration in terms of imposing a nonconforming C0-continuous strain field on the structure. By doing so, the origins of the spurious modes are discussed and two methods are presented that solve this problem. First, a geometric constraint is formulated and solved using a mixed formulation of Hu-Washizu type. This assumption leads to a consistent representation of the strain energy while eliminating spurious modes. The solution is exact, but only of theoretical interest since it produces global support. Second, an integration scheme is presented that approximates the stabilization criterion. The latter leads to a highly efficient scheme. It can even be extended to other finite element types such as hexahedrals. Numerical efficiency, convergence behaviour and stability of the new method is validated using linear tetrahedral and hexahedral elements.
In earlier research, generalized multidimensional Hilbert transforms have been constructed in m-dimensional Euclidean space, in the framework of Clifford analysis. Clifford analysis, centred around the notion of monogenic functions, may be regarded as a direct and elegant generalization to higher dimension of the theory of the holomorphic functions in the complex plane. The considered Hilbert transforms, usually obtained as a part of the boundary value of an associated Cauchy transform in m+1 dimensions, might be characterized as isotropic, since the metric in the underlying space is the standard Euclidean one. In this paper we adopt the idea of a so-called anisotropic Clifford setting, which leads to the introduction of a metric dependent m-dimensional Hilbert transform, showing, at least formally, the same properties as the isotropic one. The Hilbert transform being an important tool in signal analysis, this metric dependent setting has the advantage of allowing the adjustment of the co-ordinate system to possible preferential directions in the signals to be analyzed. A striking result to be mentioned is that the associated anisotropic (m+1)-dimensional Cauchy transform is no longer uniquely determined, but may stem from a diversity of (m+1)-dimensional "mother" metrics.
The evident advances of the computational power of the digital computers enable the modeling of the total system of structures. Such modeling demands compatible representations of the couplings of different structural subsystems. Therefore, models of dynamic interaction between the vehicle and the bridge and models of a bridge bearing, a coupling element between the bridge's superstructure and substructure, are of interest and discussed within this paper. The vehicle-bridge interaction may be described as a function connecting two sets of behavior. In this case, the coupling is embodied by mutual parameters that affect both systems, such as the frequency content of the bridge and the vehicle. Whereas the bridge bearings are elements used specifically to couple, in such elements the deformation and the transferred loads are used in characterizing the coupling The nature of these couplings and their influence on the bridge response is different. However, the need to assess the amount of dynamic response transferred by or within these couplings is a common argument.
The paper contains a description of dynamic effects in the silo wall during the outflow of a stored material. The work allows for determining the danger of construction damage due to resonant vibrations and is of practical importance by determining the influence of cyclic pressures and vibro–creeping during prolonged use of a silo. The paper was devised as a result of tests on silo walls in semi-technical scale. The model is generally applicable and allows for identification of parameters in real- size silos as well.
Euclidean Clifford analysis is a higher dimensional function theory offering a refinement of classical harmonic analysis. The theory is centered around the concept of monogenic functions, i.e. null solutions of a first order vector valued rotation invariant differential operator called the Dirac operator, which factorizes the Laplacian. More recently, Hermitean Clifford analysis has emerged as a new and successful branch of Clifford analysis, offering yet a refinement of the Euclidean case; it focusses on the simultaneous null solutions, called Hermitean (or h-) monogenic functions, of two Hermitean Dirac operators which are invariant under the action of the unitary group. In Euclidean Clifford analysis, the Clifford-Cauchy integral formula has proven to be a corner stone of the function theory, as is the case for the traditional Cauchy formula for holomorphic functions in the complex plane. Previously, a Hermitean Clifford-Cauchy integral formula has been established by means of a matrix approach. This formula reduces to the traditional Martinelli-Bochner formula for holomorphic functions of several complex variables when taking functions with values in an appropriate part of complex spinor space. This means that the theory of Hermitean monogenic functions should encompass also other results of several variable complex analysis as special cases. At present we will elaborate further on the obtained results and refine them, considering fundamental solutions, Borel-Pompeiu representations and the Teoderescu inversion, each of them being developed at different levels, including the global level, handling vector variables, vector differential operators and the Clifford geometric product as well as the blade level were variables and differential operators act by means of the dot and wedge products. A rich world of results reveals itself, indeed including well-known formulae from the theory of several complex variables.
Procedures of a construction of general solutions for some classes of partial differential equations (PDEs) are proposed and a symmetry operators approach to the raising the orders of the polynomial solutions to linear PDEs are develops. We touch upon an ''operator analytic function theory'' as the solution of a frequent classes of the equations of mathematical physics, when its symmetry operators forms vast enough space. The MAPLE© package programs for the building the operator variables is elaborated also.
