Refine
Document Type
- Conference Proceeding (857) (remove)
Institute
- Professur Informatik im Bauwesen (336)
- In Zusammenarbeit mit der Bauhaus-Universität Weimar (174)
- Professur Baubetrieb und Bauverfahren (104)
- Professur Theorie und Geschichte der modernen Architektur (94)
- Graduiertenkolleg 1462 (32)
- Institut für Strukturmechanik (ISM) (23)
- Professur Angewandte Mathematik (18)
- Institut für Konstruktiven Ingenieurbau (IKI) (12)
- Junior-Professur Computational Architecture (11)
- Bauhaus-Institut für Geschichte und Theorie der Architektur und Planung (10)
Keywords
- Computerunterstütztes Verfahren (286)
- Architektur <Informatik> (200)
- CAD (158)
- Angewandte Informatik (145)
- Angewandte Mathematik (145)
- Computer Science Models in Engineering; Multiscale and Multiphysical Models; Scientific Computing (74)
- Bauhaus (68)
- Arbeitsschutz (61)
- Baustelle (53)
- Architekturtheorie (52)
- Modellierung (50)
- Weimar (48)
- Architekturentwicklung (47)
- Bauhaus-Kolloquium (47)
- Baubetriebslehre (43)
- Architektur (40)
- Bauwerk (40)
- Verteiltes System (36)
- Building Information Modeling (35)
- Data, information and knowledge modeling in civil engineering; Function theoretic methods and PDE in engineering sciences; Mathematical methods for (robotics and) computer vision; Numerical modeling in engineering; Optimization in engineering applications (34)
- 1976 (27)
- Finite-Elemente-Methode (24)
- Deutschland / Baustellenverordnung (20)
- Ingenieurbau (20)
- 1999 (19)
- Baubetrieb (18)
- Internet (18)
- Bauplanung (17)
- Planungsprozess (17)
- Weimar / Bauhaus-Universität / Professur Baubetrieb und Bauverfahren (16)
- Optimierung (15)
- Abbruch (14)
- Datenmanagement (14)
- Tragwerk (14)
- Absturzunfall (13)
- Gebäude (13)
- Großtafelbau (13)
- Globalisierung (12)
- Städtebau (12)
- Stahlbeton (11)
- Bautechnik (10)
- Bauwesen (10)
- Beton (10)
- Datenaustausch (10)
- Mobile Computing (10)
- Prozessmanagement (10)
- Simulation (10)
- Arbeitsgestaltung (9)
- Arbeitswissenschaft (9)
- Baustatik (9)
- Bevölkerungsentwicklung (9)
- Dreidimensionales Modell (9)
- Entscheidungsunterstützung (9)
- Funknetz (9)
- Gefahrstoff (9)
- Gesundheitsschutz (9)
- Hochschulbildung (9)
- Humanisierung der Arbeit (9)
- Projektmanagement (9)
- Schale (9)
- Computerunterstütztes Lernen (8)
- Konzipieren <Technik> (8)
- Planung (8)
- Prozessmodell (8)
- Qualität (8)
- Quaternion (8)
- Management (7)
- Nachtragsvereinbarung (7)
- Nichtlineares Phänomen (7)
- Objektmodell (7)
- Ausschreibung (6)
- Bauaufnahme (6)
- Brückenbau (6)
- Informationstechnik (6)
- Lebenszyklus <Wirtschaft> (6)
- Prozessfähigkeit <Qualitätsmanagement> (6)
- Software (6)
- Wissensverarbeitung (6)
- Bauablauf (5)
- Bauphysik (5)
- Bruchmechanik (5)
- Controlling (5)
- Datenbank (5)
- Datenerfassung (5)
- Geotechnik (5)
- Informatik (5)
- Mathematisches Modell (5)
- Mehragentensystem (5)
- Produktmodell (5)
- Schweißen (5)
- Tragverhalten (5)
- Visualisierung (5)
- Bauablauf / Ablaufplanung (4)
- Bauschaden (4)
- Baustelleneinrichtung (4)
- Bauteil (4)
- Deutschland <DDR> (4)
- Elastoplastizität (4)
- Europa (4)
- Gebäudeleittechnik (4)
- Informationsmanagement (4)
- Informationssystem (4)
- Langzeitverhalten (4)
- Lernendes System (4)
- Petri-Netz (4)
- Stadtplanung (4)
- Transportables Gerät (4)
- Transportproblem (4)
- Tunnelbau (4)
- Zeitabhängigkeit (4)
- Acoustic Travel-Time Tomography (3)
- Arbeitssicherheit (3)
- Arbeitsstättenverordnung (3)
- Bauausführung (3)
- Bauindustrie (3)
- Bauklimatik (3)
- Bauvorhaben (3)
- Benutzeroberfläche (3)
- Bewehrung (3)
- Bildnerisches Gestalten (3)
- Brandschutz (3)
- Datenmodell (3)
- Dessau / Bauhaus (3)
- Deutschland / Vergabe- und Vertragsordnung für Bauleistungen (3)
- Digitalisierung (3)
- Dynamische Belastung (3)
- Entscheidung bei mehrfacher Zielsetzung (3)
- Erdbebenbelastung (3)
- Forschung (3)
- Fuzzy-Logik (3)
- Genetischer Algorithmus (3)
- Holzbau (3)
- IFC (3)
- Kunsterziehung (3)
- Marketing (3)
- Messung (3)
- Neuronales Netz (3)
- Nichtlineare Mechanik (3)
- Prognose (3)
- Rechnernetz (3)
- Rissbildung (3)
- Schwingung (3)
- Sicherheit (3)
- Stochastisches Modell (3)
- Structural Engineering (3)
- Textilfaser (3)
- Verkehrsnetz (3)
- Virtuelle Realität (3)
- Wahrscheinlichkeitsrechnung (3)
- Wavelet (3)
- XML (3)
- Zement (3)
- Zufallsvariable (3)
- Öffentlicher Auftrag / Vergabe (3)
