Refine
Document Type
- Conference Proceeding (123)
- Article (66)
- Doctoral Thesis (25)
- Master's Thesis (5)
- Diploma Thesis (1)
Institute
- Professur Informatik im Bauwesen (177)
- Professur Baubetrieb und Bauverfahren (10)
- Professur Grundbau (4)
- Professur Holz- und Mauerwerksbau (4)
- Professur Allgemeine Baustoffkunde (2)
- Professur Entwerfen und Architekturtheorie (2)
- Professur Informatik in der Architektur (2)
- Professur Massivbau I (2)
- Institut für Strukturmechanik (ISM) (1)
- Junior-Professur Computational Architecture (1)
Keywords
- Verteiltes System (37)
- Bautechnik (30)
- Bauwerk (27)
- Produktmodell (25)
- Simulation (23)
- Architektur (21)
- Modellierung (21)
- Mehragentensystem (19)
- Ingenieurbau (17)
- Planungsprozess (17)
Year of publication
- 2004 (220) (remove)
This paper presents an application of dynamic decision making under uncertainty in planning and estimating underground construction. The application of the proposed methodology is illustrated by its application to an actual tunneling project—The Hanging Lake Tunnel Project in Colorado, USA. To encompass the typical risks in underground construction, tunneling decisions are structured as a risk-sensitive Markov decision process that reflects the decision process faced by a contractor in each tunneling round. This decision process consists of five basic components: (1) decision stages (locations), (2) system states (ground classes and tunneling methods), (3) alternatives (tunneling methods), (4) ground class transition probabilities, and (5) tunneling cost structure. The paper also presents concepts related to risk preference that are necessary to model the contractor’s risk attitude, including the lottery concept, utility theory, and the delta property. The optimality equation is formulated, the model components are defined, and the model is solved by stochastic dynamic programming. The main results are the optimal construction plans and risk-adjusted project costs, both of which reflect the dynamics of subsurface construction, the uncertainty about geologic variability as a function of available information, and the contractor’s risk preference.
Recently, many reseraches on active control systems of building structures are preformed based on modern control theory and are installed real buildings. The authors have already proposed intelligent fuzzy optimal active control (IFOAC) systems. IFOAC systems imitate intelligent activities of human brains such as prediction, adaptation, decision-kaking and so on. In IFOAC systems, objective and subjective judgements on the active control can be taken into account. However, IFOAC systems are considered to be suitable for far-field erathquake and control effect becomes small in case of near-field earthqaukes which include a few velosity pules with large amplitudes. To improve control effect in case of near-souece earthquakes, the authors have also proposed hybrid control (HC) systems, in which IFOAC systems and fuzzy control system are combined. In HC systems, the fuzzy control systems are introduced as a reflective fuzzy active control (RFAC) system and imitates spinal reflection of human. In HC systems, active control forces are activated to buildings in accordance with switching rules on active control forces. In this paper, optimizations on fuzzy control rules in RFAC system and switching rules of active control forces in HC system are performed by Parameter-Free Genetic Algorithms (PfGAs). Here, the optimization is performed by using different earthquake inputs. The results of digital simulations show that the HC system can reduce maximal response displacements under restrictions on strokes of the actuator effectively in case of a near-source earthquake and the effectiveness of the proposed HC system is discussed and clarified.
The processes in the life cycle of buildings are characterised by highly distinct teamwork. The integration of all the distributed working participants, by providing an environment, which especially supports the communication and collaboration between the actors, is a fundamental step to improve the efficiency of the involved processes and to reduce the total costs. In this article, a link based modelling approach and its “intelligent” link management is introduced (1). This approach realises an integration environment based on a special building model that acts as a decision support system. The link-based modelling is characterised by the definition and specialisation of links between partial models. These intelligent managed links enable a very flexible and task specific data access and exchange between all the different views and partial models of the participants.
In this research project we intend to transfer the whole AEC-Bidding process to an agent-based virtual marketplace. Hereby, the existing legal regulations have to be considered. Important aspects in developing the virtual marketplace are to provide the possibility to realize an agentbased bidding consortium as well as to integrate subcontractors.
Integrated structural engineering system usually consists of large number of design objects that may be distributed across different platforms. These design objects need to communicate data and information among each other. For efficient communication among design objects a common communication protocol need to be defined. This paper presents the elements of a communication protocol that uses a mediator agent to facilitate communication among design objects. This protocol is termed the Mediative Communication Protocol (MCP). The protocol uses certain design communication performatives and the semantics of an Agent Communication language (ACL) mainly the Knowledge and Query Manipulation Language (KQML) to implement its steps. Details of a Mediator Agent, that will facilitate the communication among design objects, is presented. The Unified Modeling Language (UML) is used to present the Meditative protocol and show how the mediator agent can be use to execute the steps of the meditative communication protocol. An example from structural engineering application is presented to demonstrate and validate the protocol. It is concluded that the meditative protocol is a viable protocol to facilitate object-to-object communication and also has potential to facilitate communication among the different project participants at the higher level of integrated structural engineering systems.
This paper presents results of a study on distributed, or parallel, evolutionary computation in the topological design of steel structural systems in tall buildings. It describes results of extensive experimental research on various parallel evolutionary architectures applied to a complex structural design problem. The experiments were conducted using Inventor 2003, a networkbased evolutionary design support tool developed at George Mason University. First, a general introduction to evolutionary computation is provided with an emphasis on recent developments in parallel evolutionary architectures. Next, a discussion of conceptual design of steel structural systems in tall buildings is presented. Further, Inventor 2003 is briefly introduced as well as its design representation and evolutionary computation characteristics. Next, the results obtained from systematic design experiments conducted with Inventor 2003 are discussed. The objective of these experiments was to qualitatively and quantitatively investigate evolution of steel structural systems in tall buildings during a distributed evolutionary design process as well as to compare efficiency and effectiveness of various parallel evolutionary architectures with the traditional evolutionary design approaches. Two connectivity topologies (ring topology and fully-connected topology) have been investigated for four populations of structural designs evolving in parallel and using various migration strategies. Also, results of the initial sensitivity studies are reported in which two ways of initializing distributed evolutionary design processes were investigated, using either arbitrarily selected designs as initial parents or randomly generated ones. Finally, initial research conclusions are presented.
Change management has been the focus of different IT systems. These IT systems were developed to represent design information, record design rationale, facilitate design coordination and changes. They are largely based on managing reactive changes, particularly design changes, in which changes are recorded and then propagated to the relevant project members. However, proactive changes are hardly dealt with in IT systems. Proactive changes require estimating the likelihood of occurrence of a change event as well as estimating the degree of change impacts on project parameters. Changes in construction projects often result from the uncertainty associated with the imprecise and vague knowledge of much project information at the early stages of projects. This is a major outcome of the case studies carried out as part of this research. Therefore, the proposed model considers that incomplete knowledge and certain project characteristics are always behind change causes. For proactive changes, predicting a change event is the main task for modelling. The prediction model should strive to integrate these main elements: 1) project characteristics that lead to change 2) causes of change, 3) the likelihood of change occurrence, and 4) the change consequences. It should also define the dependency relationships between these elements. However, limited data (documented) are only available from previous projects for change cases and many of the above elements can only be expressed in linguistic terms. This means that the model will simulate the uncertainty and subjectivity associated with these sets of elements. Therefore, a fuzzy model is proposed in this research to capture these elements. The model analyses the impact of each set of elements on the other by assigning fuzzy values for these elements that express the uncertainty and subjectivity of their impact. The main aim is to predict change events and evaluate change effects on project parameters. The fuzzy model described above was developed in an IT system for operational purposes and was designed as a Java package of components with their supporting classes, beans, and files. This paper describes the development and the architecture of the proposed IT system to achieve these requirements. The system is intended to help project teams in dealing with change causes and then the change consequences in construction projects.
Many construction and facilities management Web sites can be found on the Internet. The interested parties on construction and facilities management Web sites can find databases of best practices, calculators, analyzers, software, expert and decision support systems, neural networks, etc. Technological innovation mainly through changes in the availability of information and communication technology inclusive databases of best practices, calculators, analyzers, software, neural networks, decision support and expert systems that have been provided by a variety of new services developed by the construction and facilities management sectors. Most of all calculators, analyzers, software, decision support and expert systems, neural networks and on-line systems seek to find out how to make the most economic decisions and most of all these decisions are intended only for economic objectives. Alternatives under evaluation have to be evaluated not only from the economic position, but take into consideration qualitative, technical, technological and other characteristics as well. Based on the analysis of the existing calculators, analyzers, information, expert and decision support systems, neural networks and in order to determine most efficient versions of best practices a Decision Support Web-Based System for Construction Innovation (IDSS) was developed by Vilnius Gediminas Technical University.
This paper presents an agent-based software, Virtual Administrator System (VAS) for the smallscale maintenance of school buildings. VAS is capable of handling a heavy load of routine, lowtech maintenance jobs. It assigns a different priority to each job application according to its significance and urgency, and automatically adjusts schedules for maintenance engineers when on-site supervision is needed. The system can help ease off the burden of routine small-scale maintenance work, making it more cost-effective and efficient in the overall management of school building maintenance. VAS posts jobs on the Web in a multi-media format and classified all applications into four categories: the on-call maintenance contract, the term maintenance contract, the guaranty maintenance contract, and the regular maintenance contract. It then estimates their urgency level and passes the information to maintenance engineers who will decide whether on-site inspection is needed. Based on the engineers’ feedback, VAS automatically implements the scheduling for inspection as well as sends out real-time or batch notifications to contractors. All these activities are recorded in a database to allow continuous research and data mining and the analysis and diagnosis of specific jobs for followup maintenance plans.
