Refine
Has Fulltext
- yes (177) (remove)
Document Type
- Conference Proceeding (114)
- Article (62)
- Master's Thesis (1)
Institute
- Professur Informatik im Bauwesen (177) (remove)
Keywords
- Verteiltes System (37)
- Bautechnik (29)
- Bauwerk (27)
- Produktmodell (23)
- Simulation (21)
- Modellierung (20)
- Mehragentensystem (19)
- Architektur (18)
- Ingenieurbau (17)
- Planungsprozess (17)
- Lernendes System (16)
- Finite-Elemente-Methode (15)
- Datenmanagement (14)
- Baubetrieb (13)
- Computerunterstütztes Verfahren (12)
- Physikalisches Verfahren (11)
- Mobile Computing (10)
- Entscheidungsunterstützung (9)
- Funknetz (9)
- Hochschulbildung (9)
- Konzipieren <Technik> (9)
- Computerunterstütztes Lernen (8)
- Wissensverarbeitung (8)
- Internet (7)
- Forschungskooperation (6)
- Geoinformationssystem (6)
- Informationstechnik (6)
- Lebenszyklus <Wirtschaft> (6)
- Wissensmanagement (6)
- Bauindustrie (5)
- Brückenbau (5)
- Europa (5)
- Forschung (5)
- Framework <Informatik> (5)
- Optimierung (5)
- Verkehrsplanung (5)
- Baukonstruktion (4)
- Controlling (4)
- Stadtplanung (4)
- API (3)
- Baustelle (3)
- CAD (3)
- Computer Supported Cooperative Work (3)
- Datenaustausch (3)
- Fuzzy-Logik (3)
- Projektmanagement (3)
- Prozessmodell (3)
- Stahlbau (3)
- Straßenbau (3)
- Virtuelle Realität (3)
- Benutzeroberfläche (2)
- Brandschutz (2)
- Data-Warehouse-Konzept (2)
- Datenbank (2)
- Dreidimensionales CAD (2)
- Dynamische Belastung (2)
- Genetischer Algorithmus (2)
- Geotechnik (2)
- Graphische Benutzeroberfläche (2)
- Holzbau (2)
- Informationsaustausch (2)
- Informationssystem (2)
- Monitorüberwachung (2)
- Neuronales Netz (2)
- Parallelverarbeitung (2)
- Prozessmanagement (2)
- Skelettbau (2)
- Software (2)
- Versionsverwaltung (2)
- Wasserbau (2)
- Adaptives System (1)
- Altbaumodernisierung (1)
- Ausbildung (1)
- Ausschreibung (1)
- Autobahn (1)
- Automatische Identifikation (1)
- Balken (1)
- Bandmatrix (1)
- Bauablauf (1)
- Bauaufnahme (1)
- Bauführung (1)
- Baukosten (1)
- Bausubstanz (1)
- Bauvorhaben (1)
- Bauwerksplanung (1)
- Bauwesen (1)
- Bedarfsforschung (1)
- Behinderte (1)
- Betriebskosten (1)
- Betriebsmittel (1)
- CAD / Architektur (1)
- CORBA (1)
- CVS <Programm> (1)
- China (1)
- Computer Aided Progress Monitoring (1)
- Constraint <Künstliche Intelligenz> (1)
- Constraintnetz (1)
- Construction Sequence (1)
- Dammbau (1)
- Datenbanksystem (1)
- EXPRESS <Programmiersprache> (1)
- Echtzeitsystem (1)
- Echtzeitverarbeitung (1)
- Elastoplastizität (1)
- Elektronischer Produktkatalog (1)
- Entropie (1)
- Entscheidungsunterstützungssystem (1)
- Entwurf (1)
- Exchanged Documents (1)
- Facility-Management (1)
- Farbenlehre (1)
- Fehler (1)
- Fraktal (1)
- Gebäude (1)
- Graphentheorie (1)
- Großbaustelle (1)
- Grundwasser (1)
- Haus (1)
- Hochhaus (1)
- Hängebrücke (1)
- Infrastruktur (1)
- Integrierte Planung (1)
- Iran (1)
- Katastrophenmanagement (1)
- Kette (1)
- Klein- und Mittelbetrieb (1)
- Kommunikationsmodell (1)
- Kommunikationsprotokoll (1)
- Konsistenz <Informatik> (1)
- Konstruktion (1)
- Konstruktionsfehler (1)
- Konvektion (1)
- Korrosion (1)
- Krankenhaus (1)
- Künstliche Intelligenz (1)
- Lebenszyklus (1)
- Luft (1)
- Management (1)
- Managementinformationssystem (1)
- Managment Information System (1)
- Maple (1)
- Markowschke (1)
- Materialflusssteuerung (1)
- Mensch-Maschine-Kommunikation (1)
- Microsoft dot net (1)
- Norm <Normung> (1)
- Normung (1)
- Nutzungsänderung (1)
- Objektorientierung (1)
- Objektversionierung (1)
- Oktalbaum (1)
- Optimal Planning (1)
- Petri-Netz (1)
- Planung (1)
- Prognose (1)
- RFID (1)
- Rechnernetz (1)
- Rissbildung (1)
- SARS (1)
- STEP (1)
- Schadstoffkonzentration (1)
- Schale (1)
- Scheduling (1)
- Scherung (1)
- Schlussfolgern (1)
- Schulgebäude (1)
- Schwingung (1)
- Shore Spacing (1)
- Shore Stiffness (1)
- Shoring System (1)
- Software Engineering (1)
- Stahlbeton (1)
- Stahlbrücke (1)
- Standard (1)
- Standardisierung (1)
- Statik (1)
- Stochastik (1)
- Straßenbrücke (1)
- Straßenkarte (1)
- Teamwork (1)
- Technische Mechanik (1)
- Tragwerk / Vorspannung (1)
- Transport (1)
- Tunnel (1)
- Tunnelbau (1)
- Turmdrehkran (1)
- Unternehmen (1)
- VRML (1)
- Versionsabgleich (1)
- Versionskontrolle (1)
- Versionsverschmelzung (1)
- Vertrag (1)
- Vorgespannte Konstruktion (1)
- Wasserkraftwerk (1)
- Werkstoffprüfung (1)