- Öffentlicher Personennahverkehr (3)
- Ablaufplanung (2)
- Akustische Laufzeit-Tomographie (2)
- Algorithmus (2)
- Anwendung (2)
- Ausbildung (2)
- Aussteifung (2)
- Bauentwurf (2)
- Bauführung (2)
- Bauingenieurstudium (2)
- Baumaschine (2)
- Bauprozess (2)
- Baustoff (2)
- Bauwirtschaft (2)
- Bedarfsermittlung (2)
- Belastung (2)
- Bildverarbeitung (2)
- Boden-Bauwerk-Wechselwirkung (2)
- CAD / Architektur (2)
- Computer Supported Cooperative Work (2)
- Computersimulation (2)
- Computerunterstützter Unterricht (2)
- Corrosion (2)
- Data-Warehouse-Konzept (2)
- Datenverwaltung (2)
- Deutschland / Gerätesicherheitsgesetz (2)
- Dokumentenverwaltungssystem (2)
- Dreidimensionales CAD (2)
- Dynamik (2)
- Dünnwandiges Bauelement (2)
- Eisenbahnbau (2)
- Emissionsüberwachung (2)
- Entwurf (2)
- Facility-Management (2)
- Flüssigkeit-Bauwerk-Wechselwirkung (2)
- Freizeitindustrie (2)
- Geoinformationssystem (2)
- Gleichgewicht (2)
- Graphische Benutzeroberfläche (2)
- Grenzzustand (2)
- Grundwasser (2)
- Hannes <Architekt> (2)
- Haus (2)
- Hochschule (2)
- Informationsaustausch (2)
- Ingenieurwissenschaften (2)
- Kalkulation (2)
- Kommunikationstechnik (2)
- Kontinuum (2)
- Kooperatives Informationssystem (2)
- Kran (2)
- Künstliche Intelligenz (2)
- Landschaftsgebundenes Bauen (2)
- Lebensdauer (2)
- Luci (2)
- Matrizenrechnung (2)
- Mechanische Eigenschaft (2)
- Mensch-Maschine-Kommunikation (2)
- Meyer (2)
- Monitorüberwachung (2)
- Netzwerk (2)
- Numerisches Verfahren (2)
- Orthotropes Bauteil (2)
- Parameteridentifikation (2)
- Platte (2)
- Preservation (2)
- Proceedings (2)
- Produktionsplanung (2)
- Prozessoptimierung (2)
- Qualitätskontrolle (2)
- Rahmentragwerk (2)
- Raumtragwerk (2)
- Reihenfolgeproblem (2)
- Sandwichbauteil (2)
- Sandwichbauweise (2)
- Schnittstelle (2)
- Sichtbeton (2)
- Sommerkurs (2)
- Sowjetunion (2)
- Stadt (2)
- Stadtsanierung (2)
- Stahlkonstruktion (2)
- Straßenbau (2)
- Transformation (2)
- Umweltfaktor (2)
- Verkehr (2)
- Virtuelles Unternehmen (2)
- Wasserbau (2)
- Windlast (2)
- Wissensmanagement (2)
- Wohnung (2)
- Wohnungsbau (2)
- Zuverlässigkeit (2)
- distributed computing (2)
- middleware (2)
- nailed constructions (2)
- nailed trusses (2)
- proceedings (2)
- summer school (2)
- urban design (2)
- 1997 (1)
- 2007 (1)
- ANSYS (1)
- Adaptable design (1)
- Adaptives System (1)
- Air quality (1)
- Akquisition (1)
- Akustische Tomographie (1)
- Alit (1)
- Alkali-Kieselsäure-Reaktion (1)
- Altbaumodernisierung (1)
- Alterung (1)
- Amplitude (1)
- Angebot (1)
- Angebotsbearbeitung (1)
- Antonin (1)
- António de Oliveira Salazar (1)
- Apartheid (1)
- Approximation (1)
- Arbeitsgemeinschaft (1)
- Arbeitspsychologie (1)
- Architecture (1)
- Architekt (1)
- Architektenrecht (1)
- Arthur (1)
- Aufwindkraftwerk (1)
- Automatische Identifikation (1)
- Automatisiertes System (1)
- Automatisierungssystem (1)
- BGVR (1)
- BIM (1)
- Bauchemie (1)
- Baudenkmal (1)
- Bauführer (1)
- Baugrund (1)
- Bauinformatik (1)
- Baukosten (1)
- Baumarkt (1)
- Bauphysik und Sanierung (1)
- Bauschutt (1)
- Baustellenverordnung (1)
- Bausubstanz (1)
- Bauverfahren (1)
- Bauwerk / Technische Überwachung (1)
- Begrüßung (1)
- Behinderte (1)
- Beleuchtung (1)
- Belüftung (1)
- Benutzer / Beteiligung (1)
- Benutzer-entworfene Wohnungen (1)
- Berechnung (1)
- Berlin (1)
- Berufshaftung (1)
- Berufstätigkeit / Stress (1)
- Berührungslose Messung (1)
- Betonbau (1)
- Betonbrücke (1)
- Betonstraße (1)
- Betriebskosten (1)
- Betriebsmittel (1)
- Betriebswirtschaft (1)
- Beulung (1)
- Beurteilung (1)
- Bewertung (1)
- Bewertungssystem (1)
- Bewirtschaftung (1)
- Bibliographie (1)
- Biegemoment (1)
- Bild (1)
- Bildanalyse (1)
- Bilddaten (1)
- Bogenbrücke (1)
- Bogenstaumauer (1)
- Boolesche Operationen (1)
- Brandgefahr (1)
- Brep (1)
- Brücke (1)
- Building Object Model (1)
- Building information modelling (1)
- Busspur (1)
- CAAD (1)
- CAE (1)
- CORBA (1)
- Cauchy-Riemannsche Differentialgleichungen (1)
- Cement (1)
- Chaostheorie (1)
- Chemische Industrie (1)
- China (1)
- Chirale Verbindungen (1)
- Chromekzem (1)
- Cognitive design computing (1)
- Collein (1)
- Computational Urban Design (1)
- Computer (1)
- Computergestütztes Verfahren (1)
- Computerunterstützte Kommunikation (1)
- Constraint <Künstliche Intelligenz> (1)
- Constraintnetz (1)
- Construction visualization (1)
