620 Ingenieurwissenschaften und zugeordnete Tätigkeiten
Refine
Document Type
- Conference Proceeding (432) (remove)
Institute
Keywords
- Arbeitsschutz (61)
- Baustelle (53)
- Modellierung (49)
- Baubetriebslehre (43)
- Bauwerk (40)
- Verteiltes System (36)
- CAD (31)
- Finite-Elemente-Methode (24)
- Architektur (21)
- Deutschland / Baustellenverordnung (20)
This is a paper about knowledge in design and how to elicit knowledge from design processes. The paper is a preparation for an empirical study of interaction in the design process. Reasonings of three authors - Schön, Broadbent and Lundequist - on design processes is presented. They all have a pragmatic perspective in common, and regard the process as an activity without a definite form. Design is seen as an activity of creating models of forms and shapes, by addressing expert knowledge in a dialogic way to problematic situations. Due to the pragmatic approach I find the pragmatist Dewey´s understanding of knowledge and elecitation of knowledge appropiate for studying design processes. According to him it is possible to build up objectified descriptions of experiences, also of such, which are based on experiences of emotional and intuitive nature. There need not be a definite border, which separates tacit knowledge from explicit knowledge - when it comes to the question of the possibility of verbal descriptions. Tacit knowledge is possible to articulate within pragmatic thinking. The conclusion is, that it is possible to study the tacit knowledge of design processes, and get some qualitative insights useful for theory building. A study of design processes can look at three different forms of knowledge. It appears as a precognitive understanding of the design situation, as integrated in the design activity - seeing the situation as something known - and in the process of creating something new.
The objective of the joint project 'Life cycle optimised system solutions for densified housing with massive wood technology', short form Basys, was the development and application of an open building system for sustainable construction in a virtual enterprise. Four partners coming from building economy and a university institute developed the building system in a comprehensive planning process. By applying massive wood technology, most requirements of densified housing can be met and individual buildings can be produced on demand.
Discrete-continual Finite Element Method of Analysis for Three-dimensional Curvilinear Structures
(2003)
This paper is devoted to discrete-continual finite element method (DCFEM) of analysis for three-dimensional curvilinear structures. Operational and variational formulations of the problem in the ring coordinate system are presented. The discrete-continual design model for structures with constant physical and geometrical parameters in longitudinal direction is offered on the basis of so-called curvilinear discrete-continual finite elements. Element coordinate system, approximation of nodal unknowns, construction of element nodal load vector are under consideration. Element system of differential equations is formulated with use of special generalized block-structured stiffness matrix of discrete-continual finite element. Local differential relations are formulated. Resultant multipoint boundary problem for system of ordinary differential equations is given. Method of analytical solution of multipoint boundary problems in structural analysis is offered as well. Its major peculiarities include universality, computer-oriented algorithm involving theory of distributions, computational stability, optimal conditionality of resultant systems, partial Jordan decomposition of matrix of coefficients, eliminating necessity of calculation of root vectors. Brief information concerning developed software is provided.
The aim of researches conducted within gamsau about urban simulation, in particular Remus project, is to allow rapid modeling of large and regular urban zones, for purpose of interactive navigation (like VRML) or for realistic rendering (ray-tracing methods). One of problems to be solved in this context is the multiplicity of data formats : inputs come from different sources, and outputs are for heterogeneous systems of visualization. Typically CSG and boundary representation must be generated, treated and converted during building of models. Furthermore, the generated models can be more or less refined, depending on requests and type of use. This paper describes the general context of data models conversion, problems concerning levels of detail and implementation done in Remus, based on object oriented approach.
Modelle und Verfahren zur Planung von langfristigen Bauprojekten unter Kapitalwertgesichtspunkten
(2003)
Langfristige Bauprojekte stellen sowohl aus technischer Sicht als auch unter Planungsgesichtspunkten überaus komplexe Herausforderungen dar. Den laufenden Auszahlungen für Löhne, Materialien und fremdbezogene Dienstleistungen stehen dabei erst nach einiger Zeit Fortschrittszahlungen für abgeschlossene Teilprojekte gegenüber. Die Durchführung eines solchen Projekts kann mithin als Investition angesehen werden. Im Gegensatz zu herkömmlichen Investitionen liegen bei Investitionsprojekten die Zeitpunkte der Ein- und Auszahlungen nicht fest, sondern sind Gegenstand der Planung. Zur Lösung des Annahme- bzw. Auswahlproblems bei Investitionsprojekten unter Sicherheit erfreut sich die Kapitalwertmethode breiter Zustimmung. Nach einer Betrachtung bekannter Ansätze zur Maximierung des Kapitalwerts von Investitionsprojekten unter Annahme eines vollkommenen Kapitalmarktes wird aufgezeigt, wie das vorgestellte Modell zur Kapitalwertmaximierung für den Fall beschränkt verfügbarer Ressourcen bzw. eines beschränkten Kreditrahmens angepasst werden kann. Die Bewertung von Investitionsprojekten auf Grundlage des optimalen Projektkapitalwerts setzt die Kenntnis des anzuwendenden Kalkulationszinsfußes und der maximalen Projektdauer voraus. Da diese Größen a priori nicht bekannt sind, entwickeln wir ein Verfahren zur Bestimmung des Kapitalwerts von Investitionsprojekten als Funktion des Kalkulationszinsfußes und der maximalen Projektdauer. Abschließend zeigen wir, wie die erzielten Resultate zur Entscheidungsunterstützung eines Bauunternehmers genutzt werden können.
Einsatz internetbasierter Projektplattformen im Bereich der Bauausführung - "Digitales Bautagebuch"
(2003)
Der Einsatz internetbasierter Projektplattformen in der Bauausführung wurde bisher kaum thematisiert. Die typischen Vorteile des Einsatzes solcher Werkzeuge, wie etwa die Unterstützung kooperativer, geographisch und zeitlich verteilter Prozesse, scheinen für diesen Einsatzbereich nicht so offensichtlich zu sein wie für den Bereich der Gebäudeplanung. Vor dem Hintergrund der anhaltend problematischen Situation der Bauwirtschaft und der Tatsache, dass im Bereich der Bauausführung oftmals die wesentlichen Ursachen für einen unplanmäßigen Ablauf von Bauprojekten oder ein Verfehlen von Kosten-, Termin- oder Qualitätszielen zu finden sind, kommt diesen Anwendungen eine große Bedeutung zu. Im Rahmen eines größeren Forschungsprojektes des BMWi (TK3 GIT Siegen / Projektträger PTJ-BEO) wurde unter dem Arbeitstitel >Digitales Bautagebuch< ein ausführungsorientiertes Modul für eine schon in den Planungsphasen des Projektes eingesetzte Projektplattform entwickelt. Dabei wurde projektbegleitend eine Umgebung implementiert, welche sowohl die Bauleitung bei ihrer täglichen Arbeit unterstützt als auch Entscheidungsträgern und anderen Projektbeteiligten einen schnellen Überblick über den Stand der Arbeiten ermöglicht. Dieser Beitrag setzt sich mit dem Einsatz internetbasierter Projektplattformen im Bereich der Bauausführung auseinander und beschreibt deren Möglichkeiten unter Einbringung der Erfahrungen aus der Anwendung im Bauprojekt TK3 GIT Siegen.
Die Technische Gediminas Universität Vilnius, Lehrstuhl Technologie der Bauproduktion und die Hochschule für Technik, Wirtschaft und Kultur Leipzig, Lehrbereich Baubetrieb, haben sich seit mehreren Jahren mit den Problemen der mehrkriteriellen Entscheidung im Bauwesen befasst. Auf Grund der unterschiedlichen Herangehensweise werden für numerische Lösungen auch unterschiedliche Methoden benutzt. Das gemeinsame Ziel war immer eine optimale Variantenauswahl für baubetriebliche Produktionsprozesse. Zur Unterstützung der numerischen Lösungen wurde gemeinsam das EDV-Programm LEVI entwickelt, welches heute wahlweise als deutschsprachige oder englischsprachige Version genutzt werden kann. Die Beschreibung der zu lösenden Probleme erfolgt in Form einer Matrix. Diese enthält die Varianten (Zeilen) und die Kriterien (Spalten). Dabei sind die Varianten Ausdruck einer Menge real existierender Situationen für ein Problem. Alle betrachteten Varianten werden durch die gleichen Kriterien bewertet. Da die Kriterien gewöhnlich unterschiedliche Dimensionen besitzen, ist ihre Wirksamkeit nicht direkt miteinander vergleichbar. Eine Ausnahme bildet die Bewertung mit einem Punktsystem. Diese beinhaltet jedoch in hohem Maße subjektive Einflüsse und sollte daher nur in Ausnahmefällen benutzt werden. Um die Schwierigkeiten der unterschiedlichen Dimensionen für die verschiedenen Kriterien zu umgehen, wird das Verhältnis zum jeweiligen Optimalwert gebildet. Damit werden gleichzeitig die Diskrepanzen, die durch die unterschiedlichen Größenordnungen der Optimalwerte entstehen, beseitigt. Für das Verhältnis des Funktionswertes zum Optimalwert existieren unterschiedliche Auffassungen. Es muss an dieser Stelle bemerkt werden, dass mit der Entscheidung über die Art des Verhältnisses zum Optimalwert auch die Lösung beeinflusst werden kann. Untersuchungen über solche Auswirkungen sind noch nicht abgeschlossen, so dass im Augenblick nur vorläufige Ergebnisse genannt werden können. Von den bekannten Transformationsmethoden benutzen die Verfasser die vektorwertige Transformation, die lineare Transformation, die relative Abweichung und eine nichtlineare Transformation. Dadurch erfolgt eine Abbildung auf das Intervall [1 ; 0 ] bzw. [ 1 ; ~ 0 ]. Für die Lösungsmethoden erfolgt eine Unterscheidung in eine einseitige oder zweiseitige Fragestellungen. Während die einseitige Fragestellung auf die Bestimmung einer Rangfolge orientiert, berechnet die zweiseitige Fragestellung ein spieltheoretisches Gleichgewicht als Ausdruck eines rationalen Verhaltens von zwei entgegengesetzten Interessengruppen und Lösungen für Spiele gegen die Natur. In Anlehnung an das statische Gleichgewicht messen die Verfasser dem spieltheoretischen Gleichgewicht für die Dimensionierung baubetrieblicher Produktionsprozesse eine besondere Bedeutung zu. Bisherige Anwendungen konzentrieren sich auf die optimale Auswahl im Wohnungsbau, die Auswahl von Konstruktionsvarianten, die Auswahl von Montagevarianten, den Einsatz von Wärmedämmstoffen u.a. Für die Dimensionierung von Produktionsprozessen mit Serienproduktion wurde eine Lösung mit einer gewichteten Matrix vorgeschlagen.
To support research in the building sector and in order to help it move towards a new digital economy, the European Commission under the 5th Framework initiative, especially the IST programme, funded various RTD projects. The opportunity to bring these IST projects together was acknowledged so that stronger links can be created under a clustering umbrella and that, moreover, links of those projects with their RTD environment could be facilitated. This has been the objective of work carried out within the ICCI (IST-2001-33022) Cluster project. This paper introduces the main aims and objectives of the project, and then presents its principal outcomes. In a second part, it synthesises the underlying concepts, technology and tools that will make ICT-based Construction a reality in a near future, and gives recommended actions for the industry, the EC and the Construction ICT R&D in Europe, giving some benefit of this project experience to the three communities.