- Work Face (1)
- World Wide Web (1)
- Wärme (1)
- XML (1)
- applets (1)
- cable force (1)
- cable stayed bridge (1)
- computergestützte Baufortschrittskontrolle (1)
- concurrency control (1)
- construction industry (1)
- construction management (1)
- data collection (1)
- initial equilibrium state (1)
- initial shape (1)
- knowledge exchange (1)
- learning objects (1)
- merge (1)
- product and process models (1)
- pull learning (1)
- reconciliation (1)
- repository (1)
- reusability (1)
- structural engineering (1)
- system (1)
- transparency (1)
- versions (1)
- web-based learning (1)
Year of publication
- 2004 (177) (remove)
Development of Urban Land Use Model to Compare Transit-Oriented and Automobile-Oriented Cities
(2004)
This study is an attempt to develop a simple simulation model that can compare the differences between automobile-oriented and transit-oriented cities, and clarify the difference between city forms by transportation modes. Following a theoretical model development, a series of simulation runs are tried. The model allocates people who commute to CBD from residential zones along a transportation corridor. As a result of many simulation analyses, it is shown that automobiles need much more traffic space in comparison with the transit as is shown by the proposed traffic space ratio both in CBD and along the corridor.
In this Paper, we explored the relation between the electricity consumption in residential sector and the automobile energy consumption in transportation sector in accordance with the location of city by employing Geographic Information System (GIS). We found in the study that the electricity consumption per capita has a tendency that is higher in city center and lower in suburbs in Utsunomiya city. It is also noted that there is little difference among total consumption between city center and suburbs, despite the fact that the density of electric appliances tends to increase in a small size house of city center and the amount of automobile energy consumption from residence is lower in city center than in suburbs.
In current AEC practice client requirements are typically recorded in a building program, which, depending on the building type, covers various aspects from the overall goals, activities and spatial needs to very detailed material and condition requirements. This documentation is used as the starting point of the design process, but as the design progresses, it is usually left aside and changes are made incrementally based on the previous design solution. These incremental small changes can lead to a solution that may no longer meet the original requirements. In addition, design is by nature an iterative process and the proposed solutions often also cause evolution in the client requirements. However, the requirements documentation is usually not updated accordingly. Finding the latest updates and evolution of the requirements from the documentation is very difficult, if not impossible. This process can lead to an end result, which is significantly different from the documented requirements. Some important requirements may not be satisfied, and even if the design process was based on agreed-upon changes in the scope and requirements, differences in the requirements documents and in the completed building can lead to well-justified doubts about the quality of the design and construction process...
In recent years, the survey is performed for repair, such as a bridge and a building built in past, spending great expense. And it is anxious for the survey technique that doesn’t need cost and time more. Then, we made an idea of the technique of precise 3D model creation by 2D pictures. However, the technique of performing the improvement in accuracy of convergent photographing and automatic acquisition of corresponding points was not established. Therefore, in this research, we try to obtain a semi-automation of corresponding points acquisition from initial corresponding points and the improvement in accuracy of convergent photographing. Moreover, we applied the research to the used house of Japanese real estate, and the applicable field was selected as the high needs of the residence of 3D model. And we developed the system that everyone could create Web / 3D model house by VRML easily without requiring expensive apparatuses or expertise.