The use of process models in the analysis, optimization and simulation of processes has proven to be extremely beneficial in the instances where they could be applied appropriately. However, the Architecture/Engineering/Construction (AEC) industries present unique challenges that complicate the modeling of their processes. A simple Engineering process model, based on the specification of Tasks, Datasets, Persons and Tools, and certain relations between them, have been developed, and its advantages over conventional techniques have been illustrated. Graph theory is used as the mathematical foundation mapping Tasks, Datasets, Persons and Tools to vertices and the relations between them to edges forming a directed graph. The acceptance of process modeling in AEC industries not only depends on the results it can provide, but the ease at which these results can be attained. Specifying a complex AEC process model is a dynamic exercise that is characterized by many modifications over the process model's lifespan. This article looks at reducing specification complexity, reducing the probability for erroneous input and allowing consistent model modification. Furthermore, the problem of resource leveling is discussed. Engineering projects are often executed with limited resources and determining the impact of such restrictions on the sequence of Tasks is important. Resource Leveling concerns itself with these restrictions caused by limited resources. This article looks at using Task shifting strategies to find a near-optimal sequence of Tasks that guarantees consistent Dataset evolution while resolving resource restrictions.
We consider a structural truss problem where all of the physical model parameters are uncertain: not just the material values and applied loads, but also the positions of the nodes are assumed to be inexact but bounded and are represented by intervals. Such uncertainty may typically arise from imprecision during the process of manufacturing or construction, or round-off errors. In this case the application of the finite element method results in a system of linear equations with numerous interval parameters which cannot be solved conventionally. Applying a suitable variable substitution, an iteration method for the solution of a parametric system of linear equations is firstly employed to obtain initial bounds on the node displacements. Thereafter, an interval tightening (pruning) technique is applied, firstly on the element forces and secondly on the node displacements, in order to obtain tight guaranteed enclosures for the interval solutions for the forces and displacements.
By the use of numerical methods and the rapid development of computer technology in the recent years, a large variety, complexity, refinement and capability of partial models have been achieved. This can be noticed in the evaluation of the reliability of structures, e.g. the increased use of spatial structural systems. For the different fields of civil engineering, well developed partial models already exist. Because these partial models are most often used separately, the general view is not entirely illustrated. Until now, there has been no common methodology for evaluating the efficiency of models; the trust in the prediction of a special engineering model has generally relied on the engineer’s experience. In this paper the basics of evaluation of simple models and coupled partial models of frame structures will be discussed using sustainable numerical methods. Furthermore, quality classes (levels) of design tasks will be defined based on their practical relevance. In addition, analysis methods will be systemized. After analysis of different published assessment methods, it may be noted, that the Efficiency Indicator Method (EWM) is most suitable for the observed evaluation problem. Therefore, the EWM was modified to the Model Efficiency Analysis (MEA) for the purpose of a holistic evaluation. The criteria are characterized by two groups, benefit and expenditure, and it is possible by calculating the quotient (benefit/expenditure) to make a statement about the efficiency of the observed models. Presently, the expenditure value is not a subject of investigation, and so the model efficiency is calculated only by the benefit value. This paper also contains the associated criteria catalog, different normalization methods, as well as weighting possibilities.
The concept is presented of the sensitivity analysis of the limit state of the structure with respect to selected basic variables. The sensitivity is presented in the form of the probability distribution of the limit state of the structure. The analysis is performed by the problem-oriented Monte Carlo simulation procedure. The procedure is based on the problem's definition of the elementary event, as a structural limit state. Thus the sample space consists of limit states of the structure. Defined on the sample space the one-dimensional random multiplier is introduced. This multiplier refers to the dominant basic variable (group of variables) of the problem. Numerical procedure results in the set of random numbers. Normalized relative histogram of this set is an estimator of the PDF of the limit state of the structure. Estimators of reliability, or the probability of failure are statistical characteristics of this histogram. The procedure is illustrated by the example of sensitivity analysis of the serviceability limit state of monumental structure. It is the colonnade of Licheń Basilica, situated in central Poland. Limit state of the structure is examined with reference to the upper deck horizontal deflection. Wind actions are taken as dominant variables. An assumption is made that the wind load intensities acting on the lower and on the upper storey of the colonnade, respectively, are identically distributed, but correlated random variables. Three correlation variants of these variables are considered. Relevant limit state histograms are analysed thereafter. The paper ends with the conclusions referring to the method and some general remarks on the fully probabilistic design.
In spite of the extensive research in dynamic soil-structure interaction (SSI), there still exist miscon-ceptions concerning the role of SSI in the seismic performance of structures, especially the ones founded on soft soil. This is due to the fact that current analytical SSI models that are used to evaluate the influence of soil on the overall structural behavior are approximate models and may involve creeds and practices that are not always precise. This is especially true in the codified approaches which in-clude substantial approximations to provide simple frameworks for the design. As the direct numerical analysis requires a high computational effort, performing an analysis considering SSI is computationally uneconomical for regular design applications. This paper outlines the set up some milestones for evaluating SSI models. This will be achieved by investigating the different assumptions and involved factors, as well as varying the configurations of R/C moment-resisting frame structures supported by single footings which are subject to seismic excita-tions. It is noted that the scope of this paper is to highlight, rather than fully resolve, the above subject. A rough draft of the proposed approach is presented in this paper, whereas a thorough illustration will be carried out throughout the presentation in the course of the conference.