The design of building projects involves several types of resources such as architects, structural engineers, mechanical engineers, electrical engineers, and draftsmen, among others. For design firms to stay in business in this very competitive market, they need to manage their resources in a way that improves productivity and cost effectiveness. This task, however, is not simple and requires thorough analysis of process-level operations, resource use, and productivity. Typically, these operational aspects are the responsibility of the design office manager who assigns available resources to the different design projects to save time and lower design expenses. It is noted that limited studies have been carried out in the literature to model overall organizational operations and behavioral aspects, particularly in firms specialized in the design of building projects. In an effort to simplify the modeling process, a simplified modeling and simulation tool is used in this research. A simulation model representing an actual design office was developed assuming that the office performs designs for small, medium, and large size building projects. The developed model was used to simulate several alternatives and examine various resource assignment strategies. The simulation was conducted over ten years and the resulting productivity and income was measured.
In this paper, a circulation-type society is expressed by recurrent architecture network described with multi-agent model which consists of the following agents: user, builder, reuse maker, fabricator, waste disposer, material maker and earth bank (see Fig.1). Structural members, materials, resources and monies move among these agents. Each agent has its own rules and aims, regarding structural damages, lifetime, cost reduction, numbers of structural members and structural systems. Reasonable prices of members (fresh, reused, recycled and disposed) can be optimized by GAs in this system considering equal distribution of monies among agents.
Communication software and distributed applications for control and building performance simulation software must be reliable, efficient, flexible, and reusable. This paper reports on progress of a project, which aims to achieve better integrated building and systems control modeling in building performance simulation by run-time coupling of distributed computer programs. These requirements motivate the use of the Common Object Request Broker Architecture (CORBA), which offers sufficient advantage than communication within simple abstraction. However, set up highly available applications with CORBA is hard. Neither control modeling software nor building performance environments have simple interface with CORBA objects. Therefore, this paper describes an architectural solution to distributed control and building performance software tools with CORBA objects. Then, it explains how much the developement of CORBA based distributed building control simulation applications is difficult. The paper finishes by giving some recommendations.
Information science researchers and developers have spent many years addressing the problem of retrieving the exact information needed and using it for analysis purposes. In informationseeking dialogues, the user, i.e. construction project manager or supplier, often asks questions about specific aspects of the tasks they want to perform. But most of the time it is difficult for the software systems to unambiguously understand their overall intentions. The existence of information tunnels (Tannenbaum 2002) aggravates this phenomenon. This study includes a detailed case study of the material management process in the construction industry. Based on this case study, the structure of a formal user model for information retrieval in construction management is proposed. This prototype user model will be incorporated into the system design for construction information management and retrieval. This information retrieval system is a user-centered product based on the development of a user configurable visitor mechanism for managing and retrieving project information without worrying too much about the underlying data structure of the database system. An executable UML model combined with OODB is used to reduce the ambiguity in the user's intentions and to achieve user satisfaction.
Im Beitrag wird belegt, dass es viele Gemeinsamkeiten von Qualitätsverletzungen und Verstößen gegen die Sicherheitsvorschriften gibt. An Hand einiger Beispiele wird gezeigt, wie sich durch – Schwachstellen in der technischen und technologischen Vorbereitung, – Mängel im Gesundheits-, Arbeits- und Brandschutz, – ungenügende Qualifikation sowie subjektives Fehlverhalten von Arbeitern, – Material-, Fertigungs- und Konstruktionsfehler Unfälle, Schadensfälle, Gesundheitsschäden und Brände insbesondere beim Schweißen ereignet haben und damit die aufgezeigten Zusammenhänge bestätigen.
Projektsteuerung gewinnt als Aufgabenfeld bei der Realisierung von Investitionsprojekten ständig an Bedeutung. Zur Bewältigung der umfangreichen und komplizierten Aufgaben des Projektsteuerers wird zunehmend Software angeboten und genutzt. Dabei ist feststellbar, daß von einer integrierten Projektsteuerung unter Berücksichtigung der Kriterien Leistung, Termin und Kosten nicht gesprochen werden kann, weil wesentliche theoretische und praktische Voraussetzungen fehlen. Im Beitrag werden Defizite der praktizierten Vorgehensweise und Lösungsansätze für eine integrierte rechnergestützte Projektsteuerung vorgestellt. Durch geeignete Formen der Projektstrukturierung und eine Kopplung auf dem Mark befindlicher Standardsoftware können geeignete Lösungen gefunden werden. Problempunkte dabei stellen die Schnittstellen zwischen den Anwenderprogrammen die Datenbeschaffung und -verwaltung sowie geeignete Verfahren zur Kostenermittlung und -verfolgung dar. Im Beitrag werden eine bereits praktizierte und eine in Entwicklung befindliche Lösung vorgestellt.
Während des Entwurfs- und Herstellungsprozesses eines architektonischen Objektes wird eine Menge organisatorischer, projektbezogener Daten zusammengetragen (z.B. Namen und Adressen von Bauherren, Firmen, Architekten, Ingenieuren, Behörden, die Art ihrer Beteiligung, Schriftverkehr). Diese Daten werden während dieses Prozesses mehrere Male verwendet, jedoch in unterschiedlichen Zusammenhängen, durch unterschiedliche Nutzer und von verschiedenen Anwendungen. Demzufolge ist eine geeignete Datenmodellierung und Datenverwaltung erforderlich, die diesen Aspekten gerecht wird. Der vorliegende Beitrag beschreibt ein Programm, welches die verschiedenen Formen der Projektdaten integriert, die Adreß-, Projekt- und Dokumentenverwaltung übernimmt, Projektinformationsdienstleistungen anbietet und Büroabläufe unterstützt.
Am Fraunhofer ISE wurde in den letzten Jahren die Simulationsumgebung ColSim entwickelt, die sich speziell zur Untersuchung von Regelungssystemen in Gebäudeenergieversorgungssystemen eignet. Zielsetzung des Designs ist die Umsetzung des simulationsbasierten Regelungsentwurfs, der einen unmittelbaren Einsatz der Regelungsmodule auf sog. Enbedded Systems gestattet. Das Simulationswerkzeug zeichnet sich durch die modulare offene Struktur aus, die eine flexible Erweiterung ermöglicht (vgl. TRNSYS [1]). Die Implementierung erfolgte im genormten ANSI-C Code, der einen plattform- unabhänigen Einsatz gewährleistet. Entwicklungsplattform stellt derzeit ein Linux Cluster dar, als Zielplattform wurden bisher sowohl eingebettete Industrie-PCs wie auch klassische Micro- controller Boards verwendet. Die Entwurfsmethode wird anhand einer Systemregelung für eine solarthermische Anlage mit 120m2 Kollektorfläche (SolarThermie2000 Anlage) demonstriert, bei der ein vernetztes Regelungssystem mit Internet-Integration zum Einsatz kommt. Das Regelungssystem verfügt seinerseits über ein Betriebssystem (schlankes embedded linux system), das die Kommunikation nach aussen gestattet. Das Regelungssystem vefügt somit über Klima- bzw Strahlungsdaten, die für den Regelungsprozess von Bedeutung sind. Die externen Informationen können einerseits zur >Einsparung< von Sensorik genutzt werden, andererseits gestatten sie den Einsatz von prädiktiver Regelungsmethodik, um den fossilen (Nachheiz-) Energieeinsatz zu minimieren. Mit Hilfe von simulationstechnischen Systemstudien kann ein adaptives Verhalten des Regelungssystems erprobt werden, das eine selbstständige Strecken- identifikation realieren kann. Beispielsweise soll beim näher beschriebenen solarthermischen System die Totzeit bestimmt werden, die sich infolge der Verrohrung zwischen Speicher und Entladegruppe ergibt. Der Betrieb der Entlade- pumpe wird einerseits in Abhängigkeit der Verfügbarkeit des Pufferwassers erfolgen, andererseits in Abhängigkeit des erwarteten Zapfvolumens durch den Verbraucher. Die vernetzten Regelungssysteme, die auf Basis der Simulationsmodelle ent- wickelt werden, sollen künftig die gesamte Energieflußanalyse des Gebäudes realisieren, wobei eine transparente Darstellung des Systemverhaltens auf Basis einer Internet Visualisierung erfolgt. Der Betreiber und Nutzer wird unmittel- bar durch die Online Dienste (SMS,Email,Fax) über das (fehlerhafte) Anlagen- verhalten informiert. Gerade die sensitiven regenerativen Systeme neigen durch ihre Komplexität zu Störungen, die oftmals nicht erkannt werden, weil die konventionellen Teilsysteme (z.B. Ergasbrenner) den Ausfall in der Regel >kompensieren<.
Einsatz eines Dokumenten - Management - Sytems (DMS) für Eingangsrechnungen in Bauunternehmen
(2003)
Die Aug. Prien Bauunternehmung hat im Jahre 2001/2002 ein DMS eingeführt. Die Gründe dafür waren, dass die Aufbewahrungsfristen von sechs auf zehn Jahre erhöht wurden, man die Abläufe in der Verwaltung straffen und die Postwege von und zu großen Baustellen sparen wollte. Die Einführung des Systems dauerte sechs Monate. Die Zusammenarbeit mit den externen Beratern wurde a-typisch gestaltet: kein Pflichtenheft (sondern Projektbeschreibung) und keinen festen Preis (sondern Budgetrahmen). Die aufkommenden Fragen und Probleme konnten in ständigen Feed-Back-Schleifen zwischen den Anwendern, dem Projektleiter und den externen Programmierer gelöst werden. Interne Widerstände konnten durch Durchsetzungswillen als auch Eingehen auf die Einwände überwunden werden. Bei der Programmierung des Systems wurde darauf geachtet, dass die Handhabung für die Anwender so einfach wie möglich gestaltet wurde. Mit der Einführung des Systems zeichnen fast alle Anwender (>90%) ihre Rechnungen am Bildschirm ab - ob in der Zentrale oder draußen auf der Baustelle. Die Bauleiter auf den Baustellen können sich über eine ISDN-Leitung auf einen Terminal-Server in der Zentrale einwählen und dann so wie im Büro arbeiten. Bereits archivierte Rechnungen können sich die Anwender jederzeit über das firmeninterne Baustellen-Informations-System (B-I-S) wieder aufrufen. Die Rechnungskontrolle braucht nicht mehr die Belege in Bauleiter-Mappen sortieren, weiß jederzeit wo eine Rechnung zur Bearbeitung liegt und bekommt nur noch die geänderten Rechnungen zur Bearbeitung (alle anderen gehen direkt in den automatischen Zahlungslauf). Durch die Einführung des Systems konnte eine Person in der Rechnungskontrolle eingespart werden. Der Return on Invest (ROI) liegt bei 1,4 Jahren, was ein guter Wert ist. Zwischenzeitlich werden weitere Belege gescannt.
Organisational and human issues have been highlighted, among other issues (ICT infrastructures, legal and contractual, etc.), as key elements in enhancing the competitiveness of the construction sector. More specifically, the importance of human resources has been recognised, especially training and professional development, in order to cultivate a stable workforce. The paper provides a review of the key training needs for the construction sector with particular reference to the uptake and exploitation of new technologies and working practices, presents an action plan to address learning and training needs, and proposes an eight-stage iterative learning and training methodology. The results will be of particular interest to managers in stakeholder organisations of all sizes throughout the sector, plus academic and research bodies intending to continue construction ICT research.
