Refine
Has Fulltext
- yes (219) (remove)
Document Type
- Conference Proceeding (123)
- Article (65)
- Doctoral Thesis (25)
- Master's Thesis (5)
- Diploma Thesis (1)
Institute
- Professur Informatik im Bauwesen (177)
- Professur Baubetrieb und Bauverfahren (10)
- Professur Grundbau (4)
- Professur Holz- und Mauerwerksbau (4)
- Professur Allgemeine Baustoffkunde (2)
- Professur Entwerfen und Architekturtheorie (2)
- Professur Informatik in der Architektur (2)
- Professur Massivbau I (2)
- Junior-Professur Computational Architecture (1)
- Junior-Professur Europäische Medienkultur (1)
Keywords
- Verteiltes System (37)
- Bautechnik (30)
- Bauwerk (27)
- Produktmodell (25)
- Simulation (23)
- Architektur (21)
- Modellierung (21)
- Mehragentensystem (19)
- Ingenieurbau (17)
- Planungsprozess (17)
Year of publication
- 2004 (219) (remove)
As computer programs become ever more complex, software development has shifted from focusing on programming towards focusing on integration. This paper describes a simulation access language (SimAL) that can be used to access and compose software applications over the Internet. Specifically, the framework is developed for the integration of tools for project management applications. The infrastructure allows users to specify and to use existing heterogeneous tools (e.g., Microsoft Project, Microsoft Excel, Primavera Project Planner, and AutoCAD) for simulation of project scenarios. This paper describes the components of the SimAL language and the implementation efforts required in the development of the SimAL framework. An illustration example bringing on-line weather forecasting service for project scheduling and management applications is provided to demonstrate the use of the simulation language and the infrastructure framework.
The construction management has been under pressure to reduce operating costs and to improve productivity using innovative information technologe (IT) solutions conformed to structural characteristics, site conditions and past experiences. Given the growing emphasis on effectiveness and efficiency in construction projects, there is an imminent need to develop a formal procedure to select the best IT application for each proposed construction project and research and development (R&D) project. As there are numerous factors that have to be considered in selecting appropriate IT in a given situation, decision-makers need to have multicriteria decision-making ability. To enable them to make the most appropriate decision in any situation, it is important that effective tools incorporating multicriteria decision-making techniques are available. In this paper, an Analytic Network Process (ANP) model is conducted for the selection of appropriate IT application for innovative construction management prior to construction or research. The paper concludes that the ANP is a viable and capable tool for conducting IT application selection in multicriteria decision-making environment.
Spatial data acquisition, integration, and modeling for real-time project life-cycle applications
(2004)
Current methods for site modeling employs expensive laser range scanners that produce dense point clouds which require hours or days of post-processing to arrive at a finished model. While these methods produce very detailed models of the scanned scene, useful for obtaining as-built drawings of existing structures, the associated computational time burden precludes the methods from being used onsite for real-time decision-making. Moreover, in many project life-cycle applications, detailed models of objects are not needed. Results of earlier research conducted by the authors demonstrated novel, highly economical methods that reduce data acquisition time and the need for computationally intensive processing. These methods enable complete local area modeling in the order of a minute, and with sufficient accuracy for applications such as advanced equipment control, simple as-built site modeling, and real-time safety monitoring for construction equipment. This paper describes a research project that is investigating novel ways of acquiring, integrating, modeling, and analyzing project site spatial data that do not rely on dense, expensive laser scanning technology and that enable scalability and robustness for real-time, field deployment. Algorithms and methods for modeling objects of simple geometric shape (geometric primitives from a limited number of range points, as well as methods provide a foundation for further development required to address more complex site situations, especially if dynamic site information (motion of personnel and equipment). Field experiments are being conducted to establish performance parameters and validation for the proposed methods and models. Initial experimental work has demonstrated the feasibility of this approach.
This paper presents an agent-based software, Virtual Administrator System (VAS) for the smallscale maintenance of school buildings. VAS is capable of handling a heavy load of routine, lowtech maintenance jobs. It assigns a different priority to each job application according to its significance and urgency, and automatically adjusts schedules for maintenance engineers when on-site supervision is needed. The system can help ease off the burden of routine small-scale maintenance work, making it more cost-effective and efficient in the overall management of school building maintenance. VAS posts jobs on the Web in a multi-media format and classified all applications into four categories: the on-call maintenance contract, the term maintenance contract, the guaranty maintenance contract, and the regular maintenance contract. It then estimates their urgency level and passes the information to maintenance engineers who will decide whether on-site inspection is needed. Based on the engineers’ feedback, VAS automatically implements the scheduling for inspection as well as sends out real-time or batch notifications to contractors. All these activities are recorded in a database to allow continuous research and data mining and the analysis and diagnosis of specific jobs for followup maintenance plans.
