54.89 Angewandte Informatik: Sonstiges
Refine
Document Type
- Conference Proceeding (113)
- Article (63)
Institute
Keywords
- Verteiltes System (37)
- Bautechnik (30)
- Bauwerk (27)
- Produktmodell (24)
- Simulation (22)
- Modellierung (20)
- Mehragentensystem (19)
- Architektur (18)
- Ingenieurbau (17)
- Planungsprozess (17)
Year of publication
- 2004 (176) (remove)
Information science researchers and developers have spent many years addressing the problem of retrieving the exact information needed and using it for analysis purposes. In informationseeking dialogues, the user, i.e. construction project manager or supplier, often asks questions about specific aspects of the tasks they want to perform. But most of the time it is difficult for the software systems to unambiguously understand their overall intentions. The existence of information tunnels (Tannenbaum 2002) aggravates this phenomenon. This study includes a detailed case study of the material management process in the construction industry. Based on this case study, the structure of a formal user model for information retrieval in construction management is proposed. This prototype user model will be incorporated into the system design for construction information management and retrieval. This information retrieval system is a user-centered product based on the development of a user configurable visitor mechanism for managing and retrieving project information without worrying too much about the underlying data structure of the database system. An executable UML model combined with OODB is used to reduce the ambiguity in the user's intentions and to achieve user satisfaction.
The planning of projects in building engineering is a complex process which is characterized by a dynamical composition and many modifications during the definition and execution time of processes. For a computer-aided and network-based cooperation a formal description of the planning process is necessary. In the research project “Relational Process Modelling in Cooperative Building Planning” a process model is described by three parts: an organizational structure with participants, a building structure with states and a process structure with activities. This research project is part of the priority program 1103 “Network-Based Cooperative Planning Processes in Structural Engineering” promoted by the German Research Foundation (DFG). Planning processes in civil engineering can be described by workflow graphs. The process structure describes the logical planning process and can be formally defined by a bipartite graph. This structure consists of activities, transitions and relationships between activities and transitions. In order to minimize errors at execution time of a planning process a consistent and structurally correct process model must be guaranteed. This contribution considers the concept and the algorithms for checking the consistency and the correctness of the process structure.
Let the information of a civil engineering application be decomposed into objects of a given set of classes. Then the set of objects forms the data base of the application. The objects contain attributes and methods. Properties of the objects are stored in the attributes. Algorithms which the objects perform are implemented in the methods of the objects. If objects are modified by a user, the consistency of data in the base is destroyed. The data base must be modified in an update to restore its consistency. The sequence of the update operations is not arbitrary, but is governed by dependence between the objects. The situation can be described mathematically with graph theory. The available algorithms for the determination of the update sequence are not suitable when the data base is large. A new update algorithm for large data bases has been developed and is presented in this paper.
In this paper we present a computer aided method supporting co-operation between different project partners, such as architects and engineers, on the basis of strictly three-dimensional models. The center of our software architecture is a product model, described by the Industry Foundation Classes (IFC) of the International Alliance for Interoperability (IAI). From this a geometrical model is extracted and automatically transferred to a computational model serving as a basis for various simulation tasks. In this paper the focus is set on the advantage of the fully three-dimensional structural analysis performed by p-version of the finite element analysis. Other simulation methods are discussed in a separate contribution of this Volume (Treeck 2004). The validity of this approach will be shown in a complex example.
