Refine
Document Type
- Article (130) (remove)
Institute
- Professur Informatik im Bauwesen (130) (remove)
Keywords
- Bautechnik (20)
- Produktmodell (19)
- Finite-Elemente-Methode (17)
- Simulation (17)
- Lernendes System (15)
- Mehragentensystem (14)
- Modellierung (13)
- Physikalisches Verfahren (11)
- Bauwerk (9)
- CAD (8)
- Forschungskooperation (6)
- Dynamische Belastung (5)
- Optimierung (5)
- Verkehrsplanung (5)
- Baukonstruktion (4)
- Framework <Informatik> (4)
- Geoinformationssystem (4)
- Stadtplanung (4)
- Stahlbau (4)
- Wissensmanagement (4)
- API (3)
- Bauwesen (3)
- Bauzeichnung (3)
- Computerunterstütztes Verfahren (3)
- Dreidimensionales Modell (3)
- Facility-Management (3)
- Fuzzy-Logik (3)
- Graphentheorie (3)
- Ingenieurbau (3)
- Tragwerk (3)
- Virtuelle Realität (3)
- Anwendung (2)
- Architektur (2)
- Balken (2)
- Bauindustrie (2)
- Bauschaden (2)
- Baustatik (2)
- Brückenbau (2)
- Datenaustausch (2)
- Datenmodell (2)
- Dialogsystem (2)
- Elastoplastizität (2)
- Entscheidungsunterstützungssystem (2)
- Europa (2)
- Festkörpermechanik (2)
- Forschung (2)
- Freie Schwingung (2)
- Geschichtetes Medium (2)
- Informationstechnik (2)
- Instandhaltung (2)
- Internet (2)
- Langzeitverhalten (2)
- Mathematisches Modell (2)
- Skelettbau (2)
- Stabilität (2)
- Standardisierung (2)
- Straßenbau (2)
- Visualisierung (2)
- Wissensverarbeitung (2)
- Öffentlicher Personennahverkehr (2)
- Ablaufplanung (1)
- Ausschreibung (1)
- Autobahn (1)
- Bandmatrix (1)
- Bauaufnahme (1)
- Bauausführung (1)
- Bauinformatik (1)
- Bauplanung (1)
- Bauteil (1)
- Bauwerksplanung (1)
- Bauzustand (1)
- Bedarfsforschung (1)
- Belastung (1)
- Beltrami-Gleichung (1)
- Beschränkung (1)
- Bewertung (1)
- Bildanalyse (1)
- Boden-Bauwerk-Wechselwirkung (1)
- Bodenmechanik (1)
- Brandschutz (1)
- Bruchmechanik (1)
- Computer Supported Cooperative Work (1)
- Computergraphik (1)
- Construction Sequence (1)
- Dammbau (1)
- Datenbank (1)
- Datenbanksystem (1)
- Datenbankverwaltung (1)
- Diskrete Optimierung (1)
- EXPRESS <Programmiersprache> (1)
- Eigenwert (1)
- Elastomer (1)
- Entscheidung bei mehrfacher Zielsetzung (1)
- Fraktal (1)
- Genetischer Algorithmus (1)
- Gittererzeugung (1)
- Gleichgewicht (1)
- Green-Funktion (1)
- Grenzzustand (1)
- Halbraum (1)
- Heuristik (1)
- Hochhaus (1)
- Holzbau (1)
- Hängebrücke (1)
- Informationsmanagement (1)
- Infrastruktur (1)
- Ingenieurholzbau (1)
- Integrierte Planung (1)
- Isotropie (1)
- Kartierung (1)
- Katastrophenmanagement (1)
- Kennzahl (1)
- Kette (1)
- Klein- und Mittelbetrieb (1)
- Kommunikationsprotokoll (1)
- Konzipieren <Technik> (1)
- Lebenszyklus (1)
- Lebenszyklus <Wirtschaft> (1)
- Luft (1)
- Managementinformationssystem (1)
- Markowschke (1)
- Mehrdimensionalität (1)
- Mustererkennung (1)
- Nichtlineares Phänomen (1)
- Numerisches Verfahren (1)
- Objektmodell (1)
- Objektorientiertes Datenbanksystem (1)
- Parallelverarbeitung (1)
- Parameteridentifikation (1)
- Pflasterungen (Mathematik) (1)
- Photogrammetrie (1)
- Plastizitätstheorie (1)
- Platte (1)
- Produktinformation (1)
- Programm (1)
- Projektdokumentation (1)
- Quantenphysik (1)
- Quaternion (1)
- Rekonstruktion (1)
- Ressourcenallokation (1)
- Rissbildung (1)
- STEP (1)
- Schadstoffkonzentration (1)
- Schulgebäude (1)
- Schwingung (1)
- Setzung (1)
- Shore Spacing (1)
- Shore Stiffness (1)
- Shoring System (1)
- Sicherheit (1)
- Software (1)
- Spannender Baum (1)
- Spannung (1)
- Stabwerk (1)
- Stadtverkehr (1)
- Stahlbeton (1)
- Stahlbrücke (1)
- Stahlkonstruktion (1)
- Standard (1)
- Stapelproblem (1)
- Statik (1)
- Stochastisches Modell (1)
- Stoffgesetz (1)
- Stokes-Problem (1)
- Straße (1)
- Straßenbrücke (1)
- Straßenkarte (1)
- Strukturanalyse (1)
- Teamwork (1)
- Temperatur (1)
- Tragwerk / Vorspannung (1)
- Trajektorie (Mathematik) (1)
- Transport (1)
- Transportproblem (1)
- Trägheit (1)
- Tunnel (1)
- Turmdrehkran (1)
- Vektorfunktion (1)
- Verbundtragwerk (1)
- Verkehrsaufkommen (1)
- Verkehrsmittelwahl (1)
- Verkehrsnetz (1)
- Versionsverwaltung (1)
- Versorgungsnetz (1)
- Verteiltes Datenverarbeitungssystem (1)
- Verteiltes System (1)
- Viskoplastizität (1)
- Vorgespannte Konstruktion (1)
- Vorspannung (1)
- Wartezeit (1)
- Wasserkraftwerk (1)
- Wechselwirkung (1)
- Wirtschaftlichkeit (1)
- Zufallsvariable (1)
- Zuverlässigkeit (1)