The paper summarizes a part of research carried out in ICCI project and provides a current review of ICT infrastructures supporting collaboration. It covers taxonomies, protocols, standards, components, typical subsystems as well as future trends and recommendation for two most important technologies with applications in AEC: (1) EIP (Enterprise information portal) – a single gateway to a company's information, knowledge base, and applications for all actors; (2) RTC (Real-Time Communication and Collaboration technologies) that provide means for asynchronous communication between geographically dislocated people using ICT. Proposed future developments are: orientation towards web services - with building information models, business intelligence, personalization, AEC information retrieval, p2p workspaces and grids.
The design of mobile IT systems, especially the design of wearable computer systems, is a complex task that requires computer science knowledge, such as that related to hardware configuration and software development, in addition to knowledge of the domain in which the system is intended to be used. Particularly in the AEC sector, it is necessary that the support from mobile information technology fit the work situation at hand. Ideally, the domain expert alone can adjust the wearable computer system to achieve this fit without having to consult IT experts. In this paper, we describe a model that helps in transferring existing design knowledge from non-AEC domains to new projects in the construction area. The base for this is a model and a methodology that describes the usage scenarios of said computer systems in an application-neutral and domain-independent way. Thus, the actual design information and experience will be transferable between different applications and domains.
This paper describes a framework for computer-aided conceptual design of building structures that results from building architectural considerations. The central task that is carried out during conceptual design is the synthesis of the structural system. This paper proposes a methodology for the synthesis of structural solutions. Given the nature of architectural constraints, user-model interactivity is devised as the most suitable computer methodology for driving the structural synthesis process. Taking advantage of the hierarchical organization of the structural system, this research proposes a top-down approach for structural synthesis. Through hierarchical refinement, the approach lends itself to the synthesis of global and local structural solutions. The components required for implementing the proposed methodology are briefly described. The main components have been incorporated in a proof-of-concept prototype that is being tested and validated with actual buildings.
Current software solutions for real estate planning, construction and use, do not model the complete life cycle of a building. Well-integrated software tools exist for the planning and construction phases. Data integrity exists throughout the planning and construction phases, but problems occur at the transition to the use-phase. At this interface, the complete data set of planning and execution gets lost. Another software deficiency is that current software solutions don’t handle construction work and maintenance work equally. This is why a new software generation is demanded, which continuously covers the entire workflow process from the planning phase to the demolition of a building. New data concepts have to be developed, which allow bringing work items for construction together with work items for real estate use.
The presented work focuses on collaboration- experiences gathered with complex design and engineering projects, using the learning platform POLE- Europe. Within the POLE environment student-teams from different universities, disciplines and cultural backgrounds are assigned to real-world projects with clearly defined design - tasks, usually to be accomplished within one semester while working in a virtual environment for most of the time. The concept of POLE and the information and collaboration technology is described.
This paper describes an ongoing research on the representation and reasoning about construction specifications, which is part of a bigger research project that aims at developing a formalism for automating the identification of deviations and defects on construction sites. We specifically describe the requirements on product and process models and an approach for representing and reasoning about construction specifications to enable automated detection and assessment of construction deviations and defects. This research builds on the previous research on modeling design specifications and extends and elaborates concept of contexts developed in that domain. The paper provides an overview of how the construction specifications are being modele d in this research and points out future steps that need to be accomplished to develop the envisioned automated deviation and defect detection system.
The development of a life cycle structured cooperation platform is described, which is based on an integrated process and goal-oriented project model. Furthermore the structure of a life cycle oriented object structure model and its implementation in the platform are documented. The complete conceptual model is described, which represents the basis of a lifecycle -oriented structuring of the planning object and supports the thematic classification of the object and project management data.
