Refine
Document Type
- Conference Proceeding (114) (remove)
Institute
- Professur Informatik im Bauwesen (114) (remove)
Keywords
- Verteiltes System (36)
- Bauwerk (23)
- Architektur (18)
- Modellierung (17)
- Planungsprozess (17)
- Ingenieurbau (16)
- Datenmanagement (14)
- Baubetrieb (13)
- Computerunterstütztes Verfahren (12)
- Mobile Computing (10)
Year of publication
- 2004 (114) (remove)
This paper describes a framework for computer-aided conceptual design of building structures that results from building architectural considerations. The central task that is carried out during conceptual design is the synthesis of the structural system. This paper proposes a methodology for the synthesis of structural solutions. Given the nature of architectural constraints, user-model interactivity is devised as the most suitable computer methodology for driving the structural synthesis process. Taking advantage of the hierarchical organization of the structural system, this research proposes a top-down approach for structural synthesis. Through hierarchical refinement, the approach lends itself to the synthesis of global and local structural solutions. The components required for implementing the proposed methodology are briefly described. The main components have been incorporated in a proof-of-concept prototype that is being tested and validated with actual buildings.
This paper presents a specific modeling technique that is focused on preparing planning processes in civil engineering. Planning processes in civil engineering are characterized by some peculiarities so that the sequence of planning tasks needs to be determined for each planning project. Neither the use of optimized partial processes nor the use of lower detailed and optimized processes guarantee an optimal overall planning process. The modeling technique considers these peculiarities. In a first step, it is focused on the logic of the planning process. Algorithms based on the graph theory determine that logic. This approach ensures consistency and logical correctness of the description of a planning process at the early beginning in its preparation phase. Sets of data – the products of engineers like technical drawings, technical models, reports, or specifications – form the core of the presented modeling technique. The production of these sets of data requires time and money. This is expressed by a specific weighting of each set of data in the presented modeling technique. The introduction of these weights allows an efficient progress measurement and controlling of a planning project. For this purpose, a link between the modeling technique used in the preparation phase and the execution phase is necessary so that target and actual values are available for controlling purposes. The present paper covers the description of this link. An example is given to illustrate the use of the modeling technique for planning processes in civil engineering projects.
A simulation system has been developed as a computer aided design tool to evaluate the effect of proposed design on the thermal environment during the designing process. This system calculates outdoor surface temperatures in order to evaluate the thermal impact of a design factor in outdoor space. In this study, the previous heat balance simulation system was improved to predict the surface temperature of a proposed design using 3D-CAD. This system is able to input the complicated outdoor spatial forms efficiently and also to evaluate the surface temperature distribution from any viewpoint.
PKPM series CAD software is an integrated CAD system for building design, which integrated the following parts: architectural design, structural design, building service design and statistic analysis of quantity and budget. These four parts share the same database with high efficiency. Over 80% of design corporation in China are using PKPM series CAD software. The detailed information and some key modules of PKPM series CAD software are mainly introduced in this paper.
This paper is a report of Radio Frequency Identification (RFID) technology and its potential applications in the commercial construction industry. RFID technology offers wireless communication between RFID tags and readers with non line-of-sight readability. These fundamental properties eliminate manual data entry and introduce the potential for automated processes to increase project productivity, construction safety, and project cost efficiency. Construction contractors, owners, and material suppliers that believe technology can further develop methods and processes in construction should feel obligated to participate in RFID studies for the advancement of the construction industry as a whole.