VARIATION OF ROTATIONAL RESTRAINT IN GRID DECK CONNECTION DUE TO CORROSION DAMAGE AND STRENGTHENING
(2006)
The approach to assessment of rotational restraint of stringer-to-crossbeam connection in a deck of 100-year old steel truss bridge is presented. Sensitivity of rotational restraint coefficient of the connection to corrosion damage and strengthening is analyzed. Two criteria of the assessment of the rotational restraint coefficient are applied: static and kinematic one. The former is based on bending moment distribution in the considered member, the latter one – on the member rotation at the given joint. 2D-element model of finite element method is described: webs and flanges are modeled with shell elements, while rivets in the connection – with system of beam and spring elements. The method of rivet modeling is verified by T-stub connection test results published in literature. FEM analyses proved that recorded extent of corrosion damage does not alter the initial rotational restraint of stringer-to-crossbeam connection. Strengthening of stringer midspan influences midspan bending moment and stringer end rotation in a different way. Usually restoring member load bearing capacity means strengthening its critical regions (where the highest stress levels occur). This alters flexural stiffness distribution over member length and influences rotational restraint at its connection to other members. The impact depends on criterion chosen for rotational restraint coefficient assessment.
Due to economical, technical or political reasons all over the world about 100 nuclear power plants have been disconnected until today. All these power stations are still waiting for their complete dismantling which, considering one reactor, causes cost of up to one Bil. Euros and lasts up to 15 years. In our contribution we present a resource-constrained project scheduling approach minimizing the total discounted cost of dismantling a nuclear power plant. A project of dismantling a nuclear power plant can be subdivided into a number of disassembling activities. The execution of these activities requires time and scarce resources like manpower, special equipment or storage facilities for the contaminated material arising from the dismantling. Moreover, we have to regard several minimum and maximum time lags (temporal constraints) between the start times of the different activities. Finally, each disassembling activity can be processed in two alternative execution modes, which lead to different disbursements and determine the resource requirements of the considered activity. The optimization problem is to determine a start time and an execution mode for each activity, such that the discounted cost of the project is minimum, and neither the temporal constraints are violated nor the activities' resource requirements exceed the availability of any scarce resource at any point in time. In our contribution we introduce an appropriate multi-mode project scheduling model with minimum and maximum time lags as well as renewable and cumulative resources for the described optimization problem. Furthermore, we show that the considered optimization problem is NP-hard in the strong sense. For small problem instances, optimal solutions can be gained from a relaxation based enumeration approach which is incorporated into a branch and bound algorithm. In order to be able to solve large problem instances, we also propose a truncated version of the devised branch and bound algorithm.
Reasonably accurate cost estimation of the structural system is quite desirable at the early stages of the design process of a construction project. However, the numerous interactions among the many cost-variables make the prediction difficult. Artificial neural networks (ANN) and case-based reasoning (CBR) are reported to overcome this difficulty. This paper presents a comparison of CBR and ANN augmented by genetic algorithms (GA) conducted by using spreadsheet simulations. GA was used to determine the optimum weights for the ANN and CBR models. The cost data of twenty-nine actual cases of residential building projects were used as an example application. Two different sets of cases were randomly selected from the data set for training and testing purposes. Prediction rates of 84% in the GA/CBR study and 89% in the GA/ANN study were obtained. The advantages and disadvantages of the two approaches are discussed in the light of the experiments and the findings. It appears that GA/ANN is a more suitable model for this example of cost estimation where the prediction of numerical values is required and only a limited number of cases exist. The integration of GA into CBR and ANN in a spreadsheet format is likely to improve the prediction rates.
Designing a structure follows a pattern of creating a structural design concept, executing a finite element analysis and developing a design model. A project was undertaken to create computer support for executing these tasks within a collaborative environment. This study focuses on developing a software architecture that integrates the various structural design aspects into a seamless functional collaboratory that satisfies engineering practice requirements. The collaboratory is to support both homogeneous collaboration i.e. between users operating on the same model and heterogeneous collaboration i.e. between users operating on different model types. Collaboration can take place synchronously or asynchronously, and the information exchange is done either at the granularity of objects or at the granularity of models. The objective is to determine from practicing engineers which configurations they regard as best and what features are essential for working in a collaborative environment. Based on the suggestions of these engineers a specification of a collaboration configuration that satisfies engineering practice requirements will be developed.