- Corrugated cardboard sandwich (1)
- Damping (1)
- Data, information and knowledge modeling in civil engineering (1)
- Database (1)
- Dateneingabegerät (1)
- Dauerhaftigkeit (1)
- Demontage (1)
- Denkmalpflege (1)
- Design optimization (1)
- Design visualization (1)
- Deutschland / Betriebssicherheitsverordnung (1)
- Deutschland / Gefahrstoffverordnung (1)
- Deutschland <Sowjetische Besatzungszone> (1)
- Deutschland <Östliche Länder> (1)
- Dialogprogrammierung (1)
- Dickwandiges Bauelement (1)
- Dictatorship (1)
- Dienstleistung (1)
- Dieselmotor (1)
- Differentialoperator (1)
- Digitales Bautagebuch (1)
- Digitales Modell (1)
- Dirac-Gleichung (1)
- Diskrete Fourier-Transformation (1)
- Diskrete Optimierung (1)
- Dreidimensionale geometrische Modellierung (1)
- Dreieck (1)
- Drohne (1)
- Druckbelastung (1)
- Duarte Pacheco (1)
- EDX (1)
- Early design stage (1)
- Echtzeitsystem (1)
- Echtzeitverarbeitung (1)
- Edmund (1)
- Eigenspannung (1)
- Eigenwert (1)
- Eigenwertproblem (1)
- Einfamilienhaus (1)
- Einsturz (1)
- Eisenbahnbrücke (1)
- Elastizitätstheorie (1)
- Elektromagnetisches Feld (1)
- Elektronischer Produktkatalog (1)
- Ellipsoid (1)
- Emission (1)
- Encosta Da Ajuda/Restelo (1)
- Energieeinsparung (1)
- Energiemanagement (1)
- Energieversorgung (1)
- Energiewende (1)
- Entropie (1)
- Entscheidungstheorie (1)
- Envi-Met (1)
- Epoxidharz (1)
- Erasmus + (1)
- Erdbebenschutz (1)
- Erlebnis (1)
- Europe (1)
- Europäische Integration (1)
- Exchanged Documents (1)
- Expertensystem (1)
- Faktor <Algebra> (1)
- Farbenlehre (1)
- Faria Da Costa (1)
- Fascism (1)
- Fassadenbegrünung (1)
- Fehler (1)
- Fertigbau (1)
- Finite-Streifen (1)
- Finite-Streifen-Methode (1)
- Flight path planning (1)
- Flugasche (1)
- Fly ash (1)
- Flächenmanagement, Flächensteuerung, Flächenoptimierung, (1)
- Focussed Ion Beam (1)
- Folded components (1)
- Forschungseinrichtung (1)
- Fragebogen zum Arbeits- und Gesundheitsschutz (1)
- Fraktal (1)
- Framework <Informatik> (1)
- Freivorbau (1)
- Frost-Tausalz-Angriff (1)
- Frost-Tausalz-Widerstand (1)
- Function theoretic methods and PDE in engineering sciences (1)
- Funktionalismus <Architektur> (1)
- Funktionsraum / Mathematik (1)
- Fuzzifizierung (1)
- Fuzzy-Optimierung (1)
- Fußboden (1)
- Förderungsprogramm (1)
- Gebrauchtmaschine (1)
- Gebäudeleitsystem (1)
- Gefängnisbau (1)
- Gefügeumwandlung (1)
- Genaufertigung (1)
- Generalunternehmer (1)
- Generelle-Interessen-Skala (1)
- Geographic Information System (1)
- Geographie (1)
- Gesamtbauwerk (1)
- Geschichte (1)
- Geschossbau (1)
- Gesellschaft (1)
- Governance (1)
- Graph (1)
- Graphentheorie (1)
- Grenzlast (1)
- Gropius (1)
- Großbaustelle (1)
- Gruppentheorie (1)
- Gründung (1)
- Gustavo Giovannoni (1)
- Haftung (1)
- Halle <Saale> (1)
- Hamilton-Operator (1)
- Heizung (1)
- Hermitesche Entwicklung (1)
- Himmelslichtquotient (1)
- Hitzebelastung (1)
- Hochschule , Fläche , Steuerung , Allokation , Hochschulorganisation , Optimierung , Management (1)
- Hochschulentwicklung (1)
- Hochschulplanung (1)
- Hubbard (1)
- Humanethologie (1)
- Hydrodynamik (1)
- IKM (1)
- Immobilienlebenszyklus (1)
- Immobilienwirtschaft (1)
- Industriedesign (1)
- Industriepark (1)
- Ingenieurbüro (1)
- Innovationsforschung (1)
- Integrierte Planung (1)
- Intelligentes System (1)
- Investitionsplanung (1)
- Iran (1)
- Italy, Rome (1)
- Iteration (1)
- Johannesburg (1)
- Joseph Stübben (1)
- Kapitalwertmethode (1)
- Katalog (1)
- Kernel <Informatik> (1)
- Klein- und Mittelbetrieb (1)
- Klein- und mittelstädtisches Unternehmen (1)
- Kommune (1)
- Kommunikationsmodell (1)
- Kommunistische Partei Deutschlands (1)
- Komplexe Funktion (1)
- Konforme Abbildung (1)
- Konrad (1)
- Konservierung (1)
- Konsistenz <Informatik> (1)
- Konstruktion (1)
- Konstruktionsfehler (1)
- Konstruktiver Ingenieurbau (1)
- Konstruktivismus <Kunst> (1)
- Konvektion (1)
- Kooperatives Arbeiten (1)
- Korrosion (1)
- Kostenanalyse (1)
- Kraftmethode (1)
- Krajewski (1)
- Krankenhaus (1)
- Kreis (1)
- Kriechen (1)
- Kultur (1)
- Kulturindustrie (1)
- Kulturwirtschaft (1)
- Kunstwerk (1)
- Kuppel (1)
- Künstlervereinigung (1)
- Laidlaw (1)
- Laplace-Transformation (1)
- Lebenszykluskonzept (1)
- Lebenszyklusorientiertes Management (1)
- Lehrter Bahnhof (1)
- Lehrtätitkeit (1)
- Leistungsbeschreibung (1)
- Leitsystem (1)
- Limestone powder (1)
- Litauen (1)