Die zunehmend erforderliche Kooperation verschiedener Beteiligter unterschiedlicher Fachbereiche und der Einsatz hochspezialisierter Fachapplikationen in heterogenen Systemumgebungen unterstreichen die Bedeutung und Notwendigkeit neuer Konzepte und Möglichkeiten zur Schaffung einer computergestützten Integrationsebene. Ziel einer computergestützten Integrationsebene ist die Verbesserung der Kooperation und Kommunikation unter den Beteiligten. Grundlage dafür ist die Etablierung eines effizienten und fehlerfreien Daten- und Informationsaustausches zwischen den verschiedenen Fachplanern und -applikationen. Die Basis für die Datenintegrationsebene bildet ein digitales Bauwerksmodell im Sinne eines >virtuellen Bauwerks<, welches alle relevanten Daten und Informationen über ein zu planendes oder real existierendes Bauwerk zur Verfügung stellt. Bei der Verwirklichung einer Bauwerksmodell-orientierten Datenintegrationsebene und deren Modellverwaltung erweist sich speziell die Definition des Bauwerksmodells also die Spezifikation der relevanten auszutauschenden Daten als äußerst komplex. Der hier vorzustellende Relationen-orientierte Ansatz, d.h. die Realisierung des Daten- und Informationsaustauschs mittels definierter Relationen und Beziehungen zwischen dynamisch modifizierbaren Domänenmodellen, bietet Ansätze zur: * Verringerung und Beherrschung der Komplexität des Bauwerksmodells (Teilmodellbildung) * Realisierung eines effizienten Datenaustauschs (Relationenmanagement) Somit stellt der Relationenorientierte Ansatz einen adäquaten Lösungsweg zur Modellierung eines digitalen Bauwerksmodells als Datenintegrationsebene für den Lebenszyklus eines Bauwerkes dar.
Bauprojekte sind in immer stärkerem Maße durch räumlich verteilt und zeitlich variant tätige hochspezialisierte Fachplaner auf Basis stark differenzierter Hard- und Softwaresysteme gekennzeichnet. Daraus ergibt sich die Notwendigkeit einer durchgängig computergestützten prozeßübergreifenden Informationsbereitstellung. Eine deklarativ orientierte integrierte Arbeits- und Planungsumgebung auf Basis eines digitalen Bauwerksmodells bietet das Potential zur Realisierung des erforderlichen Informationsaustausches. Der im Sonderforschungsbereich 524 entwickelte verknüpfungsbasierte Bauwerksmodellierungsansatz stellt einen derartigen Ansatz dar und bietet adäquate Möglichkeiten zur Modellintegration und zur modellübergreifenden Navigation im Gesamtdatenbestand auf Basis dynamisch manipulierbarer Verknüpfungen zwischen Modellelementen. Die Erstellung von Verknüpfungen stellt einen komplizierten Prozeß dar. Um ein effizientes dynamisches Definieren von Verknüpfungstypen zu gewährleisten sind unterstützende Tools im Sinne eines intelligenten Verknüpfungsmanagements notwenig. Die Hauptaufgabe dieser Hilfsmittel besteht darin, die Partialmodelle zielgerichtet zu analysieren und entsprechende Vorschläge für die Elemente eines Verknüpfungstyps zu generieren und diese auch entsprechend zu verarbeiten. Hierzu wird ein regelbasierter Ansatz mit Visualisierungsmethoden zur Erhöhung der Transparenz des Verknüpfungsmanagements kombiniert. Die Wissensbasis stellt dabei das objektorientiert strukturiert vorgehaltene Domänenwissen in den jeweiligen Partialmodellen dar. Der deklarativen Wissensabbildung folgend steht zur Erkennung von Zusammenhängen zwischen Elementen verschiedener Partialmodelle ein explizit definierter und extern vorgehaltener Regelapparat zur Verfügung. Am Beispiel einer 3D-Visualiserung der Elemente eines Partialmodells Architektur werden die entwickelten Konzepte evaluiert.
In der jüngeren Vergangenheit haben die Entwicklungen von neuen Programmen und der Rechentechnik zu radikalen Veränderungen in den Methoden der Berechnung von ingenieurtechnischen Bauten geführt. An erster Stelle sind hier die Matrizenmethoden für notwendige Berechnungen der Aufgaben anzuführen, welche eine kompakte und allgemeine Form der Aufschreibung von Gleichungen gestatten und geeignet für die Bearbeitung an Computern sind. Die elektronischen Maschinen wurden damit befähigt nicht nur Systeme linear-algebraischer Gleichungen mit hundert oder tausend von Unbekannten zu lösen, sonder auch die Bearbeitung von Differentialgleichungen, sowie die Formierung dieser Gleichungen zu übernehmen. Damit übernehmen die Computer den Grossteil des Prozesses der Berechnung und der Projektierung einer Konstruktion. Zweifellose Aktualität haben die Fragen über die Benutzung dieser Eigenschaften für die Aufgaben der Bauinformatik und Baumechanik. Diesen ist der vorliegende Artikel gewidmet. In der Praxis der Projektierung kommen oft komplexe Stabsysteme und zylindrische-gefaltete Flächensysteme vor. Dabei ist zu berücksichtigen: die Verschiebung in Stabsystemen, ihre elastischen Gründungen und die auftretenden längs- und querlaufenden Biegungen sowie harmonische Schwingungen. In diesem Artikel wird ein universeller Algorithmus zur Ausarbeitung von Matrizen für Härte- und Festigkeitsbetrachtungen für Stäbe vorgestellt. Der entwickelte Algorithmus erlaubt die Berechnung von komplizierten Stabsystemen, die in der Praxis weit verbreitet sind. Für die Ausarbeitung der Matrizen für die Festigkeitsbetrachtung wurde die symbolische Programmiersprache MAPLE benutzt. Weiterhin zeigt dieser Artikel die Berechnung von gefalteten Flächensystemen unter Verwendung des diskret- kontinuierlichen Modells von W. S. Wlasow, mit Hilfe eines universellen Algorithmus auf. Für die Aufstellung der Matrix für Festigkeitsbetrachtung werden als Systemeinstellungen die Schichtformierung und der Ausschluss nach Gauss vorgeschlagen. Am Ende des Artikels werden Beispiele für die Berechnung von komplizierten Konstruktion aufgeführt.
Engineering Desktop Anwendungen in der Tragwerksplanung auf der Grundlage der COM-Technologie
(2003)
Zur effizienten Nutzung von Office- und Computeralgebra-Software im Sinne einer Engineering Desktop Umgebung wurde ein Framework für die Tragwerksplanung entwickelt. Dieses umfasst Klassen und Methoden zur Schnittgrößenermittlung von Durchlaufträgern, Fachwerken und ebener Stabwerke sowie für Nachweise und Bemessungsaufgaben im Stahlbeton-, Stahl- und Holzbau. Die Anwendung des Frameworks im Rahmen einer Office-Software beruht auf der Komponententechnologie. Im Rahmen von MS-Windows handelt es sich um das COM-Modell. Die Komponentenbibliothek des Frameworks wurde in JAVA implementiert. Die Nutzeroberfläche kann aus Berechnungssoftware wie Excel und Mathcad bestehen. Aber auch die Entwicklung von Tragwerkseditoren oder internetbasierender Software ist damit möglich. Anwendungen des Frameworks wurden in MS-Excel mit VBA und in Mathcad mit der C++Schnittstelle realisiert. Ziel dieser Entwicklung ist eine Engineering Desktop Umgebung auf dem Computer, bei der nichtstandardisierbare Untersuchungen in der Tragwerksplanung ebenso einfach, aber effizienter, sicherer und besser dokumentiert als mit Bleistift und Papier erfolgen können. Zwei Beispiele verdeutlichen die Anwendung des Frameworks. Hierbei handelt es sich einmal um eine statische Voruntersuchung mit Mathcad, bei der die mit dem Framework entwickelten Funktionen verwendet werden. Das zweite Beispiel behandelt die Erstellung eines Teachtools in MS-Excel.
Preparation and provision of building information for planning within existing built contexts
(2004)
A prerequisite for planning within existing built contexts is precise information regarding the building substance, its construction and materials, possible damages and any modifications and additions that may have occurred during its lifetime. Using the information collected in a building survey the user should be able to “explore” the building in virtual form, as well as to assess the information contained with regard to a specific planning aspect. The functionality provided by an information module should cover several levels of information provision ranging from ‘simple retrieval’ of relevant information to the analysis and assessment of stored information with regard to particular question sets. Through the provision of basic functionality at an elementary level and the ability to extend this using plug-ins, the system concept of an open extendable system is upheld. Using this modular approach, different levels of information provision can be provided as required during the planning process.
Ziel des Teilprojekts C5 des Sonderforschungsbereichs 398 an der Ruhr-Universität Bochum ist die Entwicklung eines lebensdauerorientierten Entwurfsmodells für Stahltragwerke. Das Referenzsystem der letzten Förderperiode war eine einschiffige Stahlhalle mit Kranbahnen. Der vorliegende Beitrag stellt die Ergebnisse einer Sensitivitätsanalyse des Stahlrahmens unter Kranfahrtlasten vor. Diese Verkehrslasten wurden, völlig entkoppelt von weiteren äußeren Einflüssen wie Wind und Schnee, als poissongetriebene Pulsprozesse beschrieben, die zufälligen Eigenschaften der Kranfahrtlasten wurden in den Zufallsvariablen Pulsdauer und Pulsintensität berücksichtigt. Zur Minimierung des Rechenaufwandes der Lebensdauer-untersuchung wurden a priori einige Systemparameter anhand von Parameterstudien im Hinblick auf ihre dynamische Wirkung maßgebend festgelegt. In einer darauf aufbauenden Betriebsfestigkeitsuntersuchung wurden die Schädigungseinträge in einer Rahmenecke infolge von jeweils einzelnen Pulslastereignissen berechnet und in einer Datenbasis abgelegt. Eine abschließende Distance-Controlled Monte Carlo Simulation der Pulsprozesse über einen maximalen Zeitraum von 100 Jahren überführte die Realisationen der einzelnen Pulslasten anhand der Datenbasis in Teilschädigungen, welche nach der Palmgren/Miner-Hypothese zu einer Gesamtschädigung aufsummiert wurden. Der Einfluss der Kranlasten auf den Entwurf von Stahlhallen wurde durch den Vergleich der berechneten Lebensdauer und der planmäßig vorgegebenen Nutzungsdauer quantifiziert.
In this contribution the software design and implementation of an analysis server for the computation of failure probabilities in structural engineering is presented. The structures considered are described in terms of an equivalent Finite Element model, the stochastic properties, like e.g. the scatter of the material behavior or the incoming load, are represented using suitable random variables. Within the software framework, a Client-Server-Architecture has been implemented, employing the middleware CORBA for the communication between the distributed modules. The analysis server offers the possibility to compute failure probabilities for stochastically defined structures. Therefore, several different approximation (FORM, SORM) and simulation methods (Monte Carlo Simulation and Importance Sampling) have been implemented. This paper closes in showing several examples computed on the analysis server.
