Refine
Has Fulltext
- yes (336) (remove)
Document Type
- Conference Proceeding (336) (remove)
Institute
- Professur Informatik im Bauwesen (336) (remove)
Keywords
- Modellierung (49)
- Bauwerk (39)
- Verteiltes System (36)
- CAD (31)
- Finite-Elemente-Methode (24)
- Architektur (21)
- Computerunterstütztes Verfahren (21)
- Baubetrieb (17)
- Ingenieurbau (17)
- Internet (17)
- Planungsprozess (17)
- Bauplanung (15)
- Optimierung (15)
- Datenmanagement (14)
- Tragwerk (14)
- Gebäude (11)
- Stahlbeton (11)
- Bautechnik (10)
- Bauwesen (10)
- Datenaustausch (10)
- Mobile Computing (10)
- Baustatik (9)
- Entscheidungsunterstützung (9)
- Funknetz (9)
- Hochschulbildung (9)
- Schale (9)
- Computerunterstütztes Lernen (8)
- Dreidimensionales Modell (8)
- Konzipieren <Technik> (8)
- Prozessmodell (8)
- Quaternion (8)
- Nichtlineares Phänomen (7)
- Objektmodell (7)
- Projektmanagement (7)
- Bauaufnahme (6)
- Informationstechnik (6)
- Lebenszyklus <Wirtschaft> (6)
- Software (6)
- Wissensverarbeitung (6)
- Bauablauf (5)
- Beton (5)
- Bruchmechanik (5)
- Controlling (5)
- Datenbank (5)
- Datenerfassung (5)
- Geotechnik (5)
- Mathematisches Modell (5)
- Mehragentensystem (5)
- Produktmodell (5)
- Simulation (5)
- Tragverhalten (5)
- Angewandte Informatik (4)
- Angewandte Mathematik (4)
- Bauablauf / Ablaufplanung (4)
- Brückenbau (4)
- Building Information Modeling (4)
- Elastoplastizität (4)
- Gebäudeleittechnik (4)
- Informationsmanagement (4)
- Langzeitverhalten (4)
- Lernendes System (4)
- Petri-Netz (4)
- Transportables Gerät (4)
- Transportproblem (4)
- Zeitabhängigkeit (4)
- Bauindustrie (3)
- Baustelle (3)
- Bauteil (3)
- Bauvorhaben (3)
- Benutzeroberfläche (3)
- Bewehrung (3)
- Data, information and knowledge modeling in civil engineering; Function theoretic methods and PDE in engineering sciences; Mathematical methods for (robotics and) computer vision; Numerical modeling in engineering; Optimization in engineering applications (3)
- Datenmodell (3)
- Dynamische Belastung (3)
- Entscheidung bei mehrfacher Zielsetzung (3)
- Erdbebenbelastung (3)
- Europa (3)
- Forschung (3)
- Fuzzy-Logik (3)
- Genetischer Algorithmus (3)
- IFC (3)
- Informatik (3)
- Informationssystem (3)
- Management (3)
- Neuronales Netz (3)
- Nichtlineare Mechanik (3)
- Planung (3)
- Prozessmanagement (3)
- Rechnernetz (3)
- Rissbildung (3)
- Schwingung (3)
- Sicherheit (3)
- Stadtplanung (3)
- Stochastisches Modell (3)
- Textilfaser (3)
- Verkehrsnetz (3)
- Visualisierung (3)
- Wahrscheinlichkeitsrechnung (3)
- Wavelet (3)
- XML (3)
- Zufallsvariable (3)
- Öffentlicher Personennahverkehr (3)
- Ablaufplanung (2)
- Algorithmus (2)
- Anwendung (2)
- Aussteifung (2)
- Bauausführung (2)
- Bauentwurf (2)
- Bedarfsermittlung (2)
- Belastung (2)
- Bildverarbeitung (2)
- Boden-Bauwerk-Wechselwirkung (2)
- Brandschutz (2)
- CAD / Architektur (2)
- Computer Supported Cooperative Work (2)
- Computerunterstützter Unterricht (2)
- Data-Warehouse-Konzept (2)
- Datenverwaltung (2)
- Digitalisierung (2)
- Dokumentenverwaltungssystem (2)
- Dreidimensionales CAD (2)
- Dynamik (2)
- Dünnwandiges Bauelement (2)
- Entwurf (2)
- Flüssigkeit-Bauwerk-Wechselwirkung (2)
- Geoinformationssystem (2)
- Gleichgewicht (2)
- Graphische Benutzeroberfläche (2)
- Grenzzustand (2)
- Grundwasser (2)
- Haus (2)
- Informationsaustausch (2)
- Kontinuum (2)
- Kooperatives Informationssystem (2)
- Künstliche Intelligenz (2)
- Lebensdauer (2)
- Marketing (2)
- Matrizenrechnung (2)
- Mechanische Eigenschaft (2)
- Mensch-Maschine-Kommunikation (2)
- Monitorüberwachung (2)
- Netzwerk (2)
- Numerisches Verfahren (2)
- Orthotropes Bauteil (2)
- Parameteridentifikation (2)
- Produktionsplanung (2)
- Prognose (2)
- Prozessoptimierung (2)
- Rahmentragwerk (2)
- Raumtragwerk (2)
- Reihenfolgeproblem (2)
- Sandwichbauweise (2)
- Schnittstelle (2)
- Stahlkonstruktion (2)
- Straßenbau (2)
- Umweltfaktor (2)
- Verkehr (2)
- Virtuelle Realität (2)
- Virtuelles Unternehmen (2)
- Wasserbau (2)
- Windlast (2)
- Wissensmanagement (2)
- Zuverlässigkeit (2)
- ANSYS (1)
- Adaptives System (1)
- Altbaumodernisierung (1)
- Amplitude (1)
- Approximation (1)
- Architektur <Informatik> (1)
- Aufwindkraftwerk (1)
- Ausbildung (1)
- Ausschreibung (1)
- Automatische Identifikation (1)
- Automatisiertes System (1)
- BIM (1)
- Bauführung (1)
- Baugrund (1)
- Bauinformatik (1)
- Bauingenieurstudium (1)
- Baukosten (1)
- Bauphysik (1)
- Bausubstanz (1)
- Bauwerk / Technische Überwachung (1)
- Behinderte (1)
- Beleuchtung (1)
- Benutzer / Beteiligung (1)
- Benutzer-entworfene Wohnungen (1)
- Berechnung (1)
- Berlin (1)
- Berührungslose Messung (1)
- Betonbrücke (1)
- Betriebskosten (1)
- Betriebsmittel (1)
- Betriebswirtschaft (1)
- Beulung (1)
- Beurteilung (1)
- Bewertung (1)
- Bewertungssystem (1)
- Bewirtschaftung (1)
- Biegemoment (1)
- Bogenbrücke (1)
- Bogenstaumauer (1)
- Boolesche Operationen (1)
- Brandgefahr (1)
- Brep (1)
- Brücke (1)
- Building Object Model (1)
- Busspur (1)
- CAE (1)
- CORBA (1)
- Cauchy-Riemannsche Differentialgleichungen (1)
- Chaostheorie (1)
- China (1)
- Chirale Verbindungen (1)
- Computergestütztes Verfahren (1)
- Constraint <Künstliche Intelligenz> (1)
- Constraintnetz (1)
- Data, information and knowledge modeling in civil engineering (1)
- Dateneingabegerät (1)
- Demontage (1)
- Dialogprogrammierung (1)
- Dickwandiges Bauelement (1)
- Differentialoperator (1)
- Digitales Bautagebuch (1)
- Digitales Modell (1)
- Dirac-Gleichung (1)
- Diskrete Fourier-Transformation (1)
- Diskrete Optimierung (1)
- Dreieck (1)
- Druckbelastung (1)
- Early design stage (1)
- Echtzeitsystem (1)
- Echtzeitverarbeitung (1)
- Eigenwert (1)
- Eigenwertproblem (1)
- Einfamilienhaus (1)
- Einsturz (1)
- Eisenbahnbrücke (1)
- Elastizitätstheorie (1)
- Elektromagnetisches Feld (1)
- Elektronischer Produktkatalog (1)
- Ellipsoid (1)
- Emission (1)
- Energiemanagement (1)
- Energieversorgung (1)
- Entropie (1)
- Entscheidungstheorie (1)
- Erdbebenschutz (1)
- Exchanged Documents (1)
- Expertensystem (1)
- Faktor <Algebra> (1)
- Farbenlehre (1)
- Fehler (1)
- Fertigbau (1)
- Finite-Streifen (1)
- Finite-Streifen-Methode (1)
- Fraktal (1)
- Framework <Informatik> (1)
- Function theoretic methods and PDE in engineering sciences (1)