Grundidee der Arbeit ist es, Lösungen von Randwertaufgaben durch Linearkombinationen exakter klassischer Lösungen der Differentialgleichung zu approximieren. Die freien Koeffizienten werden dabei durch die Bestimmung der besten Approximation der Randwerte berechnet. Als Basis der Approximation werden vollständige orthogonale und nahezu orthogonale Funktionensysteme verwendet. Anhand ausgewählter Beispiele mit Randvorgaben unterschiedlicher Glattheit wird am Beispiel der Kugel die prinzipielle Anwendbarkeit der Methode getestet und hinsichtlich der Entwicklung des Fehlers der Näherungslösung, der Stabilität des Verfahrens und des numerischen Aufwandes untersucht. Die erhaltenen Resultate geben einen begründeten Anlass, die Anwendung der Methode als Bestandteil einer hybriden analytisch-numerischen Methode, insbesondere der Verknüpfung mit der FEM, weiterzuverfolgen.
Applications for civil engineering tasks usually contain graphical user interfaces for the engineering processes. Persistent objects of the applications are stored to data bases. The influence of the interaction between a graphical user interface and a data base for the development of an civil engineering application is investigated in this paper. A graphic application for the linear elastic analysis of plane frames, which was previously developed with standard tools of the Java platform, is compared to a redesigned implementation using a generalized data base for persistent objects. The investigation leads to the following results : - A strict distinction between persistent and transient objects influences the class structure of an application, in particular the class structure of a graphical user interface. - The structure of an application depends on the logic for updating of references to persistent and transient graphical objects after an application is read from a file. - The complexity of the reference management can usually be handled better by just in time referencing associated with String - identifiers rather than by automated referencing associated with Name - identifiers.
Der Verfasser begründet zunächst die aktive Erarbeitung von Sondervorschlägen und Alternativen. Im zweiten Abschnitt erfolgt die inhaltliche Strukturierung der Nebenangebote. Im Folgenden werden die Probleme beim Durchsetzen der Sondervorschläge bei der öffentlichen Hand und privaten Auftraggebern und als Alternative dazu das STRABAG teamconcept beschrieben. Im letzten Bereich wird die Verantwortung des Bauunternehmens unterstrichen und ein positives Resümee gezogen.
Zwischen den Jahren 1920 und 1930 kam es an der kalifornischen Küste zu Bauschäden an Brücken und Fahrbahnen, die sich vor allem in einer deutlichen Rissbildung äußerten. Seither werden immer wieder Bauschäden beschrieben, deren Ursache in der Reaktion von Zuschlägen, die „reaktive“ Kieselsäure enthalten, mit der Porenlösung des Betons zu sehen ist. Diese Reaktion wird als Alkali-Kieselsäure Reaktion (AKR) bezeichnet. Seit der ersten Veröffentlichung von Stanton über die „alkali-aggregate reaction“ an opalhaltigen Zuschlägen sind hunderte von Forschungsarbeiten zu diesem Thema durchgeführt und deren Ergebnisse veröffentlicht worden. Trotz eingehender Forschung seit mehr als 8o Jahren ist weder der Mechanismus der AKR vollständig geklärt noch eine eindeutige Voraussage über die Gefährdung von Bauwerken oder Bauteilen mit potentiell AKR-empfindlichen Zuschlägen möglich. Das liegt vor allen Dingen daran, das es sich bei der AKR um eine Reaktion handelt, die aus einer komplexen Abfolge chemischer und physikalischer Prozesse besteht, die in ihrer Gesamtheit zu einer Schädigung von Beton bzw. Betonbauteilen und Bauwerken führen können. Eine geschlossene Beschreibung und Behandlung dieser Reaktion ist nicht möglich, solange keine befriedigende Kenntnis über den Ablauf der einzelnen Schritte vorliegt. Dazu bedarf es grundsätzlicher Untersuchungen der einzelnen chemischen und physikalischen Reaktionsschritte sowie einer möglichst quantitativen Bewertung der