Mit einem Forschungsprojekt, das die psychische Belastungssituation von Bauleitern in den Mittelpunkt stellte, hat die Bundesanstalt für Arbeitsschutz und Arbeitsmedizin weitgehend Neuland im Bausektor beschritten. Exemplarisch wurde die Berufsgruppe der Firmenbauleiter untersucht, um aus der Ermittlung der psychischen Belastung und Beanspruchung dieser Zielgruppe Vorschläge zur Anforderungsoptimierung und Gesundheitsförderung zu unterbreiten. Die Untersuchungen belegen, dass besteht ein Bedarf an Handreichungen zur Stressverminderung besteht. Da Bauleiter eine Schlüsselposition für Arbeitsbedingungen, Sicherheit und Wirtschaftlichkeit der betreuten Baustellen haben, erreicht man mit stressvermindernden Maßnahmen für diese Personengruppe auch eine Breitenwirkung im Unternehmen.
Arbeitsschutzkonzept für den Bau einröhriger Tunnel am Beispiel der ICE-Querung des Thüringer Waldes
(2003)
Erfahrungen bei der Umsetzung der Baustellenverordnung beim Bau der ICE-Neubaustrecke in Thüringen, im Vergleich zu Projekten des Autobahnneubaus. Die entscheidende Schwierigkeit liegt in der Einröhrigkeit der Tunnel. Von entscheidender Voraussetzung für die erfolgreiche Arbeit ist eine von gegenseitiger Achtung gekennzeichnete Zusammenarbeit in der Planung zwischen Bauherrn, Planer und dem Amt für Arbeitsschutz. Wegetransportplan: Im Unterschied zum Autobahnbau gehören die Baustraßen nicht zum jeweiligen Los. Alle Zuwegungen werden gesondert betrachtet. Fluchtwege.
Limit state design of hybrid structures with meshless methods using mathematical optimization
(2003)
The revitalization of existing structures belongs to the frequently tasks in urban reconstruction processes. The adaptation for new requirements will commonly affect substantial changes in the general configuration of structures. The resulting revitalized structures are characterized by a hybrid design, where old and new, identical or diverse materials and members will be coupled in different ways. In the planning stage the treatment of these systems leads to application of complex and hybrid mechanical models respectively. High performance numerical instruments have to be applied for solving not only analysis but also targeted design problems. Because of the hybrid character of mechanical models in revitalization planning processes the use of hybrid technologies is advantageous. In this paper mixed domain technique will be used for connecting EFG and FE. The models derived will be adopted for design purposes of non-linear loaded hybrid structures. The investigations show a good adaptability of the meshless methods to the design of hybrid structures by using optimization strategies. With this method the advantages of both finite element and meshless methods can be utilized most suitable. With the property of a minimum amount of unknowns by maintaining an adequate quality of the results the application of mixed finite element and meshless methods is a promising alternative to traditional methods in structural analysis and optimization.
Online-Lehre im Einsatz
(2003)
Das im Rahmen des vom BMBF geförderten Projektes PORTIKO (Multimediale Lehr- und Lernplattform für den Studiengang Bauingenieurwesen) umfasst 10 Bauingenieurinstitute in Braunschweig und Dresden und das Fernstudium an der TU Dresden. Daneben sind drei Stabsprojekte für Didaktik, Teleteaching und Multimedia-Plattform als Dienstleister und Koordinatoren für die anderen Teilprojekte tätig. An der TU Braunschweig ist das Institut für Baustoffe, Massivbau und Brandschutz unter anderem für die Grundfachausbildung des Massivbau (5. + 6. Semester) und für eine spezielle Vertiefungsrichtung, den Brand- und Katastrophenschutz (7. bis 9. Semester), zuständig. In diesem Beitrag wird zunächst ein Überblick über die verwendete Plattform sowie die eingesetzten Hardware- und Softwaretechniken gegeben. Anschließend wird von ersten Erfahrungen über den Einsatz der Online-Lehre und die daraus gewonnen unterschiedlichen strategischen Ansätze für das weiter Vorgehen nach Projektende im Massivbau und im Brandschutz vorgestellt. Um den Praxisbezug zu vertiefen, wurden in PORTIKO zwei Projektbereiche gebildet, die auf Grund der engen Beziehung zwischen den Fächern gezielt zusammenarbeiten sollen. Dabei handelt es sich um die Bereiche >Virtuelles Haus< und >Virtuelle Infrastruktur<. Am Beispiel des Virtuellen Hauses soll gezeigt werden, wie die einzelnen Fächer mit Hilfe abgestimmter Übungsbeispiele den Studierenden die Notwendigkeit der Teamarbeit und Interaktion verschiedener Disziplinen vor Augen führen. Den Studenten stehen durch die Online-Plattform eine Vielzahl von Möglichkeiten zur Verfügung, z. B. mit Videoclips und Fotos über Versuche und Baustellen angereicherte Skripte, audio-kommentierte Vorlesungsfolien, alte Klausuren mit Musterlösungen, Aufgabenstellungen für Hausübungen, usw.. Den Studierenden können in der Online-Lehre interaktive Anwendungen zur Verfügung gestellt werden, die ein spielerisches Erproben und Beobachten von Parametereinflüssen ermöglichen. Solche interaktiven Übungen werden mit Java, Flash und Authorware erstellt. Hierzu werden Beispiele vorgestellt.
Darlegung aktueller rechtlicher Neuregelungen im Arbeitsschutz (insbes. Betriebssicherheitsverordnung) zur Angleichung der technischen Sicherheitsstandards für Produkte und der sozialen Standards für die Beschäftigten im Zusmmanhang mit dem fortschreitenden Zusammenwachsen der Mitgliedsstaaten der Europäischen.
Die digitale Unterstützung der Planungsprozesse ist ein aktueller Forschungs- und Arbeitsschwerpunkt der Professur Informatik in der Architektur (InfAR) und der Juniorprofessur Architekturinformatik der Fakultät Architektur an der Bauhaus-Universität Weimar. Verankert in dem DFG Sonderforschungsbereich 524 >Werkzeuge und Konstruktionen für die Revitalisierung von Bauwerken< entstehen Konzepte und Prototypen für eine fachlich orientierte Planungsunterstützung. Als ein Teilaspekt wird in diesem Beitrag gezeigt, wie das Handaufmaß unter Einsatz modernen taktiler Erfassungsmethoden eine ganz neue Bedeutung für die Datenerfassung gewinnen kann. Das Potenzial der verschiedenen Verfahren zur Koordinatenbestimmung mit taktilen Werkzeugen wird evaluiert. Daraus wird eine Strategie entwickelt, die für die unterschiedlichen Notwendigkeiten im Planungsfortschritt den optimierten Einsatz der taktilen Erfassung in Kombination mit klassischen Erfassungsmethoden aufzeigt. Die Realisierbarkeit eines derartigen Konzeptes wird durch Fallstudien und mögliche Ablaufszenarien für einzelne Verfahren nachgewiesen. Durch die Integration taktiler Messverfahren in die Bestandserfassung kann erreicht werden, dass - relevante (Geometrie-) Informationen in ein umfassendes Bauwerksmodell integriert werden können, - die Bauaufnahme wieder im direkten Kontakt zum Bauaufnahmeobjekt erfolgen kann und - die Verfahren so einfach und leicht von allen Beteiligten eingesetzt werden können, um die Bauaufnahme und die Planung wieder miteinander zu verzahnen.
Former achievements for integrated information management have concentrated on interoperability of applications like e.g. CAD, structural analysis or facility management, based on product models introducing additional application independent model layers (core models). In the last years it has become clear, that besides interoperability of autonomous applications, the concurrent processes of model instantiation and evolution have to be modeled, including the relationship to available project resources, persons, legal requirements and communication infrastructure. This paper discusses some basic concepts for an emerging methodology relating the fields of product modeling, project management and workflow systems by elaborating the concept of a process model, which gives a decomposition of the project goals into executable activities. Integrated information management systems should be related to process models to detect pending activities, deadlocks and alternatives of execution. According to the heterogeneous nature of project communication processes, a method for dynamic classification of ad-hoc activities is suggested, that complements predefined highlevel process definitions. In a brief outline of the system architecture, we show how sophisticated information management systems can be broadly made available by using conventional Internet technologies.
The increased implementation of site data capture technologies invariably results in an increase in data warehousing and database technologies to store captured data. However, restricted use of data beyond the initial application could potentially result in a loss of understanding of site processes. This could in turn lead to poor decision making at production, tactical and strategic levels. Concrete usage data have been collected from two piling processes. These data have been analysed and the results highlighted potential improvements that could be made to existing site management and estimating processes. A cost benefit analysis has been used to support decision making at the strategic level where the identified improvements require capital expenditure.
It has been shown that symmetries of moment functions of stochastic processes play an important role in identification of systems. They provide the group-theoretic method of choice of the model structure and model parameters. In the first stage the group-theoretic analysis of some fundamental concepts of stochastic dynamics: stochastic processes and functional series of Volterra-Wiener type has been undertaken. The analysis of group representations of the moment functions of order m for stochastic processes is the basic, original concept of the work. The following groups: symmetric Sm, special affine SAff(m), general linear GL(n, R), GL(n,C) and their subgroups play the main role in the models. In the second stage the informational entropy has been introduced as a measure of the randomness in the identified models. The group-theoretic approach underlines the unity of the nonlinear system identification and leads to useful engineering results in the range of the second-order (stochastic) theory.
Dezentrale mikrocontrollerbasierende Messtechnik in der in der Leittechnik historischer Gebäude
(2003)
Im Hintergrund stehen historische Bibliotheksgebäude, deren Bestände durch ungünstige klimatische Verhältnisse in den Innenräumen ihrer der Erhaltung gefährdet sind. Damit Maßnahmen der Gebäudeleittechnik geplant werden können, ist die Aufnahme der Umweltgrößen über einen längeren Zeitraum erforderlich. Im speziellen zielen die Maßnahmen auf die Klimatechnik mit ihren Aufgaben der Heizungsregelung, Belüftungsanlagen. Ein Messsystem kann mit dem Mikrocontroller Beck >IPC@CHIP< realisiert werden. Das an der FH Fulda entwickelte Messsystem nimmt im Abstand von drei Minuten Messwerte von Lufttemperatur, Luftfeuchte, Luftdruck und UV-Intensität auf. Sie gelten als beeinflussende Größen der organischen Materialien des Fundus. Die Messwerte werden in einer elektronischen Schaltung vorverarbeitet und einem Mikrocontroller zugeführt. Dieser archiviert die Daten fortlaufend über einen Zeitraum bis zu sieben Jahren. Der Mikrocontroller ist mit seinem internen Flash-Speicher und der Ethernet-Schnittstelle in der Lage, die gesammelten Messwerte als Webserver zur Verfügung zu stellen. Wenn das Messsystem an das Internet angeschlossen wird, können die Klimaverläufe in einem herkömmlichen Internet-Browser dargestellt werden. Dafür wurde mit der Programmiersprache Java eine Visualisierungsoberfläche erstellt. Sie bietet die verschiedensten Möglichkeiten der Datenauswertung. Dazu gehört der Zugriff auf jeden einzelnen Messwert, auf Tages-, Monats- und Jahresmittelwerte und die Errechnung von Minima und Maxima. Der Flash-Speicher wurde auch dazu benutzt, Dokumentation und Bedienhinweise abzulegen, die somit über das Netzwerk abrufbar sind. Das gesamte Messsystem ist in ein Buch integriert und erfasst seit August 2002 die klimatischen Verhältnisse der Herzogin-Anna-Amalia-Bibliothek in Weimar. Nach den erfolgten Langzeitmessungen kann darüber entschieden werden, welchen Beitrag eine Gebäudeleittechnik mit integrierter Klimaregelung zur Werterhaltung der Gegenstände leisten kann.