- Living-wall (1)
- Luftqualität (1)
- Luftverunreinigender Stoff (1)
- László (1)
- Lüftung (1)
- MCDM (1)
- Magnesiumsulfat (1)
- Managment Information System (1)
- Maple (1)
- Marcello Piacentini (1)
- Markoffsche Kette (1)
- Mart (1)
- Materialermüdung (1)
- Materialflusssteuerung (1)
- Mathematical methods for (robotics and) computer vision (1)
- Mathematische Physik (1)
- Mauerwerk (1)
- Max (1)
- Maxwellsche Gleichungen (1)
- Medialisierung (1)
- Medientechnik (1)
- Medienwirtschaft (1)
- Medienökonomie (1)
- Messtechnik (1)
- Metall (1)
- Metall verarbeitende Industrie (1)
- Methodologie (1)
- Mikroklima (1)
- Modalanalyse (1)
- Modeling (1)
- Moholy-Nagy (1)
- Monitoring (1)
- Monte-Carlo-Simulation (1)
- Moskau / WChUTEIN (1)
- Multiresolution analysis (1)
- Mörtel (1)
- Nachbehandlung (1)
- Navier-Stokes-Gleichung (1)
- Netzplantechnik (1)
- Netzwerktheorie (1)
- Neue Medien (1)
- Nichtlineare Optimierung (1)
- Nichtlineare partielle Differentialgleichung (1)
- Nichtlineares System (1)
- Nichtlinearität (1)
- Niederlande (1)
- Niedrigenergiehaus (1)
- Nonprofit-Organisation (1)
- Norm <Normung> (1)
- Normung (1)
- Numerical modeling in engineering (1)
- Nutzungsgrad (1)
- Nutzungsänderung (1)
- OIP (1)
- Oberfläche (1)
- Oberflächenanalyse (1)
- Oberflächenporosität (1)
- Objektorientierte Programmierung (1)
- Objektorientierung (1)
- Oktalbaum (1)
- Operations Research (1)
- Optimal Planning (1)
- Optimization in engineering applications (1)
- Organisationsentwicklung (1)
- Papierware (1)
- Parallelverarbeitung (1)
- Particle size distribution (1)
- Passivhaus (1)
- Personalized ventilation (1)
- Pflege (1)
- Philipp (1)
- Plant Simulation <Programm> (1)
- Planungshaftung (1)
- Planungswerkzeugen (1)
- Plastische Deformation (1)
- Plastizitätstheorie (1)
- Polyharmonische Funktion (1)
- Polystyrol (1)
- Praxisbezug (1)
- Produktgestaltung (1)
- Produktionssteuerung (1)
- Progressive Planung (1)
- Projektfinanzierung (1)
- Projektierungsbetrieb (1)
- Projektplanung (1)
- Projektsteuerung (1)
- Prozesssimulation (1)
- Prozesssteuerung (1)
- Public Private Partnership (1)
- Püschel (1)
- Qp-spaces (1)
- Quartiersanalyse (1)
- RC Wall (1)
- RFID (1)
- Randelemente-Methode (1)
- Randspannung (1)
- Rasterelektronenmikroskop (1)
- Raum (1)
- Raumordnung (1)
- Re-use (1)
- Recht (1)
- Rechteck (1)
- Rechtsanwendung (1)
- Regelungssystem (1)
- Regelungstechnik (1)
- Regenwasser (1)
- Regionalentwicklung (1)
- Regressionsanalyse (1)
- Rekonstruktion (1)
- Reparatur (1)
- Revitalisierung (1)
- Rezeption (1)
- Rippendecke (1)
- Rissverhalten (1)
- Russisch (1)
- SARS (1)
- SDOF (1)
- SEM (1)
- STEP (1)
- Schalung (1)
- Scheduling (1)
- Scherung (1)
- Schlieren imaging (1)
- Schlussfolgern (1)
- Schweißschrumpfung (1)
- Schweißwerkstatt (1)
- Schwingungsdämpfer (1)
- Second World War (1)
- Selbstverdichtender Beton (1)
- Sensitivitätsanalyse (1)
- Setting agent (1)
- Sicherheiten (1)
- Sicherheitstechnik (1)
- Simulation in construction (1)
- Slag (1)
- Software Engineering (1)
- Softwareengineering (1)
- Softwaresystem (1)
- Sonnenenergie (1)
- Sonnenscheindauer (1)
- Sonnenstrahlung (1)
- Sozialismus (1)
- Sozialunternehmen (1)
- Spannungsintensitätsfaktor (1)
- Spline-Approximation (1)
- Sprayed concrete (1)
- Spritzbeton (1)
- Spritzzement (1)
- Stabilisierung (1)
- Stadtentwässerung (1)
- Stadtgeschichte (1)
- Stadtgestaltung (1)
- Stadtsoziologie (1)
- Stahlbau (1)
- Stahlbetonbauteil (1)
- Stam (1)
- Standardisierung (1)
- Standortplanung (1)
- Statische Last (1)
- Stochastik (1)
- Stochastischer Prozess (1)
- Stoffkreislauf (1)
- Straßenbeton (1)
- Strukturwandel (1)
- Strömungsmechanik (1)
- Studienangebot (1)
- Städtische Wärmeinsel (1)
- Sulfatangriff (1)
- Sulfatträger (1)
- Summer School (1)
- Supply Chain Management (1)
- Sustainable construction technology (1)
- Synchronisierung (1)
- Systemidentifikation (1)
- Südafrika (1)
- Südafrika <Staat> (1)
- Tafelbau (1)
- Talsperre (1)
- Tarifgebundenheit (1)
- Tarifvertrag (1)
- Teamorganisation (1)
- Technische Mechanik (1)
- Temperaturfeld (1)
- Thaumasit (1)
- Theorie zweiter Ordnung (1)
- Thermal manikin (1)
- Tibor (1)
- Tolziner (1)
- Tragendes Teil (1)
- Trassierung (1)
- Träger (1)
- Tunnel (1)
- UAS (1)
- Ungarn (1)
- Unsicherheit (1)
- Unternehmen (1)
- Unternehmen / Organisation (1)
- Unterstützungsökosystem (1)
- Urban (1)