verschiedenen Einflussfaktoren. Grundsätzlich gibt es weltweit eine ganze Reihe von Richtlinien und Normen , die dazu verhelfen sollen, Schädigungen an Bauwerken durch AKR zu verhindern. In Deutschland ist das momentan gültige Regelwerk die sogenannte Alkali-Richtlinie des deutschen Ausschusses für Stahlbeton (DAfStb). Sie dient zur Beurteilung von Zuschlag nach DIN 4226 [6, 7, 8] mit alkaliempfindlichen Bestandteilen. Dabei bezieht sich der Teil 2 der Richtlinie auf Zuschläge mit Opalsandstein, Kieselkreide und Flint aus bestimmten Gewinnungsgebieten. Hier wird eine reine Zuschlagprüfung gefordert. Teil 3 der Richtlinie bezieht sich auf präkambrische Grauwacken und andere alkaliempfindliche Gesteine. Gefordert werden hier Prüfungen der Zuschläge selbst sowie Prüfung an Betonbalken und 30er Würfeln in der Nebelkammer. Für die meisten in der Richtlinie genannten Zuschläge bilden die Prüfungen und Vorschriften eine ausreichende Sicherheit, um eine AKR zu vermeiden. Dennoch treten immer wieder Schäden mit Zuschlägen auf, die nach der Alkali-Richtlinie als unempfindlich eingestuft werden müssten. Dabei handelt es sich in der Regel um Schadensfälle, die erst nach mehreren Jahren mit spät reagierenden AKR-empfindlichen Zuschlägen auftreten. Zu diesen Zuschlägen, die gegebenenfalls speziell im Nebelkammertest innerhalb von neun Monaten keine signifikante Dehnung (<0,6mm/m) aufweisen, gehören Stressquarze, Kieselkalk, Granit, Porphyr, Kieselschiefer und Grauwacke. Die vorliegende Arbeit dient speziell der Beurteilung und Einordnung von unterschiedlichen kristallinen Quarzmodifikationen sowie der Ermittlung geeigneter Untersuchungsmethoden für die Beurteilung der AKR-Empfindlichkeit von Quarz.
For the management or reorganisation of existing buildings, data concerning dimensions and construction are necessary. Often these data are given exclusively by paper-based drawings and no digital data such as a computer based product model or even a CAD-model are available. In order to perform mass calculation, damage mapping or a recalculation of the structure these drawings of the building under consideration have to be analysed manually by the engineer. This is a very time-consuming job. In order to close this gap between drawings of an existing building and a digital product model an approach is presented in this paper to digitise a drawing, to build up geometric and topologic models and to recognise construction parts of the building. Finally all recognised parts are transformed into a three-dimensional geometric model which provides all necessary geometric information for the product model. During this import process the semantics of a ground floor plan has to be converted into a 3D-model.
Vor dem Hintergrund des gesellschaftlichen Wandels sieht sich die Verkehrsforschung mit neuen Anforderungen an die Konzeption, Anpassung, Anwendung usw. von statistischen Ansätzen zur Analyse des Aktivitäten-(Verkehrs-)verhaltens konfrontiert, um auf Basis empirischer Daten adäquat Zusammenhänge der Verkehrsentstehung zu erforschen. Ausgehend von der musterorientierten Perspektive - das heißt Untersuchungsgegenstand sind chronologische Abfolgen von Ortsveränderungen und Tätigkeiten in Form von Wege-Aktivitätenmustern - besteht das Ziel einer möglichst realitätsnahen Abbildung und Erklärung von individuellen Unterschieden im Raum-Zeit-Verhalten. Neu bzw. kaum etabliert sind in diesem Kontext der eigens konzipierte Multimethodenansatz sowie die Optimal Matching Technik, die erweiterte Abbildungseigenschaften zur Distanzmessung zwischen Wege-Aktivitätenmustern aufweist. Erkannt werden durch jene Methode gleiche Tätigkeiten bzw. Ortsveränderungen, die zeitlich an unterschiedlichen Stellen der zu vergleichenden Muster angeordnet sind sowie identische Subsequenzen. Zielführend in der Datenanalyse ist nachstehende Abfolge von Verfahren: Die Klassifikation von Wege-Aktivitätenmustern zur Reduktionen deren immenser Komplexität gelingt durch Einsatz der Optimal Matching Technik. Diese