- Funktionsraum / Mathematik (1)
- Fuzzifizierung (1)
- Fuzzy-Optimierung (1)
- Gebäudeleitsystem (1)
- Generelle-Interessen-Skala (1)
- Geographic Information System (1)
- Gesamtbauwerk (1)
- Geschossbau (1)
- Graph (1)
- Graphentheorie (1)
- Grenzlast (1)
- Großbaustelle (1)
- Großtafelbau (1)
- Gruppentheorie (1)
- Gründung (1)
- Hamilton-Operator (1)
- Heizung (1)
- Hermitesche Entwicklung (1)
- Himmelslichtquotient (1)
- Holzbau (1)
- Hubbard (1)
- Hydrodynamik (1)
- Immobilienwirtschaft (1)
- Industriepark (1)
- Ingenieurbüro (1)
- Integrierte Planung (1)
- Intelligentes System (1)
- Investitionsplanung (1)
- Iran (1)
- Iteration (1)
- Kalkulation (1)
- Kapitalwertmethode (1)
- Kernel <Informatik> (1)
- Klein- und Mittelbetrieb (1)
- Klein- und mittelstädtisches Unternehmen (1)
- Kommunikationsmodell (1)
- Kommunikationstechnik (1)
- Komplexe Funktion (1)
- Konforme Abbildung (1)
- Konsistenz <Informatik> (1)
- Konstruktion (1)
- Konstruktionsfehler (1)
- Konvektion (1)
- Kooperatives Arbeiten (1)
- Korrosion (1)
- Kostenanalyse (1)
- Kraftmethode (1)
- Kran (1)
- Krankenhaus (1)
- Kreis (1)
- Kriechen (1)
- Kuppel (1)
- Laidlaw (1)
- Laplace-Transformation (1)
- Lebenszykluskonzept (1)
- Lehrter Bahnhof (1)
- Leitsystem (1)
- Luftverunreinigender Stoff (1)
- Lüftung (1)
- Managment Information System (1)
- Maple (1)
- Markoffsche Kette (1)
- Materialermüdung (1)
- Materialflusssteuerung (1)
- Mathematical methods for (robotics and) computer vision (1)
- Mathematische Physik (1)
- Mauerwerk (1)
- Maxwellsche Gleichungen (1)
- Messtechnik (1)
- Metall verarbeitende Industrie (1)
- Modalanalyse (1)
- Monte-Carlo-Simulation (1)
- Multiresolution analysis (1)
- Navier-Stokes-Gleichung (1)
- Netzplantechnik (1)
- Netzwerktheorie (1)
- Nichtlineare Optimierung (1)
- Nichtlineare partielle Differentialgleichung (1)
- Nichtlineares System (1)
- Nichtlinearität (1)
- Niedrigenergiehaus (1)
- Norm <Normung> (1)
- Normung (1)
- Numerical modeling in engineering (1)
- Nutzungsänderung (1)
- OIP (1)
- Oberfläche (1)
- Objektorientierte Programmierung (1)
- Objektorientierung (1)
- Oktalbaum (1)
- Operations Research (1)
- Optimal Planning (1)
- Optimization in engineering applications (1)
- Parallelverarbeitung (1)
- Passivhaus (1)
- Planungswerkzeugen (1)
- Plastische Deformation (1)
- Plastizitätstheorie (1)
- Platte (1)
- Polyharmonische Funktion (1)
- Polystyrol (1)
- Produktionssteuerung (1)
- Progressive Planung (1)
- Projektfinanzierung (1)
- Projektierungsbetrieb (1)
- Projektplanung (1)
- Projektsteuerung (1)
- Prozesssimulation (1)
- Qp-spaces (1)
- RFID (1)
- Randelemente-Methode (1)
- Randspannung (1)
- Raumordnung (1)
- Rechteck (1)
- Regelungssystem (1)
- Regelungstechnik (1)
- Regenwasser (1)
- Regressionsanalyse (1)
- Rekonstruktion (1)
- Reparatur (1)
- Revitalisierung (1)
- Rippendecke (1)
- SARS (1)
- SDOF (1)
- STEP (1)
- Sandwichbauteil (1)
- Schalung (1)
- Scheduling (1)
- Scherung (1)
- Schlussfolgern (1)
- Schwingungsdämpfer (1)
- Sichtbeton (1)
- Software Engineering (1)
- Softwareengineering (1)
- Softwaresystem (1)
- Sonnenenergie (1)
- Sonnenscheindauer (1)
- Sonnenstrahlung (1)
- Spannungsintensitätsfaktor (1)
- Spline-Approximation (1)
- Stabilisierung (1)
- Stadtentwässerung (1)
- Stahlbau (1)
- Stahlbetonbauteil (1)
- Standardisierung (1)
- Standortplanung (1)
- Statische Last (1)
- Stochastik (1)
- Stochastischer Prozess (1)
- Stoffkreislauf (1)
- Strömungsmechanik (1)
- Supply Chain Management (1)
- Synchronisierung (1)
- Systemidentifikation (1)
- Tafelbau (1)
- Talsperre (1)
- Teamorganisation (1)
- Technische Mechanik (1)
- Theorie zweiter Ordnung (1)
- Transformation (1)
- Trassierung (1)
- Tunnel (1)
- Tunnelbau (1)
- Unsicherheit (1)
- Unternehmen (1)
- Unternehmen / Organisation (1)
- VRML (1)
- Variantenvergleich (1)
- Variationsrechnung (1)
- Verbundbauweise (1)
- Verbundwerkstoff (1)
- Verkehrsleitsystem (1)
- Verkehrsplanung (1)
- Vernetztes System (1)
- Versagen (1)
- Verteiltes Datenbanksystem (1)
- Verteiltes Softwaresystem (1)
- Vertrag (1)
- Viereck (1)
- Viskoelastisches Gelenk (1)
- Vorfertigung (1)
- Weimar / Herzogin-Anna-Amalia-Bibliothek (1)
- Werkstoffprüfung (1)
- Wohnung (1)
- Work Face (1)
- World Wide Web (1)
- Wärme (1)
- Wärmestrom (1)
- Zeitrestriktion (1)
- Zugstab (1)
- Zusammengesetzte Fließbedingung (1)
- anforderungsorientierte Projektabwicklung (1)
- applets (1)
- building (1)
- construction industry (1)
- construction management (1)
- data collection (1)
- decision making (1)
- foundation (1)
- function spaces (1)
- internetbasierte Projektplattform (1)
- knowledge exchange (1)
- learning objects (1)
- multi-criterion analysis (1)
- product and process models (1)
- pull learning (1)
- repository (1)
- reusability (1)
- structural engineering (1)
- system (1)
- transparency (1)
- web-based learning (1)
- Änderung (1)
- Überwachung (1)
Seismic insulation is one of the most progressive types of seismic protection. Seismic insulation is understood as applying special devices for reducing of inertial seismic loads acting on a building. The constructions, shown in article, significantly more effectively solve problems of seismic protection, comparing to the existing seismic insulation systems (SIS). The Special Mechanical Engineering Design Office has developed, manufactured and tested a shock-absorber unit (SAU) of large load capacity. The SAU represents a block of number of pneumatic shock-absorbers (PSA), concentrically mounted round the guiding cylinder. The protected object rests upon the upper movable part of the guiding cylinder of the SAU. In its turn, the lower part of the SAU is rested on the foundation plate, mounted on the ground. A set of the SAU is a constructive realization of the SIS. Efficiency of such SIS has been proved as theoretically, so experimentally An effective SIS can also be created on the base of the elasto-plastic shock-absorbers developed by the KBSM. New designing and constructional solutions are based on the use of the original SIS elements, performed on the base of long time existing (in the other field of technical equipment)units, safety and durability of which have been proved by long term service (more than 20 years).