This paper presents results of a study on distributed, or parallel, evolutionary computation in the topological design of steel structural systems in tall buildings. It describes results of extensive experimental research on various parallel evolutionary architectures applied to a complex structural design problem. The experiments were conducted using Inventor 2003, a networkbased evolutionary design support tool developed at George Mason University. First, a general introduction to evolutionary computation is provided with an emphasis on recent developments in parallel evolutionary architectures. Next, a discussion of conceptual design of steel structural systems in tall buildings is presented. Further, Inventor 2003 is briefly introduced as well as its design representation and evolutionary computation characteristics. Next, the results obtained from systematic design experiments conducted with Inventor 2003 are discussed. The objective of these experiments was to qualitatively and quantitatively investigate evolution of steel structural systems in tall buildings during a distributed evolutionary design process as well as to compare efficiency and effectiveness of various parallel evolutionary architectures with the traditional evolutionary design approaches. Two connectivity topologies (ring topology and fully-connected topology) have been investigated for four populations of structural designs evolving in parallel and using various migration strategies. Also, results of the initial sensitivity studies are reported in which two ways of initializing distributed evolutionary design processes were investigated, using either arbitrarily selected designs as initial parents or randomly generated ones. Finally, initial research conclusions are presented.
The management of resources is an essential task in each construction company. Today, ERP systems and e-Business systems are available to assist construction companies to efficiently organise the allocation of their personnel and equipment within the company, but they cannot provide the company with the idle resources for every single task that has to be performed during a construction project. Therefore, companies should have an alternative solution to better exploit expensive resources and compensate their fixed costs, but also have them available at the right time for their own business activities. This paper outlines the approach taken by the EU funded project “e-Sharing” (IST-2001-33325) to support resource management between construction companies. It will describe requirements for the management of construction resources, its core features, and the integration approach. Therefore, we will outline the approach of an integrated resource type model supporting the management and classification of construction equipment, construction tasks and qualification profiles. The development is based on a cross-domain analysis and evaluation of existing models. ...
Analysis System for Bridge Test (Chinese name abbr.: QLJC) is an application software specially designed for bridge test to analyze the static and dynamic character of bridge structures, calculate efficiency ratio of load test, pick up the results of observation points and so on. In this paper, research content, system design, calculation theory, characteristics and practical application of QLJC is introduced in detail.
Some key facts about the economic environment of construction industry are explained. It is shown that construction industry is very heterogeneous and has changed drastically during the recent years due to a rapidly moving commercial environment. Two examples of todays’s use of virtual construction tools in construction projects are presented. The first example is the document control for a large international project. The second is the application of 4D modelling in the preconstruction phase of a dam project. It is shown that virtual construction, is a major international trend that currently takes up speed. Some generic industry needs for Research and Development which aims at short and medium term results are presented.
The paper presents the abstraction of process relevant information in order to enable the workflow management based on semantic data. It is shown for three examples, how the standards define the information needed to perform a certain planning activity. Abstraction of process relevant information is discussed for different granularities of the underlying processmodel. As one possible application ProMiSE is introduced, which uses process relevant data in individual tokens in a petri-net based process-model.
The contribution introduces an adaptable process model to meet the special requirements of the coordination of planning activities in AEC (Architecture, Engineering, Construction). The process model is based on the concept of Coloured Petri-Nets and uses metainformation to characterize process-relevant information and to enable process-control based on the actual results of the planning.
Efforts to define standards for representing AEC/FM data have been fairly successful. However defining a standard reference process model has not met with the same success. Yet almost every conceptual modelling or software development project starts by defining the business processes to be supported and the related requirements to be satisfied. This paper describes a new process-centred methodology for user requirements capture developed in the ICCI project (IST-2001-33022). Its essence is in recognising user requirements and use cases in the context of the real construction process, identifying the actors and roles for each individual activity and associating these activities with information, communication and standardisation requirements on the basis of a formalised specification, named the Process Matrix. In the paper we outline the history of process matrix development, introduce the basic structure of the matrix and show how it can be further extended and refined. We present also a web-based software implementation of the developed approach, describe how it has been used in ICCI and outline further perspectives.
A large-scale computer modeling and simulation method is presented for environmental flows in urban area. Several GIS and CAD data were used for the preparation of shape model and an automatic mesh generation method based on Delaunay method was developed. Parallel finite element method based on domain decomposition method was employed for the numerical simulation of natural phenomena. The present method was applied to the simulation of flood flow and wind flow in urban area. The present method is shown to be a useful planning and design tool for the natural disasters and the change of environments.
The goal of the research is the development of a computer system to plan, simulate and visualize erection processes in construction. In the research construction cranes are treated as robots with predefined degrees of freedom and crane-specific motion planning techniques are developed to generate time-optimized and collision-free paths for each piece to be erected in the project. Using inverse kinematics and structural dynamics simulation, the computer system then computes the crane motions and velocities necessary to achieve the previously calculated paths. The main benefits of the research are the accurate planning and scheduling of crane operations leading to optimization of crane usage and project schedules, as well as improving overall crane safety in the project. This research is aimed at the development of systems that will allow computer-assisted erection of civil infrastructure and ultimately to achieve fully-automated erection processes using robotic cranes...