Spatial data acquisition, integration, and modeling for real-time project life-cycle applications
(2004)
Current methods for site modeling employs expensive laser range scanners that produce dense point clouds which require hours or days of post-processing to arrive at a finished model. While these methods produce very detailed models of the scanned scene, useful for obtaining as-built drawings of existing structures, the associated computational time burden precludes the methods from being used onsite for real-time decision-making. Moreover, in many project life-cycle applications, detailed models of objects are not needed. Results of earlier research conducted by the authors demonstrated novel, highly economical methods that reduce data acquisition time and the need for computationally intensive processing. These methods enable complete local area modeling in the order of a minute, and with sufficient accuracy for applications such as advanced equipment control, simple as-built site modeling, and real-time safety monitoring for construction equipment. This paper describes a research project that is investigating novel ways of acquiring, integrating, modeling, and analyzing project site spatial data that do not rely on dense, expensive laser scanning technology and that enable scalability and robustness for real-time, field deployment. Algorithms and methods for modeling objects of simple geometric shape (geometric primitives from a limited number of range points, as well as methods provide a foundation for further development required to address more complex site situations, especially if dynamic site information (motion of personnel and equipment). Field experiments are being conducted to establish performance parameters and validation for the proposed methods and models. Initial experimental work has demonstrated the feasibility of this approach.
Site superintendents performing project management tasks on construction sites need to access project documents and need to collect information that they observe while inspecting the site. Often, information that is observed on a construction site needs to be integrated into electronic documents or project control systems. In the future, we expect integrated product and process models to be the medium for storing and handling construction project management information. Even though mobile computing devices today are already capable of storing and handling such integrated product and process data models, the user interaction with such large and complex models is difficult and not adequately addressed in the existing research. In this paper, we introduce a system that supports project management tasks on construction sites effectively and efficiently by making integrated product and process models accessible. In order to effectively and efficiently enter or access information, site superintendents need visual representations of the project data that are flexible with respect to the level of detail, the decomposition structure, and the type of visual representation. Based on this understanding of the information and data collection needs, we developed the navigational model framework and the application Site Data Collection System (SiDaCoS), which implements that framework. The navigational model framework allows site superintendents to create customized representations of information contained in a product and process model that correspond to their data access and data collection needs on site.
Although there are some good reasons to design engineering software as a stand-alone application for a single computer, there are also numerous possibilities for creating distributed engineering applications, in particular using the Internet. This paper presents some typical scenarios how engineering applications can benefit from including network capabilities. Also, some examples of Internet-based engineering applications are discussed to show how the concepts presented can be implemented.
This paper presents an application of dynamic decision making under uncertainty in planning and estimating underground construction. The application of the proposed methodology is illustrated by its application to an actual tunneling project—The Hanging Lake Tunnel Project in Colorado, USA. To encompass the typical risks in underground construction, tunneling decisions are structured as a risk-sensitive Markov decision process that reflects the decision process faced by a contractor in each tunneling round. This decision process consists of five basic components: (1) decision stages (locations), (2) system states (ground classes and tunneling methods), (3) alternatives (tunneling methods), (4) ground class transition probabilities, and (5) tunneling cost structure. The paper also presents concepts related to risk preference that are necessary to model the contractor’s risk attitude, including the lottery concept, utility theory, and the delta property. The optimality equation is formulated, the model components are defined, and the model is solved by stochastic dynamic programming. The main results are the optimal construction plans and risk-adjusted project costs, both of which reflect the dynamics of subsurface construction, the uncertainty about geologic variability as a function of available information, and the contractor’s risk preference.
The management of resources is an essential task in each construction company. Today, ERP systems and e-Business systems are available to assist construction companies to efficiently organise the allocation of their personnel and equipment within the company, but they cannot provide the company with the idle resources for every single task that has to be performed during a construction project. Therefore, companies should have an alternative solution to better exploit expensive resources and compensate their fixed costs, but also have them available at the right time for their own business activities. This paper outlines the approach taken by the EU funded project “e-Sharing” (IST-2001-33325) to support resource management between construction companies. It will describe requirements for the management of construction resources, its core features, and the integration approach. Therefore, we will outline the approach of an integrated resource type model supporting the management and classification of construction equipment, construction tasks and qualification profiles. The development is based on a cross-domain analysis and evaluation of existing models. ...