The one-dimensional continuous wavelet transform is a successful tool for signal and image analysis, with applications in physics and engineering. Clifford analysis offers an appropriate framework for taking wavelets to higher dimension. In the usual orthogonal case Clifford analysis focusses on monogenic functions, i.e. null solutions of the rotation invariant vector valued Dirac operator ∂, defined in terms of an orthogonal basis for the quadratic space Rm underlying the construction of the Clifford algebra R0,m. An intrinsic feature of this function theory is that it encompasses all dimensions at once, as opposed to a tensorial approach with products of one-dimensional phenomena. This has allowed for a very specific construction of higher dimensional wavelets and the development of the corresponding theory, based on generalizations of classical orthogonal polynomials on the real line, such as the radial Clifford-Hermite polynomials introduced by Sommen. In this paper, we pass to the Hermitian Clifford setting, i.e. we let the same set of generators produce the complex Clifford algebra C2n (with even dimension), which we equip with a Hermitian conjugation and a Hermitian inner product. Hermitian Clifford analysis then focusses on the null solutions of two mutually conjugate Hermitian Dirac operators which are invariant under the action of the unitary group. In this setting we construct new Clifford-Hermite polynomials, starting in a natural way from a Rodrigues formula which now involves both Dirac operators mentioned. Due to the specific features of the Hermitian setting, four different types of polynomials are obtained, two types of even degree and two types of odd degree. These polynomials are used to introduce a new continuous wavelet transform, after thorough investigation of all necessary properties of the involved polynomials, the mother wavelet and the associated family of wavelet kernels.
We give a sufficient and a necessary condition for an analytic function "f" on the unit disk "D" with Hadamard gap to belong to a class of weighted logarithmic Bloch space as well as to the corresponding little weighted logarithmic Bloch space under some conditions posed on the defined weight function. Also, we study the relations between the class of weighted logarithmic Bloch functions and some other classes of analytic functions by the help of analytic functions in the Hadamard gap class.
Information technology plays a key role in the everyday operation of buildings and campuses. Many proprietary technologies and methodologies can assist in effective Building Performance Monitoring (BPM) and efficient managing of building resources. The integration of related tools like energy simulator packages, facility, energy and building management systems, and enterprise resource planning systems is of benefit to BPM. However, the complexity to integrating such domain specific systems prevents their common usage. Service Oriented Architecture (SOA) has been deployed successfully in many large multinational companies to create integrated and flexible software systems, but so far this methodology has not been applied broadly to the field of BPM. This paper envisions that SOA provides an effective integration framework for BPM. Service oriented architecture for the ITOBO framework for sustainable and optimised building operation is proposed and an implementation for a building performance monitoring system is introduced.
NUMERICAL SIMULATION OF THERMO-HYGRAL ALKALI-SILICA REACTION MODEL IN CONCRETE AT THE MESOSCALE
(2010)
This research aims to model Alkali-Silica Reaction gel expansion in concrete under the influence of hygral and thermal loading, based on experimental results. ASR provokes a heterogeneous expansion in concrete leading to dimensional changes and eventually the premature failure of the concrete structure. This can result in map cracking on the concrete surface which will decrease the concrete stiffness. Factors that influence ASR are parameters such as the cement alkalinity, the number of deleterious silica from the aggregate used, concrete porosity, and external factors like temperature, humidity and external source of alkali from ingression of deicing salts. Uncertainties of the influential factors make ASR a difficult phenomenon to solve; hence my approach to this matter is to solve the problem using stochastic modelling, where a numerical simulation of concrete cross-section with integration of experimental results from Finger-Institute for Building Materials Science at the Bauhaus-Universität Weimar. The problem is formulated as a multi-field problem, combining heat transfer, fluid transfer and the reaction rate model with the mechanical stress field. Simulation is performed as a mesoscale model considering aggregates and mortar matrix. The reaction rate model will be conducted using experimental results from concrete expansions due to ASR gained from concrete prism tests. Expansive strains values for transient environmental conditions due to the reaction rate will be determined from calculation based on the reaction rate model. Results from these models will be able to predict the rate of ASR expansion and the cracking propagation that may arise.
In distributed project organisations and collaboration there is a need for integrating unstructured self-contained text information with structured project data. We consider this a process of text integration in which various text technologies can be used to externalise text content and consolidate it into structured information or flexibly interlink it with corresponding information bases. However, the effectiveness of text technologies and the potentials of text integration greatly vary with the type of documents, the project setup and the available background knowledge. The goal of our research is to establish text technologies within collaboration environments to allow for (a) flexibly combining appropriate text and data management technologies, (b) utilising available context information and (c) the sharing of text information in accordance to the most critical integration tasks. A particular focus is on Semantic Service Environments that leverage on Web service and Semantic Web technologies and adequately support the required systems integration and parallel processing of semi-structured and structured information. The paper presents an architecture for text integration that extends Semantic Service Environments with two types of integration services. Backbone to the Information Resource Sharing and Integration Service is a shared environment ontology that consolidates information on the project context and the available model, text and general linguistic resources. It also allows for the configuration of Semantic Text Analysis and Annotation Services to analyse the text documents as well as for capturing the discovered text information and sharing it through semantic notification and retrieval engines. A particular focus of the paper is the definition of the overall integration process configuring a complementary set of analyses and information sharing components.
Quality is one of the most important properties of a product. Providing the optimal quality can reduce costs for rework, scrap, recall or even legal actions while satisfying customers demand for reliability. The aim is to achieve ``built-in'' quality within product development process (PDP). The common approach therefore is the robust design optimization (RDO). It uses stochastic values as constraint and/or objective to obtain a robust and reliable optimal design. In classical approaches the effort required for stochastic analysis multiplies with the complexity of the optimization algorithm. The suggested approach shows that it is possible to reduce this effort enormously by using previously obtained data. Therefore the support point set of an underlying metamodel is filled iteratively during ongoing optimization in regions of interest if this is necessary. In a simple example, it will be shown that this is possible without significant loss of accuracy.