The goal of the research is to increase the understanding of dynamic behaviors during the crane operation, and develops computer-aided methods to improve the training of crane operators. There are approximately 125,000 cranes in operation today in the construction industry, responsible for major portion of erection activities. Unfortunately, many accidents occur every year in the U.S. and other countries related to the operation of cranes in construction sites. For example on November 28, 1989 a tower crane collapse during the construction of a building in San Francisco killing four construction workers, one civilian and injuring 28. According to the statistics from Occupational Safety Health Administration (OSHA), there were 137 crane-related fatalities from 1992 to 2001 in the US. A well-known internet website that keeps track of crane-related accidents (craneaccidents.com), reports 516 accidents and 277 fatalities from 2000 to 2002. These statistics show that even though many measures have been taken to decrease the number of crane-related accidents (Braam, 2002), the number of crane related accidents is still very large. It is important to recognize that each construction related fatality is not only a great human loss but also increases the costs of insurance, lawsuits, and the construction budget due to delay of a project (Paulson 1992)...
Most retaining walls and box culverts built for arterial road construction are simple, and the design process of these structures is often repetitive and labor-intensive because they are so similar in structural configuration. Although some integrated design automation systems developed for retaining walls and box culverts have expedited the design process of these structures, the process of collecting and distributing the resultant engineering documents has not been fully integrated with the computer applications. We have been developing a Web-based design automation system to manage the resultant documents as well as to speed up the repetitive design process. Manipulation of engineering drawings in the Web page is one of the critical functions needed for Web-based design automation. eXtensible Markup Language (XML) and XML-based vector graphics are expected to facilitate the representation of engineering drawings in the Web page. In this paper, we present how we used XML and Scalable Vector Graphics (SVG) to compose engineering drawings and represent them in the Web page. XML Data Island we designed to define drawing components turned out effective in manipulating the engineering drawings in the Web page.
The paper investigates accuracy of deflection predictions made by the finite element package ATENA and design code methods ACI and EC2. Deflections have been calculated for a large number of experimental reinforced concrete beams reported by three investigators. Statistical parameters have been established for each of the technique at different load levels, separately for the beams with small and moderate reinforcement ratio.
There exists a big gap between the capabilities of current 3D-CAD applications and their actual usage in practice. Many architects and planners still prefer to draft in 2D because the benefits of 3D modeling are difficult to explain. This presentation offers a basis to view the 3D building model not merely as the source for 2D plan generation. By adding extra dimensions like Time and Cost to the 3D building model it becomes possible to generate dynamic information on building construction progress with regards to used material, resources and cost. These additional benefits are key elements to many planners and contractors and may therefore widen the acceptance of 3D building modeling in general.
Transport problems, as, for instance, the transport of sediment in hydraulic engineering and the transport of harmful substances through porous media, play an important role in many fields of civil engineering. Other examples include the dissipation of heat or sound as well as the simulation of traffic with macroscopic models. The contribution explains the analysis of the applicability of Voronoi-based finite volume methods for the approximation of solutions of transport problems. A special concern is the discretisation of the transport equation. Current limitations of the method as well as ideas for stabilisation are explained with examples.
All construction project are constrained by their schedules, budgets and specifications, and safety and environmental regulations. These constraints made construction management more complex and difficult. At the same time, many historical data that can support the decisions in the future are kept in construction enterprises,. To use the historical data effectively and efficiently, it is essential to apply the data warehouse and data mining technologies. This paper introduces a research which aims to develop a data warehouse system according to the requirements of construction enterprises and use data mining technology to learn useful information and knowledge from the data warehouse system. The design, the development and the application of this system are detailedly introduced in this paper.
The construction industry is a supportive industry in China. IT (information technolgy), including computer technology and communication technology, as a whole is regarded as the most important means to upgrade the construction industry so that research projects were organized by Chinese government to further the application of IT in the construction industry. This study originated from one of the projects and is aimed at grasping the general situation on the application of IT in the construction industry. A questionnaire was designed for the survey, which used stratified proportional sampling method, and was carried out under the help of a government agency. This study can not only provide sound foundation for the government to make relative policies, but also reveal references for the firms in construction industry to apply IT in their business. This paper presents the preliminary result of the survey.
With the speedy development of transportation of China, especially construction of many high-grade highways, some information technology successes have been achieved in the highway and bridge engineering, such as survey, design, construction and maintenance etc. In this paper, some applications about information technology in the highway engineering were introduced and some bridge professional software developed by RIOH (Research Institute Of Highways) in recent years was also introduced.
A distributed geotechnical remote analysis of data system (Distributed G-RAD) can benefit both owners and contractors in providing better quality control and assurance on geotechnical projects. The Distributed G-RAD approach involves efficient data acquisition using PDAs with GPS capability, radio frequency identification (RFID) tags for labeling soil samples, laser scanning for measuring lift thickness and volumes of stockpiles and borrow pits. Spatial data storage is provided using a geographic information system (GIS). Portions of this system are already developed while other parts are still being considered. This paper also describes how RFID and laser scanning technologies can be used in the larger Distributed G-RAD system.
