620 Ingenieurwissenschaften und zugeordnete Tätigkeiten
Refine
Document Type
- Conference Proceeding (326)
- Article (129)
- Doctoral Thesis (8)
- Master's Thesis (1)
Institute
- Professur Informatik im Bauwesen (464) (remove)
Keywords
- Modellierung (62)
- Bauwerk (48)
- Finite-Elemente-Methode (41)
- CAD (39)
- Verteiltes System (38)
- Bautechnik (30)
- Produktmodell (24)
- Architektur (23)
- Simulation (21)
- Computerunterstütztes Verfahren (20)
The purpose of this paper is to review model for finite element techniques for non-linear crack analysis of reinforced concrete beams and slabs. The non-linear behaviour of concrete and steel were described. Some calculations of >self-stress< for concrete and reinforced concrete beam was made. Current computational aspects are discussed. Several remarks for future studies are also given. The numerical model of the concrete and reinforced concrete was described. The paper shows the results of calculations on a reinforced concrete plane stress panel with cracks. The non-linear, numerical model of calculations of reinforced concrete was assumed. Using finite elements method some calculations were made. The results of calculations like displacements, stresses and cracking are shown on diagrams. They were compared with experimental results and other finding. Some conclusions about the described model and results of calculation are shown.
Authors' own research in applied unicriterial and multicriterial optimisation of bar structures, and also an analysis of accessible bibliography on structural synthesis allows to present herein an attempt to define a general algorithm for proceeding in formulation of a structural optimisation problem. A practical aspect of such an algorithm consists, in author's opinion, in enabling a designer a correct creation of a mathematical model of synthesis problems, independently of known mathematical methods employed to looking for an unconditional extremum of function of several variables. A proposed algorithm is not a ready-for-use tool for solving all the optimisation problems, but it constitutes an easy-to-expand theoretical basis. This basis should allow a designer to create a proper set of compromises on the way to construct a mathematical model of a specific optimisation problem. The algorithm, presented in the paper, is constructed as a sequence of the one-after-another problem questions, on which the designer answers: yes or no, and a set of selections from the knowledge base consisting of the elements of an optimisation problem components. The order of making questions adopted by the authors in the algorithm is subjective, however it is supported by their experience, both in applied optimisation and in designing of structures like trusses or frames.
Der Funktionsumfang von 3D-Modellierern und die Leistung allgemein zur Verfügung stehender Rechnersysteme gestatten die Modellierung beliebiger Objekte in jeder nur denkbaren Fachdisziplin. Das potentielle Leistungsvermögen von 3D-Modellierern sollte Anreiz sein, sie so alltäglich einzusetzen, wie die etablierten Standardapplikationen. Die im Vortrag gezeigten Modelle umfassen ein kleines Spektrum der möglichen Anwendungsgebiete. Weder vom (Daten)Umfang noch von ihrem Kompliziertheitsgrad stellen sie etwas Besonderes dar. Sie sollen nur das Interesse für einen alltäglichen Einsatz von 3D-Modellierern wecken und eventuell vorhandenen Einsatzschwellen abbauen helfen. Die im Vortrag gezeigten Bildfolgen sind unter http://www.uni-weimar.de/animationen zu finden.
Der englische Physiker und Mathematiker Roger Penrose hat eine mathematische Pflasterung entdeckt, deren Formenreichtum neue Impulse in der Architektur setzen kann. In der Gemeinde Bütgenbach im Hohen Venn, Belgien, wurde das Verwaltungszentrum durch den Essener Architekten Ernst Burghartz mit mehrereren Penrose-Pflasterungen versehen. Diese beruhen auf einem Computer-Programm, welches der Vortragende zusammen mit Dr. Frank Martini entwickelt hat. Herr Burghartz hat jedoch diesen Vorentwurf nach seinen künstlerischen Vorstellungen abgewandelt.
Seit mehreren Jahren wird im Fachbereich Gestaltung, Studiengang Innenarchitektur 3D-Computergrafik und -animation in Lehrveranstaltungen ausgebildet und in Projekt- und Diplomarbeiten als Darstellungsmedium angewandt. Eine besondere Herausforderung stellen dabei die 3D-Visualisierungen von historischen Gebäuden dar. Mit den beiden nachfolgenden Beispielen soll der Einsatz und die curricularen Verknüpfung der CA-Technologie mit Studienarbeiten und Projekten zum Thema >Denkmalpflege< aufgezeigt werden. Rekonstruktion und Visualisierung des ehemaligen >Jagdschlosses Platte< bei Wiesbaden. Mit Unterstützung einer Kunsthistorikerin wurde in einer Studienarbeit das im Krieg zerstörte ehemalige Jagdschloß im Computer nachgebildet. Neben der Darstellung des Gebäudeäußeren und des zentralen Innenbereiches wurde eine Animation über die Triangulierung der klassizistischen Geometrie erstellt. Umnutzung historischer Bausubstanz am Beispiel der ehemaligen Klostersanlage >Schiffenberg< bei Gießen. Im Rahmen einer Projektarbeit wurden mehrer Konzepte entwickelt, Entwürfe erstellt und mittels Computeranimationen öffentlich präsentiert. In Kooperation mit dem Studiengang Fernsehtechnik (FH-Wiesbaden) wurde von zwei Studenten eine Videodokumentation über den gesamten Projektverlauf erstellt. Neben dem Aufzeigen der Arbeitsprozesse und dem Vorstellen des Lehrkonzeptes für die curriculare Einbindung der CA-Technologie werden aktuelle Studienergebnisse anhand von Videoprojektionen vorgestellt.