quantifiziert (Un-)ähnlichkeiten zwischen Wege-Aktivitätenmustern („Abstandsmessung“) unterschiedlicher Personen oder zu vergleichender Zeitabschnitte einer Person. Die dadurch berechnete Distanzmatrix bildet den Ausgangspunkt des clusteranalytischen Fusions-algorithmus, dessen Aufgabe die Zusammenfassung der Wege-Aktivitätenmuster ist (explorative Stufe). Die Anwendung eines multinomialen Logit-Modells ermöglicht auf Individualebene die Vorhersage der Affinität zu Wege-Aktivitätenmuster-Typen anhand von Merkmalswerten identifizierter Erklärungsgrößen der Personen, des Haushaltes usw. (induktive Stufe). Im Gegensatz zu einschlägigen Forschungsarbeiten zeichnet sich die gewählte Untersuchungsstrategie durch die Objektivität des Vorgehens aus, da eine a-priori Bildung von Personen-kategorien nicht notwendig ist. Ebenso grenzt die Berücksichtigung der zufälligen und nicht-erklärbaren Verhaltensvariabilität durch das Wahrscheinlichkeitsprinzip des gewählten Logit-Modells das eigene Vorgehen von anderen Untersuchungen ab. Aufgrund der weitgehend ungeklärten Anwendungsgrundlagen der Optimal Matching Technik befasst sich die vorliegende Arbeit zunächst mit dessen inhaltlicher Ausrichtung am Untersuchungsgegenstand. Die Anpassung der festzulegenden Aufwandswerte, welche für die benötigten Aktionen angesetzt werden, um ein Wege-Aktivitätenmuster in ein anderes zu transformieren, erfolgt mit Hilfe einer empirisch Abschätzung, die weit über ein argumentatives Vorgehen hinausgeht. Der ermittelte Sequenzabstand inkludiert dabei die operationsspezifische Distanz bei Übergängen zwischen den konstituierenden Zuständen der zu vergleichenden Wege-Aktivitätenmuster („Zustandsähnlichkeit“). Abstandsmaß für die qualitativen Zustände ist dabei die ermittelte Priorität von wege- und tätigkeitenbezogenen Handlungen. Die Relevanz einer Ausrichtung belegt auch die durchgeführte Sensitivitätsanalyse: Das Ausmaß der Empfindlichkeit der Optimal Matching Technik ist insbesondere gegenüber der Festlegung der Aufwandswerte beträchtlich. Um die Analysepotenziale des Multimethodenansatzes zu demonstrieren, werden exemplarisch interpersonelle Unterschiede im wöchentlichen Aktivitäten-(Verkehrs-)verhaltens (Datenbasis: deutsches Mobilitätspanel) analysiert. Ergebnis der Klassifikation (explorative Analysestufe) ist eine auf den ersten Blick inhaltlich stichhaltige Wege-Aktivitätenmuster-Typologie charakteristischer Wochenabläufe des Aktivitäten-(Verkehrs-)verhaltens: Unterschiedliche Arten, zeitlicher Umfang und zeitliche Lage der Haupt-aktivitäten, unterschiedliche Verkehrsverhaltensweisen sowie unterschiedliche clusterspezifische Tag zu Tag Rhythmen, Gleichförmigkeiten, Schwankungen usw. des Raum-Zeit-Verhaltens kennzeichnen die Wege-Aktivitätenmuster-Typen. Die Abbildungs-eigenschaften der Optimal-Matching Technik zeichnen sich in den erstellten Clustern nur teilweise ab: Während die Zustandselementkomposition - augenscheinlich betrachtet - passabel durch die Wege-Aktivitätenmuster-Typologie abgebildet wird, bleibt ungewiss, ob und inwieweit dies für die Abfolgeähnlichkeit gilt. Aus dem induktiven Analyseschritt geht hervor: Alter, Geschlecht, Verfügbarkeit einer ÖPNV-Zeitkarte, Führerscheinbesitz und mit herausragender Bedeutung der Erwerbsstatus signalisieren als maßgebende Erklärungsgrößen eine Trennwirkung. Überdies zeigt das Gesamtbild der ermittelten Wirkungsrichtungen und Effektstärken überzeugende Erklärungszusammenhänge auf. Damit ist ein Nachweis der Praktikabilität des eigens konzipierten Multimethodenansatzes unter Verwendung der Optimal Matching Technik zur musterorientierten Analyse des Raum-Zeit-Verhaltens erbracht.
The synchronous distributed processing of common source code in the software development process is supported by well proven methods. The planning process has similarities with the software development process. However, there are no consistent and similarly successful methods for applications in construction projects. A new approach is proposed in this contribution.