Building project, with many different players involved, requires open and commonly accepted standard for product model description. Product model based design tools support easy comparisons of design alternatives and optimisation of design solution technical quality. This supports client s decision-making and design target comparisons through the whole building project. Use of product models enable these tasks to meet both schedule and cost requirements Olof Granlund is using product models and interoperable software as the main tool in projects. The use and the realised benefits are illustrated by examples from 3 different real projects: University building, where product models were used already in the very early phases by the whole design team. Office building for research organisation, where product models were used in so called self-reporting building system. Headquarters for international company, where product models were widely used for building performance analysis and visualisations in design phase as well as for facilities management system configuration for operational phase.
This paper presents a specific modeling technique that is focused on preparing planning processes in civil engineering. Planning processes in civil engineering are characterized by some peculiarities so that the sequence of planning tasks needs to be determined for each planning project. Neither the use of optimized partial processes nor the use of lower detailed and optimized processes guarantee an optimal overall planning process. The modeling technique considers these peculiarities. In a first step, it is focused on the logic of the planning process. Algorithms based on the graph theory determine that logic. This approach ensures consistency and logical correctness of the description of a planning process at the early beginning in its preparation phase. Sets of data – the products of engineers like technical drawings, technical models, reports, or specifications – form the core of the presented modeling technique. The production of these sets of data requires time and money. This is expressed by a specific weighting of each set of data in the presented modeling technique. The introduction of these weights allows an efficient progress measurement and controlling of a planning project. For this purpose, a link between the modeling technique used in the preparation phase and the execution phase is necessary so that target and actual values are available for controlling purposes. The present paper covers the description of this link. An example is given to illustrate the use of the modeling technique for planning processes in civil engineering projects.
An architecture of a distributed planning system for the building industry has been developed. The emphasis is on highly collaborative environments in steelwork, timber construction etc. where designers concurrently handle 3D models. The overall system connects local design systems by the so-called Design Framework DFW. This framework consists of the definition of distributed components and protocols which make the collaborative design work. The process of collaborative design has been formalized on an abstract level. This paper describes how this has been done. A sample is given to illustrate the mapping of concrete scenarios of the ‘real design world’ to an abstract scenario level. This work is funded by the Deutsche Forschungsgemeinschaft DFG as part of the project SPP1103 (Meißner et al. 2003).
On Computer-Aided Instruction Tools for Teaching College Engineering Mechanics Related Courses
(2004)
In this research, questionnaires are designed to survey among teachers and students the current situation of applying Computer-Aided Instruction (CAI) tools to teaching and learning of college engineering mechanics related courses in Taiwan. The needs for CAI tools for teaching these mechanics related courses are investigated in the survey. Several prototypes of interactive multimedia tools are designed and implemented using information technologies. The applicability and effectiveness of these tools on assisting teaching of engineering mechanics related courses are discussed and evaluated. Moreover, a website for managing and sharing collected and developed CAI resources is constructed.
A simulation system has been developed as a computer aided design tool to evaluate the effect of proposed design on the thermal environment during the designing process. This system calculates outdoor surface temperatures in order to evaluate the thermal impact of a design factor in outdoor space. In this study, the previous heat balance simulation system was improved to predict the surface temperature of a proposed design using 3D-CAD. This system is able to input the complicated outdoor spatial forms efficiently and also to evaluate the surface temperature distribution from any viewpoint.
The complexity of the relationships between the actors of a building project requires high efficiency in communication. Among other things, data sharing is crucial. The exchange of data is made possible by interfaces between expert programs, which rely on product models. The latter are neutral standards with formal definitions of building objects and their attributes. This paper deals with the state of the art and the research activities concerning product models in the steel construction domain and the advantages provided by this technology for the sector.
The uniqueness and the long life cycle of buildings imply a dynamically modifiable building model. The technological foundation for the management of digital building models, a dynamic model management system (MMS), developed by our research group, allows to explicitly access and to modify the object model of the stored planning data. In this paper, the integration of constraints in digital building models will be shown. Constraints are conditions, which apply to the instances of domain model classes, and are defined by the user at runtime of the information system. For the expression of constraints, the Constraint Modelling Language (CML) has been developed and will be described in this paper. CML is a powerful, intuitively usable object-oriented language, which allows the expression of constraints at a high semantic level. A constrained-enabled MMS can verify, whether an instance fulfils the applying constraints. To ensure flexibility, the evaluation of constraints is not implicitly performed by the systems, but explicitly initiated by the user. A classification of constraint types and example usage scenarios are given.