- Zuverlässigkeitstheorie (1)
- cable force (1)
- cable stayed bridge (1)
- initial equilibrium state (1)
- initial shape (1)
This paper presents an evaluation system for steel structures of hydroelectric power stations, including hydraulic gates and penstocks, based on Fault Tree Analyasis (FTA) and performance maps. This system consists of fault tree diagrams of FTA, performance maps, design and analysis systems, and engineerin databases. These four modules are integrated by appropriate hyperlinks so that the user of this system can use it easily and seamlessly. A well developed system was applied to some illustrative example cases, and they showed that the developed methodology and system worked well and the users found the system useful and effective for their maintenance tasks at powerstations.
This paper presents results of a study on distributed, or parallel, evolutionary computation in the topological design of steel structural systems in tall buildings. It describes results of extensive experimental research on various parallel evolutionary architectures applied to a complex structural design problem. The experiments were conducted using Inventor 2003, a networkbased evolutionary design support tool developed at George Mason University. First, a general introduction to evolutionary computation is provided with an emphasis on recent developments in parallel evolutionary architectures. Next, a discussion of conceptual design of steel structural systems in tall buildings is presented. Further, Inventor 2003 is briefly introduced as well as its design representation and evolutionary computation characteristics. Next, the results obtained from systematic design experiments conducted with Inventor 2003 are discussed. The objective of these experiments was to qualitatively and quantitatively investigate evolution of steel structural systems in tall buildings during a distributed evolutionary design process as well as to compare efficiency and effectiveness of various parallel evolutionary architectures with the traditional evolutionary design approaches. Two connectivity topologies (ring topology and fully-connected topology) have been investigated for four populations of structural designs evolving in parallel and using various migration strategies. Also, results of the initial sensitivity studies are reported in which two ways of initializing distributed evolutionary design processes were investigated, using either arbitrarily selected designs as initial parents or randomly generated ones. Finally, initial research conclusions are presented.
The method of the finite elements is an adaptable numerical procedure for interpolation as well as for the numerical approximation of solutions of partial differential equations. The basis of these procedure is the formulation of suitable finite elements and element decompositions of the solution space. Classical finite elements are based on triangles or quadrangles in the two-dimensional space and tetrahedron or hexahedron in the threedimensional space. The use of arbitrary-dimensional convex and non-convex polyhedrons as the geometrical basis of finite elements increases the flexibility of generating finite element decompositions substantially and is sometimes the only way to get a clear decomposition...
A Multi-objective Model for Optimizing Construction Planning of Repetitive Infrastructure Projects
(2004)
This paper presents the development of a model for optimizing resource utilization in repetitive infrastructure projects. The model provides the capability of simultaneous minimization of both project duration and work interruptions for construction crews. The model provides in a single run, a set of nondominated solutions that represent the tradeoff between these two objectives. The model incorporates a multiobjective genetic algorithm and scheduling algorithm. The model initially generates a randomly selected set of solutions that evolves to a near optimal set of tradeoff solutions in subsequent generations. Each solution represents a unique scheduling solution that is associated with certain project duration and a number of interruption days for utilized construction crews. As such, the model provides project planners with alternative schedules along with their expected duration and resource utilization efficiency.