This article discusses how the failures of construction projects could be prevented. The focus is on using IT tools in communication. The article is based on the findings of the PROLABproject. The project seeks to find solutions for how the information can effectively be used in project management, specially in construction projects, what kind of procedures help the management of the knowledge and how the obstacles for efficient ways of administrating the information can be removed. These obstacles can be either related to use of new technology or to organization culture. The paper discusses e-mail as a medium of communication with the media richness framework (Fulk & Boyd 1991) based on the interviews done with the participants of construction projects. We found out that the emails were used in both rich way and not so rich way. Obstacles of rich use of IT communication were partly technical and partly psychological. Technology acceptance model (TAM) is used to study the actual use of emails in communication. Obstacles of the use of emails were mostly individual differences like the skills to use the system or external variables like they did not have proper software to open the attachments. Also people talked about information overload. Emails often push too much information. Keywords: IT tools, Communication, Knowledge management, Construction
Available construction time-cost trade-off analysis models can be used to generate trade-offs between these two important objectives, however, their application is limited in large-scale construction projects due to their impractical computational requirements. This paper presents the development of a scalable and multi-objective genetic algorithm that provides the capability of simultaneously optimizing construction time and cost large-scale construction projects. The genetic algorithm was implemented in a distributed computing environment that utilizes a recent standard for parallel and distributed programming called the message passing interface (MPI). The performance of the model is evaluated using a set of measures of performance and the results demonstrate the capability of the present model in significantly reducing the computational time required to optimize large-scale construction projects.
This paper presents a generic methodology for measurement system configuration when the goal is to identify behaviour models that reasonably explain observations. For such tasks, the best measurement system provides maximum separation between candidate models. In this work, the degree of separation between models is measured using Shannon’s Entropy Function. The location and type of measurement devices are chosen such that the entropy of candidate models is greatest. This methodology is tested on a laboratory structure and, to demonstrate generality, an existing fresh water supply network in a city in Switzerland. In both cases, the methodology suggests an appropriate set of sensors for identifying the state of the system.
The problem of data interoperability is now very important. The formal description of construction systems and objects must base upon the modeling for the description of construction data domain. The XML-language was selected as a basis of a universal data format, ensuring natural hierarchy of objects, flexibility, good layout and expandability. The language, developed by the author, is called Building Object Description Extensible Markup Language (bodXML). The types of all objects used by data transfer should be definite beforehand with existing methods of programming. It limits the possibilities of IT in application of new types. But the recipient software must recognize the building objects even if the kind of object is unknown at the outset. The author offers a set of main topological and geometric properties being sufficient for recognition of main three-dimensional building constructions with flat edges. The tests of artificial neuron network have shown that the recognition of a kind of the constructions represented as a set of indicated parameters happens enough confidently.
This paper describes an Internet-enabled software model that could facilitate the development and utilization of nonlinear structural analysis programs. The software model allows users easy access to the analysis core program and the analysis results by using a web-browser or other application programs. In addition, new and legacy codes can be incorporated as distributed services and be integrated with the software framework from disparate sites. A distributed project management system, taking advantages of Internet and database technologies, is implemented to store and manage model information and simulation results. Nonlinear dynamic analysis and simulations of a bridge structure is performed to illustrate the facilities of the Internet-enabled software model.
In recent years, the survey is performed for repair, such as a bridge and a building built in past, spending great expense. And it is anxious for the survey technique that doesn’t need cost and time more. Then, we made an idea of the technique of precise 3D model creation by 2D pictures. However, the technique of performing the improvement in accuracy of convergent photographing and automatic acquisition of corresponding points was not established. Therefore, in this research, we try to obtain a semi-automation of corresponding points acquisition from initial corresponding points and the improvement in accuracy of convergent photographing. Moreover, we applied the research to the used house of Japanese real estate, and the applicable field was selected as the high needs of the residence of 3D model. And we developed the system that everyone could create Web / 3D model house by VRML easily without requiring expensive apparatuses or expertise.
A distributed geotechnical remote analysis of data system (Distributed G-RAD) can benefit both owners and contractors in providing better quality control and assurance on geotechnical projects. The Distributed G-RAD approach involves efficient data acquisition using PDAs with GPS capability, radio frequency identification (RFID) tags for labeling soil samples, laser scanning for measuring lift thickness and volumes of stockpiles and borrow pits. Spatial data storage is provided using a geographic information system (GIS). Portions of this system are already developed while other parts are still being considered. This paper also describes how RFID and laser scanning technologies can be used in the larger Distributed G-RAD system.