Dezentrale mikrocontrollerbasierende Messtechnik in der in der Leittechnik historischer Gebäude
(2003)
Im Hintergrund stehen historische Bibliotheksgebäude, deren Bestände durch ungünstige klimatische Verhältnisse in den Innenräumen ihrer der Erhaltung gefährdet sind. Damit Maßnahmen der Gebäudeleittechnik geplant werden können, ist die Aufnahme der Umweltgrößen über einen längeren Zeitraum erforderlich. Im speziellen zielen die Maßnahmen auf die Klimatechnik mit ihren Aufgaben der Heizungsregelung, Belüftungsanlagen. Ein Messsystem kann mit dem Mikrocontroller Beck >IPC@CHIP< realisiert werden. Das an der FH Fulda entwickelte Messsystem nimmt im Abstand von drei Minuten Messwerte von Lufttemperatur, Luftfeuchte, Luftdruck und UV-Intensität auf. Sie gelten als beeinflussende Größen der organischen Materialien des Fundus. Die Messwerte werden in einer elektronischen Schaltung vorverarbeitet und einem Mikrocontroller zugeführt. Dieser archiviert die Daten fortlaufend über einen Zeitraum bis zu sieben Jahren. Der Mikrocontroller ist mit seinem internen Flash-Speicher und der Ethernet-Schnittstelle in der Lage, die gesammelten Messwerte als Webserver zur Verfügung zu stellen. Wenn das Messsystem an das Internet angeschlossen wird, können die Klimaverläufe in einem herkömmlichen Internet-Browser dargestellt werden. Dafür wurde mit der Programmiersprache Java eine Visualisierungsoberfläche erstellt. Sie bietet die verschiedensten Möglichkeiten der Datenauswertung. Dazu gehört der Zugriff auf jeden einzelnen Messwert, auf Tages-, Monats- und Jahresmittelwerte und die Errechnung von Minima und Maxima. Der Flash-Speicher wurde auch dazu benutzt, Dokumentation und Bedienhinweise abzulegen, die somit über das Netzwerk abrufbar sind. Das gesamte Messsystem ist in ein Buch integriert und erfasst seit August 2002 die klimatischen Verhältnisse der Herzogin-Anna-Amalia-Bibliothek in Weimar. Nach den erfolgten Langzeitmessungen kann darüber entschieden werden, welchen Beitrag eine Gebäudeleittechnik mit integrierter Klimaregelung zur Werterhaltung der Gegenstände leisten kann.
Die Inverse Matrizeniteration ist ein Verfahren zur Bestimmung der Eigenzustände reeller, symmetrischer Matrizen mit konvexer Profilstruktur. Das Verfahren zeichnet sich besonders durch den Erhalt der Profilstruktur und die Bestimmung der Eigenwerte in geordneter Reihenfolge aus. Die Iteration ermöglicht die gezielte Bestimmung mehrerer aufeinander folgender betragskleinster Eigenwerte, wie es im Bauwesen insbesondere für Stabilitäts- und Schwingungsanalysen erforderlich ist. Die Anwendung dieses Verfahrens hat gezeigt, daß ein Teil der gesuchten Eigenwerte mit wenigen Iterationszyklen bestimmt werden kann, während andere eine größere Anzahl von Iterationszyklen erfordern. Diese lokale Konvergenzverschlechterung kann durch eine Jacobi-Randkorrektur, wie sie im Beitrag näher erläutert wird, behoben werden.
Die Eisenbahnbrücken des Lehrter Bahnhofs in Berlin - Ein ganzheitliches FE-Berechnungskonzept
(2000)
Der Komplexität moderner Brückenbauwerke scheinen die verwendeten Berechungsmodelle oft nicht angemessen. Tragwerksberechnungen basieren in vielen Fällen noch auf der Vorgehensweise, das Brückenbauwerk in Einzelbauteile zu zerlegen und mit unterschiedlichen Teilmodellen zu behandeln. Das erscheint, auch vor dem Hintergrund ständig wachsender Rechnerleistung, nicht mehr zeitgemäß. Dies gilt zum Beispiel auch für die gängige Praxis, flächenhafte Brückenüberbauten mit Balkenmodellen zu berechnen. Der vorliegende Beitrag stellt ein ganzheitliches Berech-nungskonzept vor, welches auf der Basis eines einzigen FE-Modells die Berechnung des Gesamtbauwerks erlaubt. Damit wird für alle Bauteile neben der Zustandsgrößenberechnung auch die Bemessung von Stahl- und Spannbetonbauteilen bis hin zu Nachweisen wie zur Beschränkung der Rissbreite geführt. Die Anwendung dieses Berechnungskonzeptes wird am Beispiel der Eisenbahnüberführung des neuen Lehrter Bahn-hofs in Berlin gezeigt. Das verwendete FE-Modell umfasst Baugrund, Fundamente, Stahl- bzw. Gußstahlunterkonstruktion sowie den Stahl- bzw. Spannbetonüberbau. Besonderheiten sind unter anderem die Modellierung des plattenbalkenartigen Überbaus durch exzentrische, vorspannbare Schalenelemente und das getrennte Vorhalten von tragwerks- und lastbezogenen Eingabefiles. Damit gelingt die sequentielle Erfassung unterschiedlicher Bettungsmoduli zur Simulation statischer und dynamischer Beanspruchungen, die Berücksichtigung des Anspannens und der Interaktion zwischen vorgespannten Stahlverbänden zur Aufnahme von Horizontallasten sowie die Berücksichtigung unterschiedlicher statischer Systeme bei der Herstellung des Spannbetonüberbaus.
Der Versuch, alle vorhandenen Arten von Bauobjekten in einem Schema zu beschreiben, wird zu einem übermäßig großen Schema führen. Im internationalen Zentrum für Bauinformatik hat der Autor die Besonderheiten des Bauwesens formuliert und gefolgert, dass es genügt, in den Klassen topologische, geometrische und graphische Aspekte der Bauobjekte, sowie einige Hilfsbegriffe zu beschreiben. Ein Hauptziel bei der Entwicklung einer Sprache ist die Einfachheit des Schemas. Insgesamt werden etwa nur 50 Klassen für CAD-Systeme vorgeschlagen. In Modellen von Bauobjekten, die von CAD-Systemen erzeugt werden, betrifft der größte Anteil der Daten die geometrische Form der Elemente und ihre Raumlage. Zur Beschreibung der Bauobjekte werden nur 7 Hauptklassen verwendet: Entity, System, Clone, Context, Annotation, Figure und Process. Von besonderer Bedeutung ist die Klasse >Clone<. Sie erlaubt in kompakter Form die Beschreibung einer Menge ähnlicher Objekte, die sich in wenigen Parametern (zum Beispiel, der Lage im Raum) unterscheiden. Das vorgestellte Konzept führt zu einer starken Verringerung der Dateigröße und erleichtert das Erkennen der Objekte bei der Übergabe der Daten. Die Strukturdiagramme der Klassen wurden mit Hilfe der UML-Sprache erzeugt. Die Klassen sind auch im XML-Format beschreiben und können auf Homepage >http://www.mtu-net.ru/pavlov/bodXML< gelesen werden. Zur Prüfung der Anwendbarkeit des Schemas wurden Beispiele der Beschreibung verschiedener Bauobjekte entwickelt. Diese Beispiele sind auf o.g. Homepage angegeben
Es wird das gemeine Schema der Projektierung, die die Analyse des Marktes einschließt, betrachtet, die Einschätzung der Nomenklatur und des Umfanges des Produktionsausstoßes der Erzeugnisse, und die Schlüsselaufgabe der Wahl der Regimes der Bearbeitung. Die letzte Aufgabe wird - konkretisiert es werden die Formeln berichtet und die Algorithmen der Optimierung nach den Kriterien der Produktivität und den Selbstkostenpreisen. Es sind die Formeln für die Produktivität der Systeme mit der flexiblen Verbindung, präzisiert sowie die Abhängigkeiten für die Standhaftigkeit bei den kleinen Geschwindigkeiten des Schneidens. Die Schlüsselwörter: der Markt, die Regimes der Bearbeitung, die Produktivität, der Selbstkostenpreis, die Optimierung
Re-using knowledge in architecture, engineering and construction (AEC) firms can lead to greater competitive advantage, improved designs, and more effective management of constructed facilities. This paper discusses the importance of exploration and discovery of reusable knowledge from a corporate archive as opposed to simple search and retrieval. We describe and illustrate through a scenario of use an exploration framework and prototype, CoMemTM that formalizes the added value of exploration in the process of knowledge reuse. We discuss two exploration activities: (i) Breadth- Only overview exploration that assist a user to rapidly localize pockets of re-usable knowledge from the large corporate archive and (ii) Iterative breadth-depth exploration that enables a user to identify those re-usable components of the Corporate Memory that may yield design issues that were not originally considered.