- Urbanism (1)
- Urbanität (1)
- VRML (1)
- Validation (1)
- Variantenvergleich (1)
- Variationsrechnung (1)
- Verbundbauweise (1)
- Verbundwerkstoff (1)
- Vergabe (1)
- Verkehrsleitsystem (1)
- Verkehrsplanung (1)
- Vernetztes System (1)
- Versagen (1)
- Verteiltes Datenbanksystem (1)
- Verteiltes Softwaresystem (1)
- Vertrag (1)
- Verzug (1)
- Viereck (1)
- Virtual reality (1)
- Viskoelastisches Gelenk (1)
- Volkskunst (1)
- Vorfertigung (1)
- Walter (1)
- Waschbeton (1)
- Weimar / Bauhaus-Museum (1)
- Weimar / Herzogin-Anna-Amalia-Bibliothek (1)
- Weiner (1)
- Wellpappe (1)
- Werkstoffprüfung (1)
- Wissenschaftliche Einrichtung (1)
- Withdreawal (1)
- Work Face (1)
- World Wide Web (1)
- Wärme (1)
- Wärmebehandlung (1)
- Wärmestrom (1)
- ZTU-Schaubild (1)
- Zahlung (1)
- Zeitrestriktion (1)
- Zementart (1)
- Zugstab (1)
- Zusammengesetzte Fließbedingung (1)
- alite (1)
- anforderungsorientierte Projektabwicklung (1)
- applets (1)
- architecture, urbanism, dictatorship, Lisbon, Faria da Costa (1)
- backcasting (1)
- bim; cad; citygml; gbxml; thermal design (1)
- building (1)
- city extension (1)
- civic center (1)
- civic design (1)
- climatic loading (1)
- construction industry (1)
- construction management (1)
- cplan (1)
- data collection (1)
- decision making (1)
- depthmapx (1)
- design synthesis (1)
- destructive testin (1)
- development (1)
- dictatorial design (1)
- dictatorship (1)
- economic houses program (1)
- energy dispersive X-ray spectroscopy (1)
- evolutionary multi-criteria optimization (1)
- evolutionary optimization (1)
- foundation (1)
- function spaces (1)
- generative system integration (1)
- grasshopper (1)
- heat treatment (1)
- housing typologies (1)
- industrialization (1)
- interactive machine learning (1)
- interactive planning support system (1)
- internetbasierte Projektplattform (1)
- knowledge exchange (1)
- learning objects (1)
- long-term examination (1)
- ländlicher Raum (1)
- machine learning (1)
- material (1)
- material aging (1)
- multi-criterion analysis (1)
- multiple-criteria optimization (1)
- non-destructive testing (1)
- nonlinear analysis (1)
- optimization (1)
- pavement (1)
- planning history (1)
- policy objectives (1)
- political intention (1)
- preservation (1)
- product and process models (1)
- pull learning (1)
- python (1)
- regional planning (1)
- reinforced concrete wall (1)
- repository (1)
- residual stress (1)
- reusability (1)
- school of architecture (1)
- simulation (1)
- social housing (1)
- space syntax (1)
- structural engineering (1)
- system (1)
- temperature (1)
- territorial policies (1)
- town planning (1)
- transformation (1)
- transparency (1)
- urban history (1)
- urban history, urban design, fascist period, sport city, Rome, Enrico Del Debbio (1)
- urban simulation (1)
- urbanHIST (1)
- web-based learning (1)
- welding (1)
- wind-induced vibration (1)
- Änderung (1)
- Ästhetik (1)
- Étienne de Groër (1)
- Öffentliche Liegenschaften (1)
- Öffentlicher Raum (1)
- Öffentlicher Sektor (1)
- Überhitzung (1)
- Überwachung (1)
- Überwachungstechnik (1)
EXPLAINING JUNKSPACE
(2011)
Dr. Silke Ötsch is currently working on a research project on the role of architects as intermediaries in financialization founded by the Austrian Research Found (FWF) at the Department of Sociology at the University of Innsbruck. She worked as scientific employee at the Institute of Construction and Design at the Innsbruck University, as lecturer at the Institute for Architecture Theory at the University of Innsbruck (Austria), in the architectural offices of Arets Architekten in Maastricht as well as Haid und Partner in Nürnberg and for Attac Germany. Silke Ötsch received her doctoral degree at the Bauhaus-University Weimar and studied architecture in Weimar and Paris. She published books in the field of architecture theory with the title “Stripping las Vegas” (with K. Jaschke) and “Überwältigen und Schmeicheln”, and articels in the review GAM and others, and published in the field of political economy, among others the book “Das Casino schließen” (together with T. Sauer and P. Wahl) on the financial crisis and “Räume der Offshore-Welt” (together with Celia Di Pauli), which is a publication on concrete spaces of tax havens and offshore centres in Europe and their implications. Her main research interest is globalization and financial architecture.