The paper investigates accuracy of deflection predictions made by the finite element package ATENA and design code methods ACI and EC2. Deflections have been calculated for a large number of experimental reinforced concrete beams reported by three investigators. Statistical parameters have been established for each of the technique at different load levels, separately for the beams with small and moderate reinforcement ratio.
Efforts to define standards for representing AEC/FM data have been fairly successful. However defining a standard reference process model has not met with the same success. Yet almost every conceptual modelling or software development project starts by defining the business processes to be supported and the related requirements to be satisfied. This paper describes a new process-centred methodology for user requirements capture developed in the ICCI project (IST-2001-33022). Its essence is in recognising user requirements and use cases in the context of the real construction process, identifying the actors and roles for each individual activity and associating these activities with information, communication and standardisation requirements on the basis of a formalised specification, named the Process Matrix. In the paper we outline the history of process matrix development, introduce the basic structure of the matrix and show how it can be further extended and refined. We present also a web-based software implementation of the developed approach, describe how it has been used in ICCI and outline further perspectives.
A comprehensive framework of information management system for construction projects in China has been established through extensive literature survey and field investigation. It utilizes the potential information technologies and covers the practical management patterns as well as the major aspects of construction project management. It can be used to guide and evaluate the design of the information management systems for construction projects in order to make the system to be applicable to a wide variety of construction projects and survive the changes in project management.
The goal of the research is the development of a computer system to plan, simulate and visualize erection processes in construction. In the research construction cranes are treated as robots with predefined degrees of freedom and crane-specific motion planning techniques are developed to generate time-optimized and collision-free paths for each piece to be erected in the project. Using inverse kinematics and structural dynamics simulation, the computer system then computes the crane motions and velocities necessary to achieve the previously calculated paths. The main benefits of the research are the accurate planning and scheduling of crane operations leading to optimization of crane usage and project schedules, as well as improving overall crane safety in the project. This research is aimed at the development of systems that will allow computer-assisted erection of civil infrastructure and ultimately to achieve fully-automated erection processes using robotic cranes...
Buildings require both for construction and, due to their comparatively long life cycle for maintenance, significant raw material and energy resources. So far available knowledge about resource consumption during an entire life cycle of a building is still quite rare, because various criteria affect each other and/or overlay mutually. In this contribution a model based software concept is presented using an integrated approach for life cycle simulation and assessment of buildings. The essential point of the development consists of connecting an IFC compliant product model of a building via the Internet with data bases for the resource and energy requirement of building materials. Furthermore, numerical simulations allow calculating and minimizing the energy consumption, the resource requirement, the waste streams and also the noxious emissions. In the context of this paper we present the first release of software programs for architects and engineers, which help them to evaluate their design decisions objectively in early planning steps. Additionally the usage of the software is demonstrated by a test case study for a real world building. By applying this software in practice a substantial contribution for saving energy and natural resources can be provided in the sense of sustainable and ecological building design.
The paper presents a general map-based approach to prototyping of products in virtual reality environments. Virtual prototyping of products is considered as a consistent simulation and visualization process mapping the source product model into its target visual representations. The approach enables to interrelate formally the product and visual information models with each other by defining mapping rules, to specify a prototyping scenario as a composition of map instances, and then to explore particular product models in virtual reality environments by interpreting the composed scenario. Having been realized, the proposed approach provides for the strongly formalized method and the common software framework to build virtual prototyping applications. As a result, the applications gain in expressiveness, reusability and reliability, as well as take on additional runtime flexibility...
In current AEC practice client requirements are typically recorded in a building program, which, depending on the building type, covers various aspects from the overall goals, activities and spatial needs to very detailed material and condition requirements. This documentation is used as the starting point of the design process, but as the design progresses, it is usually left aside and changes are made incrementally based on the previous design solution. These incremental small changes can lead to a solution that may no longer meet the original requirements. In addition, design is by nature an iterative process and the proposed solutions often also cause evolution in the client requirements. However, the requirements documentation is usually not updated accordingly. Finding the latest updates and evolution of the requirements from the documentation is very difficult, if not impossible. This process can lead to an end result, which is significantly different from the documented requirements. Some important requirements may not be satisfied, and even if the design process was based on agreed-upon changes in the scope and requirements, differences in the requirements documents and in the completed building can lead to well-justified doubts about the quality of the design and construction process...