Discrete-continual Finite Element Method of Analysis for Three-dimensional Curvilinear Structures
(2003)
This paper is devoted to discrete-continual finite element method (DCFEM) of analysis for three-dimensional curvilinear structures. Operational and variational formulations of the problem in the ring coordinate system are presented. The discrete-continual design model for structures with constant physical and geometrical parameters in longitudinal direction is offered on the basis of so-called curvilinear discrete-continual finite elements. Element coordinate system, approximation of nodal unknowns, construction of element nodal load vector are under consideration. Element system of differential equations is formulated with use of special generalized block-structured stiffness matrix of discrete-continual finite element. Local differential relations are formulated. Resultant multipoint boundary problem for system of ordinary differential equations is given. Method of analytical solution of multipoint boundary problems in structural analysis is offered as well. Its major peculiarities include universality, computer-oriented algorithm involving theory of distributions, computational stability, optimal conditionality of resultant systems, partial Jordan decomposition of matrix of coefficients, eliminating necessity of calculation of root vectors. Brief information concerning developed software is provided.
Available construction time-cost trade-off analysis models can be used to generate trade-offs between these two important objectives, however, their application is limited in large-scale construction projects due to their impractical computational requirements. This paper presents the development of a scalable and multi-objective genetic algorithm that provides the capability of simultaneously optimizing construction time and cost large-scale construction projects. The genetic algorithm was implemented in a distributed computing environment that utilizes a recent standard for parallel and distributed programming called the message passing interface (MPI). The performance of the model is evaluated using a set of measures of performance and the results demonstrate the capability of the present model in significantly reducing the computational time required to optimize large-scale construction projects.
In this contribution the software design and implementation of an analysis server for the computation of failure probabilities in structural engineering is presented. The structures considered are described in terms of an equivalent Finite Element model, the stochastic properties, like e.g. the scatter of the material behavior or the incoming load, are represented using suitable random variables. Within the software framework, a Client-Server-Architecture has been implemented, employing the middleware CORBA for the communication between the distributed modules. The analysis server offers the possibility to compute failure probabilities for stochastically defined structures. Therefore, several different approximation (FORM, SORM) and simulation methods (Monte Carlo Simulation and Importance Sampling) have been implemented. This paper closes in showing several examples computed on the analysis server.
Bei komplexen Gründungskonstruktionen sind Planungsfehler durch eine konsistente Modellierung vermeidbar. Manuelle Berechnungsmethoden ermöglichen im allgemeinen ein dreidimensionales Vorgehen nicht. Numerische Berechnungsmethoden, wie z.B. die Finite-Element-Methode, sind ein optimales Werkzeug zur ganzheitlichen Simulation des Problems. Die für die Finite-Element-Analyse notwendige Diskretisierung komplexer Bau- grundstrukturen ist manuell nicht zu bewältigen. Der vorliegende Beitrag zeigt wie ein Finite-Element-Modell automatisch aus einem geotechnischen Modell unter Berücksichtigung der spezifischen Anforderungen der Baugrund-Tragwerk-Struktur und des Bauablaufes erzeugt werden kann. Hierbei wird die Berücksichtigung der geometrischen und der mechanischen Besonderheiten bei der Netzgenerierung dargestellt.
Informations-und Kommunikationtechniken haben im Bauwesen noch nicht die gewünschten Vorteile für Kosten und Qualität von Bauobjekten erzielt. Die Vielfalt der dafür genutzten Systeme und Formate führt häufig zu Redundanzen und Informationsverlusten in den Planungs- und Bauprozessen sowie Problemen beim Datenaustausch zwischen den Systemen. Durch die Datenmengen, die in CAD, AVA, Terminplanung, Tabellenkalkulation, Textverarbeitung etc. durch unterschiedliche Beteiligte erzeugt werden, ist darüber hinaus das Risiko einer unterschiedlichen Datenaktualität enorm. Als Konsequenz dieser Erkenntnisse bestand die Aufgabe, eine ganzheitliche und durchgängige Produkt- und Prozeßstrategie für den preiswerten Einfamilienhausbau zu entwickeln. Die Grundlage dafür bildet ein komplexes System von rationellen Entwurfsregeln, Konstruktionslösungen und Bau- und Baustofflogistikkonzepten auf der Basis moderner Informations- und Kommunikationstechnologien.
The paper deals with the simulation of the non-linear and time dependent behaviour of complex structures in engineering. Such simulations have to provide high accuracy in the prediction of deformations and stability, by taking into account the long term influences of the non-linear behaviour of the material as well as the large deformation and contact conditions. The limiting factors of the computer simulation are the computer run time and the memory requirement during solving large scale problems. To overcome these problems we use a dynamic-explicit time integration procedure for the solution of the semi-discrete equations of motion, which is very suited for parallel processing. In the paper at first we give a brief review of the theoretical background of the mechanical modelling and the dynamic-explicit technique for the solution of the semi-discrete equations of motion. Then the concept of parallel processing will be discussed . A test example concludes the paper.
Die Entwicklung von Projekten des Hoch- und Industriebaus ist durch eine Vielzahl von zu verarbeitenden Informationen und Bewertungsgrundlagen in den Planungsphasen der Bau-land- sowie der Hoch- und Industriebauentwicklung für die Kostenkalkulation geprägt. Die Identifizierung, Beschaffung, Verwaltung und Verarbeitung dieser nach Art, Form und Inhalt bei den Kommunikationspartnern verteilt vorliegenden Informationen führt zu komplexen Planungsprozessen. Zur Bewältigung dieser Komplexität ist die Bauprojektentwicklung kooperativ in vernetzten Systemen durchzuführen. Insbesondere kann die Kostenkalkulation auf Basis der sich zeitlich verändernden Fachinformation im Netz effizient, zeitnah und mit hoher Qualität durchgeführt werden. Die bisher eingesetzten Methoden und Verfahren unterstützen die Projektplaner bei der Datenerfassung und -verarbeitung der kostenrelevanten Informationen nur in lokalen Computernetzen. Die Erfassung von Kosteninformationen, wie zum Beispiel Kostenschätzungen zur Planung von Projekten oder die im Laufe der Projektentwicklung entstehenden Kosten, liegen jedoch verteilt bei den Projektpartnern vor. Es ist daher notwendig, zur Vermeidung von Erfassungs-fehlern und zur Steigerung der Kooperation der Projektpartner bei der wirtschaftlichen Kalkulation von Bauprojekten, den Projektpartnern eine rechnergestützte und projektweite Kalkulation unter Nutzung von Computernetzwerken zu ermöglichen. Die Autoren stellen ein agenten-basiertes Kooperationsmodell für die Kosten-Kalkulation in Rahmen der Bauprojektentwicklung in vernetzten Systemen vor, das durch Strukturierung der Planungsinformationen die selbständige Suche nach klar definierten Informationen auf Basis mobiler Internet-Agenten dynamisch-adaptiv unterstützt.
The US Department of Highways is embarked on a very ambitious program to renovate much of the bridges and highways allover the USA. While it is doing so, it is also trying to take advantage of using such program to enhance the research for future programs. One of those projects is a 1000 ft. (305 m) long concrete bridge in the State of Vermont, located in the North East of USA. It is scheduled for renovation, in which the deck and its side parapet walls will be replaced. New England Transportation Consortium (NETC) decided to make further use of this project to find what effect will the heavy demolition tools have on the concrete to remain in place. The goal is to find out the extent of the experimental measurement agreement with the analytical results. In order to accomplish such a goal, numerous strain gages were installed at and in the vicinity of the demolition areas. Those gages will measure the effect of the demolition on the adjacent areas, and how far the destructive effect of the powerful demolition tools can propagate through different parts of the structure. The gages are connected to National Instruments data acquisition equipment, which is connected to a lap top computer to save all the acquired data. The analytical part the project will be using the energy method, which means that the energy applied by the demolition tools should equal the energy absorbed by the demolished structure, in elastic and plastic deformation forms.
Ein Algorithmus zur Lösung von Tourenproblemen mit Zeitrestriktionen und inhomogenem Fahrzeugpark
(2003)
Es wird ein Algorithmus vorgestellt, der auf Tourenprobleme mit verschiedenen Restriktionen anwendbar ist. Zum einen können sowohl die Aufträge der Kunden als auch die Fahrzeuge mit Zeitrestriktionen in Form eines oder mehrerer Zeitfenster versehen sein. Zum anderen stehen auszuliefernde Waren nur in gewissen zeitabhängigen Stückzahlen zur Verfügung. Die vorhandenen Fahrzeuge besitzen hinsichtlich Kapazität und Geschwindigkeit unterschiedliche Eigenschaften, wobei von den Kunden gewisse Fahrzeugtypen ausgeschlossen werden können. Die Aufträge werden zunächst hinsichtlich örtlichem und zeitlichem Abstand in Cluster unterteilt. Den Clustern werden auf der Basis von Bewertungen Fahrzeuge zugeordnet, mit denen Touren innerhalb der Cluster erzeugt werden. Das Aufstellen der Touren erfolgt mittels eines Savingsverfahrens, bei dem das Saving aus einer örtlichen und einer zeitlichen Komponente besteht. Der Algorithmus läßt sich über eine Vielzahl an Parametern steuern.