The growing competition pressure in the building industry increases the demands on the design and construction processes in respect to economical, technical and time aspects. These demands require efficient improvements of the value-added chain, which can be realized mainly with the usage of innovative information- and communication-technologies. To support the collaboration of all participants involved in a certain building project the Workflow-Management-System “BauKom-Online” has been developed. In the focus of the system is to support the coordination of the participants and their information exchange. Such a software-method is well suited to ensure a high quality planning process. The modelling of business-processes enables a better self-comprehension of the participants work and helps to enhance the project performance. The system architecture of BauKom-Online contains two basic components: the processmodelling tool and the workflow-engine. The process-model contains of activities and states of the planning and construction processes and their relations. These connected processes compose the workflow. Such a process-model for engineering purposes has to satisfy several needs, e.g., the consideration of planning and building alternatives, dynamic changes of the model during execution of the project and the linkage to further technical objects like costs, building structure, specifications and documentmanagement. Furthermore, the scheduling of the project can be done within the process-model and can be visualized as a Gantt-diagram. ...
As a result of the pilot-project “Grundwasser-Online” the supervision and the active controlling of large monitoring- and catchment-areas are realised by a co-operative integration of all related institutions, a synchronisation-process to combine all distributed data into one central server database, and a high-level eGovernment-Service to provide evaluated information over the internet. Based on this software system the local authorities are able to supervise the groundwater-levels and to find adequate decisions, which finally result in official permissions for the usage of groundwater-reservoirs by the water supply companies.
The purpose of this research is to develop the method to retrieve a building name from the impression of the building. First, the images of the building are registered as database by the questionnaire. Next, the images of the objective building are compared with the degree of matching in image databases, and the building with high synthetic matching degree is retrieved. This system could get a good retrieval result. Moreover, image processing was done, and image databases are trained by neural network from the amount of characteristics of the image, and the retrieval system by image processing was examined.
Business and engineering knowledge in AEC/FM is captured mainly implicitly in project and corporate document repositories. Even with the increasing integration of model-based systems with project information spaces, a large percentage of the information exchange will further on rely on isolated and rather poorly structured text documents. In this paper we propose an approach enabling the use of product model data as a primary source of engineering knowledge to support information externalisation from relevant construction documents, to provide for domain-specific information retrieval, and to help in re-organising and re-contextualising documents in accordance to the user’s discipline-specific tasks and information needs. Suggested is a retrieval and mining framework combining methods for analysing text documents, filtering product models and reasoning on Bayesian networks to explicitly represent the content of text repositories in personalisable semantic content networks. We describe the proposed basic network that can be realised on short-term using minimal product model information as well as various extensions towards a full-fledged added value integration of document-based and model-based information.
Advances in construction data analysis techniques have provided useful tools to discover explicit knowledge on historical databases supporting project managers’ decision making. However, in many situations, historical data are extracted and preprocessed for knowledge discovery based on time-consuming and problem-specific data preparation solutions, which often results in inefficiencies and inconsistencies. To overcome the problem, we are working on the development of a new data fusion methodology, which is designed to provide timely and consistent access to historical data for efficient and effective management knowledge discovery. The methodology is intended to be a new bridge between historical databases and data analysis techniques, which shields project managers from complex data preparation solutions, and enables them to use discovered knowledge for decision making more conveniently. This paper briefly describes the motivation, the background and the initial results of the ongoing research.
The paper describes further developments of the interactive evolutionary design concept relating to the emergence of mutually inclusive regions of high performance design solutions. These solutions are generated from cluster-oriented genetic algorithm (COGAs) output and relate to a number of objectives introduced during the preliminary design of military airframes. The data-mining of multi-objective COGA (moCOGA) output further defines these regions through the application of clustering algorithms, data reduction and variable attribute relevance analyses. A number of visual representations of the COGA output projected onto both variable and objective space are presented. The multi-objective output of the COGA is compared to output from a Strength Pareto Evolutionary Algorithm (SPEA-II) to illustrate the manner in which moCOGAs can generate good approximations to Pareto frontiers.
The methods currently used for scheduling building processes have some major advantages as well as disadvantages. The main advantages are the arrangement of the tasks of a project in a clear, easily readable form and the calculation of valuable information like critical paths. The main disadvantage on the other hand is the inflexibility of the model caused by the modeling paradigms. Small changes of the modeled information strongly influence the whole model and lead to the need to change many more details in the plan. In this article an approach is introduced allowing the creation of more flexible schedules. It aims towards a more robust model that lowers the need to change more than a few information while being able to calculate the important propositions of the known models and leading to further valuable conclusions.