This is a paper about knowledge in design and how to elicit knowledge from design processes. The paper is a preparation for an empirical study of interaction in the design process. Reasonings of three authors - Schön, Broadbent and Lundequist - on design processes is presented. They all have a pragmatic perspective in common, and regard the process as an activity without a definite form. Design is seen as an activity of creating models of forms and shapes, by addressing expert knowledge in a dialogic way to problematic situations. Due to the pragmatic approach I find the pragmatist Dewey´s understanding of knowledge and elecitation of knowledge appropiate for studying design processes. According to him it is possible to build up objectified descriptions of experiences, also of such, which are based on experiences of emotional and intuitive nature. There need not be a definite border, which separates tacit knowledge from explicit knowledge - when it comes to the question of the possibility of verbal descriptions. Tacit knowledge is possible to articulate within pragmatic thinking. The conclusion is, that it is possible to study the tacit knowledge of design processes, and get some qualitative insights useful for theory building. A study of design processes can look at three different forms of knowledge. It appears as a precognitive understanding of the design situation, as integrated in the design activity - seeing the situation as something known - and in the process of creating something new.
The objective of the joint project 'Life cycle optimised system solutions for densified housing with massive wood technology', short form Basys, was the development and application of an open building system for sustainable construction in a virtual enterprise. Four partners coming from building economy and a university institute developed the building system in a comprehensive planning process. By applying massive wood technology, most requirements of densified housing can be met and individual buildings can be produced on demand.
The aim of this paper is to present so-called discrete-continual boundary element method (DCBEM) of structural analysis. Its field of application comprises buildings constructions, structures and also parts and components for the residential, commercial and un-inhabitant structures with invariability of physical and geometrical parameters in some dimensions. We should mention here in particular such objects as beams, thin-walled bars, strip foundations, plates, shells, deep beams, high-rise buildings, extensional buildings, pipelines, rails, dams and others. DCBEM comes under group of semianalytical methods. Semianalytical formulations are contemporary mathematical models which currently becoming available for realization due to substantial speed-up of computer productivity. DCBEM is based on the theory of the pseudodifferential boundary equations. Corresponding pseudodifferential operators are discretely approximated using Fourier analysis or wavelet analysis. The main DCBEM advantages against the other methods of the numerical analysis is a double reduction in dimension of the problem (discrete numerical division applied not to the full region of the interest but only to the boundary of the region cross section, as a matter of fact one is solving an one-dimensional problem with the finite step on the boundary area of the region), one has opportunities to carrying out very detailed analysis of the specific chosen zones, simplified initial data preparation, simplistic and adaptive algorithms. There are two methods to define and conduct DCBEM analysis developed – indirect (IDCBEM) and direct (DDCBEM), thus indirect like in boundary element method (BEM) applied and used little bit more than direct.
Discrete-continual Finite Element Method of Analysis for Three-dimensional Curvilinear Structures
(2003)
This paper is devoted to discrete-continual finite element method (DCFEM) of analysis for three-dimensional curvilinear structures. Operational and variational formulations of the problem in the ring coordinate system are presented. The discrete-continual design model for structures with constant physical and geometrical parameters in longitudinal direction is offered on the basis of so-called curvilinear discrete-continual finite elements. Element coordinate system, approximation of nodal unknowns, construction of element nodal load vector are under consideration. Element system of differential equations is formulated with use of special generalized block-structured stiffness matrix of discrete-continual finite element. Local differential relations are formulated. Resultant multipoint boundary problem for system of ordinary differential equations is given. Method of analytical solution of multipoint boundary problems in structural analysis is offered as well. Its major peculiarities include universality, computer-oriented algorithm involving theory of distributions, computational stability, optimal conditionality of resultant systems, partial Jordan decomposition of matrix of coefficients, eliminating necessity of calculation of root vectors. Brief information concerning developed software is provided.
The aim of researches conducted within gamsau about urban simulation, in particular Remus project, is to allow rapid modeling of large and regular urban zones, for purpose of interactive navigation (like VRML) or for realistic rendering (ray-tracing methods). One of problems to be solved in this context is the multiplicity of data formats : inputs come from different sources, and outputs are for heterogeneous systems of visualization. Typically CSG and boundary representation must be generated, treated and converted during building of models. Furthermore, the generated models can be more or less refined, depending on requests and type of use. This paper describes the general context of data models conversion, problems concerning levels of detail and implementation done in Remus, based on object oriented approach.
The execution of project activities generally requires the use of (renewable) resources like machines, equipment or manpower. The resource allocation problem consists in assigning time intervals to the execution of the project activities while taking into account temporal constraints between activities emanating from technological or organizational requirements and costs incurred by the resource allocation. If the total procurement cost of the different renewable resources has to be minimized we speak of a resource investment problem. If the cost depends on the smoothness of the resource utilization over time the underlying problem is called a resource levelling problem. In this paper we consider a new tree-based enumeration method for solving resource investment and resource levelling problems exploiting some fundamental properties of spanning trees. The enumeration scheme is embedded in a branch-and-bound procedure using a workload-based lower bound and a depth first search. Preliminary computational results show that the proposed procedure is promising for instances with up to 30 activities.
Modelle und Verfahren zur Planung von langfristigen Bauprojekten unter Kapitalwertgesichtspunkten
(2003)
Langfristige Bauprojekte stellen sowohl aus technischer Sicht als auch unter Planungsgesichtspunkten überaus komplexe Herausforderungen dar. Den laufenden Auszahlungen für Löhne, Materialien und fremdbezogene Dienstleistungen stehen dabei erst nach einiger Zeit Fortschrittszahlungen für abgeschlossene Teilprojekte gegenüber. Die Durchführung eines solchen Projekts kann mithin als Investition angesehen werden. Im Gegensatz zu herkömmlichen Investitionen liegen bei Investitionsprojekten die Zeitpunkte der Ein- und Auszahlungen nicht fest, sondern sind Gegenstand der Planung. Zur Lösung des Annahme- bzw. Auswahlproblems bei Investitionsprojekten unter Sicherheit erfreut sich die Kapitalwertmethode breiter Zustimmung. Nach einer Betrachtung bekannter Ansätze zur Maximierung des Kapitalwerts von Investitionsprojekten unter Annahme eines vollkommenen Kapitalmarktes wird aufgezeigt, wie das vorgestellte Modell zur Kapitalwertmaximierung für den Fall beschränkt verfügbarer Ressourcen bzw. eines beschränkten Kreditrahmens angepasst werden kann. Die Bewertung von Investitionsprojekten auf Grundlage des optimalen Projektkapitalwerts setzt die Kenntnis des anzuwendenden Kalkulationszinsfußes und der maximalen Projektdauer voraus. Da diese Größen a priori nicht bekannt sind, entwickeln wir ein Verfahren zur Bestimmung des Kapitalwerts von Investitionsprojekten als Funktion des Kalkulationszinsfußes und der maximalen Projektdauer. Abschließend zeigen wir, wie die erzielten Resultate zur Entscheidungsunterstützung eines Bauunternehmers genutzt werden können.