Im Rahmen eines BMWT-geförderten Projekts entstand innerhalb einer Kooperation der Ritter Energie-und Umwelttechnik mit der Universität Karlsruhe (Fachbereich Bauphysik und Technischer Ausbau) eine bedarfsgeführte Fuzzy-Regelung für eine Lüftungsanlage mit Wärmerückgewinnung. Da bei Niedrigenergie-und Passivhäusern die Wärmeverluste über die Lüftung vergleichsweise hoch sind, besteht hier noch Einsparbedarf.Eine bedarfsgeführte Regelung kann die Lüftungsrate reduzieren, wenn z.B. mehrere Bewohner abwesend sind oder Fensterlüftung betrieben wird und die Luftqualität somit gut genug ist. Ausserdem wird die Lüftung reduziert, wenn die Raumluft in der Heizperiode zu trocken wird. Die sog. Fuzzy-Logik eignet sich gut für solche Regelungsaufgaben, bei denen menschliches Empfinden und Entscheiden nachgebildet werden soll. Fuzzy bedeutet eigentlich >unscharf<, d.h. es wird mit unscharfen Begriffen gearbeitet. Eine typische Anweisung in einer Fuzzy-Regelbasis lautet z.B. >Wenn die Luft trocken ist dann wenig lüften<. Der Prozess, in dem die Zugehörigkeit einer scharfen Messgröße zu den verschiedenen Fuzzy-Sets wie >trocken<, >mittel< und >feucht< bestimmt wird, heisst >Fuzzifizierung<. Das Anwenden der Regeln und das Extrahieren des unscharfen Ergebnisses heisst >Interferenz<. Abschließend wird eine >Defuzzifizierung< vorgenommen, um wieder ein scharfes Ergebnis zu erhalten. Die Fuzzy-Lüftungsregelung hat sich in Feldtests sehr gut bewährt. Simulationsrechnungen mit dem Gebäudesimulationsprogramm >ColSim< haben ausserdem gezeigt, dass im Passivhaus bis zu 16% der für Heizen und Lüften verbrauchten Primärenergie eingespart werden kann, wenn die Fuzzy-Regelung gegen eine konventionelle Drei-Stufen-Regelung auf Stufe >Normal< antritt. Gleichzeitig wird der Wohnkomfort deutlich erhöht, da Luftqualität und Feuchte stets im richtigten Bereich bleiben.
Zur Berechnung der Böeneinwirkungen auf ein Brückenbauwerk wird ein stochastisches Modell vorgestellt. Die Windkraft aus der Böenbelastung wird dabei als systemunabhängige Luftkraft betrachtet welche in mathematischer Hinsicht dadurch gekennzeichnet ist, daß die aeroelastischen Bewegungsdifferentialgleichungen inhomogener Natur sind und der Bewegungsablauf den Charakter einer erzwungenen abklingenden Schwingung hat. Ausgehend von den nicht linearen partiellen Differentialgleichungen für Verschiebung und Torsion wird mittels der Galerkin Prozedur ein System von totalen Differentialgleichungen abgeleitet. Die äußeren Luftkräfte werden als gefilterter Poissonprozess von Dirac Impulsen dargestellt. Zur Berechnung der statistischen Momente des Differentialgleichungssystem wird die Itô'sche Differentialformel erweitert und in ein System von algebraischen nicht linearen Gleichungen transformiert. Diese dienen zur Berechnung des Momentenverlaufs für den stationären Anteil des stochastischen Prozesses. Der Abschluß des so erhaltenen nicht linearen Gleichungssystems erfolgt über die Methode der Kumulantenabschlußtechnik.
Trotz der langjährigen Erfahrung bei der Anwendung objektorientierter Konzepte bei der Modellierung von Gebäuden ist es bisher nicht gelungen, ein allgemein anerkanntes Gebäudemodell im Rechner abzubilden. Das mag zum einen daran liegen, daß die Standardisierung eines solchen Modells bis heute zu keinem Abschluß gekommen ist. Zum anderen aber scheint vor allem die Problematik der Abbildung eines solchen Gebäudemodells in das Objektmodell einer Programmiersprache bisher unterschätzt worden zu sein. Die erhoffte Durchgängigkeit von objektorientierter Analyse, Entwurf und Programmierung gelingt bei Anwendungen für Entwurfsaufgaben nicht. Das gilt vor allem für Anwendungen, die frühe Entwurfsphasen unterstützen und damit erst zur Definition eines Gebäudemodells beitragen. Im Bereich der Softwareentwicklung wird das Konzept des Objektes als Ordnungsbegriff zur Strukturierung von Softwaremodulen benutzt. Die Übertragung dieser Ordnung in die Welt des Ingenieurs oder Architekten zur Bezeichnung eines konkreten Elements aus einem Modell (Raum 42 aus der Menge aller Räume des Gebäudes Blumenstraße 7) kann daher nur zu begrenzten Erfolgen führen. Aus der Analyse der Widersprüchlichkeit des Objektbegriffs zwischen Softwareentwickler (Programmierer) und Softwareanwender (Ingenieur, Architekt) wird im folgenden ein Laufzeitsystem für dynamische Objektstrukturen entwickelt, das es dem Softwareentwickler erlaubt, sowohl auf die Struktur als auch auf die Ausprägung eines Modells zuzugreifen. Dem Softwareanwender können damit Werkzeuge zur Verfügung gestellt werden, die es ihm gestatten, Gebäudemodelle zu definieren. Das Laufzeitsystem enthält zum einen eine Reihe von Klassen, die es ermöglichen, die Struktur von Anwenderobjekten dynamisch zu beschreiben und zu analysieren. Eine zweite Art von Klassen erlaubt das Erzeugen und Verändern von Anwenderobjekten, die diesen Strukturen entsprechen
Ziel des Teilprojekts C5 des Sonderforschungsbereichs 398 an der Ruhr-Universität Bochum ist die Entwicklung eines lebensdauerorientierten Entwurfsmodells für Stahltragwerke. Das Referenzsystem der letzten Förderperiode war eine einschiffige Stahlhalle mit Kranbahnen. Der vorliegende Beitrag stellt die Ergebnisse einer Sensitivitätsanalyse des Stahlrahmens unter Kranfahrtlasten vor. Diese Verkehrslasten wurden, völlig entkoppelt von weiteren äußeren Einflüssen wie Wind und Schnee, als poissongetriebene Pulsprozesse beschrieben, die zufälligen Eigenschaften der Kranfahrtlasten wurden in den Zufallsvariablen Pulsdauer und Pulsintensität berücksichtigt. Zur Minimierung des Rechenaufwandes der Lebensdauer-untersuchung wurden a priori einige Systemparameter anhand von Parameterstudien im Hinblick auf ihre dynamische Wirkung maßgebend festgelegt. In einer darauf aufbauenden Betriebsfestigkeitsuntersuchung wurden die Schädigungseinträge in einer Rahmenecke infolge von jeweils einzelnen Pulslastereignissen berechnet und in einer Datenbasis abgelegt. Eine abschließende Distance-Controlled Monte Carlo Simulation der Pulsprozesse über einen maximalen Zeitraum von 100 Jahren überführte die Realisationen der einzelnen Pulslasten anhand der Datenbasis in Teilschädigungen, welche nach der Palmgren/Miner-Hypothese zu einer Gesamtschädigung aufsummiert wurden. Der Einfluss der Kranlasten auf den Entwurf von Stahlhallen wurde durch den Vergleich der berechneten Lebensdauer und der planmäßig vorgegebenen Nutzungsdauer quantifiziert.