This paper describes a couple of new truss structures based on fractal geometry. One is the famous Sierpinski Gasket and another is a fractal triangle derived by means of applying a process forming leaves of a cedar tree using M. F. Barnsley’s contraction mapping theory. Therefore a pair of x-y coordinates of an arbitrary nodal point on the structures are generated easily if IFS(Iterated Function System) codes and a scale of them are specified. Structural members are defined similarly. Thus data for frame analysis can be generated automatically, which is significant if the objective structure has complex configuration. Next analytical results under vertical and wind loadings in Japanese Building Code are shown. Here members are assumed to be timber and to have cross section of 15cm×15cm. Finally authors conclude that geometrically new truss structures were developed and automatic data generation for frame analysis was attained using IFS. Analytical results show they contribute to saving material when compared it with King-post truss.
The process of matching data represented in two different data models is a longstanding issue in the exchange of data between different software systems. While the traditional manual matching approach cannot meet today’s demands on data exchange, research shows that a fully automated generic approach for model matching is not likely, and generic semi-automated approaches are not easy to implement. In this paper, we present an approach that focuses on matching data models in a specific domain. The approach combines a basic model matching approach and a version matching approach to deduce new matching rules to enable data transfer between two evolving data models.
Let the information of a civil engineering application be decomposed into objects of a given set of classes. Then the set of objects forms the data base of the application. The objects contain attributes and methods. Properties of the objects are stored in the attributes. Algorithms which the objects perform are implemented in the methods of the objects. If objects are modified by a user, the consistency of data in the base is destroyed. The data base must be modified in an update to restore its consistency. The sequence of the update operations is not arbitrary, but is governed by dependence between the objects. The situation can be described mathematically with graph theory. The available algorithms for the determination of the update sequence are not suitable when the data base is large. A new update algorithm for large data bases has been developed and is presented in this paper.
The development of a life cycle structured cooperation platform is described, which is based on an integrated process and goal-oriented project model. Furthermore the structure of a life cycle oriented object structure model and its implementation in the platform are documented. The complete conceptual model is described, which represents the basis of a lifecycle -oriented structuring of the planning object and supports the thematic classification of the object and project management data.
Information and Communication Technologies (ITC) in education have been extensively discussed nowadays. In this e-learning scenario, the construction and use of environments that support teaching and learning is a reality. Therefore, for time and general resource savings it is crucial the access to hypermedia contents with great interactivity and with high reusability. Substantial efforts have been centered in the search for a metadata proposal (metadata is a generic term used to describe data that can be used to identify and to describe common characteristics among different documents) that can be standardized and is system independent for the so called learning objects.
The truss model for predicting shear resistance of reinforced concrete beams has usually been criticized because of its underestimation of the concrete shear strength especially for beams with low shear reinforcement. Two challengers are commonly encountered in any truss model and are responsible for its inaccurate shear strength prediction. First: the cracking angle is usually assumed empirically and second the shear contribution of the arching action is usually neglected. This research introduces a nouvelle approach, by using Artificial Neural Network (ANN) for accurately evaluating the shear cracking angle of reinforced and prestressed concrete beams. The model inputs include the beam geometry, concrete strength, the shear reinforcement ratio and the prestressing stress if any. ...
Indentation experiments have been carried out over the past century to determine hardness of materials. Modern indentation machines have the capability to continuously monitor load and displacement to high precision and accuracy. In recent years, research interests have focussed on methods to extract material properties from indentation load-displacement curves. Analytical methods to interpret the indentation load-displacement curves are difficult to formulate due to material and geometric nonlinearities as well as complex contact interactions. In the present study, an artificial neural network model was constructed for interpretation of indentation load-displacement curves. Large strain-large deformation finite element analyses were first carried out to simulate indentation experiments. The data from finite element analyses were then used to train the artificial neural network model. The artificial neural network model was able to accurately determine the material properties when presented with load-displacement curves which were not used in the training process. The proposed artificial neural network model is robust and directly relates the characteristics of the indentation loaddisplacement curve to the elasto-plastic material properties.