The goal of the research is to increase the understanding of dynamic behaviors during the crane operation, and develops computer-aided methods to improve the training of crane operators. There are approximately 125,000 cranes in operation today in the construction industry, responsible for major portion of erection activities. Unfortunately, many accidents occur every year in the U.S. and other countries related to the operation of cranes in construction sites. For example on November 28, 1989 a tower crane collapse during the construction of a building in San Francisco killing four construction workers, one civilian and injuring 28. According to the statistics from Occupational Safety Health Administration (OSHA), there were 137 crane-related fatalities from 1992 to 2001 in the US. A well-known internet website that keeps track of crane-related accidents (craneaccidents.com), reports 516 accidents and 277 fatalities from 2000 to 2002. These statistics show that even though many measures have been taken to decrease the number of crane-related accidents (Braam, 2002), the number of crane related accidents is still very large. It is important to recognize that each construction related fatality is not only a great human loss but also increases the costs of insurance, lawsuits, and the construction budget due to delay of a project (Paulson 1992)...
The complexity of the relationships between the actors of a building project requires high efficiency in communication. Among other things, data sharing is crucial. The exchange of data is made possible by interfaces between expert programs, which rely on product models. The latter are neutral standards with formal definitions of building objects and their attributes. This paper deals with the state of the art and the research activities concerning product models in the steel construction domain and the advantages provided by this technology for the sector.
Modeling of Freeway Traffic
(2004)
An integrated modeling of freeway traffic is developed, whose implementation in an uniform computer –aided simulation model facilitate comparative evaluation and systematic coupling of several traffic simulations, traffic controls, traffic measurements and traffic scenarios. The integrated modeling of freeway traffic is a basic mapping of freeway networks, control methods, measurements and different simulations of traffic flow...
Particle Simulation and Evaluation of Personal Exposure to Contaminant Sources in an Elevation Space
(2004)
An elevator, which figures a small volume, is normally used by everyone for a short period of time and equipped with simple ventilation system..Any contaminant released within it may cause serious problem. This research adapt a fire and smoke simulation software (FDS) into non-fire indoor airflow scario. Differently from previous research, particles are chosen as a risk evalution unit. A personal and multi-personal exposure model is proposed. The model takes the influence of the human thermal boundary, coughing, inhalation, exhalation, standing position, and the fan factor into account. The model is easy-to-use and suitable for the design of elevator system in practice.
Pre-stressed structural elements are widely used in large-span structures. As a rule, they have higher stiffness characteristics. Pre-stressed rods can be applied as girders of different purpose, and as their separate parts, e.g. rods of trusses and frames. Among numerous ways of prestressing the compression of girders, trusses, and frames by tightenings from high-strength materials is under common application.
The paper summarizes a part of research carried out in ICCI project and provides a current review of ICT infrastructures supporting collaboration. It covers taxonomies, protocols, standards, components, typical subsystems as well as future trends and recommendation for two most important technologies with applications in AEC: (1) EIP (Enterprise information portal) – a single gateway to a company's information, knowledge base, and applications for all actors; (2) RTC (Real-Time Communication and Collaboration technologies) that provide means for asynchronous communication between geographically dislocated people using ICT. Proposed future developments are: orientation towards web services - with building information models, business intelligence, personalization, AEC information retrieval, p2p workspaces and grids.
The highway product model based on the length information of the centerline, and the application system is developed. This paper shows the schema and the modeling process of the product model, which includes geometric elements such as an alignment, lanes, sidewalks, shoulders and sprits, and accessories such as guard fences, plantings and signs. Furthermore, The Highway Sequence Editor (HSE) is developed as an application system to verify the model.
The Priority Programme ‘Network Based Co-operation in Structural Engineering’ of the ‘German Research Foundation’ (DFG) has been established in the year 2000. This paper describes and discusses the main research directions and first results of the workgroup ‘Distributed Product Models’. The five projects of the workgroup have developed completely different solutions for specific application domains. Each solution concept deals with a consistent product modeling and knowledge processing in a distributed environment in the planning process. The individual solution approaches of the projects are described and the underlying basic assumptions are discussed. A unified system architecture is described for all projects of the workgroup. Two different approaches (object-oriented and graph-based models) have been introduced for product and knowledge modeling. The common structure of these models will be explained to fully understand the differences of these modeling approaches. Finally the concepts for co-operative work and conflict management in a distributed environment are described: The solution approaches will be distinguished by classifying the supported co-operation according to time. A final scientific summary describes the state-of-the-art in network based co-operation in structural engineering: The role of research directions like knowledge modeling, standard product modeling and versioning in the distributed planning process will be explained.
An architecture of a distributed planning system for the building industry has been developed. The emphasis is on highly collaborative environments in steelwork, timber construction etc. where designers concurrently handle 3D models. The overall system connects local design systems by the so-called Design Framework DFW. This framework consists of the definition of distributed components and protocols which make the collaborative design work. The process of collaborative design has been formalized on an abstract level. This paper describes how this has been done. A sample is given to illustrate the mapping of concrete scenarios of the ‘real design world’ to an abstract scenario level. This work is funded by the Deutsche Forschungsgemeinschaft DFG as part of the project SPP1103 (Meißner et al. 2003).