Der Einsatz von CAD-Applikationen hat die Planungsarbeit im Bauwesen entscheidend verändert. In der Entwurfsplanung sind die Änderungen bereits deutlich erkennbar. Seit der Anwendung von dreidimensionalen Planungswerkzeugen kann der Bauherr das Bauwerk in seiner virtuellen Gesamtheit am Computer betrachten und bewerten. Dies bietet viele Vorteile. So ist der Planer gezwungen alle wesentlichen Details a priori exakt zu planen, wodurch viele Fehler vermieden werden können. Dies bietet insbesondere für Planungen in Baubetrieben, z.B. im Rahmen der Arbeitsvorbereitung, neue Einsatzmöglichkeiten.
The development of 3D technologies during the last decades in many different areas, leads us towards the complete 3D representation of planet earth on a high level of detail. On the lowest level we have geographical information systems (GIS) representing the outer layer of our planet as a 3D model. In the meantime these systems do not only give a geographical model but also present additional information like ownership, infrastructure and others that might be of interest for the construction business. In future these systems will serve as basis for virtual environments for planning and simulation of construction sites. In addition to this work is done on the integration of GIS systems with 3D city models in the area of urban planning and thus integration of different levels of detail. This article presents research work on the use of 3D models in construction on the next level of detail below the level of urban planning. The 3D city model is taken as basis for the 3D model of the construction site. In this virtual nD-world a contractor can organize and plan his resources, simulate different variants of construction processes and thus find out the most effective solution for the consideration of costs and time. On the basis of former researches the authors present a new approach for cost estimation and simulation using development technologies from game software.
Nur durch Aufträge entsteht das Potenzial, die hochwertigen und modernen Produkte, Verfahren und Systeme auch erfolgreich und vielfach in die Realität umzusetzen. Deshalb sind auch im traditionellen Bauwesen die Mechanismen des Marketings für die Akquisition zu analysieren und hinterfragt der Verfasser das Bild von Baubetrieben als kompetente Anbieter für alle Phasen des Bauens vom Baustoff bis zur Inbetriebnahme eines schlüsselfertigen Objektes. Systemanbieter bereiten die Basis für eine innovative und vernetzte Arbeitsweise.
The optimization of continuous structures requires careful attention to discretization errors. Compared to ordinary low order formulation (h-elements) in conjunction with an adaptive mesh refinement in each optimization step, the use of high order finite elements (so called p-elements) has several advantages. However, compared to the h-method a higher order finite element analysis program poses higher demands from a software engineering point of view. In this article the basics of an object oriented higher order finite element system especially tailored to the use in structural optimization is presented. Besides the design of the system, aspects related to the employed implementation language Java are discussed.
Current disaster management procedures rely primarily on heuristics which result in their strategies being very cautious and sub-optimum in terms of saving life, minimising damage and returning the building to its normal function. Also effective disaster management demands decentralized, dynamic, flexible, short term and across domain resource sharing, which is not well supported by existing distributing computing infrastructres. The paper proposes a conceptual framework for emergency management in the built environment, using Semantic Grid as an integrating platform for different technologies. The framework supports a distributed network of specialists in built environment, including structural engineers, building technologists, decision analysts etc. It brings together the necessary technology threads, including the Semantic Web (to provide a framework for shared definitions of terms, resources and relationships), Web Services (to provide dynamic discovery and integration) and Grid Computing (for enhanced computational power, high speed access, collaboration and security control) to support rapid formation of virtual teams for disaster management. The proposed framework also make an extensive use of modelling and simulation (both numerical and using visualisations), data mining (to find resources in legacy data sets) and visualisation. It also include a variety of hardware instruments with access to real time data. Furthermore the whole framework is centred on collaborative working by the virtual team. Although focus of this paper is on disaster management, many aspects of the discussed Grid and Visualisation technologies will be useful for any other forms of collaboration. Conclusions are drawn about the possible future impact on the built environment.
This paper describes a couple of new truss structures based on fractal geometry. One is the famous Sierpinski Gasket and another is a fractal triangle derived by means of applying a process forming leaves of a cedar tree using M. F. Barnsley’s contraction mapping theory. Therefore a pair of x-y coordinates of an arbitrary nodal point on the structures are generated easily if IFS(Iterated Function System) codes and a scale of them are specified. Structural members are defined similarly. Thus data for frame analysis can be generated automatically, which is significant if the objective structure has complex configuration. Next analytical results under vertical and wind loadings in Japanese Building Code are shown. Here members are assumed to be timber and to have cross section of 15cm×15cm. Finally authors conclude that geometrically new truss structures were developed and automatic data generation for frame analysis was attained using IFS. Analytical results show they contribute to saving material when compared it with King-post truss.