Preparation and provision of building information for planning within existing built contexts
(2004)
A prerequisite for planning within existing built contexts is precise information regarding the building substance, its construction and materials, possible damages and any modifications and additions that may have occurred during its lifetime. Using the information collected in a building survey the user should be able to “explore” the building in virtual form, as well as to assess the information contained with regard to a specific planning aspect. The functionality provided by an information module should cover several levels of information provision ranging from ‘simple retrieval’ of relevant information to the analysis and assessment of stored information with regard to particular question sets. Through the provision of basic functionality at an elementary level and the ability to extend this using plug-ins, the system concept of an open extendable system is upheld. Using this modular approach, different levels of information provision can be provided as required during the planning process.
Communication software and distributed applications for control and building performance simulation software must be reliable, efficient, flexible, and reusable. This paper reports on progress of a project, which aims to achieve better integrated building and systems control modeling in building performance simulation by run-time coupling of distributed computer programs. These requirements motivate the use of the Common Object Request Broker Architecture (CORBA), which offers sufficient advantage than communication within simple abstraction. However, set up highly available applications with CORBA is hard. Neither control modeling software nor building performance environments have simple interface with CORBA objects. Therefore, this paper describes an architectural solution to distributed control and building performance software tools with CORBA objects. Then, it explains how much the developement of CORBA based distributed building control simulation applications is difficult. The paper finishes by giving some recommendations.
Organisational and human issues have been highlighted, among other issues (ICT infrastructures, legal and contractual, etc.), as key elements in enhancing the competitiveness of the construction sector. More specifically, the importance of human resources has been recognised, especially training and professional development, in order to cultivate a stable workforce. The paper provides a review of the key training needs for the construction sector with particular reference to the uptake and exploitation of new technologies and working practices, presents an action plan to address learning and training needs, and proposes an eight-stage iterative learning and training methodology. The results will be of particular interest to managers in stakeholder organisations of all sizes throughout the sector, plus academic and research bodies intending to continue construction ICT research.
This paper describes an approach to support co-operation of experts in heterogeneous geotechnical engineering project environments during both regular execution and handling of exceptional situations. A co-operation platform is introduced which is based on a generalized information model mapping key information about the construction project, the construction process as well as the organization structure. Several tools are provided to operate the information model in a network based environment.
To support research in the building sector and in order to help it move towards a new digital economy, the European Commission under the 5th Framework initiative, especially the IST programme, funded various RTD projects. The opportunity to bring these IST projects together was acknowledged so that stronger links can be created under a clustering umbrella and that, moreover, links of those projects with their RTD environment could be facilitated. This has been the objective of work carried out within the ICCI (IST-2001-33022) Cluster project. This paper introduces the main aims and objectives of the project, and then presents its principal outcomes. In a second part, it synthesises the underlying concepts, technology and tools that will make ICT-based Construction a reality in a near future, and gives recommended actions for the industry, the EC and the Construction ICT R&D in Europe, giving some benefit of this project experience to the three communities.
This ethnographic study reports on emerging work processes and practices observed in the AEC (Architecture/Engineering/Construction) Global Teamwork program, i.e., what people experience when interacting with and through collaboration technologies, why people practice in the way they do, how the practice fits into the environment and changes the work patterns. It presents the experience of two high-performance typical but extreme AEC teamwork cases adopting and adapting to collaboration technologies and how these technologies in practice impact their work processes. The findings illustrate the importance of collaboration technologies in cross-disciplinary, global teamwork. Observations indicate that high performance teams that use the collaboration technologies effectively exhibit collaboration readiness at an early stage and manage to define a “third way” to meet the demands of the cross-disciplinary, multi cultural and geographically distributed AEC workspace. The observations and implications represent the blueprint for yearly innovations and improvements to the design of the AEC Global Teamwork program.