Einsatz eines Dokumenten - Management - Sytems (DMS) für Eingangsrechnungen in Bauunternehmen
(2003)
Die Aug. Prien Bauunternehmung hat im Jahre 2001/2002 ein DMS eingeführt. Die Gründe dafür waren, dass die Aufbewahrungsfristen von sechs auf zehn Jahre erhöht wurden, man die Abläufe in der Verwaltung straffen und die Postwege von und zu großen Baustellen sparen wollte. Die Einführung des Systems dauerte sechs Monate. Die Zusammenarbeit mit den externen Beratern wurde a-typisch gestaltet: kein Pflichtenheft (sondern Projektbeschreibung) und keinen festen Preis (sondern Budgetrahmen). Die aufkommenden Fragen und Probleme konnten in ständigen Feed-Back-Schleifen zwischen den Anwendern, dem Projektleiter und den externen Programmierer gelöst werden. Interne Widerstände konnten durch Durchsetzungswillen als auch Eingehen auf die Einwände überwunden werden. Bei der Programmierung des Systems wurde darauf geachtet, dass die Handhabung für die Anwender so einfach wie möglich gestaltet wurde. Mit der Einführung des Systems zeichnen fast alle Anwender (>90%) ihre Rechnungen am Bildschirm ab - ob in der Zentrale oder draußen auf der Baustelle. Die Bauleiter auf den Baustellen können sich über eine ISDN-Leitung auf einen Terminal-Server in der Zentrale einwählen und dann so wie im Büro arbeiten. Bereits archivierte Rechnungen können sich die Anwender jederzeit über das firmeninterne Baustellen-Informations-System (B-I-S) wieder aufrufen. Die Rechnungskontrolle braucht nicht mehr die Belege in Bauleiter-Mappen sortieren, weiß jederzeit wo eine Rechnung zur Bearbeitung liegt und bekommt nur noch die geänderten Rechnungen zur Bearbeitung (alle anderen gehen direkt in den automatischen Zahlungslauf). Durch die Einführung des Systems konnte eine Person in der Rechnungskontrolle eingespart werden. Der Return on Invest (ROI) liegt bei 1,4 Jahren, was ein guter Wert ist. Zwischenzeitlich werden weitere Belege gescannt.
Einsatz internetbasierter Projektplattformen im Bereich der Bauausführung - "Digitales Bautagebuch"
(2003)
Der Einsatz internetbasierter Projektplattformen in der Bauausführung wurde bisher kaum thematisiert. Die typischen Vorteile des Einsatzes solcher Werkzeuge, wie etwa die Unterstützung kooperativer, geographisch und zeitlich verteilter Prozesse, scheinen für diesen Einsatzbereich nicht so offensichtlich zu sein wie für den Bereich der Gebäudeplanung. Vor dem Hintergrund der anhaltend problematischen Situation der Bauwirtschaft und der Tatsache, dass im Bereich der Bauausführung oftmals die wesentlichen Ursachen für einen unplanmäßigen Ablauf von Bauprojekten oder ein Verfehlen von Kosten-, Termin- oder Qualitätszielen zu finden sind, kommt diesen Anwendungen eine große Bedeutung zu. Im Rahmen eines größeren Forschungsprojektes des BMWi (TK3 GIT Siegen / Projektträger PTJ-BEO) wurde unter dem Arbeitstitel >Digitales Bautagebuch< ein ausführungsorientiertes Modul für eine schon in den Planungsphasen des Projektes eingesetzte Projektplattform entwickelt. Dabei wurde projektbegleitend eine Umgebung implementiert, welche sowohl die Bauleitung bei ihrer täglichen Arbeit unterstützt als auch Entscheidungsträgern und anderen Projektbeteiligten einen schnellen Überblick über den Stand der Arbeiten ermöglicht. Dieser Beitrag setzt sich mit dem Einsatz internetbasierter Projektplattformen im Bereich der Bauausführung auseinander und beschreibt deren Möglichkeiten unter Einbringung der Erfahrungen aus der Anwendung im Bauprojekt TK3 GIT Siegen.
n allen Stadien des Planungsprozesses von Gebäuden nehmen Entwurfsentscheidungen starken Einfluß auf die bauphysikalische Qualität eines Gebäudes. Im Rahmen dieses Beitrags wird deshalb die Integration bauphysikalischer Gesichtspunkte in den Planungsprozeß vorgestellt, bei welcher dem Fachingenieur geeignete Werkzeuge zur Verfügung gestellt werden, die es erlauben, das zu planende Gebäude als Einheit von baulicher Hülle, Anlagentechnik und Nutzung zu betrachten. Darauf aufbauend wird eine gezielte Überprüfung des Gebäudemodells mit Hilfe von bauphysikalischen Nachweisen und Simulationen durchgeführt, um eine bauphysikalische Entscheidungsunterstützung im Entwurfsprozeß vornehmen zu können. Das erarbeitete Programmsystem VAMOS (Verteilte Applikation zur Modellierung und Optimierung bauphysikalischer Systeme) nutzt die Middleware-Technologie CORBA konsequent für die dynamische, netzwerkweite Integration fünf verschiedener aufgabenspezifischer Komponenten: Die erste Komponente zur Modellerzeugung und -manipulation wurde auf Basis des CAD-Systems AutoCAD als ARX-Laufzeitmodul erstellt. Dadurch ist es einerseits möglich, bestehende Planungsabläufe unter Verwendung von Standardwerkzeugen des entwerfenden Ingenieurs zu erhalten, andererseits können die umfangreichen Fähigkeiten des AutoCAD-Geometriekerns für die Erstellung komplexer dreidimensionaler Bauteilgeometrien genutzt werden. In der zweiten Komponenten wurde eine objektorientiertes Datenbanksystem in das Gesamtsystem integriert, das auch für die Verwaltung verschiedener Versionen von Gebäudeentwürfen verwendet wird. Die bauphysikalischen Nachweise, die auf Basis der zentral im Netzwerk bereitgestellten Modelle automatisiert durchgeführt werden können, wurden auf Basis der Java-Applet-Technologie abgebildet, um die zentrale Wartbarkeit und Anpassbarkeit an Veränderungen der Vorschriften und Gesetzesgrundlagen zu ermöglichen. Dabei wurden sowohl die aktuelle Wärmeschutzverordnung (WSVO) als auch die Energieeinsparverordnung (EnEV) berücksichtigt. Für die ganzheitliche Erfassung des Gebäudeenergiehaushaltes wurde das Simulationsprogramm TRNSYS um ein Schnittstellenmodul unter Verwendung von IDL-Interfaces erweitert, so daß die direkte Integration der umfangreichen Funktionalitäten in das Gesamtsystem möglich wird. Um die Modellierung auf der Basis von realistischen Parametern durchführen zu können, wurde eine Komponente entwickelt, die unter Verwendung der Technologie mobiler Internet-Agenten die dynamische Recherche von herstellerspezifischen Parametern im Internet ermöglicht.
Engineering Desktop Anwendungen in der Tragwerksplanung auf der Grundlage der COM-Technologie
(2003)
Zur effizienten Nutzung von Office- und Computeralgebra-Software im Sinne einer Engineering Desktop Umgebung wurde ein Framework für die Tragwerksplanung entwickelt. Dieses umfasst Klassen und Methoden zur Schnittgrößenermittlung von Durchlaufträgern, Fachwerken und ebener Stabwerke sowie für Nachweise und Bemessungsaufgaben im Stahlbeton-, Stahl- und Holzbau. Die Anwendung des Frameworks im Rahmen einer Office-Software beruht auf der Komponententechnologie. Im Rahmen von MS-Windows handelt es sich um das COM-Modell. Die Komponentenbibliothek des Frameworks wurde in JAVA implementiert. Die Nutzeroberfläche kann aus Berechnungssoftware wie Excel und Mathcad bestehen. Aber auch die Entwicklung von Tragwerkseditoren oder internetbasierender Software ist damit möglich. Anwendungen des Frameworks wurden in MS-Excel mit VBA und in Mathcad mit der C++Schnittstelle realisiert. Ziel dieser Entwicklung ist eine Engineering Desktop Umgebung auf dem Computer, bei der nichtstandardisierbare Untersuchungen in der Tragwerksplanung ebenso einfach, aber effizienter, sicherer und besser dokumentiert als mit Bleistift und Papier erfolgen können. Zwei Beispiele verdeutlichen die Anwendung des Frameworks. Hierbei handelt es sich einmal um eine statische Voruntersuchung mit Mathcad, bei der die mit dem Framework entwickelten Funktionen verwendet werden. Das zweite Beispiel behandelt die Erstellung eines Teachtools in MS-Excel.