DAS KOLLOQUIUM
(2011)
Geb.1946 in Luckenwalde, nach dem Studium der Architektur in Weimar Promotion 1974 auf dem Gebiet der Architekturtheorie, 1973 bis 1980 Abteilung Theorie und Geschichte der Architektur am Institut für Städtebau und Architektur der Bauakademie in Berlin. Arbeiten zur Architekturpsychologie und Architektursemiotik sowie Beiträge zur empirischen Wirkungsforschung in der Architektur. Ab 1980 Lehrtätigkeit an der Hochschule für Architektur und Bauwesen (HAB) Weimar. 1992 Berufung zum Universitätsprofessor an der HAB für das Fach „Entwerfen und Architekturtheorie“, im gleichen Jahr Wahl zum Rektor der Hochschule, 1996 Wiederwahl für weitere vier Jahre. Publikationen zur Architekturtheorie, Konzeption und Veranstaltung der Internationalen Bauhaus-Kolloquien, internationale Programme mit der WASEDA Universität Tokyo, dem IIT Chicago, seit Mitte der 90er Jahre jährliche Entwurfsakademie in Rom. 2003 Wahl zum Dekan der Fakultät Architektur und 2004 erneute Wahl zum Rektor der Bauhaus-Universität Weimar.
Einsatz internetbasierter Projektplattformen im Bereich der Bauausführung - "Digitales Bautagebuch"
(2003)
Der Einsatz internetbasierter Projektplattformen in der Bauausführung wurde bisher kaum thematisiert. Die typischen Vorteile des Einsatzes solcher Werkzeuge, wie etwa die Unterstützung kooperativer, geographisch und zeitlich verteilter Prozesse, scheinen für diesen Einsatzbereich nicht so offensichtlich zu sein wie für den Bereich der Gebäudeplanung. Vor dem Hintergrund der anhaltend problematischen Situation der Bauwirtschaft und der Tatsache, dass im Bereich der Bauausführung oftmals die wesentlichen Ursachen für einen unplanmäßigen Ablauf von Bauprojekten oder ein Verfehlen von Kosten-, Termin- oder Qualitätszielen zu finden sind, kommt diesen Anwendungen eine große Bedeutung zu. Im Rahmen eines größeren Forschungsprojektes des BMWi (TK3 GIT Siegen / Projektträger PTJ-BEO) wurde unter dem Arbeitstitel >Digitales Bautagebuch< ein ausführungsorientiertes Modul für eine schon in den Planungsphasen des Projektes eingesetzte Projektplattform entwickelt. Dabei wurde projektbegleitend eine Umgebung implementiert, welche sowohl die Bauleitung bei ihrer täglichen Arbeit unterstützt als auch Entscheidungsträgern und anderen Projektbeteiligten einen schnellen Überblick über den Stand der Arbeiten ermöglicht. Dieser Beitrag setzt sich mit dem Einsatz internetbasierter Projektplattformen im Bereich der Bauausführung auseinander und beschreibt deren Möglichkeiten unter Einbringung der Erfahrungen aus der Anwendung im Bauprojekt TK3 GIT Siegen.
We present recent developments of adaptive wavelet solvers for elliptic eigenvalue problems. We describe the underlying abstract iteration scheme of the preconditioned perturbed iteration. We apply the iteration to a simple model problem in order to identify the main ideas which a numerical realization of the abstract scheme is based upon. This indicates how these concepts carry over to wavelet discretizations. Finally we present numerical results for the Poisson eigenvalue problem on an L-shaped domain.