Recently, many reseraches on active control systems of building structures are preformed based on modern control theory and are installed real buildings. The authors have already proposed intelligent fuzzy optimal active control (IFOAC) systems. IFOAC systems imitate intelligent activities of human brains such as prediction, adaptation, decision-kaking and so on. In IFOAC systems, objective and subjective judgements on the active control can be taken into account. However, IFOAC systems are considered to be suitable for far-field erathquake and control effect becomes small in case of near-field earthqaukes which include a few velosity pules with large amplitudes. To improve control effect in case of near-souece earthquakes, the authors have also proposed hybrid control (HC) systems, in which IFOAC systems and fuzzy control system are combined. In HC systems, the fuzzy control systems are introduced as a reflective fuzzy active control (RFAC) system and imitates spinal reflection of human. In HC systems, active control forces are activated to buildings in accordance with switching rules on active control forces. In this paper, optimizations on fuzzy control rules in RFAC system and switching rules of active control forces in HC system are performed by Parameter-Free Genetic Algorithms (PfGAs). Here, the optimization is performed by using different earthquake inputs. The results of digital simulations show that the HC system can reduce maximal response displacements under restrictions on strokes of the actuator effectively in case of a near-source earthquake and the effectiveness of the proposed HC system is discussed and clarified.
Research on Establishment of a Standard of Traffic Impact Assessment with Integrated Database System
(2004)
Planning support systems, such as geographical information system (GIS) and traffic flow simulation models, are widely in use in recent urban planning research. In this paper we propose a method to apply traffic impact assessment (TIA) to large-scale, commercial developments. In TIA research we often encounter the problem of increasing amount of data that is necessary for detailed investigation and analysis, as the scale of commercial developments become larger and more complex. As a result, TIA presents two problems. The first problem is the difficulty of data acquisition. The second problem is the reliability of data. As a solution, we developed an integrated database system.
The paper introduced the research and application of the highway construction management information integrated system. Explained the development and application of highway survey applet run on mobile telephone supporting Java and the technique of transmitting engineering data by GPRS wireless network technology. And expounded the development and application of highway engineering construction field data collecting software run on Pocket-PC. Recommended the technique of engineering long distance data transmitting based on C/S structure adopting VPN (Virtual Private Networks) technology. Especially expatiated on the research on the platform of highway construction management information integrated system adopting geography information system (GIS) technique, database technique and network technique. And said all to subsystem about bid manage, contract management, engineering design drawing, engineering survey calculation, measure and pay, data processing on engineering experiment, quantity assessing, project plan and progress, engineering document management etc. Besides? proposed highway construction project visual analysis and inquiry system based on Web-GIS; Explained the research and application of highway engineering construction OA based on B/S structure; real-time workflow and information processing such as the management of administration, business and procedure of authorization and information distribution. At last, the author described the prospect of the application of C/S and B/S structure in trade software development in the highway construction management.
In current AEC practice client requirements are typically recorded in a building program, which, depending on the building type, covers various aspects from the overall goals, activities and spatial needs to very detailed material and condition requirements. This documentation is used as the starting point of the design process, but as the design progresses, it is usually left aside and changes are made incrementally based on the previous design solution. These incremental small changes can lead to a solution that may no longer meet the original requirements. In addition, design is by nature an iterative process and the proposed solutions often also cause evolution in the client requirements. However, the requirements documentation is usually not updated accordingly. Finding the latest updates and evolution of the requirements from the documentation is very difficult, if not impossible. This process can lead to an end result, which is significantly different from the documented requirements. Some important requirements may not be satisfied, and even if the design process was based on agreed-upon changes in the scope and requirements, differences in the requirements documents and in the completed building can lead to well-justified doubts about the quality of the design and construction process...
A distributed geotechnical remote analysis of data system (Distributed G-RAD) can benefit both owners and contractors in providing better quality control and assurance on geotechnical projects. The Distributed G-RAD approach involves efficient data acquisition using PDAs with GPS capability, radio frequency identification (RFID) tags for labeling soil samples, laser scanning for measuring lift thickness and volumes of stockpiles and borrow pits. Spatial data storage is provided using a geographic information system (GIS). Portions of this system are already developed while other parts are still being considered. This paper also describes how RFID and laser scanning technologies can be used in the larger Distributed G-RAD system.