In the focus of the Bologna-contract of the European secretaries of education the universities are invited to aim a unification and comparability of certificates and to offer compatible and cooperative models of education. Among existing lectures in the Internet there will arise a new competition between the universities in netbased teaching and learning environments. For the use of distributed sources of information and for the possibility to generate free configurable sequences of education modules you need management systems which are able to handle different formats of documents and to assemble it to consistent and valid lessons. Beside elementar viewing-functions, fusion of information also administrative tasks are needed, e.g. automated efficiency controls, adaptive learning surroundings. This paper attends to three aspects: - netbased teaching and learning in the area of the instruction of civil engineers - netbased information assembling and fusion of knowledge bases to higher level documents - netbased learning with international coordinated projects
For the management or reorganisation of existing buildings, data concerning dimensions and construction are necessary. Often these data are given exclusively by paper-based drawings and no digital data such as a computer based product model or even a CAD-model are available. In order to perform mass calculation, damage mapping or a recalculation of the structure these drawings of the building under consideration have to be analysed manually by the engineer. This is a very time-consuming job. In order to close this gap between drawings of an existing building and a digital product model an approach is presented in this paper to digitise a drawing, to build up geometric and topologic models and to recognise construction parts of the building. Finally all recognised parts are transformed into a three-dimensional geometric model which provides all necessary geometric information for the product model. During this import process the semantics of a ground floor plan has to be converted into a 3D-model.
This paper focuses on a new three-level discretisation strategy which enables the transition between continuum/structural (I) and structural/black box modelling (II). The transition (I) is realised by means of a model adaptive concept based on an innovative finite element technology. For transition (II) we apply the truncated balanced realisation method (TBR). The latter represents an established system theoretical model reduction technique which is here combined with a novel substructure technique. The approach provides a modular concept to facilitate the computational analysis of complex structures. The final goal is to apply the strategy to life time estimation.
This paper examines the impact of information technology (IT) utilization on construction firm performance. Based on empirical data collected from 74 US construction firms, the analyses provide evidence that IT has a positive impact on overall firm performance, schedule performance, and cost performance. Firm performance is a composite score of several metrics of performance: schedule performance, cost performance, customer satisfaction, safety performance, and profit. No relationship is found between IT utilization and customer satisfaction, safety, or profit, although this may be due to limitations of the study given strong correlations between IT utilization and cost and schedule performnance. The empirical evidence of positive association between performance and IT use provided by this research is significant to both construction practice and research literature. This evidence should encourage firms to adopt and invest in IT tools.
This paper describes a research project that addresses the difficulties in dealing with regulatory documents such as national and regional codes. These documents tend to be voluminous, heavily cross-referenced, possibly ambiguous and even conflicting at times. There are often multiple documents that need to be consulted and satisfied; however it is a difficult task to locate all of the relevant provisions. In addition, sections dealing with the same or similar conceptual ideas sometimes lay down conflicting requirements. We propose a framework for regulation representation, analysis and comparison with emphasis on the extraction of similarities between provisions. We focus on accessibility regulations, whose intent is to provide the same or equivalent access to a building and its facilities for disabled persons. An XML regulatory repository is developed to extract structural as well as non-structural features from government regulations to help user understanding and computational analysis. A similarity analysis is performed between different sources of regulations. In order to achieve a better comparison between provisions, we employ a combination of feature matching and structural analysis. Results are shown on comparisons between American and European codes, as well as on the domain of electronic-rulemaking.
A/E/C Team members, while collaborating on building projects, rely on past experiences and content through the use of project design archives (whether in paper or digital format). This leads to underutilization of potential knowledge, as decision-making of data, information, and knowledge reuse is limited by access to these archives, due to sheer size and inconvenient presentation. This paper presents an integrated solution that leverages two technologies CoMem (Corporate Memory) and iRoom (interactive Room) developed at Stanford. This addresses critical limitations, i.e., content, context, visualization and interactivity, constraining the process of collaborative exploration towards knowledge reuse and decision-making.