Die Technische Gediminas Universität Vilnius, Lehrstuhl Technologie der Bauproduktion und die Hochschule für Technik, Wirtschaft und Kultur Leipzig, Lehrbereich Baubetrieb, haben sich seit mehreren Jahren mit den Problemen der mehrkriteriellen Entscheidung im Bauwesen befasst. Auf Grund der unterschiedlichen Herangehensweise werden für numerische Lösungen auch unterschiedliche Methoden benutzt. Das gemeinsame Ziel war immer eine optimale Variantenauswahl für baubetriebliche Produktionsprozesse. Zur Unterstützung der numerischen Lösungen wurde gemeinsam das EDV-Programm LEVI entwickelt, welches heute wahlweise als deutschsprachige oder englischsprachige Version genutzt werden kann. Die Beschreibung der zu lösenden Probleme erfolgt in Form einer Matrix. Diese enthält die Varianten (Zeilen) und die Kriterien (Spalten). Dabei sind die Varianten Ausdruck einer Menge real existierender Situationen für ein Problem. Alle betrachteten Varianten werden durch die gleichen Kriterien bewertet. Da die Kriterien gewöhnlich unterschiedliche Dimensionen besitzen, ist ihre Wirksamkeit nicht direkt miteinander vergleichbar. Eine Ausnahme bildet die Bewertung mit einem Punktsystem. Diese beinhaltet jedoch in hohem Maße subjektive Einflüsse und sollte daher nur in Ausnahmefällen benutzt werden. Um die Schwierigkeiten der unterschiedlichen Dimensionen für die verschiedenen Kriterien zu umgehen, wird das Verhältnis zum jeweiligen Optimalwert gebildet. Damit werden gleichzeitig die Diskrepanzen, die durch die unterschiedlichen Größenordnungen der Optimalwerte entstehen, beseitigt. Für das Verhältnis des Funktionswertes zum Optimalwert existieren unterschiedliche Auffassungen. Es muss an dieser Stelle bemerkt werden, dass mit der Entscheidung über die Art des Verhältnisses zum Optimalwert auch die Lösung beeinflusst werden kann. Untersuchungen über solche Auswirkungen sind noch nicht abgeschlossen, so dass im Augenblick nur vorläufige Ergebnisse genannt werden können. Von den bekannten Transformationsmethoden benutzen die Verfasser die vektorwertige Transformation, die lineare Transformation, die relative Abweichung und eine nichtlineare Transformation. Dadurch erfolgt eine Abbildung auf das Intervall [1 ; 0 ] bzw. [ 1 ; ~ 0 ]. Für die Lösungsmethoden erfolgt eine Unterscheidung in eine einseitige oder zweiseitige Fragestellungen. Während die einseitige Fragestellung auf die Bestimmung einer Rangfolge orientiert, berechnet die zweiseitige Fragestellung ein spieltheoretisches Gleichgewicht als Ausdruck eines rationalen Verhaltens von zwei entgegengesetzten Interessengruppen und Lösungen für Spiele gegen die Natur. In Anlehnung an das statische Gleichgewicht messen die Verfasser dem spieltheoretischen Gleichgewicht für die Dimensionierung baubetrieblicher Produktionsprozesse eine besondere Bedeutung zu. Bisherige Anwendungen konzentrieren sich auf die optimale Auswahl im Wohnungsbau, die Auswahl von Konstruktionsvarianten, die Auswahl von Montagevarianten, den Einsatz von Wärmedämmstoffen u.a. Für die Dimensionierung von Produktionsprozessen mit Serienproduktion wurde eine Lösung mit einer gewichteten Matrix vorgeschlagen.
To support research in the building sector and in order to help it move towards a new digital economy, the European Commission under the 5th Framework initiative, especially the IST programme, funded various RTD projects. The opportunity to bring these IST projects together was acknowledged so that stronger links can be created under a clustering umbrella and that, moreover, links of those projects with their RTD environment could be facilitated. This has been the objective of work carried out within the ICCI (IST-2001-33022) Cluster project. This paper introduces the main aims and objectives of the project, and then presents its principal outcomes. In a second part, it synthesises the underlying concepts, technology and tools that will make ICT-based Construction a reality in a near future, and gives recommended actions for the industry, the EC and the Construction ICT R&D in Europe, giving some benefit of this project experience to the three communities.
We present an algebraically extended 2D image representation in this paper. In order to obtain more degrees of freedom, a 2D image is embedded into a certain geometric algebra. Combining methods of differential geometry, tensor algebra, monogenic signal and quadrature filter, the novel 2D image representation can be derived as the monogenic extension of a curvature tensor. The 2D spherical harmonics are employed as basis functions to construct the algebraically extended 2D image representation. From this representation, the monogenic signal and the monogenic curvature signal for modeling intrinsically one and two dimensional (i1D/i2D) structures are obtained as special cases. Local features of amplitude, phase and orientation can be extracted at the same time in this unique framework. Compared with the related work, our approach has the advantage of simultaneous estimation of local phase and orientation. The main contribution is the rotationally invariant phase estimation, which enables phase-based processing in many computer vision tasks.
The design of building projects involves several types of resources such as architects, structural engineers, mechanical engineers, electrical engineers, and draftsmen, among others. For design firms to stay in business in this very competitive market, they need to manage their resources in a way that improves productivity and cost effectiveness. This task, however, is not simple and requires thorough analysis of process-level operations, resource use, and productivity. Typically, these operational aspects are the responsibility of the design office manager who assigns available resources to the different design projects to save time and lower design expenses. It is noted that limited studies have been carried out in the literature to model overall organizational operations and behavioral aspects, particularly in firms specialized in the design of building projects. In an effort to simplify the modeling process, a simplified modeling and simulation tool is used in this research. A simulation model representing an actual design office was developed assuming that the office performs designs for small, medium, and large size building projects. The developed model was used to simulate several alternatives and examine various resource assignment strategies. The simulation was conducted over ten years and the resulting productivity and income was measured.
Global standard?
(2000)
Wissenschaftliches Kolloquium vom 14. bis 16. Oktober 1999 in Weimar an der Bauhaus-Universität zum Thema: ‚global village - Perspektiven der Architektur'
MAD is a Beijing-based architectural design studio. In their work, they are examining and developing a unique concept of futurism through current theoretical practice in architectural design, landscape design, and urban planning. In 2006, MAD was awarded the Architectural League Young Architects Forum Award. In the same year, MAD was shown at the ‘MAD in China’ exhibition in Venice during the Architecture Bienniale, and the ‘MAD Under Construction’ exhibition at the Tokyo Gallery in Beijing. MAD’s conceptual proposal, Super Star – A mobile China Town was exhibited in the Uneternal City of the 11th Architecture Biennale in Venice. Ma Yansong received his Master of Architecture from the Yale University School of Architecture in 2002. Prior to founding MAD in 2004, Mr. Ma worked as a project designer with Zaha Hadid Architects and Eisenman Architects. He also taught architecture at the Central Academy of Fine Arts in Beijing. In 2008, one of his built works, Hongluo Clubhouse, was nominated as one of the 100 designs by the London Design Museum. He was also nominated as one of the 20 most influential young architects today by ICON.
In this paper, a circulation-type society is expressed by recurrent architecture network described with multi-agent model which consists of the following agents: user, builder, reuse maker, fabricator, waste disposer, material maker and earth bank (see Fig.1). Structural members, materials, resources and monies move among these agents. Each agent has its own rules and aims, regarding structural damages, lifetime, cost reduction, numbers of structural members and structural systems. Reasonable prices of members (fresh, reused, recycled and disposed) can be optimized by GAs in this system considering equal distribution of monies among agents.