For the management or reorganisation of existing buildings, data concerning dimensions and construction are necessary. Often these data are given exclusively by paper-based drawings and no digital data such as a computer based product model or even a CAD-model are available. In order to perform mass calculation, damage mapping or a recalculation of the structure these drawings of the building under consideration have to be analysed manually by the engineer. This is a very time-consuming job. In order to close this gap between drawings of an existing building and a digital product model an approach is presented in this paper to digitise a drawing, to build up geometric and topologic models and to recognise construction parts of the building. Finally all recognised parts are transformed into a three-dimensional geometric model which provides all necessary geometric information for the product model. During this import process the semantics of a ground floor plan has to be converted into a 3D-model.
The presented work focuses on collaboration- experiences gathered with complex design and engineering projects, using the learning platform POLE- Europe. Within the POLE environment student-teams from different universities, disciplines and cultural backgrounds are assigned to real-world projects with clearly defined design - tasks, usually to be accomplished within one semester while working in a virtual environment for most of the time. The concept of POLE and the information and collaboration technology is described.
This paper presents a specific modeling technique that is focused on preparing planning processes in civil engineering. Planning processes in civil engineering are characterized by some peculiarities so that the sequence of planning tasks needs to be determined for each planning project. Neither the use of optimized partial processes nor the use of lower detailed and optimized processes guarantee an optimal overall planning process. The modeling technique considers these peculiarities. In a first step, it is focused on the logic of the planning process. Algorithms based on the graph theory determine that logic. This approach ensures consistency and logical correctness of the description of a planning process at the early beginning in its preparation phase. Sets of data – the products of engineers like technical drawings, technical models, reports, or specifications – form the core of the presented modeling technique. The production of these sets of data requires time and money. This is expressed by a specific weighting of each set of data in the presented modeling technique. The introduction of these weights allows an efficient progress measurement and controlling of a planning project. For this purpose, a link between the modeling technique used in the preparation phase and the execution phase is necessary so that target and actual values are available for controlling purposes. The present paper covers the description of this link. An example is given to illustrate the use of the modeling technique for planning processes in civil engineering projects.
The Priority Programme ‘Network Based Co-operation in Structural Engineering’ of the ‘German Research Foundation’ (DFG) has been established in the year 2000. This paper describes and discusses the main research directions and first results of the workgroup ‘Distributed Product Models’. The five projects of the workgroup have developed completely different solutions for specific application domains. Each solution concept deals with a consistent product modeling and knowledge processing in a distributed environment in the planning process. The individual solution approaches of the projects are described and the underlying basic assumptions are discussed. A unified system architecture is described for all projects of the workgroup. Two different approaches (object-oriented and graph-based models) have been introduced for product and knowledge modeling. The common structure of these models will be explained to fully understand the differences of these modeling approaches. Finally the concepts for co-operative work and conflict management in a distributed environment are described: The solution approaches will be distinguished by classifying the supported co-operation according to time. A final scientific summary describes the state-of-the-art in network based co-operation in structural engineering: The role of research directions like knowledge modeling, standard product modeling and versioning in the distributed planning process will be explained.
Building project, with many different players involved, requires open and commonly accepted standard for product model description. Product model based design tools support easy comparisons of design alternatives and optimisation of design solution technical quality. This supports client s decision-making and design target comparisons through the whole building project. Use of product models enable these tasks to meet both schedule and cost requirements Olof Granlund is using product models and interoperable software as the main tool in projects. The use and the realised benefits are illustrated by examples from 3 different real projects: University building, where product models were used already in the very early phases by the whole design team. Office building for research organisation, where product models were used in so called self-reporting building system. Headquarters for international company, where product models were widely used for building performance analysis and visualisations in design phase as well as for facilities management system configuration for operational phase.