Major problems of applying selective sensitivity to system identification are requirement of precise knowledge about the system parameters and realization of the required system of forces. This work presents a procedure which is able to deriving selectively sensitive excitation by iterative experiments. The first step is to determine the selectively sensitive displacement and selectively sensitive force patterns. These values are obtained by introducing the prior information of system parameters into an optimization which minimizes the sensitivities of the structure response with respect to the unselected parameters while keeping the sensitivities with respect to the selected parameters as a constant. In a second step the force pattern is used to derive dynamic loads on the tested structure and measurements are carried out. An automatic control ensures the required excitation forces. In a third step, measured outputs are employed to update the prior information. The strategy is to minimize the difference between a predicted displacement response, formulated as function of the unknown parameters and the measured displacements, and the selectively sensitive displacement calculated in the first step. With the updated values of the parameters a re-analysis of selective sensitivity is performed and the experiment is repeated until the displacement response of the model and the actual structure are conformed. As an illustration a simply supported beam made of steel, vibrated by harmonic excitation is investigated, thereby demonstrating that the adaptive excitation can be obtained efficiently.
A UNIFIED APPROACH FOR THE TREATMENT OF SOME HIGHER DIMENSIONAL DIRAC TYPE EQUATIONS ON SPHERES
(2010)
Using Clifford analysis methods, we provide a unified approach to obtain explicit solutions of some partial differential equations combining the n-dimensional Dirac and Euler operators, including generalizations of the classical time-harmonic Maxwell equations. The obtained regular solutions show strong connections between hypergeometric functions and homogeneous polynomials in the kernel of the Dirac operator.
For the dynamic behavior of lightweight structures like thin shells and membranes exposed to fluid flow the interaction between the two fields is often essential. Computational fluid-structure interaction provides a tool to predict this interaction and complement or eventually replace expensive experiments. Partitioned analyses techniques enjoy great popularity for the numerical simulation of these interactions. This is due to their computational superiority over simultaneous, i.e. fully coupled monolithic approaches, as they allow the independent use of suitable discretization methods and modular analysis software. We use, for the fluid, GLS stabilized finite elements on a moving domain based on the incompressible instationary Navier-Stokes equations, where the formulation guarantees geometric conservation on the deforming domain. The structure is discretized by nonlinear, three-dimensional shell elements.
Commonly used sequential staggered coupling schemes may exhibit instabilities due to the so-called artificial added mass effect. As best remedy to this problem subiterations should be invoked to guarantee kinematic and dynamic continuity across the fluid-structure interface. Since iterative coupling algorithms are computationally very costly, their convergence rate is very decisive for their usability. To ensure and accelerate the convergence of this iteration the updates of the interface position are relaxed. The time dependent, 'optimal' relaxation parameter is determined automatically without any user-input via exploiting a gradient method or applying an Aitken iteration scheme.
Sand-bentonite mixtures are well recognized as buffer and sealing material in nuclear waste repository constructions. The behaviour of compacted sand-bentonite mixture needs to be well understood in order to guarantee the safety and the efficiency of the barrier construction. This paper presents numerical simulations of swelling test and coupled thermo-hydro-mechanical (THM) test on compacted sand-bentonite mixture in order to reveal the influence of the temperature and hydraulic gradients on the distribution of temperature, mechanical stress and water content in such materials. Sensitivity analysis is carried out to identify the parameters which influence the most the response of the numerical model. Results of back analysis of the model parameters are reported and critically assessed.
In order to make control decisions, Smart Buildings need to collect data from multiple sources and bring it to a central location, such as the Building Management System (BMS). This needs to be done in a timely and automated fashion. Besides data being gathered from different energy using elements, information of occupant behaviour is also important for a building’s requirement analysis. In this paper, the parameter of Occupant Density was considered to help find behaviour of occupants towards a building space. Through this parameter, support for building energy consumption and requirements based on occupant need and demands was provided. The demonstrator presented provides information on the number of people present in a particular building space at any time, giving the space density. Such collections of density data made over a certain period of time represents occupant behaviour towards the building space, giving its usage patterns. Similarly, inventory items were tracked and monitored for moving out or being brought into a particular read zone. For both, people and inventory items, this was achieved using small, low-cost, passive Ultra-High Frequency (UHF) Radio Frequency Identification (RFID) tags. Occupants were given the tags in a form factor of a credit card to be possessed at all times. A central database was built where occupant and inventory information for a particular building space was maintained for monitoring and providing a central data access.