The construction industry is a project-based business bringing together many different organisations to complete a desired goal. The strategic use of Information and Communication Technologies (ICT) has enabled this goal to be completed more effectively. Two issues require addressing, the technology itself and the implementation factors of the technology. Such implementation factors should consider, among other factors, the legal and contractual issues associated with the use of ICT, training requirements and its effects on the organisational culture. To date the legal and contractual issues have not been extensively covered, and it is recognised that the technologies have not been properly covered by any recognised legal and contractual practices. This in turn is threatening to inhibit the growth and prosperity of the use of the technology on construction projects. This paper discusses these legal and contractual issues and describes methods and tools that can be used to enable the growth of technology to be used in a legal and contractually valid environment.
Collaboration in AEC Design : Web-enabling Applications using Peer-to-Peer Office Communicator
(2004)
A market analysis conducted by Gartner Dataquest in August 2001 has shown the typical characteristics of the AEC design process. High volatility in membership of AEC design groups and members dispersed over several external offices is the common collaboration scenario. Membership is most times short lived, compared to the overall duration of the process. A technical solution has to take that into account by making joining and leaving a collaborative work group very easy. The modelling of roles of collaboration between group members must be based on a commonly understood principle like the publisher / subscriber model, where the individual that is responsible for the distribution of vital information is clear. Security issues and trust in the confidentiality of the system is a central concern for the acceptance of the system. Therefore, keeping the subset of data that will be published under the absolute control of the publisher is a must. This is not the case with server-based scenarios, sometimes even due to psychological reasons. A loosely bound Peer-to-Peer network offers advantages over a server-based solution, because of less administrative overhead and simple installation procedures. In a peer-to-peer environment, a publish/subscribe role model can be more easily implemented. The publish/subscribe model matches the way AEC processes are modelled in real world scenarios today, where legal proof of information exchange between external offices is of high importance. Workflow management systems for small to midsize companies of the AEC industry may adopt the peer-to-peer approach to collaboration in the future. Further investigations are being made on the research level (WINDS) by integrating the viewer and redlining application Collaborate! into a collaborative environment.
This paper deals with two different agent-based approaches aimed at the incorporation of complex design information into multi-agent planning systems. The first system facilitates collaborative structural design processes, the second one supports fire engineering in buildings. Both approaches are part of two different research projects that belong to the DFG1 priority program 1103 entitled “Network-based Co-operative Planning Processes in Structural Engineering“ (DFG 2000). The two approaches provide similar database wrapper agents to integrate relevant design information into two multi-agent systems: Database wrapper agents make the relevant product model data usable for further agents in the multi-agent system, independent on their physical location. Thus, database wrapper agents act as an interface between multi-agent system and heterogeneous database systems. The communication between the database wrapper agents and other requesting agents presumes a common vocabulary: a specific database ontology that maps database related message contents into database objects. Hereby, the software-wrapping technology enables the various design experts to plug in existing database systems and data resources into a specific multi-agent system easily. As a consequence, dynamic changes in the design information of large collaborative engineering projects are adequately supported. The flexible architecture of the database wrapper agent concept is demonstrated by the integration of an XML and a relational database system.
This article discusses how the failures of construction projects could be prevented. The focus is on using IT tools in communication. The article is based on the findings of the PROLABproject. The project seeks to find solutions for how the information can effectively be used in project management, specially in construction projects, what kind of procedures help the management of the knowledge and how the obstacles for efficient ways of administrating the information can be removed. These obstacles can be either related to use of new technology or to organization culture. The paper discusses e-mail as a medium of communication with the media richness framework (Fulk & Boyd 1991) based on the interviews done with the participants of construction projects. We found out that the emails were used in both rich way and not so rich way. Obstacles of rich use of IT communication were partly technical and partly psychological. Technology acceptance model (TAM) is used to study the actual use of emails in communication. Obstacles of the use of emails were mostly individual differences like the skills to use the system or external variables like they did not have proper software to open the attachments. Also people talked about information overload. Emails often push too much information. Keywords: IT tools, Communication, Knowledge management, Construction
The promise of lower costs for sensors that can be used for construction inspection means that inspectors will continue to have new choices to consider in creating inspection plans. However, these emerging inspection methods can require different activities, resources, and decisions such that it can be difficult to compare the emerging methods with other methods that satisfy the same inspection needs. Furthermore, the context in which inspection is performed can significantly influence how well certain inspection methods are suited for a given set of goals for inspection. Context information, such as weather, security, and the regulatory environment, can be used to understand what information about a component should be collected and how an inspection should be performed. The research described in this paper is aimed at developing an approach for comparing and selecting inspection plans. This approach consists of (1) refinement of given goals for inspection, if necessary, in order to address any additional information needs due to a given context and in order to reach a level of detail that can be addressed by an inspection activity; (2) development of constraints to describe how an inspection should be achieved; (3) matching of goals to available inspection methods, and generation of activities and resource plans in order to address the goals; and (4) selection of an inspection plan from among the possible plans that have been identified. The authors illustrate this approach with observations made at a local construction site.