Construction is a conservative industry that over the last twenty ye ars has experienced drastic changes in the way that interdisciplinary teams interact to design and execute a project. In this article we offer a general overview of how the main participants cooperate in the different phases of a construction project, and which are some of the main areas for communication improvement. We also explore the communication tools used in the exchange of information, and identify the main causes of information breakdown. The general framework of this study is of application to both standard and green projects. At the end of the article we discuss the peculiarities of green buildings. Our goal is to offer a series of industry insights derived from the perspective of a general contractor aimed at identifying the areas where contributions in computing and information exchange could have a greater impact on the successful completion of a project.
An important feature of the 2003 SARS outbreak in Canada, Singapore, and Hong Kong was that many health care workers (HCWs) developed SARS after caring for patients with SARS. This has been ascribed to inadequate or ineffective patient isolation. However, it is difficult for dense cities to provide sufficient isolation facilities within a short period of time. This has raised concerns from the public for new strategies in the planning and design of isolation facilities. Considering that SARS or other infectious diseases could seriously damage our society’s development, isolation facilities that could be rapidly and economically constructed with appropriate environmental controls are essential. For this reason, the design team of the Department of Architecture collaborated with a special task force from the Faculty of Medicine, who are the frontline medical officers treating the SARS patients, to design Rapidly Assembled Isolation Patient Wards. Both architecture and medicine are well established disciplines, but they have little in common in terms of the mode of knowledge construction and practice. This induced much intellectual exploration and research interest in conducting this study. The process has provided an important reference for cross disciplinary studies between the architectural and medical domains.
Spatial data acquisition, integration, and modeling for real-time project life-cycle applications
(2004)
Current methods for site modeling employs expensive laser range scanners that produce dense point clouds which require hours or days of post-processing to arrive at a finished model. While these methods produce very detailed models of the scanned scene, useful for obtaining as-built drawings of existing structures, the associated computational time burden precludes the methods from being used onsite for real-time decision-making. Moreover, in many project life-cycle applications, detailed models of objects are not needed. Results of earlier research conducted by the authors demonstrated novel, highly economical methods that reduce data acquisition time and the need for computationally intensive processing. These methods enable complete local area modeling in the order of a minute, and with sufficient accuracy for applications such as advanced equipment control, simple as-built site modeling, and real-time safety monitoring for construction equipment. This paper describes a research project that is investigating novel ways of acquiring, integrating, modeling, and analyzing project site spatial data that do not rely on dense, expensive laser scanning technology and that enable scalability and robustness for real-time, field deployment. Algorithms and methods for modeling objects of simple geometric shape (geometric primitives from a limited number of range points, as well as methods provide a foundation for further development required to address more complex site situations, especially if dynamic site information (motion of personnel and equipment). Field experiments are being conducted to establish performance parameters and validation for the proposed methods and models. Initial experimental work has demonstrated the feasibility of this approach.
For planning in existing built contexts, the building survey is the starting point for initial planning proposals, for the diagnosis and documentation of building damages, for the creation of objectives catalogues, for the detailed design of renovation and conversion measures and for ensuring fulfilment of building legislation, particularly by change of use and refitting. An examination of currently available IT-tools shows insufficient support for planning within existing contexts, most notably a deficit with regard to information capture and administration. This paper discusses the concept for a modular surveying system (basic concept, separation of geometry from semantic data, and separation into sub-systems) and the prototypical realisation of a system for the complete support of the entire building surveying process for existing buildings. The project aims to contribute to the development of a planning system for existing buildings. ...
The contribution describes the didactical integration of wireless access networks for the campus of the University of Karlsruhe in the education of architects and engineers. It focuses on the development of an interdisciplinary communication network to encourage and promote the communication and collaboration between students. The project assumes that significant learning progresses in net-based learning scenarios are based upon the synchronous and asynchronous cooperation between the students themselves. The remote cooperation across borders of disciplines makes high demands on capacity in communicating and cooperating of the involved persons as well as on the supporting tools. Therefore, the collective acquisition of knowledge and cooperation has to be trained intensively during the studies. Based on the design and project oriented cooperation platform netzentwurf.de the authors developed the tools “Jobadmin“ to administrate multidisciplinary workgroups, the “Swarm Knowledge Catalogue“ to collect and store knowledge and “LivingCampus“, an instrument providing basic services for dynamic communication.