Expert systems integrating fuzzy reasoning techniques represent a powerful tool to support practicing engineers during the early stages of structural design. In this context fuzzy models have proved themselves to be very suitable for the representation of complex design knowledge. However their definition is a laborious task. This paper introduces an approach for the design and the optimization of fuzzy systems based upon Genetic Programming. To keep the emerging fuzzy systems transparent a new framework for the definition of linguistic variables is also introduced.
This paper presents a new design environment based on Multi-Agents and Virtual Reality (VR). In this research, a design system with a virtual reality function was developed. The virtual world was realized by using GL4Java, liquid crystal shutter glasses, sensor systems, etc. And the Multi-Agent CAD system with product models, which had been developed before, was integrated with the VR design system. A prototype system was developed for highway steel plate girder bridges, and was applied to a design problem. The application verified the effectiveness of the developed system.
A Multi-objective Model for Optimizing Construction Planning of Repetitive Infrastructure Projects
(2004)
This paper presents the development of a model for optimizing resource utilization in repetitive infrastructure projects. The model provides the capability of simultaneous minimization of both project duration and work interruptions for construction crews. The model provides in a single run, a set of nondominated solutions that represent the tradeoff between these two objectives. The model incorporates a multiobjective genetic algorithm and scheduling algorithm. The model initially generates a randomly selected set of solutions that evolves to a near optimal set of tradeoff solutions in subsequent generations. Each solution represents a unique scheduling solution that is associated with certain project duration and a number of interruption days for utilized construction crews. As such, the model provides project planners with alternative schedules along with their expected duration and resource utilization efficiency.
A comprehensive framework of information management system for construction projects in China has been established through extensive literature survey and field investigation. It utilizes the potential information technologies and covers the practical management patterns as well as the major aspects of construction project management. It can be used to guide and evaluate the design of the information management systems for construction projects in order to make the system to be applicable to a wide variety of construction projects and survive the changes in project management.
The Priority Programme ‘Network Based Co-operation in Structural Engineering’ of the ‘German Research Foundation’ (DFG) has been established in the year 2000. This paper describes and discusses the main research directions and first results of the workgroup ‘Distributed Product Models’. The five projects of the workgroup have developed completely different solutions for specific application domains. Each solution concept deals with a consistent product modeling and knowledge processing in a distributed environment in the planning process. The individual solution approaches of the projects are described and the underlying basic assumptions are discussed. A unified system architecture is described for all projects of the workgroup. Two different approaches (object-oriented and graph-based models) have been introduced for product and knowledge modeling. The common structure of these models will be explained to fully understand the differences of these modeling approaches. Finally the concepts for co-operative work and conflict management in a distributed environment are described: The solution approaches will be distinguished by classifying the supported co-operation according to time. A final scientific summary describes the state-of-the-art in network based co-operation in structural engineering: The role of research directions like knowledge modeling, standard product modeling and versioning in the distributed planning process will be explained.
Today’s building industry not only demands more and more reduced construction time on building site, but also an advanced and mostly construction attendant design phase. Even though there is software available to support design processes in distributed environments, most applications only support simple document based exchange of information. In this paper a knowledge based system is presented to support cooperative, comprehensive design processes in distributed environments. The presented research project is financially supported by the German Research Community (DFG – Deutsche Forschungsgemeinschaft).
In our project, we develop new tools for the conceptual design phase. During conceptual design, the coarse functionality and organization of a building is more important than a detailed worked out construction. We identify two roles, first the knowledge engineer who is responsible for knowledge definition and maintenance; second the architect who elaborates the conceptual design. The tool for the knowledge engineer is based on graph technology, it is specified using PROGRES and the UPGRADE framework. The tools for the architect are integrated to the industrial CAD tool ArchiCAD. Consistency between knowledge and conceptual design is ensured by the constraint checker, another extension to ArchiCAD.
Current disaster management procedures rely primarily on heuristics which result in their strategies being very cautious and sub-optimum in terms of saving life, minimising damage and returning the building to its normal function. Also effective disaster management demands decentralized, dynamic, flexible, short term and across domain resource sharing, which is not well supported by existing distributing computing infrastructres. The paper proposes a conceptual framework for emergency management in the built environment, using Semantic Grid as an integrating platform for different technologies. The framework supports a distributed network of specialists in built environment, including structural engineers, building technologists, decision analysts etc. It brings together the necessary technology threads, including the Semantic Web (to provide a framework for shared definitions of terms, resources and relationships), Web Services (to provide dynamic discovery and integration) and Grid Computing (for enhanced computational power, high speed access, collaboration and security control) to support rapid formation of virtual teams for disaster management. The proposed framework also make an extensive use of modelling and simulation (both numerical and using visualisations), data mining (to find resources in legacy data sets) and visualisation. It also include a variety of hardware instruments with access to real time data. Furthermore the whole framework is centred on collaborative working by the virtual team. Although focus of this paper is on disaster management, many aspects of the discussed Grid and Visualisation technologies will be useful for any other forms of collaboration. Conclusions are drawn about the possible future impact on the built environment.
Many problems related to data integration in AEC can be better tackled by an approach that takes into account the heterogeneity of tasks, models and applications but does not require continuous consistency of the evolving design data, at each data management operation. Such an approach must incorporate adequate services that can facilitate reintegration of concurrently modified data at reasonably selected coordination points. In this paper we present a set of methods which, used in combination, can achieve that goal. After a description of the principal envisaged cooperative work scenario each of these methods is discussed in detail and current observations drawn from their software realisation are given. Whilst the suggested approach is valid for any EXPRESS-based data model, the practical focus of work has been on facilitating IFC-driven integration.
An architecture of a distributed planning system for the building industry has been developed. The emphasis is on highly collaborative environments in steelwork, timber construction etc. where designers concurrently handle 3D models. The overall system connects local design systems by the so-called Design Framework DFW. This framework consists of the definition of distributed components and protocols which make the collaborative design work. The process of collaborative design has been formalized on an abstract level. This paper describes how this has been done. A sample is given to illustrate the mapping of concrete scenarios of the ‘real design world’ to an abstract scenario level. This work is funded by the Deutsche Forschungsgemeinschaft DFG as part of the project SPP1103 (Meißner et al. 2003).
The paper summarizes a part of research carried out in ICCI project and provides a current review of ICT infrastructures supporting collaboration. It covers taxonomies, protocols, standards, components, typical subsystems as well as future trends and recommendation for two most important technologies with applications in AEC: (1) EIP (Enterprise information portal) – a single gateway to a company's information, knowledge base, and applications for all actors; (2) RTC (Real-Time Communication and Collaboration technologies) that provide means for asynchronous communication between geographically dislocated people using ICT. Proposed future developments are: orientation towards web services - with building information models, business intelligence, personalization, AEC information retrieval, p2p workspaces and grids.
The synchronous distributed processing of common source code in the software development process is supported by well proven methods. The planning process has similarities with the software development process. However, there are no consistent and similarly successful methods for applications in construction projects. A new approach is proposed in this contribution.
Vor dem Hintergrund des gesellschaftlichen Wandels sieht sich die Verkehrsforschung mit neuen Anforderungen an die Konzeption, Anpassung, Anwendung usw. von statistischen Ansätzen zur Analyse des Aktivitäten-(Verkehrs-)verhaltens konfrontiert, um auf Basis empirischer Daten adäquat Zusammenhänge der Verkehrsentstehung zu erforschen. Ausgehend von der musterorientierten Perspektive - das heißt Untersuchungsgegenstand sind chronologische Abfolgen von Ortsveränderungen und Tätigkeiten in Form von Wege-Aktivitätenmustern - besteht das Ziel einer möglichst realitätsnahen Abbildung und Erklärung von individuellen Unterschieden im Raum-Zeit-Verhalten. Neu bzw. kaum etabliert sind in diesem Kontext der eigens konzipierte Multimethodenansatz sowie die Optimal Matching Technik, die erweiterte Abbildungseigenschaften zur Distanzmessung zwischen Wege-Aktivitätenmustern aufweist. Erkannt werden durch jene Methode gleiche Tätigkeiten bzw. Ortsveränderungen, die zeitlich an unterschiedlichen Stellen der zu vergleichenden Muster angeordnet sind sowie identische Subsequenzen. Zielführend in der Datenanalyse ist nachstehende Abfolge von Verfahren: Die Klassifikation von Wege-Aktivitätenmustern zur Reduktionen deren immenser Komplexität gelingt durch Einsatz der Optimal Matching Technik. Diese quantifiziert (Un-)ähnlichkeiten zwischen Wege-Aktivitätenmustern („Abstandsmessung“) unterschiedlicher Personen oder zu vergleichender Zeitabschnitte einer Person. Die dadurch berechnete Distanzmatrix bildet den Ausgangspunkt des clusteranalytischen Fusions-algorithmus, dessen Aufgabe die Zusammenfassung der Wege-Aktivitätenmuster ist (explorative Stufe). Die Anwendung eines multinomialen Logit-Modells ermöglicht auf Individualebene die Vorhersage der Affinität zu Wege-Aktivitätenmuster-Typen anhand von Merkmalswerten identifizierter Erklärungsgrößen der Personen, des Haushaltes usw. (induktive Stufe). Im Gegensatz zu einschlägigen Forschungsarbeiten zeichnet sich die gewählte Untersuchungsstrategie durch die Objektivität des Vorgehens aus, da eine a-priori Bildung von Personen-kategorien nicht notwendig ist. Ebenso grenzt die Berücksichtigung der zufälligen und nicht-erklärbaren Verhaltensvariabilität durch das Wahrscheinlichkeitsprinzip des gewählten Logit-Modells das eigene Vorgehen von anderen Untersuchungen ab. Aufgrund der weitgehend ungeklärten Anwendungsgrundlagen der Optimal Matching Technik befasst sich die vorliegende Arbeit zunächst mit dessen inhaltlicher Ausrichtung am Untersuchungsgegenstand. Die Anpassung der festzulegenden Aufwandswerte, welche für die benötigten Aktionen angesetzt werden, um ein Wege-Aktivitätenmuster in ein anderes zu transformieren, erfolgt mit Hilfe einer empirisch Abschätzung, die weit über ein argumentatives Vorgehen hinausgeht. Der ermittelte Sequenzabstand inkludiert dabei die operationsspezifische Distanz bei Übergängen zwischen den konstituierenden Zuständen der zu vergleichenden Wege-Aktivitätenmuster („Zustandsähnlichkeit“). Abstandsmaß für die qualitativen Zustände ist dabei die ermittelte Priorität von wege- und tätigkeitenbezogenen Handlungen. Die Relevanz einer Ausrichtung belegt auch die durchgeführte Sensitivitätsanalyse: Das Ausmaß der Empfindlichkeit der Optimal Matching Technik ist insbesondere gegenüber der Festlegung der Aufwandswerte beträchtlich. Um die Analysepotenziale des Multimethodenansatzes zu demonstrieren, werden exemplarisch interpersonelle Unterschiede im wöchentlichen Aktivitäten-(Verkehrs-)verhaltens (Datenbasis: deutsches Mobilitätspanel) analysiert. Ergebnis der Klassifikation (explorative Analysestufe) ist eine auf den ersten Blick inhaltlich stichhaltige Wege-Aktivitätenmuster-Typologie charakteristischer Wochenabläufe des Aktivitäten-(Verkehrs-)verhaltens: Unterschiedliche Arten, zeitlicher Umfang und zeitliche Lage der Haupt-aktivitäten, unterschiedliche Verkehrsverhaltensweisen sowie unterschiedliche clusterspezifische Tag zu Tag Rhythmen, Gleichförmigkeiten, Schwankungen usw. des Raum-Zeit-Verhaltens kennzeichnen die Wege-Aktivitätenmuster-Typen. Die Abbildungs-eigenschaften der Optimal-Matching Technik zeichnen sich in den erstellten Clustern nur teilweise ab: Während die Zustandselementkomposition - augenscheinlich betrachtet - passabel durch die Wege-Aktivitätenmuster-Typologie abgebildet wird, bleibt ungewiss, ob und inwieweit dies für die Abfolgeähnlichkeit gilt. Aus dem induktiven Analyseschritt geht hervor: Alter, Geschlecht, Verfügbarkeit einer ÖPNV-Zeitkarte, Führerscheinbesitz und mit herausragender Bedeutung der Erwerbsstatus signalisieren als maßgebende Erklärungsgrößen eine Trennwirkung. Überdies zeigt das Gesamtbild der ermittelten Wirkungsrichtungen und Effektstärken überzeugende Erklärungszusammenhänge auf. Damit ist ein Nachweis der Praktikabilität des eigens konzipierten Multimethodenansatzes unter Verwendung der Optimal Matching Technik zur musterorientierten Analyse des Raum-Zeit-Verhaltens erbracht.