The paper introduced the research and application of the highway construction management information integrated system. Explained the development and application of highway survey applet run on mobile telephone supporting Java and the technique of transmitting engineering data by GPRS wireless network technology. And expounded the development and application of highway engineering construction field data collecting software run on Pocket-PC. Recommended the technique of engineering long distance data transmitting based on C/S structure adopting VPN (Virtual Private Networks) technology. Especially expatiated on the research on the platform of highway construction management information integrated system adopting geography information system (GIS) technique, database technique and network technique. And said all to subsystem about bid manage, contract management, engineering design drawing, engineering survey calculation, measure and pay, data processing on engineering experiment, quantity assessing, project plan and progress, engineering document management etc. Besides? proposed highway construction project visual analysis and inquiry system based on Web-GIS; Explained the research and application of highway engineering construction OA based on B/S structure; real-time workflow and information processing such as the management of administration, business and procedure of authorization and information distribution. At last, the author described the prospect of the application of C/S and B/S structure in trade software development in the highway construction management.
In this research project we intend to transfer the whole AEC-Bidding process to an agent-based virtual marketplace. Hereby, the existing legal regulations have to be considered. Important aspects in developing the virtual marketplace are to provide the possibility to realize an agentbased bidding consortium as well as to integrate subcontractors.
In the focus of the Bologna-contract of the European secretaries of education the universities are invited to aim a unification and comparability of certificates and to offer compatible and cooperative models of education. Among existing lectures in the Internet there will arise a new competition between the universities in netbased teaching and learning environments. For the use of distributed sources of information and for the possibility to generate free configurable sequences of education modules you need management systems which are able to handle different formats of documents and to assemble it to consistent and valid lessons. Beside elementar viewing-functions, fusion of information also administrative tasks are needed, e.g. automated efficiency controls, adaptive learning surroundings. This paper attends to three aspects: - netbased teaching and learning in the area of the instruction of civil engineers - netbased information assembling and fusion of knowledge bases to higher level documents - netbased learning with international coordinated projects
Beside the standard calculation programs for civil engineering buildings mathematical programs have been lately established for the solution of differential equations for the analysis of mechanical and static systems. Programs like Maple, Matlab, MathCAD and Mathematica are popular in this field. To the knowledge of the authors, the widest application functionality offers the program Maple. Its advantages are, e.g. the alternatively symbolic or numerical solution of differential equation systems, the easy handling of parameter studies, the immediate visualization of results, the definition of macros for selected calculation steps and their export in other computer languages and, not least, the automatically generated, very clear documentation of the matehematical calculus.
Re-examination of the behaviour of structures can be necessary due to deterioration or changes in the traffic situation during their lifetime. The Finite Element Method (FEM) is widely used in order to accomplish numerical analysis. Considering the development of computer performance, more detailed FEM models can be analyzed, even on site, with mobile computers. To compensate the increasing amount of data needed for the model input, measures need to be taken to save time, by distributing the work. In order to provide consistency to the model, fedback data must be checked upon reception. A local wireless computer network of ultra-portable devices linked together with a computer can provide the coordination necessary for efficient parallel working. Based on a digital model consisting of all data gathered, structural modelling and numerical analysis are performed automatically. Thus, the user is released from the work that can be automatized and the time needed for the overall analysis of a structure is decreased.
The process of matching data represented in two different data models is a longstanding issue in the exchange of data between different software systems. While the traditional manual matching approach cannot meet today’s demands on data exchange, research shows that a fully automated generic approach for model matching is not likely, and generic semi-automated approaches are not easy to implement. In this paper, we present an approach that focuses on matching data models in a specific domain. The approach combines a basic model matching approach and a version matching approach to deduce new matching rules to enable data transfer between two evolving data models.
Physically Based Modeling and Multi-Physical Simulation System for Wood Structure Fire Performance
(2004)
This research is devoted to promoting the performance-based engineering in wood structure fire. It looks into the characteristic of the material, structural composing and collapse detecting to find out the main factors in the wood structure collapse in fire. The aim of the research is to provide an automatic simulation platform for the complicated circulation. A physically based model for slim member for beams and columns and a frame of multi-physical simulation are provided to implement the system. The physically based model contains material model, structural mechanics model, material mechanics model, as well as geometry model for the compositive simulation. The multi-physical simulation is built on the model and has the capacity to carry out a simulation combining structural, fire (thermal, CFD) and material degradation simulation. The structural and fire simulation rely on two sophisticated software respectively, ANSYS (an FEA software) and FDS (with a core of CFD). Researchers of the paper develop system by themselves to combine the two existing ones. The system has the capability to calculate the wood char to find out the loss of cross-section and to detect the collapse caused in different ways. The paper gives a sample of Chinese traditional house to show how this simulation system works.
The influence of vortex-induces vibrations on vertical tie rods has been proved as a determinant load factor in the lifetime-oriented dimensioning of arched steel bridges. Particularly, the welded connection plates between the suspenders and the arches often exhibit cracks induced primarily rods. In this context, the synchronization of the vortex-shedding to the rod motion in a critical wind velocity range, the so-called lock-in effect, is of essential interest.