For analysis and planing of transport networks detailed information concerning travel sequences is required. The paper examines an activity chain model to determine stochastic travel demand which individual generates in order to participate in activity or sequence of activities over the day. The transition from one activity to another depends on the activity participation decision, which is made sequentially and is constrained in space and time. Activity chains derived from travel survey data are used as a base to develop a more realistic model than conventional discrete trip models. Probabilistic concepts and statistical procedures are used to estimate characteristics of travel demand such as the number of daily out-of-home activities and transition probability from one activity to another participated by homogeneous behavioural groups. In addition, the paper compares the model for two different sized towns.
Anhand von Ergebnissen aus dem FABEL-Projekt wird gezeigt, welche Beiträge Methoden der Künstlichen Intelligenz, insbesondere der Wissensverarbeitung beim Entwurf komplexer Gebäude leisten können. Exemplarisch werden spezialisierte wissensintensive Methoden, und allgemeine fallbasierte Methoden zum Retrieval und zur Wiederverwendung früherer Entwürfe vorgestellt. Es werden Fragen der Integration von Wissen, Fällen und Daten diskutiert. Der Prototyp des FABEL-Projekts verwendet die Metapher der virtuellen Baustelle, um die verschiedenen Methoden als Planungswerkzeuge in einem CAD-System integriert anzubieten. Ein Planungsmodell dient der zusätzlichen Orientierung des Planers. Die Ergebnisse sind interessant für den Entwurf komplexer Unikate, dürften aber auch als Zusatz zu elektronisch angebotenen Katalogen relevant sein.
The development of the qualitative methods of investigation of dynamic systems, suggested by the authors, is the effective means for identification of dynamic systems. The results of the extensive investigations of the behaviour of linear dynamic systems and symmetrical system with double well potential under polyharmonic excitation are given in the paper. Phase space of dynamic systems is multi-dimensional. Each point of this space is characterized by not less than four co-ordinates. In particular: displacement, velocity, acceleration and time. Real space has three dimensions. It is more convenient for the analysis. We consider the phase space as limited to three dimensions, namely displacement, velocity and acceleration. Another choice of parameters of phase planes is also possible [1, 2]. Phase trajectory on a plane is of the greatest interest. It is known that accelerations of points are more sensitive to deviations of oscillations from harmonic ones. It is connected with the fact that power criteria on it are interpreted most evidently. Besides, dependence is back symmetric relative to axis of the diagram of elastic characteristic. Only the phase trajectories allow establishing a type and a level of non-linearity of a system. The results of the extensive investigations of the dynamic systems behaviour under polyharmonic excitation are given in the paper. The use of the given phase trajectories enables us to determine with a high degree of reliability the following peculiarities: - presence or absence of non-linear character of behaviour of a dynamic system; - type of non-linearity; - type of dynamic process (oscillations of the basic tone, combinative oscillations, chaotic oscillations.). Unlike existing asymptotic and stochastic methods of identification of dynamic systems, the use of the suggested technique is not connected with the use of a significant amount of computing procedures, and also it has a number of advantages at the investigation of complicated oscillations.
The subject of this talk is the problem of surface design based upon a mesh that may contain both triangular and quadrangular domains. We investigate the cases when such a combined mesh occurs more preferable for bivariate data interpolation than a pure triangulation. First we describe a modification of the well-known flipping algorithm that constructs a locally optimal combined mesh with a predefined quality criterion. Then we introduce two quality measures for triangular and quadrangular domains and present the results of a computational experiment that compares integral interpolation errors and errors in gradients caused by the piecewise surface models produced by the flipping algorithm with the introduced quality measures. The experiment shows that triangular meshes with the Delaunay quality measure provide better interpolation accuracy only if the interpolated function is strictly convex, as well as a saddle-shaped function is better interpolated by bilinear patches within a combined mesh. For a randomly shaped function combined meshes demonstrate smaller error values and better stability in compare with pure triangulations. At the end we consider other resources for mesh improvement, such as excluding >bad< points from the input set for the mesh generating procedure. Because the function values at these points should not be lost, some linear or bilinear patches are replaced by nonlinear patches that pass through the excluded points.
The worldwide growth of communication networks and associated technologies provide the basic infrastructure for new ways of executing the engineering process. Collaboration amongst team members seperated in time and location is of particular importance. Two broad themes can be recognized in research pertaining to distributed collaboration. One theme focusses on the technical and technological aspects of distributed work, while the other emphasises human aspects thereof. The case of finite element structural analysis in a distributed collaboratory is examined in this paper. An approach is taken which has its roots in human aspects of the structural analysis task. Based on experience of how structural engineers currently approach and execute this task while utilising standard software designed for use on local workstations only, criteria are stated for a software architechture that could support collaborative structural analysis. Aspects of a pilot application and the results of qualitative performance measurements are discussed.
A lot of real-life problems lead frequently to the solution of a complicated (large scale, multicriteria, unstable, nonsmooth etc.) nonlinear optimization problem. In order to cope with large scale problems and to develop many optimum plans a hiearchical approach to problem solving may be useful. The idea of hierarchical decision making is to reduce the overall complex problem into smaller and simpler approximate problems (subproblems) which may thereupon treated independently. One way to break a problem into smaller subproblems is the use of decomposition-coordination schemes. For finding proper values for coordination parameters in convex programming some rapidly convergent iterative methods are developed, their convergence properties and computational aspects are examined. Problems of their global implementation and polyalgorithmic approach are discussed as well.
In der vorliegenden Arbeit werden dickwandige Schalentragwerke unter statischen Belastungen betrachtet. Die Schale besteht aus verschiedenen Zonen und in jeder Zone wird die Schalenmittelflaeche mittels eines eigenen Geometriegleichungssystems definiert. Das Verzerrungsfeld hat allen 6 unabhaengigen Komponenten unter der Annahme, dass die Querschnittsfasern, die normal zu der Mittelflaeche der unbelasteten Schale sind, geradelinig bleiben. Ein dreidimensionales isoparametrisches finites Element wird vorgeschlagen. Die Berechnung wird mit der Hilfe der Makroelemententechnik durchgefuehrt. In der Arbeit werden die wesentliche Parameter der Schalengeometrie, sowie auch entsprechendes Anteil von Klassen des konstruktiven Modells, definiert. Ein konstruktives Informationsmodell und ein FEM-Informationsmodell, werden entwickelt. Die Informationsverbindungen zwischen den beiden Modellen werden definiert. Diese objektorientierten Modelle werden in Programmiersprache Microsoft Visual C++ v.4.0 unter Windows 95 implementiert. Als numerisches Beispiel wird ein Bogenmauertragwerk betrachtet.
The purpose of this research is to develop the method to retrieve a building name from the impression of the building. First, the images of the building are registered as database by the questionnaire. Next, the images of the objective building are compared with the degree of matching in image databases, and the building with high synthetic matching degree is retrieved. This system could get a good retrieval result. Moreover, image processing was done, and image databases are trained by neural network from the amount of characteristics of the image, and the retrieval system by image processing was examined.
An important feature of the 2003 SARS outbreak in Canada, Singapore, and Hong Kong was that many health care workers (HCWs) developed SARS after caring for patients with SARS. This has been ascribed to inadequate or ineffective patient isolation. However, it is difficult for dense cities to provide sufficient isolation facilities within a short period of time. This has raised concerns from the public for new strategies in the planning and design of isolation facilities. Considering that SARS or other infectious diseases could seriously damage our society’s development, isolation facilities that could be rapidly and economically constructed with appropriate environmental controls are essential. For this reason, the design team of the Department of Architecture collaborated with a special task force from the Faculty of Medicine, who are the frontline medical officers treating the SARS patients, to design Rapidly Assembled Isolation Patient Wards. Both architecture and medicine are well established disciplines, but they have little in common in terms of the mode of knowledge construction and practice. This induced much intellectual exploration and research interest in conducting this study. The process has provided an important reference for cross disciplinary studies between the architectural and medical domains.
Complex gridshell structures used in architecturally ambitious constructions remain as appealing as ever in the public realm. This paper describes the theory and approach behind the software realisation of a tool which helps in finding the affine self-weight geometry of gridshell structures. The software tool DOMEdesign supports the formal design process of lattice and grid shell structures based upon the laws of physics. The computer-aided simulation of suspension models is used to derive structurally favourable forms for domes and arches subject to compression load, based upon the input of simple architectonic parameters. Irregular plans, three-dimensional topography, a choice different kinds of shell lattice structures and the desired height of the dome are examples of design parameters which can be used to modify the architectural design. The provision of data export formats for structural dimensioning and visualisation software enables engineers and planners to use the data in future planning and to communicate the design to the client.
Die digitale Unterstützung der Planungsprozesse ist ein aktueller Forschungs- und Arbeitsschwerpunkt der Professur Informatik in der Architektur (InfAR) und der Juniorprofessur Architekturinformatik der Fakultät Architektur an der Bauhaus-Universität Weimar. Verankert in dem DFG Sonderforschungsbereich 524 >Werkzeuge und Konstruktionen für die Revitalisierung von Bauwerken< entstehen Konzepte und Prototypen für eine fachlich orientierte Planungsunterstützung. Als ein Teilaspekt wird in diesem Beitrag die Vision eines mitwachsenden Geometriemodells für das computergestützte Bauaufmaß gezeigt, welches den Aufnehmenden von der Erstbegehung an begleitet. Die bei jeder Phase der Bauaufnahme gewonnenen Geometrieinformationen sollen in den anschließenden Phasen wiederverwendet, konkretisiert bzw. korrigiert werden. Aufmaßtechniken und Geometriemodell sind dabei eng gekoppelt. Verschiedene Sichten auf ein gemeinsames Geometriemodell haben zum Ziel, den Nutzer die Vorteile planarer Abbildungen nutzen zu lassen, ohne die dreidimensionale Übersicht zu verlieren oder entsprechende räumliche Manipulationen zu missen. Das Geometriemodell ist dabei in ein dynamisches Bauwerksmodell eingebettet. Der folgende Beitrag bezieht sich auf die Bauaufnahme mit folgenden Vorgaben: - die Bauaufnahme dient der Vorbereitung der Bauplanung im Bestand - es wird nur eine Genauigkeitsstufe (im Bereich von +/- 10 cm) unterstützt - die Geometrieabbildung des aufzunehmenden Bauwerkes beruht ausschließlich auf ebenen Oberflächen
The paper describes a concept for the step-by-step computer-aided capture and representation of geometric building data in the context of planning-oriented building surveying. Selected aspects of the concept have been implemented and tested as prototypes. The process of step-by-step capture and representation is determined by the order in which the user experiences the building. Only the information that the user knows (can see) or can reasonably deduce is represented. In addition approaches to the flexible combination of different measuring techniques and geometric abstractions are described which are based upon geodetic computational adjustment.
The truss model for predicting shear resistance of reinforced concrete beams has usually been criticized because of its underestimation of the concrete shear strength especially for beams with low shear reinforcement. Two challengers are commonly encountered in any truss model and are responsible for its inaccurate shear strength prediction. First: the cracking angle is usually assumed empirically and second the shear contribution of the arching action is usually neglected. This research introduces a nouvelle approach, by using Artificial Neural Network (ANN) for accurately evaluating the shear cracking angle of reinforced and prestressed concrete beams. The model inputs include the beam geometry, concrete strength, the shear reinforcement ratio and the prestressing stress if any. ...