Die Informatik im Bauwesen oder kurz Bauinformatik hat sich in den vergangenen Jahren in Deutschland kontinuierlich entwickelt und sie hat einen festen Platz in den Fakultäten im Bauingenieurwesen an den deutschen Universitäten erhalten. Diese Entwicklung war anfänglich sehr stark fixiert auf die Berechnungen des physikalischen Verhaltens von Bauwerken. In den letzten Jahren kamen weitere Gebiete hinzu. Hier ist vor allem die Zeichnungserstellung (CAD) hervorzuheben. Diese Entwicklungen haben einen großen Reifegrad erlangt und sie haben einen festen Platz in Lehre und Forschung in der Bauinformatik. Die Rolle der Bauinformatik allgemein hat in den letzten Jahren eine stürmische Entwicklung genommen. Die Breite der Anwendungen hat ständig zugenommen und die Forderung nach einer durchgängigen Nutzbarkeit aller Informationen, die in diesem Zusammenhang bearbeitet werden, wird immer stärker gestellt. Besonders zwei Problemstellungen stehen im Mittelpunkt vieler Entwicklungen in der Bauindustrie und in den entsprechenden Softwarehäusern. Dies sind die Entwicklung und Nutzung technischer Modelle zur Unterstützung des Bauprozesses und die Unterstützung betriebswirtschaftlicher Anforderungen in der Bauindustrie. Vor allem die zweite Anforderung war bisher kaum Gegenstand der Bauinformatik. Aktuelle Bestrebungen vor allem aus der Praxis wirken darauf hin, diesen Zustand zu ändern. Die Fakultät Bauingenieurwesen an der Bauhaus-Universität beginnt diesen Anforderungen dadurch Rechnung zu tragen, daß kontinuierlich die notwendigen Voraussetzungen geschaffen werden, um diese Thematik in Lehre und Forschung kompetent aufnehmen zu können. Externe Referenten, die an der Spitze entsprechender Entwicklungen sind, werden in die Lehre mit eingebunden. Dies soll eine kontinuierliche Weiterentwicklung einleiten, die helfen soll, eine zeitgemäße Ausbildung der zukünftigen Bauingenieure sicherzustellen.
Die Aufgaben des Bauwesens erfordern den direkten Zugriff auf Objekte einer Datenbasis, die in dem Arbeitsspeicher einer Sitzung und in mehreren Binärdateien verteilt sind. In den Methoden einer Anwendung soll jedes Objekt unabhängig vom Ort seiner Speicherung mit seinem Namen als persistentem Identifikator direkt ansprechbar sein. Bei Bedarf sollen Objekte automatisch aus Dateien nachgeladen werden. Der Anwender soll bestimmen können, in welcher Datei ein bestimmtes Objekt gespeichert wird. Die Zugriffszeit auf ein Objekt soll im Mittel mit der Zugriffszeit auf ein Objekt in einer Java-Methode vergleichbar sein. Ein Konzept einer generalisierten Datenbasis wird vorgestellt. Seine Leistungsfähigkeit wird mit der vorhandenen Software für die Aufbewahrung und Verwaltung von Daten im Bauwesen verglichen. Es erweist sich als zweckmäßig, bereits im Entwurf einer Anwendung streng zwischen persistenten und transienten Objekten zu unterscheiden. Alle persistenten Objekte der Anwendung werden benannt. Unbenannte persistente Objekte der Java Plattform, beispielsweise Kollektionen und graphische Objekte, sind ebenfalls mit einem Griff (einem von der Datenbasis zugeteilten Namen) speicherbar. Der Zugriff auf ein Objekt ist schnell, da nur primitive Datentypen und Strings in binärer Form ohne Rückgriff auf Datenbanken gespeichert werden.
Der Fokus des Projektes liegt auf einer besseren Unterstützung der kooperativen Aspekte im Bauwerksentwurf und der Anwendung von ComponentWare-Techniken in der Architektur des Entwurfssystems. Es muß festgestellt werden, daß die Kooperation der Beteiligten im Entwurfsprozeß von Bauwerken durch die heute praktizierten Datenaustauschverfahren nicht oder nur unbefriedigend unterstützt wird und das keine Lösung dieses Problems durch die Weiterentwicklung von filebasierten Datenaustauschformaten zu erwarten ist. Im Rahmen des Projektes wird mit einer CORBA-Umgebung für Smalltalk-80 ein verteilbares Objektsystem realisiert. Als Architektur des Systems wurde eine hybride Herangehensweise gewählt, bei der allgemeine Informationen auf einem zentralen Server verwaltet werden und die eigentlichen Projektinformationen bei Bedarf repliziert werden. Wie allgemein in GroupWare - orientierten Systemen notwendig, müssen effektive Mechanismen der Nebenläufigkeitskontrolle und zur Sperrung bestimmter Modellbereiche realisiert werden. Wichtig ist für kooperative Entwurfssysteme die Systemunterstützung der Beseitigung der Folgen von kollidierenden Entwurfsintensionen durch die Bearbeiter. Dazu werden unter anderem Remote-Pointer-Mechanismen realisiert. In Abhängigkeit von der Rolle eines Bearbeiters werden diesem Sichten auf des Objektmodell (Partialmodelle) zugeordnet. Es werden Mechanismen zur Autorisierung des Zugriffs auf Partialmodelle implementiert, zu diesem Zweck erfolgt eine Nutzerauthentifizierung. Beziehungen zwischen Partialmodellen werden durch eine spezielle Relation im Objektsystem abgebildet. Die Konzeption des Objektsystems lehnt sich an die PREPLAN-Philosophie an. Das impliziert die Unterstützung von Entwurfshandlungen sowohl in Bottom-Up- als auch in Top-Down - Richtung. Benutzer können das Objektsystem um eigene Klassen erweitern bzw. existierende Klassen modifizieren und Attribute mit Defaultwerten belegen, um das System inkrementell mit Domänenwissen anreichern zu können. Von großer Bedeutung für kooperative Entwurfssysteme sind eine Versionsverwaltung und die Bereitstellung von Undo - und Redo - Mechanismen. Es ist möglich, multimediale Daten im Objektmodell abzulegen und diese in Abhängigkeit von ihrem Format wiederzugeben bzw. zu bearbeiten. Das beschriebene System befindet sich derzeit in der Implementierung.
In der vorliegenden Arbeit werden dickwandige Schalentragwerke unter statischen Belastungen betrachtet. Die Schale besteht aus verschiedenen Zonen und in jeder Zone wird die Schalenmittelflaeche mittels eines eigenen Geometriegleichungssystems definiert. Das Verzerrungsfeld hat allen 6 unabhaengigen Komponenten unter der Annahme, dass die Querschnittsfasern, die normal zu der Mittelflaeche der unbelasteten Schale sind, geradelinig bleiben. Ein dreidimensionales isoparametrisches finites Element wird vorgeschlagen. Die Berechnung wird mit der Hilfe der Makroelemententechnik durchgefuehrt. In der Arbeit werden die wesentliche Parameter der Schalengeometrie, sowie auch entsprechendes Anteil von Klassen des konstruktiven Modells, definiert. Ein konstruktives Informationsmodell und ein FEM-Informationsmodell, werden entwickelt. Die Informationsverbindungen zwischen den beiden Modellen werden definiert. Diese objektorientierten Modelle werden in Programmiersprache Microsoft Visual C++ v.4.0 unter Windows 95 implementiert. Als numerisches Beispiel wird ein Bogenmauertragwerk betrachtet.
In dem vorliegenden Beitrag sind die Einsatzmöglichkeiten nichtlinearer Berechnungsverfahren aufgezeigt. Hierbei zeichnen sich mehrdimensionale Modelle auf Grundlage der Methode der Finiten Elemente durch die erzielbare Realitätsnähe aus. Für den Nachweis ausreichender Sicherheit in den Grenzzuständen der Trag- und Gebrauchstauglichkeit ist die Verbindung mit zuverlässigkeitstheoretischen Algorithmen dargestellt Hierbei wird die Grenzzustandsgleichung durch Ansatz eines als offene Schnittstelle konzipierten Algorithmus approximiert. Bei der Verknüpfung von nichtlinearen mechanischen Modellen und Zuverlässigkeitsanalysen wird das rechnerische Sicherheitsniveau wesentlich durch die statistischen Parameter der betrachteten Basisvariablen geprägt. Der Beitrag enthält Angaben für Verteilungsarten und -parameter für Nachweise im Stahlbetonbau
During the establishing of fundamentals in a building project a huge amount of influence factors and boundary conditions have to be investigated in order to provide the prerequisites for further planning processes. These investigative tasks are often related with a great effort concerning time and money, because there are no standardized workflows and interfaces which provide an efficient access to the necessary information related to a specific construction site. Within the fundamental investigation human and natural circumstances have to be taken into account. Thus, in this project two examples have been chosen in order to demonstrate the holistic approach for an integration and provision of georeferenced information. The developed internet-site http://www.grundlagenermittlung.de has been designed to support architects and civil engineers in early planning phases of a building project efficiently. It offers web-based services based on dynamic interfaces for a flexible search and collection of information concerning the building site. Therefore, a central Metadatabase-Server for Description, Discovery and Integration has been established which enables a registration of georeferenced services and the redirection of incoming requests to other, distributed data pools. Using this Yellow-Page concept in combination with the underlying meta-data based on the ISO 19115 standard an efficient investigation of geographical and environmental information becomes possible.