Efforts to define standards for representing AEC/FM data have been fairly successful. However defining a standard reference process model has not met with the same success. Yet almost every conceptual modelling or software development project starts by defining the business processes to be supported and the related requirements to be satisfied. This paper describes a new process-centred methodology for user requirements capture developed in the ICCI project (IST-2001-33022). Its essence is in recognising user requirements and use cases in the context of the real construction process, identifying the actors and roles for each individual activity and associating these activities with information, communication and standardisation requirements on the basis of a formalised specification, named the Process Matrix. In the paper we outline the history of process matrix development, introduce the basic structure of the matrix and show how it can be further extended and refined. We present also a web-based software implementation of the developed approach, describe how it has been used in ICCI and outline further perspectives.
Organisational and human issues have been highlighted, among other issues (ICT infrastructures, legal and contractual, etc.), as key elements in enhancing the competitiveness of the construction sector. More specifically, the importance of human resources has been recognised, especially training and professional development, in order to cultivate a stable workforce. The paper provides a review of the key training needs for the construction sector with particular reference to the uptake and exploitation of new technologies and working practices, presents an action plan to address learning and training needs, and proposes an eight-stage iterative learning and training methodology. The results will be of particular interest to managers in stakeholder organisations of all sizes throughout the sector, plus academic and research bodies intending to continue construction ICT research.
The construction industry is a project-based business bringing together many different organisations to complete a desired goal. The strategic use of Information and Communication Technologies (ICT) has enabled this goal to be completed more effectively. Two issues require addressing, the technology itself and the implementation factors of the technology. Such implementation factors should consider, among other factors, the legal and contractual issues associated with the use of ICT, training requirements and its effects on the organisational culture. To date the legal and contractual issues have not been extensively covered, and it is recognised that the technologies have not been properly covered by any recognised legal and contractual practices. This in turn is threatening to inhibit the growth and prosperity of the use of the technology on construction projects. This paper discusses these legal and contractual issues and describes methods and tools that can be used to enable the growth of technology to be used in a legal and contractually valid environment.
To support research in the building sector and in order to help it move towards a new digital economy, the European Commission under the 5th Framework initiative, especially the IST programme, funded various RTD projects. The opportunity to bring these IST projects together was acknowledged so that stronger links can be created under a clustering umbrella and that, moreover, links of those projects with their RTD environment could be facilitated. This has been the objective of work carried out within the ICCI (IST-2001-33022) Cluster project. This paper introduces the main aims and objectives of the project, and then presents its principal outcomes. In a second part, it synthesises the underlying concepts, technology and tools that will make ICT-based Construction a reality in a near future, and gives recommended actions for the industry, the EC and the Construction ICT R&D in Europe, giving some benefit of this project experience to the three communities.
The research reported in this article was conducted to mainly explore the two common numeric prediction techniques, the model tree and the regression tree, when used in conjunction with bagging as a wrapper method. Bagging is used to improve the prediction accuracy of these two algorithms, and results are compared with the ones obtained earlier by the k-nearest neighbor (KNN) algorithm. From the conducted experiments, both the bagged regression tree and bagged model tree produce better results than not only their corresponding regression tree and model tree alone, but also the KNN with optimal value of k equal to 7. In addition, the bagged model tree yields the lowest prediction errors and a highest correlation coefficient of 0.81. It is demonstrated that it is feasible to use the bagged model tree for engineering applications in prediction problems such as estimating the remaining service life of bridge decks.
This article discusses how the failures of construction projects could be prevented. The focus is on using IT tools in communication. The article is based on the findings of the PROLABproject. The project seeks to find solutions for how the information can effectively be used in project management, specially in construction projects, what kind of procedures help the management of the knowledge and how the obstacles for efficient ways of administrating the information can be removed. These obstacles can be either related to use of new technology or to organization culture. The paper discusses e-mail as a medium of communication with the media richness framework (Fulk & Boyd 1991) based on the interviews done with the participants of construction projects. We found out that the emails were used in both rich way and not so rich way. Obstacles of rich use of IT communication were partly technical and partly psychological. Technology acceptance model (TAM) is used to study the actual use of emails in communication. Obstacles of the use of emails were mostly individual differences like the skills to use the system or external variables like they did not have proper software to open the attachments. Also people talked about information overload. Emails often push too much information. Keywords: IT tools, Communication, Knowledge management, Construction
This paper reports on the latest results in the development of a new approach for simulating the thermal behavior of buildings that overcomes the limitations of conventional heat-transfer simulation methods such as FDM and FEM. The proposed technique uses a coarse-grain approach to model development whereby each element represents a complete building component such as a wall, internal space, or floor. The thermal behavior of each coarse-grain element is captured using empirical modeling techniques such as artificial neural networks (ANNs). The main advantages of the approach compared to conventional simulation methods are: (a) simplified model construction for the end-user; (b) simplified model reconfiguration; (c) significantly faster simulation runs (orders of magnitude faster for two and three-dimensional models); and (d) potentially more accurate results. The paper demonstrates the viability of the approach through a number of experiments with a model of a composite wall. The approach is shown to be able to sustain highly accurate longterm simulation runs, if the coarse-grain modeling elements are implemented as ANNs. In contrast, an implementation of the coarse-grain elements using a linear model is shown to function inaccurately and erratically. The paper concludes with an identification of on-going work and future areas for development of the technique.
A/E/C Team members, while collaborating on building projects, rely on past experiences and content through the use of project design archives (whether in paper or digital format). This leads to underutilization of potential knowledge, as decision-making of data, information, and knowledge reuse is limited by access to these archives, due to sheer size and inconvenient presentation. This paper presents an integrated solution that leverages two technologies CoMem (Corporate Memory) and iRoom (interactive Room) developed at Stanford. This addresses critical limitations, i.e., content, context, visualization and interactivity, constraining the process of collaborative exploration towards knowledge reuse and decision-making.
Collaborative Design Processes: A Class on Concurrent Collaboration in Multidisciplinary Design
(2004)
The rise of concurrent engineering in construction demands early team formation and constant communication throughout the project life cycle, but educational models in architecture, engineering and construction have been slow to adjust to this shift in project organization. Most students in these fields spend the majority of their college years working on individual projects that do not build teamwork or communication skills. Collaborative Design Processes (CDP) is a capstone design course where students from the University of Illinois at Urbana-Champaign and the University of Florida learn methods of collaborative design enhanced by the use of information technology. Students work in multidisciplinary teams to collaborate from remote locations via the Internet on the design of a facility. An innovation of this course compared to previous efforts is that students also develop process designs for the integration of technology into the work of multidisciplinary design teams. The course thus combines both active and reflective learning about collaborative design and methods. The course is designed to provide students the experience, tools, and methods needed to improve design processes and better integrate the use of technology into AEC industry work practices. This paper describes the goals, outcomes and significance of this new, interdisciplinary course for distributed AEC education. Differences from existing efforts and lessons learned to promote collaborative practices are discussed. Principal conclusions are that the course presents effective pedagogy to promote collaborative design methods, but faces challenges in both technology and in traditional intra-disciplinary training of students.