Models in the context of engineering can be classified in process based and data based models. Whereas the process based model describes the problem by an explicit formulation, the data based model is often used, where no such mapping can be found due to the high complexity of the problem. Artificial Neuronal Networks (ANN) is a data based model, which is able to “learn“ a mapping from a set of training patterns. This paper deals with the application of ANN in time dependent bathymetric models. A bathymetric model is a geometric representation of the sea bed. Typically, a bathymetry is been measured and afterwards described by a finite set of measured data. Measuring at different time steps leads to a time dependent bathymetric model. To obtain a continuous surface, the measured data has to be interpolated by some interpolation method. Unlike the explicitly given interpolation methods, the presented time dependent bathymetric model using an ANN trains the approximated surface in space and time in an implicit way. The ANN is trained by topographic measured data, which consists of the location (x,y) and time t. In other words the ANN is trained to reproduce the mapping h = f(x,y,t) and afterwards it is able to approximate the topographic height for a given location and date. In a further step, this model is extended to take meteorological parameters into account. This leads to a model of more predictive character.
We consider efficient numerical methods for the solution of partial differential equations with stochastic coefficients or right hand side. The discretization is performed by the stochastic finite element method (SFEM). Separation of spatial and stochastic variables in the random input data is achieved via a Karhunen-Loève expansion or Wiener's polynomial chaos expansion. We discuss solution strategies for the Galerkin system that take advantage of the special structure of the system matrix. For stochastic coefficients linear in a set of independent random variables we employ Krylov subspace recycling techniques after having decoupled the large SFEM stiffness matrix.
We investigate aspects of tram-network section reliability, which operates as a part of the model of whole city tram-network reliability. Here, one of the main points of interest is the character of the chronological development of the disturbances (namely the differences between time of departure provided in schedule and real time of departure) on subsequent sections during tram line operation. These developments were observed in comprehensive measurements done in Krakow, during one of the main transportation nodes (Rondo Mogilskie) rebuilding. All taken building activities cause big disturbances in tram lines operation with effects extended to neighboring sections. In a second part, the stochastic character of section running time will be analyzed more detailed. There will be taken into consideration sections with only one beginning stop and also with two or three beginning stops located at different streets at an intersection. Possibility of adding results from sections with two beginning stops to one set will be checked with suitable statistical tests which are used to compare the means of the two samples. Section running time may depend on the value of gap between two following trams and from the value of deviation from schedule. This dependence will be described by a multi regression formula. The main measurements were done in the city center of Krakow in two stages: before and after big changes in tramway infrastructure.
Reducing energy consumption is one of the major challenges for present day and will continue for future generations. The emerging EU directives relating to energy (EU EPBD and the EU Directive on Emissions Trading) now place demands on building owners to rate the energy performance of their buildings for efficient energy management. Moreover European Legislation (Directive 2006/32/EC) requires Facility Managers to reduce building energy consumption and operational costs. Currently sophisticated building services systems are available integrating off-the-shelf building management components. However this ad-hoc combination presents many difficulties to building owners in the management and upgrade of these systems. This paper addresses the need for integration concepts, holistic monitoring and analysis methodologies, life-cycle oriented decision support and sophisticated control strategies through the seamless integration of people, ICT-devices and computational resources via introducing the newly developed integrated system architecture. The first concept was applied to a residential building and the results were elaborated to improve current building conditions.
Optimum technological solutions must take into account the entire life cycle of structures including design procedures as well as quality assurance, inspection, maintenance, and repair strategies. Unfortunately, current design standards do not provide a satisfactory basis to ensure expected structural lifetimes. The latter may vary from only a few years for temporary structures to over a century for bridges, water dams or nuclear repositories. Consistent scientific concepts are urgently required to cover this wide spectrum of lifetimes in structural design and maintenance. This was a motivation for a group of scientists at the Ruhr-University Bochum (RUB) to start a special research program supported by the German Research Foundation (DFG) within the Cooperative Research Center SFB 398 since 1996. Institutes of the University Wuppertal and of the University Essen-Duisburg joined the research group. The goal of the Center is to study sources of damage and deterioration in materials and structures, to develop consistent models and simulation methods, to predict structural lifetimes and finally to integrate this predictions into new lifetime-oriented design strategies.
Research activities in our center are organised in three Project Groups as follows:
- Modelling of lifetime effects
- Methods for lifetime-oriented structural analyses
- Future lifespan-oriented design strategies.
FREE VIBRATION FREQUENCIES OF THE CRACKED REINFORCED CONCRETE BEAMS - METHODS OF CALCULATIONS
(2010)
The paper presents method of calculation of natural frequencies of the cracked reinforced concrete beams including discreet model of crack. The described method is based on the stiff finite elements method. It was modified in such a way as to take into account local discontinuities (ie. cracks). In addition, some theoretical studies as well as experimental tests of concrete mechanics based on discrete crack model were taken into consideration. The calculations were performed using the author’s own numerical algorithm. Moreover, other calculation methods of dynamic reinforced concrete beams presented in standards and guidelines are discussed. Calculations performed by using different methods are compared with the results obtained in experimental tests.
For assessment of old buildings, thermal graphic analysis aided with infra-red camera have been employed in a wide range nowadays. Image processing and evaluation can be economically practicable only if the image evaluation can also be automated to the largest extend. For that reason methods of computer vision are presented in this paper to evaluate thermal images. To detect typical thermal image elements, such as thermal bridges and lintels in thermal images respectively gray value images, methods of digital image processing have been applied, of which numerical procedures are available to transform, modify and encode images. At the same time, image processing can be regarded as a multi-stage process. In order to be able to accomplish the process of image analysis from image formation through perfecting and segmentation to categorization, appropriate functions must be implemented. For this purpose, different measuring procedures and methods for automated detection and evaluation have been tested.