Three-dimensional models of urban objects play an important role in the urban applications such as urban planning, environmental concerning, or urban disaster mitigations. While the modeling of urban objects is time consuming and storage costing. This paper presents solutions for this. Buildings with regular shapes and plane roofs are constructed into computer models by identifying of graphic elements from the digital maps of urban area to get building base plane and building heights. Buildings with irregular shapes and non-plane roofs are constructed into computer models by employment of a specific system developed by the authors. Road objects and topologies are constructed into computer models by employment of specific algorithms. The solutions presented in this paper has been used in the development of urban disaster mitigation system for Shantou, China.
The construction management has been under pressure to reduce operating costs and to improve productivity using innovative information technologe (IT) solutions conformed to structural characteristics, site conditions and past experiences. Given the growing emphasis on effectiveness and efficiency in construction projects, there is an imminent need to develop a formal procedure to select the best IT application for each proposed construction project and research and development (R&D) project. As there are numerous factors that have to be considered in selecting appropriate IT in a given situation, decision-makers need to have multicriteria decision-making ability. To enable them to make the most appropriate decision in any situation, it is important that effective tools incorporating multicriteria decision-making techniques are available. In this paper, an Analytic Network Process (ANP) model is conducted for the selection of appropriate IT application for innovative construction management prior to construction or research. The paper concludes that the ANP is a viable and capable tool for conducting IT application selection in multicriteria decision-making environment.
We present a software prototype for fluid flow problems in civil engineering, which combines essential features of Computational Steering approaches with efficient methods for model transfer and high performance computing. The main components of the system are described: - The modeler with a focus on the data management of the product model - The pre-processing and the post-processing toolkit - The simulation kernel based on the Lattice Boltzmann method - The required hardware for real-time computing
Re-using knowledge in architecture, engineering and construction (AEC) firms can lead to greater competitive advantage, improved designs, and more effective management of constructed facilities. This paper discusses the importance of exploration and discovery of reusable knowledge from a corporate archive as opposed to simple search and retrieval. We describe and illustrate through a scenario of use an exploration framework and prototype, CoMemTM that formalizes the added value of exploration in the process of knowledge reuse. We discuss two exploration activities: (i) Breadth- Only overview exploration that assist a user to rapidly localize pockets of re-usable knowledge from the large corporate archive and (ii) Iterative breadth-depth exploration that enables a user to identify those re-usable components of the Corporate Memory that may yield design issues that were not originally considered.
The research reported in this article was conducted to mainly explore the two common numeric prediction techniques, the model tree and the regression tree, when used in conjunction with bagging as a wrapper method. Bagging is used to improve the prediction accuracy of these two algorithms, and results are compared with the ones obtained earlier by the k-nearest neighbor (KNN) algorithm. From the conducted experiments, both the bagged regression tree and bagged model tree produce better results than not only their corresponding regression tree and model tree alone, but also the KNN with optimal value of k equal to 7. In addition, the bagged model tree yields the lowest prediction errors and a highest correlation coefficient of 0.81. It is demonstrated that it is feasible to use the bagged model tree for engineering applications in prediction problems such as estimating the remaining service life of bridge decks.
This paper describes the concept, implementation and application of the Web-based Information System ‘Turtle’ for data monitoring, analysis, reporting and management in engineering projects. The system uses a generalised object-oriented approach for information modelling of physical state variables from measurements and simulations by sets of tensor objects and is implemented platform-independently as a Web application. This leads to a more flexible handling of measurement and simulation information in distributed and interdisciplinary engineering projects based on the concept of information sharing. The potential and advantages of Web-based information systems like ‘Turtle’ are described for one selected application example: a measurement programme dealing with the physical limnology of Lake Constance.
Some key facts about the economic environment of construction industry are explained. It is shown that construction industry is very heterogeneous and has changed drastically during the recent years due to a rapidly moving commercial environment. Two examples of todays’s use of virtual construction tools in construction projects are presented. The first example is the document control for a large international project. The second is the application of 4D modelling in the preconstruction phase of a dam project. It is shown that virtual construction, is a major international trend that currently takes up speed. Some generic industry needs for Research and Development which aims at short and medium term results are presented.