Re-using knowledge in architecture, engineering and construction (AEC) firms can lead to greater competitive advantage, improved designs, and more effective management of constructed facilities. This paper discusses the importance of exploration and discovery of reusable knowledge from a corporate archive as opposed to simple search and retrieval. We describe and illustrate through a scenario of use an exploration framework and prototype, CoMemTM that formalizes the added value of exploration in the process of knowledge reuse. We discuss two exploration activities: (i) Breadth- Only overview exploration that assist a user to rapidly localize pockets of re-usable knowledge from the large corporate archive and (ii) Iterative breadth-depth exploration that enables a user to identify those re-usable components of the Corporate Memory that may yield design issues that were not originally considered.
This paper describes a research project that addresses the difficulties in dealing with regulatory documents such as national and regional codes. These documents tend to be voluminous, heavily cross-referenced, possibly ambiguous and even conflicting at times. There are often multiple documents that need to be consulted and satisfied; however it is a difficult task to locate all of the relevant provisions. In addition, sections dealing with the same or similar conceptual ideas sometimes lay down conflicting requirements. We propose a framework for regulation representation, analysis and comparison with emphasis on the extraction of similarities between provisions. We focus on accessibility regulations, whose intent is to provide the same or equivalent access to a building and its facilities for disabled persons. An XML regulatory repository is developed to extract structural as well as non-structural features from government regulations to help user understanding and computational analysis. A similarity analysis is performed between different sources of regulations. In order to achieve a better comparison between provisions, we employ a combination of feature matching and structural analysis. Results are shown on comparisons between American and European codes, as well as on the domain of electronic-rulemaking.
This ethnographic study reports on emerging work processes and practices observed in the AEC (Architecture/Engineering/Construction) Global Teamwork program, i.e., what people experience when interacting with and through collaboration technologies, why people practice in the way they do, how the practice fits into the environment and changes the work patterns. It presents the experience of two high-performance typical but extreme AEC teamwork cases adopting and adapting to collaboration technologies and how these technologies in practice impact their work processes. The findings illustrate the importance of collaboration technologies in cross-disciplinary, global teamwork. Observations indicate that high performance teams that use the collaboration technologies effectively exhibit collaboration readiness at an early stage and manage to define a “third way” to meet the demands of the cross-disciplinary, multi cultural and geographically distributed AEC workspace. The observations and implications represent the blueprint for yearly innovations and improvements to the design of the AEC Global Teamwork program.
We present a software prototype for fluid flow problems in civil engineering, which combines essential features of Computational Steering approaches with efficient methods for model transfer and high performance computing. The main components of the system are described: - The modeler with a focus on the data management of the product model - The pre-processing and the post-processing toolkit - The simulation kernel based on the Lattice Boltzmann method - The required hardware for real-time computing
In this paper, a circulation-type society is expressed by recurrent architecture network described with multi-agent model which consists of the following agents: user, builder, reuse maker, fabricator, waste disposer, material maker and earth bank (see Fig.1). Structural members, materials, resources and monies move among these agents. Each agent has its own rules and aims, regarding structural damages, lifetime, cost reduction, numbers of structural members and structural systems. Reasonable prices of members (fresh, reused, recycled and disposed) can be optimized by GAs in this system considering equal distribution of monies among agents.
The purpose of this research is to develop the method to retrieve a building name from the impression of the building. First, the images of the building are registered as database by the questionnaire. Next, the images of the objective building are compared with the degree of matching in image databases, and the building with high synthetic matching degree is retrieved. This system could get a good retrieval result. Moreover, image processing was done, and image databases are trained by neural network from the amount of characteristics of the image, and the retrieval system by image processing was examined.
Most retaining walls and box culverts built for arterial road construction are simple, and the design process of these structures is often repetitive and labor-intensive because they are so similar in structural configuration. Although some integrated design automation systems developed for retaining walls and box culverts have expedited the design process of these structures, the process of collecting and distributing the resultant engineering documents has not been fully integrated with the computer applications. We have been developing a Web-based design automation system to manage the resultant documents as well as to speed up the repetitive design process. Manipulation of engineering drawings in the Web page is one of the critical functions needed for Web-based design automation. eXtensible Markup Language (XML) and XML-based vector graphics are expected to facilitate the representation of engineering drawings in the Web page. In this paper, we present how we used XML and Scalable Vector Graphics (SVG) to compose engineering drawings and represent them in the Web page. XML Data Island we designed to define drawing components turned out effective in manipulating the engineering drawings in the Web page.
This paper describes the concept and experiences of the international Open Distance Learning Course ‘HydroWeb’. This course deals with the introduction of Web-based Collaborative Engineering in standard education programmes of water related engineering and civil engineering based on information sharing. Organized under the umbrella of IAHR and ETNET21 this course is collaboration from several universities from all over the world. Started in 1999 the course demonstrates the potential and innovative opportunities of Web-Technology in education, research and engineering: Students from the different partner universities form small distributed teams to solve a given engineering problem in a time window of two weeks. To overcome the spatial distribution the students apply modern Web technology such as video conferencing, application sharing and document management. All results as well as the final reports are presented as Web document on a shared Web-based project platform (http://www.hydro-web.org). Besides the experiences to apply standard Web tools and working methods based on information sharing instead the conventional information exchange in the daily engineering work the students improve their soft skills operate successfully in international and interdisciplinary project environments as part of the ‘Technical Culture’ of nowadays.
For planning in existing built contexts, the building survey is the starting point for initial planning proposals, for the diagnosis and documentation of building damages, for the creation of objectives catalogues, for the detailed design of renovation and conversion measures and for ensuring fulfilment of building legislation, particularly by change of use and refitting. An examination of currently available IT-tools shows insufficient support for planning within existing contexts, most notably a deficit with regard to information capture and administration. This paper discusses the concept for a modular surveying system (basic concept, separation of geometry from semantic data, and separation into sub-systems) and the prototypical realisation of a system for the complete support of the entire building surveying process for existing buildings. The project aims to contribute to the development of a planning system for existing buildings. ...
For the management or reorganisation of existing buildings, data concerning dimensions and construction are necessary. Often these data are given exclusively by paper-based drawings and no digital data such as a computer based product model or even a CAD-model are available. In order to perform mass calculation, damage mapping or a recalculation of the structure these drawings of the building under consideration have to be analysed manually by the engineer. This is a very time-consuming job. In order to close this gap between drawings of an existing building and a digital product model an approach is presented in this paper to digitise a drawing, to build up geometric and topologic models and to recognise construction parts of the building. Finally all recognised parts are transformed into a three-dimensional geometric model which provides all necessary geometric information for the product model. During this import process the semantics of a ground floor plan has to be converted into a 3D-model.
Preparation and provision of building information for planning within existing built contexts
(2004)
A prerequisite for planning within existing built contexts is precise information regarding the building substance, its construction and materials, possible damages and any modifications and additions that may have occurred during its lifetime. Using the information collected in a building survey the user should be able to “explore” the building in virtual form, as well as to assess the information contained with regard to a specific planning aspect. The functionality provided by an information module should cover several levels of information provision ranging from ‘simple retrieval’ of relevant information to the analysis and assessment of stored information with regard to particular question sets. Through the provision of basic functionality at an elementary level and the ability to extend this using plug-ins, the system concept of an open extendable system is upheld. Using this modular approach, different levels of information provision can be provided as required during the planning process.
Complex gridshell structures used in architecturally ambitious constructions remain as appealing as ever in the public realm. This paper describes the theory and approach behind the software realisation of a tool which helps in finding the affine self-weight geometry of gridshell structures. The software tool DOMEdesign supports the formal design process of lattice and grid shell structures based upon the laws of physics. The computer-aided simulation of suspension models is used to derive structurally favourable forms for domes and arches subject to compression load, based upon the input of simple architectonic parameters. Irregular plans, three-dimensional topography, a choice different kinds of shell lattice structures and the desired height of the dome are examples of design parameters which can be used to modify the architectural design. The provision of data export formats for structural dimensioning and visualisation software enables engineers and planners to use the data in future planning and to communicate the design to the client.
Building activities in the construction industry in Germany increasingly concentrate on building measures in or involving the existing built environment. Before planning can begin, buildings must be surveyed in whole or in part with the surveying of geometric data playing a dominant role. The geometric survey is typically undertaken using geodetic or photogrammetric measuring techniques and equipment that have been adapted for use in building surveying. Accordingly appropriate technical knowledge is required in order to be able to operate them as well as a considerable financial investment. Such equipment and surveying methods are usually adaptations from other disciplines. The paper discusses and presents approaches to developing “new” equipment for building surveying, devised with the needs of building surveying in mind – redesigns or new designs for surveying tools. The designs are the result of an inter-disciplinary project between the Faculty of Architecture and the Faculty of Product Design at the Bauhaus Universität Weimar.
Three-dimensional models of urban objects play an important role in the urban applications such as urban planning, environmental concerning, or urban disaster mitigations. While the modeling of urban objects is time consuming and storage costing. This paper presents solutions for this. Buildings with regular shapes and plane roofs are constructed into computer models by identifying of graphic elements from the digital maps of urban area to get building base plane and building heights. Buildings with irregular shapes and non-plane roofs are constructed into computer models by employment of a specific system developed by the authors. Road objects and topologies are constructed into computer models by employment of specific algorithms. The solutions presented in this paper has been used in the development of urban disaster mitigation system for Shantou, China.