We propose a new approach to the numerical solution of quasi-static elastic-plastic problems based on the Moreau-Yosida theorem. After the time discretization, the problem is expressed as an energy minimization problem for unknown displacement and plastic strain fields. The dependency of the minimization functional on the displacement is smooth whereas the dependency on the plastic strain is non-smooth. Besides, there exists an explicit formula, how to calculate the plastic strain from a given displacement field. This allows us to reformulate the original problem as a minimization problem in the displacement only. Using the Moreau-Yosida theorem from the convex analysis, the minimization functional in the displacements turns out to be Frechet-differentiable, although the hidden dependency on the plastic strain is non-differentiable. The seconds derivative exists everywhere apart from the elastic-plastic interface dividing elastic and plastic zones of the continuum. This motivates to implement a Newton-like method, which converges super-linearly as can be observed in our numerical experiments.
MULTI-SITE CONSTRUCTION PROJECT SCHEDULING CONSIDERING RESOURCE MOVING TIME IN DEVELOPING COUNTRIES
(2010)
Under the booming construction demands in developing countries, particularly in Vietnam situation, construction contractors often perform multiple concurrent projects in different places. In construction project scheduling processes, the existing scheduling methods often assume the resource moving time between activities/projects to be negligible. When multiple projects are deployed in different places and far from each other, this assumption has many shortcomings for properly modelling the real-world constraints. Especially, with respect to developing countries such as the Vietnam which contains transportation systems that are still in backward and low technical standards. This paper proposes a new algorithm named Multi-Site Construction Project Scheduling - MCOPS. The objective of this algorithm is to solve the problem of minimising multi-site construction project duration under limited available conditions of renewable resources (labour, machines and equipment) combining with the moving time of required resource among activities/projects. Additionally, in order to mitigate the impact of resource moving time into the multi-site project duration, this paper proposed a new priority rule: Minimum Resource Moving Time (MinRMT). The MinRMT is applied to rank the finished activities according to a priority order, to support the released resources to the scheduling activities. In order to investigate the impact of the resource moving time among activities during the scheduling process, computational experimentation was implemented. The results of the MCOPS-based computational experiments showed that, the resource moving time among projects has significantly impacted the multi-site project durations and this amount of time can not be ignored in the multi-site project scheduling process. Besides, the efficient application of the MinRMT is also demonstrated through the achieved results of the computational experiment in this paper. Though the efforts in this paper are based on the Vietnamese construction conditions, the proposed method can be usefully applied in other developing countries which have similar construction conditions.
ESTIMATING UNCERTAINTIES FROM INACCURATE MEASUREMENT DATA USING MAXIMUM ENTROPY DISTRIBUTIONS
(2010)
Modern engineering design often considers uncertainties in geometrical and material parameters and in the loading conditions. Based on initial assumptions on the stochastic properties as mean values, standard deviations and the distribution functions of these uncertain parameters a probabilistic analysis is carried out. In many application fields probabilities of the exceedance of failure criteria are computed. The out-coming failure probability is strongly dependent on the initial assumptions on the random variable properties. Measurements are always more or less inaccurate data due to varying environmental conditions during the measurement procedure. Furthermore the estimation of stochastic properties from a limited number of realisation also causes uncertainties in these quantities. Thus the assumption of exactly known stochastic properties by neglecting these uncertainties may not lead to very useful probabilistic measures in a design process. In this paper we assume the stochastic properties of a random variable as uncertain quantities caused by so-called epistemic uncertainties. Instead of predefined distribution types we use the maximum entropy distribution which enables the description of a wide range of distribution functions based on the first four stochastic moments. These moments are taken again as random variables to model the epistemic scatter in the stochastic assumptions. The main point of this paper is the discussion on the estimation of these uncertain stochastic properties based on inaccurate measurements. We investigate the bootstrap algorithm for its applicability to quantify the uncertainties in the stochastic properties considering imprecise measurement data. Based on the obtained estimates we apply standard stochastic analysis on a simple example to demonstrate the difference and the necessity of the proposed approach.
In engineering science the modeling and numerical analysis of complex systems and relations plays an important role. In order to realize such an investigation, for example a stochastic analysis, in a reasonable computational time, approximation procedure have been developed. A very famous approach is the response surface method, where the relation between input and output quantities is represented for example by global polynomials or local interpolation schemes as Moving Least Squares (MLS). In recent years artificial neural networks (ANN) have been applied as well for such purposes. Recently an adaptive response surface approach for reliability analyses was proposed, which is very efficient concerning the number of expensive limit state function evaluations. Due to the applied simplex interpolation the procedure is limited to small dimensions. In this paper this approach is extended for larger dimensions using combined ANN and MLS response surfaces for evaluating the adaptation criterion with only one set of joined limit state points. As adaptation criterion a combination by using the maximum difference in the conditional probabilities of failure and the maximum difference in the approximated radii is applied. Compared to response surfaces on directional samples or to plain directional sampling the failure probability can be estimated with a much smaller number of limit state points.
