Determining the earthquake hazard of any settlement is one of the primary studies for reducing earthquake damage. Therefore, earthquake hazard maps used for this purpose must be renewed over time. Turkey Earthquake Hazard Map has been used instead of Turkey Earthquake Zones Map since 2019. A probabilistic seismic hazard was performed by using these last two maps and different attenuation relationships for Bitlis Province (Eastern Turkey) were located in the Lake Van Basin, which has a high seismic risk. The earthquake parameters were determined by considering all districts and neighborhoods in the province. Probabilistic seismic hazard analyses were carried out for these settlements using seismic sources and four different attenuation relationships. The obtained values are compared with the design spectrum stated in the last two earthquake maps. Significant differences exist between the design spectrum obtained according to the different exceedance probabilities. In this study, adaptive pushover analyses of sample-reinforced concrete buildings were performed using the design ground motion level. Structural analyses were carried out using three different design spectra, as given in the last two seismic design codes and the mean spectrum obtained from attenuation relationships. Different design spectra significantly change the target displacements predicted for the performance levels of the buildings.
The paper analyses the application of 3D gaming technologies in the simulation of processes associated with human resources and machinery on construction sites in order to determine process costs. It addresses the problem of detailing in process simulation. The authors outline special boundary conditions for the simulation of cost-relevant resource processes on virtual construction sites. The approach considers different needs for detailing in process simulation during the planning and building phase. For simulation of process costs on a construction site (contractors view) the level of detail has to be set to high. A prototype for determination of process durations (and hereby process costs) developed at the Bauhaus University Weimar is presented as a result of ongoing researches on detailing in process simulation. It shows the method of process cost determination on a high level of detail (game between excavator and truck) through interaction with the virtual environment of the site.