The contribution describes the didactical integration of wireless access networks for the campus of the University of Karlsruhe in the education of architects and engineers. It focuses on the development of an interdisciplinary communication network to encourage and promote the communication and collaboration between students. The project assumes that significant learning progresses in net-based learning scenarios are based upon the synchronous and asynchronous cooperation between the students themselves. The remote cooperation across borders of disciplines makes high demands on capacity in communicating and cooperating of the involved persons as well as on the supporting tools. Therefore, the collective acquisition of knowledge and cooperation has to be trained intensively during the studies. Based on the design and project oriented cooperation platform netzentwurf.de the authors developed the tools “Jobadmin“ to administrate multidisciplinary workgroups, the “Swarm Knowledge Catalogue“ to collect and store knowledge and “LivingCampus“, an instrument providing basic services for dynamic communication.
The uniqueness and the long life cycle of buildings imply a dynamically modifiable building model. The technological foundation for the management of digital building models, a dynamic model management system (MMS), developed by our research group, allows to explicitly access and to modify the object model of the stored planning data. In this paper, the integration of constraints in digital building models will be shown. Constraints are conditions, which apply to the instances of domain model classes, and are defined by the user at runtime of the information system. For the expression of constraints, the Constraint Modelling Language (CML) has been developed and will be described in this paper. CML is a powerful, intuitively usable object-oriented language, which allows the expression of constraints at a high semantic level. A constrained-enabled MMS can verify, whether an instance fulfils the applying constraints. To ensure flexibility, the evaluation of constraints is not implicitly performed by the systems, but explicitly initiated by the user. A classification of constraint types and example usage scenarios are given.
The increasing demands in building and civil engineering – with regard to the growing amount of legal requirements and the needs of a flexible usage of the building - requires an optimisation of all processes during the planning and construction phases. This aim can be only reached by transferring of innovative information and communication technologies in the field of cooperation of all partners in a building project. In this article the enhancement of the existing planning processes based on an improved information management is introduced. Since the late 90ies the availability of hardware and software infrastructures for a networkbased cooperation, e.g. email, in small and middle-sized companies increased the problems of an unstructured communication in the planning and construction processes. These problems have not been solved by the usage of the upcoming project communication systems either, which are often used as a simple medium for data transfer. Because of the easy way of distributing documents to all planning partners a huge amount of files and subsequent versions can be stored so that the planners often have to scope with an information overflow. The underlying hierarchical structures based on simple files stored in tree views are not sufficient for an adequate representation of the different specific views of the planners and the management of relationships between the three information domains building structure, costs and time schedules. ..
Construction is a conservative industry that over the last twenty ye ars has experienced drastic changes in the way that interdisciplinary teams interact to design and execute a project. In this article we offer a general overview of how the main participants cooperate in the different phases of a construction project, and which are some of the main areas for communication improvement. We also explore the communication tools used in the exchange of information, and identify the main causes of information breakdown. The general framework of this study is of application to both standard and green projects. At the end of the article we discuss the peculiarities of green buildings. Our goal is to offer a series of industry insights derived from the perspective of a general contractor aimed at identifying the areas where contributions in computing and information exchange could have a greater impact on the successful completion of a project.
An important feature of the 2003 SARS outbreak in Canada, Singapore, and Hong Kong was that many health care workers (HCWs) developed SARS after caring for patients with SARS. This has been ascribed to inadequate or ineffective patient isolation. However, it is difficult for dense cities to provide sufficient isolation facilities within a short period of time. This has raised concerns from the public for new strategies in the planning and design of isolation facilities. Considering that SARS or other infectious diseases could seriously damage our society’s development, isolation facilities that could be rapidly and economically constructed with appropriate environmental controls are essential. For this reason, the design team of the Department of Architecture collaborated with a special task force from the Faculty of Medicine, who are the frontline medical officers treating the SARS patients, to design Rapidly Assembled Isolation Patient Wards. Both architecture and medicine are well established disciplines, but they have little in common in terms of the mode of knowledge construction and practice. This induced much intellectual exploration and research interest in conducting this study. The process has provided an important reference for cross disciplinary studies between the architectural and medical domains.
This paper examines the impact of information technology (IT) utilization on construction firm performance. Based on empirical data collected from 74 US construction firms, the analyses provide evidence that IT has a positive impact on overall firm performance, schedule performance, and cost performance. Firm performance is a composite score of several metrics of performance: schedule performance, cost performance, customer satisfaction, safety performance, and profit. No relationship is found between IT utilization and customer satisfaction, safety, or profit, although this may be due to limitations of the study given strong correlations between IT utilization and cost and schedule performnance. The empirical evidence of positive association between performance and IT use provided by this research is significant to both construction practice and research literature. This evidence should encourage firms to adopt and invest in IT tools.
The paper describes a concept for the step-by-step computer-aided capture and representation of geometric building data in the context of planning-oriented building surveying. Selected aspects of the concept have been implemented and tested as prototypes. The process of step-by-step capture and representation is determined by the order in which the user experiences the building. Only the information that the user knows (can see) or can reasonably deduce is represented. In addition approaches to the flexible combination of different measuring techniques and geometric abstractions are described which are based upon geodetic computational adjustment.
The construction industry is a supportive industry in China. IT (information technolgy), including computer technology and communication technology, as a whole is regarded as the most important means to upgrade the construction industry so that research projects were organized by Chinese government to further the application of IT in the construction industry. This study originated from one of the projects and is aimed at grasping the general situation on the application of IT in the construction industry. A questionnaire was designed for the survey, which used stratified proportional sampling method, and was carried out under the help of a government agency. This study can not only provide sound foundation for the government to make relative policies, but also reveal references for the firms in construction industry to apply IT in their business. This paper presents the preliminary result of the survey.
In recent years, the survey is performed for repair, such as a bridge and a building built in past, spending great expense. And it is anxious for the survey technique that doesn’t need cost and time more. Then, we made an idea of the technique of precise 3D model creation by 2D pictures. However, the technique of performing the improvement in accuracy of convergent photographing and automatic acquisition of corresponding points was not established. Therefore, in this research, we try to obtain a semi-automation of corresponding points acquisition from initial corresponding points and the improvement in accuracy of convergent photographing. Moreover, we applied the research to the used house of Japanese real estate, and the applicable field was selected as the high needs of the residence of 3D model. And we developed the system that everyone could create Web / 3D model house by VRML easily without requiring expensive apparatuses or expertise.
The planning of projects in building engineering is a complex process which is characterized by a dynamical composition and many modifications during the definition and execution time of processes. For a computer-aided and network-based cooperation a formal description of the planning process is necessary. In the research project “Relational Process Modelling in Cooperative Building Planning” a process model is described by three parts: an organizational structure with participants, a building structure with states and a process structure with activities. This research project is part of the priority program 1103 “Network-Based Cooperative Planning Processes in Structural Engineering” promoted by the German Research Foundation (DFG). Planning processes in civil engineering can be described by workflow graphs. The process structure describes the logical planning process and can be formally defined by a bipartite graph. This structure consists of activities, transitions and relationships between activities and transitions. In order to minimize errors at execution time of a planning process a consistent and structurally correct process model must be guaranteed. This contribution considers the concept and the algorithms for checking the consistency and the correctness of the process structure.
Let the information of a civil engineering application be decomposed into objects of a given set of classes. Then the set of objects forms the data base of the application. The objects contain attributes and methods. Properties of the objects are stored in the attributes. Algorithms which the objects perform are implemented in the methods of the objects. If objects are modified by a user, the consistency of data in the base is destroyed. The data base must be modified in an update to restore its consistency. The sequence of the update operations is not arbitrary, but is governed by dependence between the objects. The situation can be described mathematically with graph theory. The available algorithms for the determination of the update sequence are not suitable when the data base is large. A new update algorithm for large data bases has been developed and is presented in this paper.
The management of resources is an essential task in each construction company. Today, ERP systems and e-Business systems are available to assist construction companies to efficiently organise the allocation of their personnel and equipment within the company, but they cannot provide the company with the idle resources for every single task that has to be performed during a construction project. Therefore, companies should have an alternative solution to better exploit expensive resources and compensate their fixed costs, but also have them available at the right time for their own business activities. This paper outlines the approach taken by the EU funded project “e-Sharing” (IST-2001-33325) to support resource management between construction companies. It will describe requirements for the management of construction resources, its core features, and the integration approach. Therefore, we will outline the approach of an integrated resource type model supporting the management and classification of construction equipment, construction tasks and qualification profiles. The development is based on a cross-domain analysis and evaluation of existing models. ...
This paper presents a specific modeling technique that is focused on preparing planning processes in civil engineering. Planning processes in civil engineering are characterized by some peculiarities so that the sequence of planning tasks needs to be determined for each planning project. Neither the use of optimized partial processes nor the use of lower detailed and optimized processes guarantee an optimal overall planning process. The modeling technique considers these peculiarities. In a first step, it is focused on the logic of the planning process. Algorithms based on the graph theory determine that logic. This approach ensures consistency and logical correctness of the description of a planning process at the early beginning in its preparation phase. Sets of data – the products of engineers like technical drawings, technical models, reports, or specifications – form the core of the presented modeling technique. The production of these sets of data requires time and money. This is expressed by a specific weighting of each set of data in the presented modeling technique. The introduction of these weights allows an efficient progress measurement and controlling of a planning project. For this purpose, a link between the modeling technique used in the preparation phase and the execution phase is necessary so that target and actual values are available for controlling purposes. The present paper covers the description of this link. An example is given to illustrate the use of the modeling technique for planning processes in civil engineering projects.
The design of building projects involves several types of resources such as architects, structural engineers, mechanical engineers, electrical engineers, and draftsmen, among others. For design firms to stay in business in this very competitive market, they need to manage their resources in a way that improves productivity and cost effectiveness. This task, however, is not simple and requires thorough analysis of process-level operations, resource use, and productivity. Typically, these operational aspects are the responsibility of the design office manager who assigns available resources to the different design projects to save time and lower design expenses. It is noted that limited studies have been carried out in the literature to model overall organizational operations and behavioral aspects, particularly in firms specialized in the design of building projects. In an effort to simplify the modeling process, a simplified modeling and simulation tool is used in this research. A simulation model representing an actual design office was developed assuming that the office performs designs for small, medium, and large size building projects. The developed model was used to simulate several alternatives and examine various resource assignment strategies. The simulation was conducted over ten years and the resulting productivity and income was measured.