A/E/C Team members, while collaborating on building projects, rely on past experiences and content through the use of project design archives (whether in paper or digital format). This leads to underutilization of potential knowledge, as decision-making of data, information, and knowledge reuse is limited by access to these archives, due to sheer size and inconvenient presentation. This paper presents an integrated solution that leverages two technologies CoMem (Corporate Memory) and iRoom (interactive Room) developed at Stanford. This addresses critical limitations, i.e., content, context, visualization and interactivity, constraining the process of collaborative exploration towards knowledge reuse and decision-making.
Re-using knowledge in architecture, engineering and construction (AEC) firms can lead to greater competitive advantage, improved designs, and more effective management of constructed facilities. This paper discusses the importance of exploration and discovery of reusable knowledge from a corporate archive as opposed to simple search and retrieval. We describe and illustrate through a scenario of use an exploration framework and prototype, CoMemTM that formalizes the added value of exploration in the process of knowledge reuse. We discuss two exploration activities: (i) Breadth- Only overview exploration that assist a user to rapidly localize pockets of re-usable knowledge from the large corporate archive and (ii) Iterative breadth-depth exploration that enables a user to identify those re-usable components of the Corporate Memory that may yield design issues that were not originally considered.
This ethnographic study reports on emerging work processes and practices observed in the AEC (Architecture/Engineering/Construction) Global Teamwork program, i.e., what people experience when interacting with and through collaboration technologies, why people practice in the way they do, how the practice fits into the environment and changes the work patterns. It presents the experience of two high-performance typical but extreme AEC teamwork cases adopting and adapting to collaboration technologies and how these technologies in practice impact their work processes. The findings illustrate the importance of collaboration technologies in cross-disciplinary, global teamwork. Observations indicate that high performance teams that use the collaboration technologies effectively exhibit collaboration readiness at an early stage and manage to define a “third way” to meet the demands of the cross-disciplinary, multi cultural and geographically distributed AEC workspace. The observations and implications represent the blueprint for yearly innovations and improvements to the design of the AEC Global Teamwork program.
The methods currently used for scheduling building processes have some major advantages as well as disadvantages. The main advantages are the arrangement of the tasks of a project in a clear, easily readable form and the calculation of valuable information like critical paths. The main disadvantage on the other hand is the inflexibility of the model caused by the modeling paradigms. Small changes of the modeled information strongly influence the whole model and lead to the need to change many more details in the plan. In this article an approach is introduced allowing the creation of more flexible schedules. It aims towards a more robust model that lowers the need to change more than a few information while being able to calculate the important propositions of the known models and leading to further valuable conclusions.
This paper reports on the latest results in the development of a new approach for simulating the thermal behavior of buildings that overcomes the limitations of conventional heat-transfer simulation methods such as FDM and FEM. The proposed technique uses a coarse-grain approach to model development whereby each element represents a complete building component such as a wall, internal space, or floor. The thermal behavior of each coarse-grain element is captured using empirical modeling techniques such as artificial neural networks (ANNs). The main advantages of the approach compared to conventional simulation methods are: (a) simplified model construction for the end-user; (b) simplified model reconfiguration; (c) significantly faster simulation runs (orders of magnitude faster for two and three-dimensional models); and (d) potentially more accurate results. The paper demonstrates the viability of the approach through a number of experiments with a model of a composite wall. The approach is shown to be able to sustain highly accurate longterm simulation runs, if the coarse-grain modeling elements are implemented as ANNs. In contrast, an implementation of the coarse-grain elements using a linear model is shown to function inaccurately and erratically. The paper concludes with an identification of on-going work and future areas for development of the technique.
The Priority Programme ‘Network Based Co-operation in Structural Engineering’ of the ‘German Research Foundation’ (DFG) has been established in the year 2000. This paper describes and discusses the main research directions and first results of the workgroup ‘Distributed Product Models’. The five projects of the workgroup have developed completely different solutions for specific application domains. Each solution concept deals with a consistent product modeling and knowledge processing in a distributed environment in the planning process. The individual solution approaches of the projects are described and the underlying basic assumptions are discussed. A unified system architecture is described for all projects of the workgroup. Two different approaches (object-oriented and graph-based models) have been introduced for product and knowledge modeling. The common structure of these models will be explained to fully understand the differences of these modeling approaches. Finally the concepts for co-operative work and conflict management in a distributed environment are described: The solution approaches will be distinguished by classifying the supported co-operation according to time. A final scientific summary describes the state-of-the-art in network based co-operation in structural engineering: The role of research directions like knowledge modeling, standard product modeling and versioning in the distributed planning process will be explained.
We present a software prototype for fluid flow problems in civil engineering, which combines essential features of Computational Steering approaches with efficient methods for model transfer and high performance computing. The main components of the system are described: - The modeler with a focus on the data management of the product model - The pre-processing and the post-processing toolkit - The simulation kernel based on the Lattice Boltzmann method - The required hardware for real-time computing