Indentation experiments have been carried out over the past century to determine hardness of materials. Modern indentation machines have the capability to continuously monitor load and displacement to high precision and accuracy. In recent years, research interests have focussed on methods to extract material properties from indentation load-displacement curves. Analytical methods to interpret the indentation load-displacement curves are difficult to formulate due to material and geometric nonlinearities as well as complex contact interactions. In the present study, an artificial neural network model was constructed for interpretation of indentation load-displacement curves. Large strain-large deformation finite element analyses were first carried out to simulate indentation experiments. The data from finite element analyses were then used to train the artificial neural network model. The artificial neural network model was able to accurately determine the material properties when presented with load-displacement curves which were not used in the training process. The proposed artificial neural network model is robust and directly relates the characteristics of the indentation loaddisplacement curve to the elasto-plastic material properties.
This paper describes monitoring of the in-valley discharge and underground water level at the place where the tunnel will be constructed and also, the numerical analysis for prediction applying the Tank Model and Linear Filter Method to calculate the prediction. The application of these analyses has actually allowed the change of underground water level to be grasped and more effective information system to be established by comparing the real-time monitoring data with the real-time calculation of prediction.
Situation und Entwicklungstendenzen; Arbeitsprozesse im Arbeitsschutz; Das Internet; Arbeitsschutz im Internet (Internet-Inhalte auf dem Weg zum papierlosen Büro); Datenaustausch und papierloses Büro. Dank Telekommunikation und Internet sind wir auf dem besten Weg zum papierlosen Büro. Papier gebundenen Informationen werden jetzt schon durch Online-Dienste und digitale Dokumenten-Management-Systeme zurückgedrängt. Dank Vernetzung wachsen die Möglichkeiten simultanen Arbeitens. Auf dem Gebiet des Arbeitsschutzes bestehen aktuell bereits gute Arbeitsmöglichkeiten.
Die Baumaschinentechnik hat einen hohen Stand erreicht. Auch die Automatisierungstechnik hat in breitem Maße Einzug in die moderne Fertigungstechnik gehalten und ist unbemerkt zur Selbstverständlichkeit geworden. Wesentliche Entwicklungssprünge vollziehen sich mit der zunehmenden Systembetrachtung der Bauproduktion durch vernetztes Arbeiten bei umfassender Anwendung der Telekommunikationstechnik. Die Fertigungsprozesse lassen sich dadurch besser steuern und sind transparenter nachvollzieh- und abrechenbar. Zu erwarten ist, dass sich die Entwicklungen zum Bauen mit intelligenten Baumaschinen und Geräten mit zunehmender Geschwindigkeit fortsetzt und nicht nur die Effizienz in der Bauindustrie verbessern, sondern auch das Image der Bauberufe verbessern wird. Der Verfasser gibt einen Überblick und Beispiele zu dieser Entwicklung.
Es wird ein Verfahren vorgestellt, das erlaubt, die Vermessung von Porengrößen in Sichtbetonflächen sowie die Beurteilung von Farbeindrücken automatisiert durchzuführen. Subjektive Einflüsse bei der Bewertung werden ausgeschlossen, gleichzeitig werden Einsparungseffekte von 80% und mehr gegenüber Handauszählungen von Lunkern nachgewiesen. Die verwendeten Techniken sind ein spezieller Markierungsrahmen, eine hochauflösende Digitalkamera und spezielle Bildanalyseprozeduren. Letztere leisten die notwendigen Vorverarbeitungsfunktionen, wie geometrische Entzerrung, Kalibrierung sowie einen Helligkeitsausgleich, und nehmen die durchzuführenden Bewertungen vor. Das sind Porengrößen- und verteilungsanalyse sowie Farbvergleiche mit definierten Normalen zur Beurteilung von Farbhomogenitäten über den zu analysierenden Sichtbetonflächen. Die Ergebnisprotokollierung erfolgt sowohl bildlich als auch datentechnisch, letzteres z. B. in einem Excelfile. Die Durchgängigkeit des Verfahrens wird an einer Reihe von in Sichtbetonbauweise ausgeführten Bauten veranschaulicht, z. B. dem Bundeskanzleramt und dem Hörsaalzentrum der TU-Dresden. Wesentliche Einflussparameter wie Beleuchtungsgeometrie oder Helligkeitsschwellen werden diskutiert und Vergleiche zu durchgeführten Handmessungen gezogen. Der vorgestellte Ansatz ist in weiterer Forschung anwendungsorientiert aufzubereiten, vergleichende Untersuchungen zu durch Experten durchgeführten Messungen sind zu Validierungszwecken vorzunehmen. Der Ansatz kann einen Beitrag zu Normungsfragen liefern. Seine Nutzbarkeit ist auch für spezielle Bereiche der Entwicklung von Betonmischtechnologien oder in der Fertigelementefertigung gegeben. Im Beitrag sind die relevanten Verfahrensschritte bildlich und in tabellarischer Form untersetzt.
The problem F|n=2|F is to minimize the given objective function F(C1,m, C2,m) of completion times Ci,m of two jobs i Î J={1, 2} processed on m machines M={1, 2, …, m}. Both jobs have the same technological route through m machines. Processing time ti,k of job iÎ J on machine kÎ M is known. Operation preemptions are not allowed. Let R2m be space of non-negative 2m-dimensional real vectors t=(t1,1,…, t1,m, t2,1,…, t2,m) with Chebyshev’s distance d(t, t*). To solve problem F|n=2|F, we can use the geometric algorithm, which includes the following steps: 1) construct digraph (V, A) for problem F|n=2|F and find so-called border vertices in (V, A); 2) construct the set of trajectories corresponding to the shortest paths Rt in digraph (V, A) from the origin vertex to each of the border vertices; 3) find an optimal path in the set Rt that represents a schedule with minimal value of the objective function F. Let path tu Î Rt be optimal for the problem F|n=2|F with operation processing times defined by vector t. If for any small positive real number e > 0 there exists vector t*Î R2m such that d(t, t*) = e and path tu is not optimal for the problem F|n=2|F with operation processing times defined by vector t*, then optimality of path tu is not stable. The main result of the paper is the proof of necessary and sufficient conditions for optimality stability of path tu. If objective function F is continuous non-decreasing (e.g., makespan, total completion time, maximal lateness or total tardiness), then to test whether optimality of the path tu Î Rt is stable takes O(m log m) time.
Collaborative Design Processes: A Class on Concurrent Collaboration in Multidisciplinary Design
(2004)
The rise of concurrent engineering in construction demands early team formation and constant communication throughout the project life cycle, but educational models in architecture, engineering and construction have been slow to adjust to this shift in project organization. Most students in these fields spend the majority of their college years working on individual projects that do not build teamwork or communication skills. Collaborative Design Processes (CDP) is a capstone design course where students from the University of Illinois at Urbana-Champaign and the University of Florida learn methods of collaborative design enhanced by the use of information technology. Students work in multidisciplinary teams to collaborate from remote locations via the Internet on the design of a facility. An innovation of this course compared to previous efforts is that students also develop process designs for the integration of technology into the work of multidisciplinary design teams. The course thus combines both active and reflective learning about collaborative design and methods. The course is designed to provide students the experience, tools, and methods needed to improve design processes and better integrate the use of technology into AEC industry work practices. This paper describes the goals, outcomes and significance of this new, interdisciplinary course for distributed AEC education. Differences from existing efforts and lessons learned to promote collaborative practices are discussed. Principal conclusions are that the course presents effective pedagogy to promote collaborative design methods, but faces challenges in both technology and in traditional intra-disciplinary training of students.
This paper is concerned with the numerical treatment of quasilinear elliptic partial differential equations. In order to solve the given equation we propose to use a Galerkin approach, but, in contrast to conventional finite element discretizations, we work with trial spaces that, not only exhibit the usual approximation and good localization properties, but, in addition, lead to expansions of any element in the underlying Hilbert spaces in terms in multiscale or wavelet bases with certain stability properties. Specifically, we select as trial spaces a nested sequence of spaces from an appropriate biorthogonal multiscale analysis. This gives rise to a nonlinear discretized system. To overcome the problems of nonlinearity, we make use of the machinery of interpolating wavelets to obtain knot oriented quadrature rules. Finally, Newton's method is applied to approximate the solution in the given ansatz space. The results of some numerical experiments with different biorthogonal systems, confirming the applicability of our scheme, are presented.
To fulfil safety requirements the changes in the static and/or dynamic behaviour of the structure must be analysed with great care. These changes are often caused by local reduction of the stiffness of the structure caused by the irregularities in the structure, as for example cracks. In simple structures such analysis can be performed directly, by solving equations of motion, but for more complex structures a different approach, usually numerical, must be applied. The problem of crack implementation into the structure behaviour has been studied by many authors who have usually modelled the crack as a massless rotational spring of suitable stiffness placed at the beam at the location where the crack occurs. Recently, the numerical procedure for the computation of the stiffness matrix for a beam element with a single transverse crack has been replaced with the element stiffness matrix written in fully symbolic form. A detailed comparison of the results obtained by using 200 2D finite elements with those obtained with a single cracked beam element has confirmed the usefulness of such element.
Nach dem Tariftreuegesetz soll jedes Bauunternehmen, welches sich um einen öffentlichen Auftrag bewirbt, eine Tariftreueerklärung abgeben, in der sich dieser Betrieb verpflichtet, den Lohn des Bautarifvertrages zu bezahlen, in dessen Bundesland sich die Baustelle befindet. Die Zielsetzung des Gesetzes, nämlich die Ordnungsfunktion der Tarifverträge bei Bauleistungen zu stärken sowie arbeits- und sozialpolitisch unerwünschte Fehlentwicklungen zu bekämpfen bzw. zu vermeiden, kann nach Auffassung des Autors mit dem geplanten Gesetz nicht erreicht werden.
Die Situation in der Immobilienwirtschaft hat sich in den letzten Jahren grundlegend verändert. Die Neubauaktivitäten in ganz Deutschland sind deutlich zurückgegangen. Das Bauen im Bestand mit den Tätigkeitsfeldern der Renovierung, Modernisierung und Instandsetzung rückt daher in den Mittelpunkt der Aktivitäten. Laut Bundesarbeitskreis Altbauerneuerungen werden im nächsten Jahr 74 Prozent des gesamten Bauvolumens auf die Modernisierung von alten Häusern entfallen, der Anteil der Neubaumaßnahmen geht auf 26 Prozent zurück. Dies gilt nicht nur für Wohn-, sondern auch für Gewerbeimmobilien. Die anhaltende Rezession und die Entzauberung der New Economy ziehen in diesem Bereich Leerstände und fallende Mieten nach sich. Auch die Wohnungswirtschaft hat vor allem in den neuen Ländern mit Leerständen zu kämpfen. Diese Tatsache zwingt Immobilienbetreiber zunehmend dazu, Methoden zu ergreifen und Werkzeuge einzusetzen, die die Effizienz im eigenen Unternehmen steigern. Die Aufgabenstellung lautet: Mehr Sanierungsprojekte in der selben Zeit abwickeln. Dies setzt eine prozessorientierte Vorgehensweise und unterstützende Werkzeuge voraus. Mit dem baucommunicator wurde ein Werkzeug entwickelt, dass es dem Gebäudemanager ermöglicht, bei der Abwicklung von Bau- und Sanierungsmaßnahmen im Aufgabenfeld der Koordination dieser Aufgabenstellung zu entsprechen. Die Kernfunktionen der Software sind das Termin-, Kosten und Qualitätsmanagement bei der Abwicklung von Bauprozessen. Die unternehmensübergreifende Konzeption erlaubt sowohl dem Auftraggeber, wie auch den ausführenden Betrieben den Zugriff auf die zentral abgelegten Projektinformationen. Die Workflow-Funktionalität des baucommunicator führt zu einer Reduktion der Prozessaktivitäten. Dadurch werden Kosten eingespart und die Ausführungsqualität gesteigert.