Methods with the convergence order p 2 (Newton`s, tangent hyperbolas, tangent parabolas etc.) and their approximate variants are studied. Conditions are presented under which the approximate variants preserve their convergence rate intrinsic to these methods and some computational aspects (possibilities to organize parallel computation, globalization of a method, the solution of the linear equations versus the matrix inversion at every iteration etc.) are discussed. Polyalgorithmic computational schemes (hybrid methods) combining the best features of various methods are developed and possibilities of their application to numerical solution of two-point boundary-value problem in ordinary differential equations and decomposition-coordination problem in convex programming are analyzed.
In the given paper the generalized formulation of the problem of computer modelling of the complex-composite structure interaction with different types of dynamic loads and effects is discussed. Here the analysis is given as for the usage of some universal computing systems for the solution of such problems. Also if is shown that the quantification of the dynamic models of the complex-composite systems with the variable structure, depending on the character and intensivity of the effects, is necessary. The different variants of the joint and the space structure element modelling are gested. It allows to consider the complex modes of the joint bending-torsional oscillations of such structures as bridges, towers, high-rise buildings. The peculiarities of the modelling and testing of some problems of the objects aerodynamics and the interaction of the frameworks constructions with shock and movable loads are considered. In this paper the examples of the complex-composite structure dynamic analysis are shown. It is achieved by means of some special methods of the input of the real inducements and loads of the exploitated analog-object into the computing model. The suggested models found a wide use both at the design of new structures and the dynamic monitoring of the exploitated structures.
Bei der Betrachtung von Stapelproblemen ergibt sich unter anderem folgendes Problem: Ein gegebener Stapel - bestehend aus den Elementen v i der Menge V - soll an anderer Stelle in einer vorgeschriebenen, veränderten Struktur wieder aufgebaut werden. Dazu stehen Hilfsstapelplätze zur Verfügung. Die Optimierung dieses Problems hinsichtlich der Anzahl der benötigten Hilfsstapelplätze ist NP-vollständig. Es werden Erfahrungen mit einem Branch-and-Bound Algorithmus zur Lösung des Problems vorgestellt sowie ein heuristischer Algorithmus diskutiert
Gegenstand der Betrachtung ist ein spezielles Tourenproblem der Schüttgutoptimierung. Man stelle sich als Realitätsbezug ein Transportunternehmen vor, das eine Anzahl von gleichartigen Fahrzeugen in einem Fuhrpark stationiert hat. Vorgegebene Mengen von Schüttgut müssen von einer Kiesgrube zu mehreren Baustellen transportiert werden. Dabei sind Be- und Entladezeiten, unterschiedliche mittlere Geschwindigkeiten für Leer- bzw. Lastfahrten und Schichtzeiten zu berücksichtigen. Gesucht ist eine optimale Anzahl von einzusetzenden Fahrzeugen und die zugehörigen Tourenpläne mit dem Ziel der Minimierung der Transportkosten unter Beachtung der Lieferverträge. Die Lösung des Problems erfolgt in zwei Phasen. Zuerst wird die Frage geklärt, wieviele Fahrzeuge bei minimalem Kostenniveau einzusetzen und welche zu den Leerfahrten gehörigen Teilstrecken wie oft zu befahren sind. Anschließend wird mit heuristischen Verfahren versucht, die Menge der zu fahrenden Teilstrecken so auf die Fahrzeuge aufzuteilen, daß für jedes Fahrzeug eine zulässige Tour entsteht. Zur komplexen Lösung einer denkbaren Aufgabe liegt ein Programm in der Programmiersprache PASCAL vor. Die erzielten numerischen Resultate belegen, daß auch für Probleme größerer Dimension eine Optimallösung oder sehr gute Näherungen in vernünftiger Zeit gefunden werden.
Priority-rule methods for approximately minimizing the duration of a project subject to minimal and maximal time lags between the activities of the project and limited availability of renewable resources are considered. Such a project can be modelled by a cyclic activity-on-node network. Two generation schemes for constructing feasible schedules are discussed: the serial and parallel schemes. Two different kinds of heuristic procedures are proposed. The sequential or direct method processes the activities or respectively nodes of the project network one after another without considering the strong components separately. The contraction method uses a bottom-up technique. First, a feasible subschedule is determined for each strong component. Second, each strong component is replaced by a single node and the resulting acyclic network is treated by the direct method. In conclusion, some results from an experimental performance analysis of the heuristics are given using a new network generator.