Car following models are used to describe the behavior of a number of cars on the road dependent on the distance to the car in front. We introduce a system of ordinary differential equations and perform a theoretical and numerical analysis in order to find solutions that reflect various traffic situations. We present three different variations of the model motivated by reality.
The application of a recent method using formal power series is proposed. It is based on a new representation for solutions of Sturm-Liouville equations. This method is used to calculate the transmittance and reflectance coefficients of finite inhomogeneous layers with high accuracy and efficiency. Tailoring the refraction index profile defining the inhomogeneous media it is possible to develop very important applications such as optical filters. A number of profiles were evaluated and then some of them selected in order to perform an improvement of their characteristics via the modification of their profiles.
Image processing has been much inspired by the human vision, in particular with regard to early vision. The latter refers to the earliest stage of visual processing responsible for the measurement of local structures such as points, lines, edges and textures in order to facilitate subsequent interpretation of these structures in higher stages (known as high level vision) of the human visual system. This low level visual computation is carried out by cells of the primary visual cortex. The receptive field profiles of these cells can be interpreted as the impulse responses of the cells, which are then considered as filters. According to the Gaussian derivative theory, the receptive field profiles of the human visual system can be approximated quite well by derivatives of Gaussians. Two mathematical models suggested for these receptive field profiles are on the one hand the Gabor model and on the other hand the Hermite model which is based on analysis filters of the Hermite transform. The Hermite filters are derivatives of Gaussians, while Gabor filters, which are defined as harmonic modulations of Gaussians, provide a good approximation to these derivatives. It is important to note that, even if the Gabor model is more widely used than the Hermite model, the latter offers some advantages like being an orthogonal basis and having better match to experimental physiological data. In our earlier research both filter models, Gabor and Hermite, have been developed in the framework of Clifford analysis. Clifford analysis offers a direct, elegant and powerful generalization to higher dimension of the theory of holomorphic functions in the complex plane. In this paper we expose the construction of the Hermite and Gabor filters, both in the classical and in the Clifford analysis framework. We also generalize the concept of complex Gaussian derivative filters to the Clifford analysis setting. Moreover, we present further properties of the Clifford-Gabor filters, such as their relationship with other types of Gabor filters and their localization in the spatial and in the frequency domain formalized by the uncertainty principle.
In this paper proposed the application of two-parameters damage model, based on non-linear finite element approach, to the analysis of masonry panels. Masonry is treated as a homogenized material, for which the material characteristics can be defined by using homogenization technique. The masonry panels subjected to shear loading are studied by using the proposed procedure within the framework of three-dimensional analyses. The nonlinear behaviour of masonry can be modelled using concepts of damage theory. In this case an adequate damage function is defined for taking into account different response of masonry under tension and compression states. Cracking can, therefore, be interpreted as a local damage effect, defined by the evolution of known material parameters and by one or several functions which control the onset and evolution of damage. The model takes into account all the important aspects which should be considered in the nonlinear analysis of masonry structures such as the effect of stiffness degradation due to mechanical effects and the problem of objectivity of the results with respect to the finite element mesh. Finally the proposed damage model is validated with a comparison with experimental results available in the literature.
Adopting the European laws concerning environmental protection will require sustained efforts of the authorities and communities from Romania; implementing modern solutions will become a fast and effective option for the improvement of the functioning systems, in order to prevent disasters. As a part of the urban infrastructure, the drainage networks of pluvial and residual waters are included in the plan of promoting the systems which protect the environmental quality, with the purpose of integrated and adaptive management. The paper presents a distributed control system for sewer network of Iasi town. Unsatisfactory technical state of the actual sewer system is exposed, focusing on objectives related to implementation of the control system. The proposed distributed control system of Iasi drainage network is based on the implementation of the hierarchic control theory for diagnose, sewer planning and management. There are proposed two control levels: coordinating and local execution. Configuration of the distributed control system, including data acquisition and conversion equipment, interface characteristics, local data bus, data communication network, station configuration are widely described. The project wish to be an useful instrument for the local authorities in the preventing and reducing the impact of future natural disasters over the urban areas by means of modern technologies.
The execution of project activities generally requires the use of (renewable) resources like machines, equipment or manpower. The resource allocation problem consists in assigning time intervals to the execution of the project activities while taking into account temporal constraints between activities emanating from technological or organizational requirements and costs incurred by the resource allocation. If the total procurement cost of the different renewable resources has to be minimized we speak of a resource investment problem. If the cost depends on the smoothness of the resource utilization over time the underlying problem is called a resource levelling problem. In this paper we consider a new tree-based enumeration method for solving resource investment and resource levelling problems exploiting some fundamental properties of spanning trees. The enumeration scheme is embedded in a branch-and-bound procedure using a workload-based lower bound and a depth first search. Preliminary computational results show that the proposed procedure is promising for instances with up to 30 activities.