Möglichkeiten der Projektrealisierung: Einzelvergabe der Planungs- und Bauaufgaben, Vergabe aller Planungs- und Bauaufgaben an einen Generalunternehmer. Die frühzeitige Einbindung eines erfahrenen und fachkundigen Generalunternehmers gibt dem Auftraggeber die Möglichkeit, bei minimiertem Risiko zu einer wirtschaftlich und bautechnisch optimalen Lösung seiner Bauaufgabe zu kommen.
Erfahrungen belegen, dass gemäß des Grundsatzes – „Arbeitssicherheit ist Chefsache!“ – Baustellensicherheit ohne den Bauherren nicht zu machen ist und die im „Bauherren-Unternehmen“ praktizierte Sicherheitskultur (identisch mit dem Sachverhalt, Sicherheit zu wollen!) maßgebliche Voraussetzung für ein erfolgreiches Sicherheitsenga-gement des Bauherren ist. Dieses Engagement beginnt bei der Kontraktorenauswahl, setzt sich über eine Sicherheitsleistungen berücksichtigende Gestaltung von Verträgen mit dem HAN und den NAN fort und umfasst darüber hinaus die gesamte Palette konzeptioneller und operativer Führungsaufgaben, die zu bearbeiten sind, um auf der Baustelle Gefährdungen für Leben und Gesundheit sowie sonstige Schadenereignisse zu vermeiden. Der Einsatz eines fachkompetenten und mit den notwendigen Befugnissen ausgestatteten „Si-Ge-Ko“ ist ein weiterer ganz wichtiger Erfolgsgarant für effiziente Sicherheitsarbeit, während für den nach BaustellV gleichfalls erforderlichen Si-Ge-Plan eine adäquate Bewertung nicht bestätigt werden kann.
Für den Entwurf von Ingenieurbauten ist eine zuverlässige Prognose über den Spannungsverlauf im Bauwerk und auf dessen Rand von großer Bedeutung. Eine geschlossene Lösung der elastischen Bestimmungsgleichungen des Bauwerks ist in der Regel nicht verfügbar. Es wird daher unter Verwendung der Methode der gewichteten Reste eine schwache Form der Gleichungen abgeleitet, die zu einem gemischten Arbeitsprinzip führt. Das zugehörige Finite-Elemente-Modell erlaubt es Spannungen am Rand des Bauwerks zu ermitteln, die im Gleichgewicht zu den angreifenden Lasten stehen.
Vor dem Hintergrund einer sich verschärfenden Umweltgesetzgebung sowie der Erkenntnis, dass Bauabfälle sich grundsätzlich für eine Stoffkreislaufführung eignen, hat der Rückbau von Bauwerken in den letzten Jahren verstärkt an Bedeutung gewonnen. Aufgrund oftmals strenger Zeit- und Kostenvorgaben für einen Rückbau, begrenzter Verfügbarkeit von Personal und Betriebsmitteln, einer weitgehenden Unikatfertigung sowie wechselnder Standorte kommt dabei der projektorientierten Planung von Maßnahmen auf der Baustelle große Bedeutung zu. Im Rahmen des Beitrages werden Ansätze zur Modellierung und Lösung der sich hieraus ergebenden Probleme zur Planung und Optimierung von (Rück-) Bauabläufen unter Verwendung von Projektplanungsmodellen und -methoden vorgestellt. Hierbei werden neben betriebswirtschaftlichen auch umweltrelevante sowie technische Fragestellungen im Zusammenhang mit der Planung von Rückbauprojekten aufgegriffen. Eine Anwendung der Planungsansätze auf reale Gebäude zeigt, dass sich durch Kombination von Gebäuderückbau und Aufbereitungstechnik eine Qualitätsverbesserung von Recyclingbaustoffen erzielen lässt. Zur Umsetzung der hierzu erforderlichen Maßnahmen werden unter Berücksichtigung individueller abfallwirtschaftlicher Rahmenbedingungen der jeweiligen Planungsregion, gebäude- und baustellenbezogener Besonderheiten, technischer sowie kapazitiver Restriktionen Ablaufpläne für den Gebäuderückbau berechnet. Die für unterschiedliche Planungsregionen vorgenommenen Modellrechnungen weisen nach, dass sich die Demontage von Gebäuden gegenüber einem konventionellen Gebäudeabbruch unter bestimmten Rahmenbedingungen bereits wirtschaftlich vorteilhaft realisieren lässt. Abgerundet wird der Beitrag durch einen Ausblick auf Möglichkeiten einer Realisierung komplexer Bauabläufe auch unter strengen Zeitvorgaben sowie bei begrenzten Platzverhältnissen mit Hilfe fertigungssynchroner Ressourceneinsatzplanung sowie auf die Berücksichtigung von Unsicherheiten in der Planung und Ausführung von Rückbauprojekten.
Zur Berechnung der Böeneinwirkungen auf ein Brückenbauwerk wird ein stochastisches Modell vorgestellt. Die Windkraft aus der Böenbelastung wird dabei als systemunabhängige Luftkraft betrachtet welche in mathematischer Hinsicht dadurch gekennzeichnet ist, daß die aeroelastischen Bewegungsdifferentialgleichungen inhomogener Natur sind und der Bewegungsablauf den Charakter einer erzwungenen abklingenden Schwingung hat. Ausgehend von den nicht linearen partiellen Differentialgleichungen für Verschiebung und Torsion wird mittels der Galerkin Prozedur ein System von totalen Differentialgleichungen abgeleitet. Die äußeren Luftkräfte werden als gefilterter Poissonprozess von Dirac Impulsen dargestellt. Zur Berechnung der statistischen Momente des Differentialgleichungssystem wird die Itô'sche Differentialformel erweitert und in ein System von algebraischen nicht linearen Gleichungen transformiert. Diese dienen zur Berechnung des Momentenverlaufs für den stationären Anteil des stochastischen Prozesses. Der Abschluß des so erhaltenen nicht linearen Gleichungssystems erfolgt über die Methode der Kumulantenabschlußtechnik.
Die Kooperation zwischen Menschen und Computern gewinnt in zahlreichen Problemstellungen mehr und mehr an Bedeutung. Ein wesentlicher Grund hierfür ist die ständig wachsende Komplexität relevanter Problemstellungen. Dadurch bedingt sind weder der Mensch noch der Computer alleine in der Lage, zufriedenstellende Lösungen zu entwickeln. Die Kombination der individuellen Fähigkeiten hat sich in vielen Bereichen als gewinnbringend erwiesen. Genetische Algorithmen (GA) als Repräsentanten der >Evolutionary Computation< stellen einen Ansatz zur Lösung hochkomplexer Optimierungsaufgaben dar, der sich an den Vorgängen der Evolution orientiert. Im Gegensatz zu vielen anderen Optimierungsverfahren bringen sie einige Eigenarten mit, die kooperative Erweiterungen einfach und erfolg-versprechend machen. Der vorgestellte kommunizierende Genetische Algorithmus kombiniert die Vorteile der GA mit der Fähigkeit zur Kooperation. Es gelingt bei seiner Verwendung, gute externe Vorschläge aufzunehmen, während schlechte Vorschläge keinerlei negative Auswirkungen zeigen. Diese Robustheit gegen Irrtümer und Fehleingaben macht den KGA zu einer idealen Basis für Programme zur kooperativen Problemlösung.
Today´s procedures for the awarding of public construction performance contracts are mainly paper-based. Although the usage of electronic means is permitted in the VOB, the regulations are not sufficient yet. Especially software agents within the AEC-bidding process were not considered at all. The acceptance of an agent-based virtual marketplace for AEC-bidding depends on a reliable and trustworthy public key infrastructure according to the (German) digital signature act. Only if confidentiality, integrity, non-repudiation, and authentication are provided reliably, users will assign sensitive business processes like public tendering procedures to software agents. The development of a secure agent-based virtual marketplace for AEC-bidding according to legal regulations is an entirely new approach from a technical as well as from a legal point of view. The objective of this research project is the development of intelligent software-agents which are able to legally call for bids, to calculate proposals, and to award the successful bidder.
This paper is a report of Radio Frequency Identification (RFID) technology and its potential applications in the commercial construction industry. RFID technology offers wireless communication between RFID tags and readers with non line-of-sight readability. These fundamental properties eliminate manual data entry and introduce the potential for automated processes to increase project productivity, construction safety, and project cost efficiency. Construction contractors, owners, and material suppliers that believe technology can further develop methods and processes in construction should feel obligated to participate in RFID studies for the advancement of the construction industry as a whole.
Anlass zum Abriss der Brücke; Das abzubrechende Bauwerk; Vorgaben für den Abbruch (gemäß der Ausschreibung, aus statischer Sicht, aus Arbeitsschutzgründen); Abbruch der Aufbauten und der Fahrbahnplatte (Abbruch der Aufbauten, Problem Festpunkt Bogenscheitel – Fahrbahn, Abbruch Plattenbalken und Pfeilerscheiben); Abbruch der Bögen (Abbruchgerüst, Scheitelöffnung, Bogenrückbau, Kontrollsystem). Noch nie zuvor war in Deutschland eine Bogenbrücke auf diese Art und Weise abgebrochen worden. Maßgeblich für das Gelingen des schwierigen Rückbaus der Teufelstalbrücke war das Verantwortungsbewusstsein der Beteiligten im Zusammenhang mit der notwendigen Risikobereitschaft, aber auch mit der Vermeidung unnötiger Restrisiken schon von vornherein. Zur Risikominimierung trugen die gute Organisation des Vorhabens, regelmäßige gemeinsame Baustellenbegehungen mit Vertretern der für Sicherheit zuständigen Institutionen (Amt für Arbeitsschutz Gera, Bau-Berufsgenossenschaft, Sicher-heits- und Gesundheitsschutzkoordinator) sowie die technische Ausstattung bei. All dies führte letztendlich zum Erfolg einer Maßnahme, bei der man den bisherigen Erfahrungsbereich verlassen musste.
Ein Algorithmus zur Lösung von Tourenproblemen mit Zeitrestriktionen und inhomogenem Fahrzeugpark
(2003)
Es wird ein Algorithmus vorgestellt, der auf Tourenprobleme mit verschiedenen Restriktionen anwendbar ist. Zum einen können sowohl die Aufträge der Kunden als auch die Fahrzeuge mit Zeitrestriktionen in Form eines oder mehrerer Zeitfenster versehen sein. Zum anderen stehen auszuliefernde Waren nur in gewissen zeitabhängigen Stückzahlen zur Verfügung. Die vorhandenen Fahrzeuge besitzen hinsichtlich Kapazität und Geschwindigkeit unterschiedliche Eigenschaften, wobei von den Kunden gewisse Fahrzeugtypen ausgeschlossen werden können. Die Aufträge werden zunächst hinsichtlich örtlichem und zeitlichem Abstand in Cluster unterteilt. Den Clustern werden auf der Basis von Bewertungen Fahrzeuge zugeordnet, mit denen Touren innerhalb der Cluster erzeugt werden. Das Aufstellen der Touren erfolgt mittels eines Savingsverfahrens, bei dem das Saving aus einer örtlichen und einer zeitlichen Komponente besteht. Der Algorithmus läßt sich über eine Vielzahl an Parametern steuern.