The growing competition pressure in the building industry increases the demands on the design and construction processes in respect to economical, technical and time aspects. These demands require efficient improvements of the value-added chain, which can be realized mainly with the usage of innovative information- and communication-technologies. To support the collaboration of all participants involved in a certain building project the Workflow-Management-System “BauKom-Online” has been developed. In the focus of the system is to support the coordination of the participants and their information exchange. Such a software-method is well suited to ensure a high quality planning process. The modelling of business-processes enables a better self-comprehension of the participants work and helps to enhance the project performance. The system architecture of BauKom-Online contains two basic components: the processmodelling tool and the workflow-engine. The process-model contains of activities and states of the planning and construction processes and their relations. These connected processes compose the workflow. Such a process-model for engineering purposes has to satisfy several needs, e.g., the consideration of planning and building alternatives, dynamic changes of the model during execution of the project and the linkage to further technical objects like costs, building structure, specifications and documentmanagement. Furthermore, the scheduling of the project can be done within the process-model and can be visualized as a Gantt-diagram. ...
Applications for civil engineering tasks usually contain graphical user interfaces for the engineering processes. Persistent objects of the applications are stored to data bases. The influence of the interaction between a graphical user interface and a data base for the development of an civil engineering application is investigated in this paper. A graphic application for the linear elastic analysis of plane frames, which was previously developed with standard tools of the Java platform, is compared to a redesigned implementation using a generalized data base for persistent objects. The investigation leads to the following results : - A strict distinction between persistent and transient objects influences the class structure of an application, in particular the class structure of a graphical user interface. - The structure of an application depends on the logic for updating of references to persistent and transient graphical objects after an application is read from a file. - The complexity of the reference management can usually be handled better by just in time referencing associated with String - identifiers rather than by automated referencing associated with Name - identifiers.
Integrated Engineering Workflow focused on the Structural Engineering in the Industrial Environment
(2004)
The engineering and construction industry has been slow to exploit the full potential of information technology. The industry is highly fragmented, price sensitive, risk-adverse, and profit margins are small. Each project is unique with a small amount of technological innovation opportunities to capitalise on from one project to the next. Technological innovations that have been taking place are just simulating the old traditional paper workflow. Engineering information in digital form is being conveyed using traditional paper representations, which have to be interpreted by humans before the information can be used in other applications, thereby creating ‘islands of information’. It can be seen that poorly implemented IT strategies are duplicating paperwork, rather than reducing or eliminating it (Crowley et al., 2000). This paper will introduce the Integrated Engineering Workflow (IEW) concept to re-organise a structural discipline working on multi-disciplinary projects so as to maximise the advantages offered by new information technology.
As a result of the pilot-project “Grundwasser-Online” the supervision and the active controlling of large monitoring- and catchment-areas are realised by a co-operative integration of all related institutions, a synchronisation-process to combine all distributed data into one central server database, and a high-level eGovernment-Service to provide evaluated information over the internet. Based on this software system the local authorities are able to supervise the groundwater-levels and to find adequate decisions, which finally result in official permissions for the usage of groundwater-reservoirs by the water supply companies.
Available construction time-cost trade-off analysis models can be used to generate trade-offs between these two important objectives, however, their application is limited in large-scale construction projects due to their impractical computational requirements. This paper presents the development of a scalable and multi-objective genetic algorithm that provides the capability of simultaneously optimizing construction time and cost large-scale construction projects. The genetic algorithm was implemented in a distributed computing environment that utilizes a recent standard for parallel and distributed programming called the message passing interface (MPI). The performance of the model is evaluated using a set of measures of performance and the results demonstrate the capability of the present model in significantly reducing the computational time required to optimize large-scale construction projects.
Cost and Schedule Controlling in Relation to Liquidity Management during Construction Projects
(2004)
The present paper describes a software application which can be used for relating the scheduled events of a construction project with the respective financial parameters, leading to an overall improvement in general controlling and liquidity management. For this purpose, existing construction schedules are taken and details of the assignment are recorded. Thus it becomes possible to assess a future payment status should changes in the designated schedule occur.
The methods currently used for scheduling building processes have some major advantages as well as disadvantages. The main advantages are the arrangement of the tasks of a project in a clear, easily readable form and the calculation of valuable information like critical paths. The main disadvantage on the other hand is the inflexibility of the model caused by the modeling paradigms. Small changes of the modeled information strongly influence the whole model and lead to the need to change many more details in the plan. In this article an approach is introduced allowing the creation of more flexible schedules. It aims towards a more robust model that lowers the need to change more than a few information while being able to calculate the important propositions of the known models and leading to further valuable conclusions.
Some key facts about the economic environment of construction industry are explained. It is shown that construction industry is very heterogeneous and has changed drastically during the recent years due to a rapidly moving commercial environment. Two examples of todays’s use of virtual construction tools in construction projects are presented. The first example is the document control for a large international project. The second is the application of 4D modelling in the preconstruction phase of a dam project. It is shown that virtual construction, is a major international trend that currently takes up speed. Some generic industry needs for Research and Development which aims at short and medium term results are presented.
As computer programs become ever more complex, software development has shifted from focusing on programming towards focusing on integration. This paper describes a simulation access language (SimAL) that can be used to access and compose software applications over the Internet. Specifically, the framework is developed for the integration of tools for project management applications. The infrastructure allows users to specify and to use existing heterogeneous tools (e.g., Microsoft Project, Microsoft Excel, Primavera Project Planner, and AutoCAD) for simulation of project scenarios. This paper describes the components of the SimAL language and the implementation efforts required in the development of the SimAL framework. An illustration example bringing on-line weather forecasting service for project scheduling and management applications is provided to demonstrate the use of the simulation language and the infrastructure framework.
Indentation experiments have been carried out over the past century to determine hardness of materials. Modern indentation machines have the capability to continuously monitor load and displacement to high precision and accuracy. In recent years, research interests have focussed on methods to extract material properties from indentation load-displacement curves. Analytical methods to interpret the indentation load-displacement curves are difficult to formulate due to material and geometric nonlinearities as well as complex contact interactions. In the present study, an artificial neural network model was constructed for interpretation of indentation load-displacement curves. Large strain-large deformation finite element analyses were first carried out to simulate indentation experiments. The data from finite element analyses were then used to train the artificial neural network model. The artificial neural network model was able to accurately determine the material properties when presented with load-displacement curves which were not used in the training process. The proposed artificial neural network model is robust and directly relates the characteristics of the indentation loaddisplacement curve to the elasto-plastic material properties.
The truss model for predicting shear resistance of reinforced concrete beams has usually been criticized because of its underestimation of the concrete shear strength especially for beams with low shear reinforcement. Two challengers are commonly encountered in any truss model and are responsible for its inaccurate shear strength prediction. First: the cracking angle is usually assumed empirically and second the shear contribution of the arching action is usually neglected. This research introduces a nouvelle approach, by using Artificial Neural Network (ANN) for accurately evaluating the shear cracking angle of reinforced and prestressed concrete beams. The model inputs include the beam geometry, concrete strength, the shear reinforcement ratio and the prestressing stress if any. ...
This paper is a report of Radio Frequency Identification (RFID) technology and its potential applications in the commercial construction industry. RFID technology offers wireless communication between RFID tags and readers with non line-of-sight readability. These fundamental properties eliminate manual data entry and introduce the potential for automated processes to increase project productivity, construction safety, and project cost efficiency. Construction contractors, owners, and material suppliers that believe technology can further develop methods and processes in construction should feel obligated to participate in RFID studies for the advancement of the construction industry as a whole.
At the start of the conceptual design process, designers start to give tangible form to their thoughts by sketching. This helps with reasoning and communicates ideas to other members of the team. Sketches are gradually worked up into more formal drawings which are then passed to the other stages of the design process. There are however some problems with basing early ideas on sketching. For example, due to their ad-hoc nature, sketches tend only to be diagrammatic representations and so designers cannot be sure that their ideas are feasible and what is being proposed meets the constraints described in the client brief. This can result in designers wasting time working up ideas which prove to be unsuitable. Also the process of constraint checking is complex and time consuming and so designers tend limit their search of possible options and instead choose satisfying rather than good solutions. This paper describes the INTEGRA project which examines the role of sketching in early conceptual design and how this can be linked to other aspects of the process and particularly automated constraint checking using an IT based approach. The focus for the work is the design of framed buildings. A multi-disciplinary approach has been adopted and the work has been undertaken in close collaboration with practising designers and clients.
Als Folge des hohen Termindrucks während des Bauablaufes, ist es besonders wichtig den Fortschritt eines Bauvorhabens zeitnah zu überwachen. Auf Großbaustellen kann die effektive Kontrolle nicht mehr ohne technische Hilfsmittel durchgeführt werden. Die Arbeit stellt verschiedene Szenarien für die verteilte Fortschrittserfassung vor und untersucht welche Anforderungen an ein System für die verteilte Erfassung gestellt werden. Dazu wird zuerst das bestehende CVS-System analysiert, um anschließend daraus ein Konzept für die Versionierung von Objekten und den automatischen Abgleich von Objektversionen zu entwickeln. Später wird gezeigt, wie dieses Konzept mit Hilfe von C# und dem Microsoft®-.NET-Framework umgesetzt werden kann.
Building project, with many different players involved, requires open and commonly accepted standard for product model description. Product model based design tools support easy comparisons of design alternatives and optimisation of design solution technical quality. This supports client s decision-making and design target comparisons through the whole building project. Use of product models enable these tasks to meet both schedule and cost requirements Olof Granlund is using product models and interoperable software as the main tool in projects. The use and the realised benefits are illustrated by examples from 3 different real projects: University building, where product models were used already in the very early phases by the whole design team. Office building for research organisation, where product models were used in so called self-reporting building system. Headquarters for international company, where product models were widely used for building performance analysis and visualisations in design phase as well as for facilities management system configuration for operational phase.
