56.03 Methoden im Bauingenieurwesen
Refine
Document Type
- Conference Proceeding (113)
- Article (64)
- Doctoral Thesis (3)
Institute
Keywords
- Verteiltes System (37)
- Bautechnik (30)
- Bauwerk (27)
- Produktmodell (24)
- Simulation (22)
- Modellierung (21)
- Mehragentensystem (19)
- Architektur (18)
- Ingenieurbau (17)
- Planungsprozess (17)
Year of publication
- 2004 (180) (remove)
Efforts to define standards for representing AEC/FM data have been fairly successful. However defining a standard reference process model has not met with the same success. Yet almost every conceptual modelling or software development project starts by defining the business processes to be supported and the related requirements to be satisfied. This paper describes a new process-centred methodology for user requirements capture developed in the ICCI project (IST-2001-33022). Its essence is in recognising user requirements and use cases in the context of the real construction process, identifying the actors and roles for each individual activity and associating these activities with information, communication and standardisation requirements on the basis of a formalised specification, named the Process Matrix. In the paper we outline the history of process matrix development, introduce the basic structure of the matrix and show how it can be further extended and refined. We present also a web-based software implementation of the developed approach, describe how it has been used in ICCI and outline further perspectives.
A large-scale computer modeling and simulation method is presented for environmental flows in urban area. Several GIS and CAD data were used for the preparation of shape model and an automatic mesh generation method based on Delaunay method was developed. Parallel finite element method based on domain decomposition method was employed for the numerical simulation of natural phenomena. The present method was applied to the simulation of flood flow and wind flow in urban area. The present method is shown to be a useful planning and design tool for the natural disasters and the change of environments.
The goal of the research is the development of a computer system to plan, simulate and visualize erection processes in construction. In the research construction cranes are treated as robots with predefined degrees of freedom and crane-specific motion planning techniques are developed to generate time-optimized and collision-free paths for each piece to be erected in the project. Using inverse kinematics and structural dynamics simulation, the computer system then computes the crane motions and velocities necessary to achieve the previously calculated paths. The main benefits of the research are the accurate planning and scheduling of crane operations leading to optimization of crane usage and project schedules, as well as improving overall crane safety in the project. This research is aimed at the development of systems that will allow computer-assisted erection of civil infrastructure and ultimately to achieve fully-automated erection processes using robotic cranes...
The goal of the research is to increase the understanding of dynamic behaviors during the crane operation, and develops computer-aided methods to improve the training of crane operators. There are approximately 125,000 cranes in operation today in the construction industry, responsible for major portion of erection activities. Unfortunately, many accidents occur every year in the U.S. and other countries related to the operation of cranes in construction sites. For example on November 28, 1989 a tower crane collapse during the construction of a building in San Francisco killing four construction workers, one civilian and injuring 28. According to the statistics from Occupational Safety Health Administration (OSHA), there were 137 crane-related fatalities from 1992 to 2001 in the US. A well-known internet website that keeps track of crane-related accidents (craneaccidents.com), reports 516 accidents and 277 fatalities from 2000 to 2002. These statistics show that even though many measures have been taken to decrease the number of crane-related accidents (Braam, 2002), the number of crane related accidents is still very large. It is important to recognize that each construction related fatality is not only a great human loss but also increases the costs of insurance, lawsuits, and the construction budget due to delay of a project (Paulson 1992)...
Most retaining walls and box culverts built for arterial road construction are simple, and the design process of these structures is often repetitive and labor-intensive because they are so similar in structural configuration. Although some integrated design automation systems developed for retaining walls and box culverts have expedited the design process of these structures, the process of collecting and distributing the resultant engineering documents has not been fully integrated with the computer applications. We have been developing a Web-based design automation system to manage the resultant documents as well as to speed up the repetitive design process. Manipulation of engineering drawings in the Web page is one of the critical functions needed for Web-based design automation. eXtensible Markup Language (XML) and XML-based vector graphics are expected to facilitate the representation of engineering drawings in the Web page. In this paper, we present how we used XML and Scalable Vector Graphics (SVG) to compose engineering drawings and represent them in the Web page. XML Data Island we designed to define drawing components turned out effective in manipulating the engineering drawings in the Web page.
The paper investigates accuracy of deflection predictions made by the finite element package ATENA and design code methods ACI and EC2. Deflections have been calculated for a large number of experimental reinforced concrete beams reported by three investigators. Statistical parameters have been established for each of the technique at different load levels, separately for the beams with small and moderate reinforcement ratio.
There exists a big gap between the capabilities of current 3D-CAD applications and their actual usage in practice. Many architects and planners still prefer to draft in 2D because the benefits of 3D modeling are difficult to explain. This presentation offers a basis to view the 3D building model not merely as the source for 2D plan generation. By adding extra dimensions like Time and Cost to the 3D building model it becomes possible to generate dynamic information on building construction progress with regards to used material, resources and cost. These additional benefits are key elements to many planners and contractors and may therefore widen the acceptance of 3D building modeling in general.
Transport problems, as, for instance, the transport of sediment in hydraulic engineering and the transport of harmful substances through porous media, play an important role in many fields of civil engineering. Other examples include the dissipation of heat or sound as well as the simulation of traffic with macroscopic models. The contribution explains the analysis of the applicability of Voronoi-based finite volume methods for the approximation of solutions of transport problems. A special concern is the discretisation of the transport equation. Current limitations of the method as well as ideas for stabilisation are explained with examples.
All construction project are constrained by their schedules, budgets and specifications, and safety and environmental regulations. These constraints made construction management more complex and difficult. At the same time, many historical data that can support the decisions in the future are kept in construction enterprises,. To use the historical data effectively and efficiently, it is essential to apply the data warehouse and data mining technologies. This paper introduces a research which aims to develop a data warehouse system according to the requirements of construction enterprises and use data mining technology to learn useful information and knowledge from the data warehouse system. The design, the development and the application of this system are detailedly introduced in this paper.
The construction industry is a supportive industry in China. IT (information technolgy), including computer technology and communication technology, as a whole is regarded as the most important means to upgrade the construction industry so that research projects were organized by Chinese government to further the application of IT in the construction industry. This study originated from one of the projects and is aimed at grasping the general situation on the application of IT in the construction industry. A questionnaire was designed for the survey, which used stratified proportional sampling method, and was carried out under the help of a government agency. This study can not only provide sound foundation for the government to make relative policies, but also reveal references for the firms in construction industry to apply IT in their business. This paper presents the preliminary result of the survey.