This paper describes an approach to support co-operation of experts in heterogeneous geotechnical engineering project environments during both regular execution and handling of exceptional situations. A co-operation platform is introduced which is based on a generalized information model mapping key information about the construction project, the construction process as well as the organization structure. Several tools are provided to operate the information model in a network based environment.
Im vorliegenden Beitrag wird ein in das FE-Programmsystem ANSYS implementiertes elastoplastisches Berechnungsmodell zur nichtlinearen, räumlichen Untersuchung von Mauerwerkstrukturen vorgestellt. Die Modellierung des heterogenen Baustoffs Mauerwerk erfolgt mit Hilfe eines verschmierten Ersatzkontinuums. Das anisotrope Materialverhalten wird sowohl hinsichtlich der Spannungs-Dehnungsbeziehung als auch bei der Beschreibung der Festigkeit berücksichtigt. Durch die Verwendung einer zusammengesetzten Fließbedingung ist es möglich, das Versagen der einzelnen Mauerwerkkomponenten Stein und Mörtelfugen und des Verbundes zu berücksichtigen. Dadurch ist die Anwendbarkeit des Modells für mehrere Mauerwerksarten gegeben. Die hierfür verwendeten Materialparameter sind aus einfachen Kleinkörperversuchen bestimmbar oder innerhalb gewisser Grenzen aus empirischen Formeln berechenbar. Die notwendige Beschränkung der Anzahl der Materialparameter sichert die praktische Anwendbarkeit des entwickelten Berechnungsmodells. Die numerische Umsetzung des hier verwendeten impliziten Berechnungsverfahrens lässt sich in eine lokale und eine globale Iterationsebene gliedern. Die lokale Iteration am Integrationspunkt dient der Spannungsrückführung. Dabei sind die Besonderheiten der Verarbeitung mehrflächiger Fließfiguren zu beachten. Die globale Iteration auf Systemebene sichert die Umlagerung des Residuums. Mit der Nachrechnung von Versuchsergebnissen soll das entwickelte Modell verifiziert und seine physikalische Leistungsfähigkeit eingeschätzt werden.
The contribution describes the didactical integration of wireless access networks for the campus of the University of Karlsruhe in the education of architects and engineers. It focuses on the development of an interdisciplinary communication network to encourage and promote the communication and collaboration between students. The project assumes that significant learning progresses in net-based learning scenarios are based upon the synchronous and asynchronous cooperation between the students themselves. The remote cooperation across borders of disciplines makes high demands on capacity in communicating and cooperating of the involved persons as well as on the supporting tools. Therefore, the collective acquisition of knowledge and cooperation has to be trained intensively during the studies. Based on the design and project oriented cooperation platform netzentwurf.de the authors developed the tools “Jobadmin“ to administrate multidisciplinary workgroups, the “Swarm Knowledge Catalogue“ to collect and store knowledge and “LivingCampus“, an instrument providing basic services for dynamic communication.
>Virtual Organizations<, >Virtual Enterprises< und >Smart Organizations< werden immer häufiger als zukünftige Geschäftsform für des Bauwesens und insbesondere der Bauplanung gesehen. Ziel dieser Organisationsformen ist es, eine temporäre geschäftliche Zusammenarbeit zur Erschließung neuer Geschäftsfelder aufzubauen, ausgehend von einer strategischen Geschäftsverbindung. Insbesondere für kleine Planungsbüros können sich hieraus Möglichkeiten zur Durchführung größerer Projekte eröffnen, indem notwendige Ressourcen, wie z.B. Fachingenieure, jeder Zeit flexibel integriert werden können. Neben dem Auftreten als Projektmanager besteht für die Planungsbüros auch die Möglichkeit Spezialwissen sowie nicht benötigte Ressourcen in andere Projekte zu integrieren. Ziel ist es dabei, eine kontinuierliche Auslastung der Mitarbeiter sicherzustellen. Durch die Nutzung einer geeigneten und allgemein zugänglichen IT-Infrastruktur über das Internet können neue Partner ohne großen Aufwand in ein Projekt aufgenommen werden indem diesen Zugriffe auf alle notwendigen Projektinformationen gegeben wird. Mit der Bereitstellung passender IT-Werkzeuge für das Projektmanagement, Datenmanagement und Vertragsmanagement wird eine effektive Projektbearbeitung gewährleistet. In diesem Beitrag werden die konzeptionellen Grundlagen virtueller Organisation genauer betrachtet und deren Anwendbarkeit auf virtuelle Planungsteams im Bauwesen untersucht. Anschließend wird, aufbauend auf diese Erkenntnisse, der Aufbau und die Komponenten einer Softwareumgebung zur Unterstützung des virtuellen Planungsteams erörtert. Zum Schluss erfolgt eine Darstellung des durch das BmBF geförderte Projekt iCSS.
Anwendungen der Methoden des Operations Research in der Praxis des Projektmanagements sind so gut wie kaum zu finden. Diese Anwendungslücke ist umso erstaunlicher, als es eine große Zahl von theoretischen Veröffentlichungen zum Themenkreis >Operations Research und Projektmanagement< gibt . Der Beitrag arbeitet die verschiedenen Ursachen für die bislang geringe praktische Relevanz der Disziplin >Operations Research< heraus und macht Vorschläge, wie in Zukunft anwendungsfreundlichere Modelle entwickelt werden können.
Information and Communication Technologies (ITC) in education have been extensively discussed nowadays. In this e-learning scenario, the construction and use of environments that support teaching and learning is a reality. Therefore, for time and general resource savings it is crucial the access to hypermedia contents with great interactivity and with high reusability. Substantial efforts have been centered in the search for a metadata proposal (metadata is a generic term used to describe data that can be used to identify and to describe common characteristics among different documents) that can be standardized and is system independent for the so called learning objects.
Recent research shows that current learning strategies in construction industry have not been effective in implementing lean principles in construction. With that in mind the researchers set to investigate an alternative learning strategy in order to promote learning at the international level. A web-based environment, was developed for this project with the intent of promoting learning and knowledge exchange on the theory and practice of "process transparency" across different countries.
Business and engineering knowledge in AEC/FM is captured mainly implicitly in project and corporate document repositories. Even with the increasing integration of model-based systems with project information spaces, a large percentage of the information exchange will further on rely on isolated and rather poorly structured text documents. In this paper we propose an approach enabling the use of product model data as a primary source of engineering knowledge to support information externalisation from relevant construction documents, to provide for domain-specific information retrieval, and to help in re-organising and re-contextualising documents in accordance to the user’s discipline-specific tasks and information needs. Suggested is a retrieval and mining framework combining methods for analysing text documents, filtering product models and reasoning on Bayesian networks to explicitly represent the content of text repositories in personalisable semantic content networks. We describe the proposed basic network that can be realised on short-term using minimal product model information as well as various extensions towards a full-fledged added value integration of document-based and model-based information.
Das studentische Projekt Umweltorientiertes Projektmanagement (UWoPM) eröffnet eine neue Generation von Arbeitsweisen im Projektmanagement. Umweltbelange wirken über Rechtsvorschriften immer stärker in das Projektgeschäft hinein. Durch Einbeziehung von rechtsrelevanten Daten in die Projektdatenbasis sowie von Rechtsbestimmungen in die Wissensbasis wird eine Softwareunterstützung für (wenn auch zunächst nur elementare) Rechtsfragen geboten. Eine spezielle Präsentation von Rechtswissen und eine komfortable Unterstützung der Antragstellung sollen dies in die Selbstverständlichkeiten des Projektmanagements einbringen. Gleichzeitig bietet der UWoPM-Prototyp zeitgemäße Systemlösungen für die Kommunikation Antragsteller - Behörde sowie für den Workflow innerhalb der Genehmigungsbehörde. Dieser Vortrag gibt Einführung und Übersicht zu insgesamt 18 Diplomarbeiten, in denen die Einzelkomponenten des UWoPM entwickelt wurden. Zentrales Problem war die Überführung gesetzlicher Vorschriften in Wissensbasen. Durch Beschränkung auf >Kernbestimmungen< und Ausweis von Interpretationsbedarf wurde ein prinzipieller Lösungsweg realisiert. Die technische Realisierung konnte zwar über einen Prototyp noch nicht hinausgehen, weist aber die Realisierbarkeit des Gesamtansatzes nach.
The general motivation of this research is to develop software to support the handling of the increased complexity of architectural design. In this paper we describe a system providing general support during the whole process. Instead of only developing design tools we are also addressing the problem of the operating environment of these tools. We conclude that design tools have to be integrated in an open, modular, distributed, user friendly and efficient environment. Two major fields have to be addressed - the development of design tools and the realisation of an integrated system as their operation environment. We will briefly focus on the latter by discussing known technologies in the field of information technology and other design disciplines that can be used to realise such an environment. Regarding the first subject we have to state the need of a detailed tool specification. As a solution we suggest a strategy where the tool functions are specified on the basis of a transformation, where a hierarchical process model is mapped into specifications of different design tools realising appropriate support for all sub-processes of architectural design. Using this strategy the main steps to develop such a support system are: implementation of a framework as basis for the integrated design system decision whether the tool specification are already implemented in available tools in this case these tools can be integrated using known methods for tool coupling otherwise new design tools have to be developed according to the framework
This paper describes a didactic application that is part of a research project whose main aim is to develop a computer-aided system which will assist design and construction processes. It is based on the visual simulation of construction activities. Geometric modeling and virtual reality techniques are used in the visualization of the design process and to define user-friendly interfaces in order to access construction information, which could prove useful to Civil Engineering professionals. As a first step, was developed a prototype that serves as a didactic tool for Civil Engineering students of disciplines concerned with building construction. The construction of a double brick wall is the case studied. The wall is defined as a three dimensional model formed with the several components needed to edify it. Using the wall's virtual model it is possible to show, in an interactive way, the sequence of the construction process and observe from any point of view the configurations in detail of the building components. This is then a didactic tool application in construction processes domain of great interest to Civil Engineering students.
The construction of a new building interferes with the existent environment. A careful aesthetic study must be made at an early stage in the design and the visualization of a three-dimensional (3D) model of the structure is the best way to analyse it. As some structures presents a complex shape is difficult to execute a 3D model as well as the specific drawings. Using traditional graphical systems, the execution of deck specific drawings is extremely time consuming and the 3D deck model gives an approximation only of the exterior shape of the deck. The modelling scheme proposed here allows the automation of the geometric design phases related to the deck bridge element using as a means of integration a geometric database representative of the real deck shape. This concept was implemented in a computer program. This application is an important support in the process design namely at the conceptual and graphical stages. The computer application provides an important tool to the bridge designer particularly at the conceptual stage, as it allows aesthetic and structural evaluation of the bridge at an early stage in the design. The geometric modelling process and graphical results of a case study are presented.