This paper focuses on a new three-level discretisation strategy which enables the transition between continuum/structural (I) and structural/black box modelling (II). The transition (I) is realised by means of a model adaptive concept based on an innovative finite element technology. For transition (II) we apply the truncated balanced realisation method (TBR). The latter represents an established system theoretical model reduction technique which is here combined with a novel substructure technique. The approach provides a modular concept to facilitate the computational analysis of complex structures. The final goal is to apply the strategy to life time estimation.
The promise of lower costs for sensors that can be used for construction inspection means that inspectors will continue to have new choices to consider in creating inspection plans. However, these emerging inspection methods can require different activities, resources, and decisions such that it can be difficult to compare the emerging methods with other methods that satisfy the same inspection needs. Furthermore, the context in which inspection is performed can significantly influence how well certain inspection methods are suited for a given set of goals for inspection. Context information, such as weather, security, and the regulatory environment, can be used to understand what information about a component should be collected and how an inspection should be performed. The research described in this paper is aimed at developing an approach for comparing and selecting inspection plans. This approach consists of (1) refinement of given goals for inspection, if necessary, in order to address any additional information needs due to a given context and in order to reach a level of detail that can be addressed by an inspection activity; (2) development of constraints to describe how an inspection should be achieved; (3) matching of goals to available inspection methods, and generation of activities and resource plans in order to address the goals; and (4) selection of an inspection plan from among the possible plans that have been identified. The authors illustrate this approach with observations made at a local construction site.
The approach discussed here is part of research into an overall concept for digital instruments which support the entire planning process and help in enabling planning decisions to be based upon clear reasoning and plausible arguments. Such specialist systems must take into account currently available technology, such as networked working patterns, object-orientation, building and product models as well as the working method of the planner. The paper describes a plausibility instrument for the formulation of colour scheme proposals for building interiors and elevations. With the help of intuitively usable light simulations, colour, material and spatial concepts can be assessed realistically. The software prototype “Coloured Architecture” is conceived as a professional extension to conventional design tools for the modelling of buildings. As such it can be used by the architect in the earliest design phases of the planning process as well as for colour implementation on location.
Structural engineering projects are increasingly organized in networked cooperations due to a permanently enlarged competition pressure and a high degree of complexity while performing the concurrent design activities. Software that intends to support such collaborative structural design processes implicates enormous requirements. In the course of our common research work, we analyzed the pros and cons of the application of both the peer-to-peer (University of Bonn) and multiagent architecture style (University of Bochum) within the field of collaborative structural design. In this paper, we join the benefits of both architecture styles in an integrated conceptual approach. We demonstrate the surplus value of the integrated multiagent–peer-to-peer approach by means of an example scenario in which several structural engineers are co-operatively designing the basic structural elements of an arched bridge, applying heterogeneous CAD systems.
Although there are some good reasons to design engineering software as a stand-alone application for a single computer, there are also numerous possibilities for creating distributed engineering applications, in particular using the Internet. This paper presents some typical scenarios how engineering applications can benefit from including network capabilities. Also, some examples of Internet-based engineering applications are discussed to show how the concepts presented can be implemented.
Assuring global consistency in a cooperative working environment is the main focus of many nowaday research projects in the field of civil engineering and others. In this paper, a new approach based on octrees will be discussed. It will be shown that by the usage of octrees not only the management and control of processes in a network-based working environment can be optimised but also an efficient integration platform for processes from various disciplines – such as architecture and civil engineering – can be provided. By means of an octree-based collision detection resp. consistency assurance a client-server-architecture will be described as well as sophisticated information services for a further support of cooperative work.
The worldwide growth of communication networks and associated technologies provide the basic infrastructure for new ways of executing the engineering process. Collaboration amongst team members seperated in time and location is of particular importance. Two broad themes can be recognized in research pertaining to distributed collaboration. One theme focusses on the technical and technological aspects of distributed work, while the other emphasises human aspects thereof. The case of finite element structural analysis in a distributed collaboratory is examined in this paper. An approach is taken which has its roots in human aspects of the structural analysis task. Based on experience of how structural engineers currently approach and execute this task while utilising standard software designed for use on local workstations only, criteria are stated for a software architechture that could support collaborative structural analysis. Aspects of a pilot application and the results of qualitative performance measurements are discussed.
Building design in Civil Engineering is characterized by the cooperation of experts in multiple disciplines. Close cooperation of engineers in different fields is the basis of high product quality, short development periods and a minimum of investment costs. For each building the engineers have to create a new fire engineering model. The consistent realization of the fire engineering model in all details has high demands on communication, collaboration and building models. Thereby, to preserve the related design models consistent to each other and compatible with the rules of fire engineering is a complex task. In addition, regulations and guidelines vary according to the building location, so the knowledge base must be integrated dynamically into the planning process. This contribution covers the integration of engineers and design models into a cooperation network on the basis of mobile agents. The distributed models of architectural design, structural planning and fire engineering are supported. These models are implemented as XML-based models which can be accessed by mobile agents for information retrieval and for processing tasks. Agents are provided to all planners, they are enabled to check up the distributed design models with the knowledge base of the fire protection regulations,. With the use of such an agent each planner is supported to check up his planning for accordance with the fire protection requirements. The fire-engineering-agent analyzes the design and detects inconsistencies by processing fire protection requirements and design model facts in a rule-based expert system. The possibility to check the planning information at an early state in the sense of compatibility to the fire protection regulations enables a comprehensive diagnosis of the design and the reduction of planning errors.
This paper describes an approach to support co-operation of experts in heterogeneous geotechnical engineering project environments during both regular execution and handling of exceptional situations. A co-operation platform is introduced which is based on a generalized information model mapping key information about the construction project, the construction process as well as the organization structure. Several tools are provided to operate the information model in a network based environment.
The scientific transfer of key technology features to developing countries, together with adequate competence, localisation and adaptation, is the primary purpose of the proposed investigation. It is evident that introducing high-level CAD design and detailing will improve the planning process in developing countries. Successful utilization of applied information technology for the planning process, however, depends on the user-interface of individual software. Therefore, to open the great opportunity embedded in CAD software for clients globally, the language and character-set barrier of traditional user-interfaces must be overcome. A proposal for a research program is given here to address such issue in favour of global civil engineering.
This paper deals with two different agent-based approaches aimed at the incorporation of complex design information into multi-agent planning systems. The first system facilitates collaborative structural design processes, the second one supports fire engineering in buildings. Both approaches are part of two different research projects that belong to the DFG1 priority program 1103 entitled “Network-based Co-operative Planning Processes in Structural Engineering“ (DFG 2000). The two approaches provide similar database wrapper agents to integrate relevant design information into two multi-agent systems: Database wrapper agents make the relevant product model data usable for further agents in the multi-agent system, independent on their physical location. Thus, database wrapper agents act as an interface between multi-agent system and heterogeneous database systems. The communication between the database wrapper agents and other requesting agents presumes a common vocabulary: a specific database ontology that maps database related message contents into database objects. Hereby, the software-wrapping technology enables the various design experts to plug in existing database systems and data resources into a specific multi-agent system easily. As a consequence, dynamic changes in the design information of large collaborative engineering projects are adequately supported. The flexible architecture of the database wrapper agent concept is demonstrated by the integration of an XML and a relational database system.
Die Arbeit beschreibt ein Konzept zur computergestützten, schrittweisen Erfassung und Abbildung der Geometrie von Gebäuden im Kontext der planungsrelevanten Bauaufnahme. Zunächst wird die Bauaufnahme als Erstellung eines verwendungsspezifischen Modells betrachtet. Anschließend wird der Fokus auf das geometrische Abbild gelegt. Es werden u.a. die Aufmaßtechniken Handaufmaß, Tachymetrie und Photogrammetrie bewertet und gebäudetypische geometrische Abstraktionen aufgelistet. Danach erfolgt eine Aufstellung von Anforderungen an ein computergestütztes Aufmaßsystem, welche mit kommerziellen Lösungen aus dem nichtgeodätischen Bereich verglichen wird. Im Hauptteil wird das zu Beginn genannte Konzept beschrieben. Betrachtet wird die skizzenbasierte Erstellung eines nichtmaßlichen geometrischen Abbildes des Gebäudes in den Frühphasen der Bauaufnahme, seine anschließende schrittweise maßliche Anpassung an das Original und topologische Detaillierung im Zuge des Bauaufmaßes, sowie die Extraktion von Bauteilen und ihren geometrischen Parametern. Zur Vereinfachung der maßlichen Anpassung des geometrischen Abbildes im Aufmaßprozeß werden geometrische Abstraktionen wie Parallelitäten, rechte Winkel usw. genutzt, aber nicht erzwungen. Mit Hilfe der Ausgleichungsrechnung erfolgt eine Zusammenführung der geometrischen Abstraktionen und verschiedener Aufmaßtechniken. Es werden die nötigen Beobachtungsgleichungen und andere relevante Aspekte beschrieben. Gezeigt wird weiter ein Konzept, wie ein nutzerseitig veränderbares Bauwerksmodell mit dem geometrischen Abbild in Bezug gebracht werden kann, wobei aus dem geometrischen Abbild geometrische Parameter des nutzerseitig veränderbaren Bauwerkmodells gewonnen werden können. Ausgesuchte Problematiken der Arbeit wurden prototypisch implementiert und getestet. Hierbei stand die Verbindung der Aufmaßtechniken und geometrischen Abstraktionen im Mittelpunkt. Die geometrischen Ansätze der Arbeit beschränken sich auf planare Oberflächen.