Structural engineering projects are increasingly organized in networked cooperations due to a permanently enlarged competition pressure and a high degree of complexity while performing the concurrent design activities. Software that intends to support such collaborative structural design processes implicates enormous requirements. In the course of our common research work, we analyzed the pros and cons of the application of both the peer-to-peer (University of Bonn) and multiagent architecture style (University of Bochum) within the field of collaborative structural design. In this paper, we join the benefits of both architecture styles in an integrated conceptual approach. We demonstrate the surplus value of the integrated multiagent–peer-to-peer approach by means of an example scenario in which several structural engineers are co-operatively designing the basic structural elements of an arched bridge, applying heterogeneous CAD systems.
Expert systems integrating fuzzy reasoning techniques represent a powerful tool to support practicing engineers during the early stages of structural design. In this context fuzzy models have proved themselves to be very suitable for the representation of complex design knowledge. However their definition is a laborious task. This paper introduces an approach for the design and the optimization of fuzzy systems based upon Genetic Programming. To keep the emerging fuzzy systems transparent a new framework for the definition of linguistic variables is also introduced.
Das Ziel der vorliegenden Arbeit besteht in der Entwicklung einer Strategie zur physikalisch nichtlinearen Analyse von Aussteifungssystemen. Der Anwendungsschwerpunkt umfasst neben dem traditionellen Aufgabenumfang zur Analyse neu zu errichtender Tragwerke gleichzeitig auch Planungsaufgaben, die mit Umbau- und Sanierungsmaßnahmen verbunden sind. Veränderungen, die sich während der Nutzungsgeschichte oder im Revitalisierungsprozess ergeben, werden in den Berechnungsmodellen berücksichtigt. In vielen Fällen ist es aus planerischer Sicht zweckmäßig, die Nichtlinearität des Materialverhaltens zur Erschließung von Tragreserven in den normativen Nachweiskonzepten mit einzubeziehen. Der damit verbundene numerische Aufwand wird durch die Verwendung separater Modelle zur Erfassung des Querschnitts- und des Systemtragverhaltens begrenzt, ohne die Komplexität der Aufgabenstellung zu reduzieren. Aus detaillierten Querschnittsuntersuchungen der Tragwände werden integrale Materialbeziehungen abgeleitet, welche die Grundlage für die nichtlineare Tragwerksanalyse darstellen. Die Modellbildung gegliederter Aussteifungswände basiert auf deren Zerlegung in ebene finite Stabsegmente, die sich durch die Diskretisierung in Längs- und in Querrichtung ergeben. Zusätzlich zu den an den Stabenden angreifenden Normalkräften, Querkräften und Biegemomenten werden an den Elementlängsrändern Schubbeanspruchungen erfasst. Die physikalische Nichtlinearität wird durch die Einbeziehung integraler Materialbeziehungen an den Segmenträndern berücksichtigt. Die numerische Umsetzung erfolgt mit Methoden der mathematischen Optimierung. Die Leistungsfähigkeit der Berechnungsstrategie wird exemplarisch anhand von Untersuchungen an Aussteifungssystemen in Großtafelbauweise nachgewiesen.
Integrated structural engineering system usually consists of large number of design objects that may be distributed across different platforms. These design objects need to communicate data and information among each other. For efficient communication among design objects a common communication protocol need to be defined. This paper presents the elements of a communication protocol that uses a mediator agent to facilitate communication among design objects. This protocol is termed the Mediative Communication Protocol (MCP). The protocol uses certain design communication performatives and the semantics of an Agent Communication language (ACL) mainly the Knowledge and Query Manipulation Language (KQML) to implement its steps. Details of a Mediator Agent, that will facilitate the communication among design objects, is presented. The Unified Modeling Language (UML) is used to present the Meditative protocol and show how the mediator agent can be use to execute the steps of the meditative communication protocol. An example from structural engineering application is presented to demonstrate and validate the protocol. It is concluded that the meditative protocol is a viable protocol to facilitate object-to-object communication and also has potential to facilitate communication among the different project participants at the higher level of integrated structural engineering systems.