Re-examination of the behaviour of structures can be necessary due to deterioration or changes in the traffic situation during their lifetime. The Finite Element Method (FEM) is widely used in order to accomplish numerical analysis. Considering the development of computer performance, more detailed FEM models can be analyzed, even on site, with mobile computers. To compensate the increasing amount of data needed for the model input, measures need to be taken to save time, by distributing the work. In order to provide consistency to the model, fedback data must be checked upon reception. A local wireless computer network of ultra-portable devices linked together with a computer can provide the coordination necessary for efficient parallel working. Based on a digital model consisting of all data gathered, structural modelling and numerical analysis are performed automatically. Thus, the user is released from the work that can be automatized and the time needed for the overall analysis of a structure is decreased.
Collaboration in AEC Design : Web-enabling Applications using Peer-to-Peer Office Communicator
(2004)
A market analysis conducted by Gartner Dataquest in August 2001 has shown the typical characteristics of the AEC design process. High volatility in membership of AEC design groups and members dispersed over several external offices is the common collaboration scenario. Membership is most times short lived, compared to the overall duration of the process. A technical solution has to take that into account by making joining and leaving a collaborative work group very easy. The modelling of roles of collaboration between group members must be based on a commonly understood principle like the publisher / subscriber model, where the individual that is responsible for the distribution of vital information is clear. Security issues and trust in the confidentiality of the system is a central concern for the acceptance of the system. Therefore, keeping the subset of data that will be published under the absolute control of the publisher is a must. This is not the case with server-based scenarios, sometimes even due to psychological reasons. A loosely bound Peer-to-Peer network offers advantages over a server-based solution, because of less administrative overhead and simple installation procedures. In a peer-to-peer environment, a publish/subscribe role model can be more easily implemented. The publish/subscribe model matches the way AEC processes are modelled in real world scenarios today, where legal proof of information exchange between external offices is of high importance. Workflow management systems for small to midsize companies of the AEC industry may adopt the peer-to-peer approach to collaboration in the future. Further investigations are being made on the research level (WINDS) by integrating the viewer and redlining application Collaborate! into a collaborative environment.
In this contribution, the design of an analysis environment is presented, that supports an analyst to come to a decision within a gradual collaborative planning process. An analyst represents a project manager, planner or any other person, involved in the planning process. Today, planning processes are managed by several geographically distributed planners and project managers. Thus, complexity of such a process rises even more. Prediction of consequences of many planning decisions is not possible, in particular since assessment of a planning advance is not trivial. There have to be considered several viewpoints, that depend on individual perceptions. In the following, methods are presented to realize planning decision support.
In the AEC (Architecture / Engineering / Construction) industry a number of individuals and organisations collaborate and work jointly on a construction project. The resulting consortium has large pool of expertise and experience and can be defined as a Virtual Organisation (VO) formed for the duration of the project. VOs are electronically networked organisations where IT and web based communication technology play an important role in coordinating various activities of these organisations. This paper describes the design, development and implementation of a Grid enabled application called the Product Supplier Catalogue Database (PSCD) which supports collaborative working in consortia. As part of the Grid-enabling process, specialised metadata is being developed to enable PSCD to effectively utilise Grid middleware such as Globus and Java CoG toolkits. We also describe our experience whilst designing, developing and deploying the security service of the application using the Globus Security Interface (GSI).
The conceptual structure of an application that can support the structural analysis task in a distributed collaboratory is described in (van Rooyen and Olivier 2004). The application described there has a standalone component for executing the finite element method on a local workstation in the absence of network access. This application is comparable to current, local workstation based finite element packages. However, it differs fundamentally from standard packages since the application itself, and its objects, are adapted to support distributed execution of the analysis task. Basic aspects of an object-oriented framework for the development of applications which can be used in similar distributed collaboratories are described in this paper. An important feature of this framework is its application-centred design. This means that an application can contain any number of engineering models, where the models are formed by the collection of objects according to semantic views within the application. This is achieved through very flexible classes Application and Model, which are described in detail. The advantages of the application-centred design approach is demonstrated with reference to the design of steel structures, where the finite element analysis model, member design model and connection design model interact to provide the required functionality.
Communication software and distributed applications for control and building performance simulation software must be reliable, efficient, flexible, and reusable. This paper reports on progress of a project, which aims to achieve better integrated building and systems control modeling in building performance simulation by run-time coupling of distributed computer programs. These requirements motivate the use of the Common Object Request Broker Architecture (CORBA), which offers sufficient advantage than communication within simple abstraction. However, set up highly available applications with CORBA is hard. Neither control modeling software nor building performance environments have simple interface with CORBA objects. Therefore, this paper describes an architectural solution to distributed control and building performance software tools with CORBA objects. Then, it explains how much the developement of CORBA based distributed building control simulation applications is difficult. The paper finishes by giving some recommendations.
The contribution introduces a method for the distributed process modelling in order to support the process orientation in Structural Engineering, i.e., the modelling, analysis and management of planning processes. The approach is based on the Petri Net theory for the modelling of planning processes and workflows in Structural Engineering. Firstly, a central and coarse process model serves as a pre-structuring system for the detailed modelling of the technical planning activities. Secondly, the involved planning participants generate distributed process models with detailed technical workflow information. Finally, these distributed process models will be combined in the central workflow net. The final net is of great importance for the process orientation in Structural Engineering, i.e., the identification, publication, analysis, optimization and finally the management of planning processes.
The process of matching data represented in two different data models is a longstanding issue in the exchange of data between different software systems. While the traditional manual matching approach cannot meet today’s demands on data exchange, research shows that a fully automated generic approach for model matching is not likely, and generic semi-automated approaches are not easy to implement. In this paper, we present an approach that focuses on matching data models in a specific domain. The approach combines a basic model matching approach and a version matching approach to deduce new matching rules to enable data transfer between two evolving data models.
This paper describes an ongoing research on the representation and reasoning about construction specifications, which is part of a bigger research project that aims at developing a formalism for automating the identification of deviations and defects on construction sites. We specifically describe the requirements on product and process models and an approach for representing and reasoning about construction specifications to enable automated detection and assessment of construction deviations and defects. This research builds on the previous research on modeling design specifications and extends and elaborates concept of contexts developed in that domain. The paper provides an overview of how the construction specifications are being modele d in this research and points out future steps that need to be accomplished to develop the envisioned automated deviation and defect detection system.
The increased implementation of site data capture technologies invariably results in an increase in data warehousing and database technologies to store captured data. However, restricted use of data beyond the initial application could potentially result in a loss of understanding of site processes. This could in turn lead to poor decision making at production, tactical and strategic levels. Concrete usage data have been collected from two piling processes. These data have been analysed and the results highlighted potential improvements that could be made to existing site management and estimating processes. A cost benefit analysis has been used to support decision making at the strategic level where the identified improvements require capital expenditure.
Information science researchers and developers have spent many years addressing the problem of retrieving the exact information needed and using it for analysis purposes. In informationseeking dialogues, the user, i.e. construction project manager or supplier, often asks questions about specific aspects of the tasks they want to perform. But most of the time it is difficult for the software systems to unambiguously understand their overall intentions. The existence of information tunnels (Tannenbaum 2002) aggravates this phenomenon. This study includes a detailed case study of the material management process in the construction industry. Based on this case study, the structure of a formal user model for information retrieval in construction management is proposed. This prototype user model will be incorporated into the system design for construction information management and retrieval. This information retrieval system is a user-centered product based on the development of a user configurable visitor mechanism for managing and retrieving project information without worrying too much about the underlying data structure of the database system. An executable UML model combined with OODB is used to reduce the ambiguity in the user's intentions and to achieve user satisfaction.
Spatial data acquisition, integration, and modeling for real-time project life-cycle applications
(2004)
Current methods for site modeling employs expensive laser range scanners that produce dense point clouds which require hours or days of post-processing to arrive at a finished model. While these methods produce very detailed models of the scanned scene, useful for obtaining as-built drawings of existing structures, the associated computational time burden precludes the methods from being used onsite for real-time decision-making. Moreover, in many project life-cycle applications, detailed models of objects are not needed. Results of earlier research conducted by the authors demonstrated novel, highly economical methods that reduce data acquisition time and the need for computationally intensive processing. These methods enable complete local area modeling in the order of a minute, and with sufficient accuracy for applications such as advanced equipment control, simple as-built site modeling, and real-time safety monitoring for construction equipment. This paper describes a research project that is investigating novel ways of acquiring, integrating, modeling, and analyzing project site spatial data that do not rely on dense, expensive laser scanning technology and that enable scalability and robustness for real-time, field deployment. Algorithms and methods for modeling objects of simple geometric shape (geometric primitives from a limited number of range points, as well as methods provide a foundation for further development required to address more complex site situations, especially if dynamic site information (motion of personnel and equipment). Field experiments are being conducted to establish performance parameters and validation for the proposed methods and models. Initial experimental work has demonstrated the feasibility of this approach.
During the establishing of fundamentals in a building project a huge amount of influence factors and boundary conditions have to be investigated in order to provide the prerequisites for further planning processes. These investigative tasks are often related with a great effort concerning time and money, because there are no standardized workflows and interfaces which provide an efficient access to the necessary information related to a specific construction site. Within the fundamental investigation human and natural circumstances have to be taken into account. Thus, in this project two examples have been chosen in order to demonstrate the holistic approach for an integration and provision of georeferenced information. The developed internet-site http://www.grundlagenermittlung.de has been designed to support architects and civil engineers in early planning phases of a building project efficiently. It offers web-based services based on dynamic interfaces for a flexible search and collection of information concerning the building site. Therefore, a central Metadatabase-Server for Description, Discovery and Integration has been established which enables a registration of georeferenced services and the redirection of incoming requests to other, distributed data pools. Using this Yellow-Page concept in combination with the underlying meta-data based on the ISO 19115 standard an efficient investigation of geographical and environmental information becomes possible.