The construction management has been under pressure to reduce operating costs and to improve productivity using innovative information technologe (IT) solutions conformed to structural characteristics, site conditions and past experiences. Given the growing emphasis on effectiveness and efficiency in construction projects, there is an imminent need to develop a formal procedure to select the best IT application for each proposed construction project and research and development (R&D) project. As there are numerous factors that have to be considered in selecting appropriate IT in a given situation, decision-makers need to have multicriteria decision-making ability. To enable them to make the most appropriate decision in any situation, it is important that effective tools incorporating multicriteria decision-making techniques are available. In this paper, an Analytic Network Process (ANP) model is conducted for the selection of appropriate IT application for innovative construction management prior to construction or research. The paper concludes that the ANP is a viable and capable tool for conducting IT application selection in multicriteria decision-making environment.
Business enterprises find themselves forced to choose between plots within a predetermined site instead of choosing a site within a region to be distinguished for industrial uses. Their traditional role in making their own market studies regarding inputs and outputs is no longer valid under the new circumstances. The central planner has taken over their role and given them limited paths along which they can practice their production. Site selection has turned into plot selection within a predetermined site. Modeling is a technique used in regional planning, which allows the demonstration of certain industrial park related relations in a numerical form. The science of mathematics is widely used in this technique because of its ability to set relations in a logical relationship that can clarify the dilemma under discussion and reflect results in numerical form. This paper observes the relationship between the architectural product and its effect on the urban fabric in regions and provinces by means of scientific modeling. The developed method for the clarification of the relationship between the industrial parks and urban localities in Jordan can by used to determine similar cases elsewhere. A new model for the evaluation of big-scale projects, such as industrial parks, which was developed in the author's dissertation at the Graz University of Technology, is going to be presented. This modeling technique was called the Ranking Model (RM). The constructed RM gives no solutions for existing regional planning disparities, but rather points to possible solutions according to the strategies followed in each country.
Im Hinblick auf einen effizienten Austausch von Planungsinformationen bei mittleren und größeren Bauprojekten werden in den letzten Jahren vermehrt internetbasierte Projektkommunikationssysteme (PKS) eingesetzt, welche neben einer netzwerkweiten Bereitstellung von Dateien auch klassische Aufgaben des Planmanagements hinsichtlich der Bereitstellung von Dokumenten-Verteiler und der Abbildung der Planungshistorie übernehmen. Aufgrund von leicht zu nutzenden Mechanismen zur Bereitstellung von Planungsinformationen durch die Fachplaner und die zentrale Speicherung aller anfallenden Dokumente entstehen dabei leicht erhebliche Datenmengen, bei denen effiziente Verwaltungsmechanismen unabdingbar sind. Die lediglich auf Baumstrukturen basierenden Organisationsstrukturen, welche vor allem eine chronologische Sortierung erlauben, reichen deshalb bei weitem nicht aus. Weiterhin ist eine effiziente Gestaltung der Projektdurchführung mit diesem rein dokumentenbasierten Ansätzen allein nicht möglich, da zwischen den bereitgestellten Informationen nur unzureichend Verknüpfungen erstellt werden können. Fachliche Beziehungen somit nicht abgebildet werden können, so dass insbesondere bei durchgeführten Änderungen die zugrunde liegenden Planungsinformationen nicht konsistent gehalten und Auswirkungen von Planungsänderungen auf andere Gewerke nur schwer ermittelt werden können....
Detailuntersuchungen an Tragwerken führen bei FE-Berechnungen immer wieder auf das Problem einer geeigneten Netzgestaltung. Während in weiten Bereichen ein grobes Netz ausreicht, muß an kritischen Stellen ein sehr feines Netz gewählt werden, um gerade dort hinreichend genaue Ergebnisse zu erhalten. Bei der Realisierung lokaler Netzverdichtungen stellt die Gestaltung des Übergangs vom groben zum feinen Netz das Hauptproblem dar. Im Beitrag wird hierzu eine Familie von FE-Übergangselementen vorgestellt, mit denen sich eine voll-kompatible Kopplung von wenigen großen Elementen mit vielen kleinen Elementen bereits über nur eine Stufe erzielen läßt. Diese neu entwickelten sogenannten pNh-Elemente ermöglichen an einer oder mehreren Seiten den Anschluß von N kleineren Elementen (Elementseiten für h-Verfeinerung). Das wird durch N stückweise definierte Ansatzfunktionen an den entsprechenden Seiten erreicht, wobei die Teilung nicht äquidistant sein braucht. Darüber hinaus ist es möglich, Elemente unterschiedlichen Polynomgrades p an den Standardseiten und den Verfeinerungsseiten anzuschließen. Der praktische Einsatz der Übergangselemente setzt geeignete automatische oder halbautomatische Netzgeneratoren voraus, die diese Elemente einbeziehen. Im Rahmen einer substrukturorientierten Modellierung läßt sich dies besonders günstig realisieren. Im Beitrag wird gezeigt, wie durch Zerlegung des Gesamtmodells in Bereiche mit grobem Netz, mit Übergangsnetz und mit feinem Netz, eine effektive Generierung der Netzverdichtungen zu erreichen ist. An einem praktischen Beispiel aus dem Bauingenieurwesen werden die Vorteile des vorgestellten Übergangselementkonzeptes umfassend demonstriert.
We give a summary of our results based on discrete Cauchy-Riemann operators in the plane. These operators are defined in a way that the factorization of the real Laplacian into two adjoint Cauchy-Riemann operators is possible. This property is similar to the continuous case and can especially be used for calculating the discrete fundamental solution of our finite difference operators. Based on the discrete fundamental solution we define a discrete operator that is right inverse to the discrete Cauchy-Riemann operator. In relation with this operator and an operator on the boundary we are able to prove a discrete version of the Borel-Pompeiu formula. In the second part we present a possibility to solve discrete Stokes and Navier-Stokes problems. The concept is based on the orthogonal decomposition of the space l2 into the space of discrete holomorphic functions and its orthogonal complement. By introducing the orthoprojectors P+h and Q+h we can prove the existence and uniqueness of the solution of discrete Stokes problems. In addition we state a problem that is equivalent to the discrete Navier-Stokes problem and can be used in an iteration procedure to describe the solution of this problem. For a special case of the Navier-Stokes equations we are able to calculate discrete potential and stream functions. The adapted model includes important algebraical properties and can immediately be used for numerical calculations. A numerical example is presented at the end of the article.
A computational strategy that employs a multi-level approach to model the physical phenomena that occur during a structural collapse is used to simulate demolition of a multi-story precast concrete building. The building is modeled by means of beam elements, whose rigidity relations have been derived from a fracture mechanics-based model of cracked RC panels and joints. The motion and deformation of the collapsing building are solved as a transient dynamic problem in the finite displacements/ rotations range. The presented approach appears as an efficient way to verify whether a proposed demolition method leads to the desired mechanism of building collapse. By simulating various blasting scenarios, the most suitable demolition procedure is identified.
Die Methode der Finiten Elemente ist ein numerisches Verfahren zur Interpolation vorgegebener Werte und zur numerischen Approximation von Lösungen stationärer oder instationärer partieller Differentialgleichungen bzw. Systemen partieller Differentialgleichungen. Grundlage dieser Verfahren ist die Formulierung geeigneter Finiter Elemente und Finiter Element Zerlegungen. Finite Elemente besitzen in der Regel eine geometrische Basis bestehend aus Strecken im eindimensionalen, Drei- oder Vierecken im zweidimensionalen und Tetra- oder Hexaedern im dreidimensionalen euklidischen Raum, eine Menge von Freiheitsgraden und eine Basis von Funktionen. Die geometrische Basis eines Finiten Elements wird verallgemeinert als geometrische Zelle formuliert. Diese geschlossene geometrische Formulierung führt zu einer geometrieunabhängigen Definition der Basisfunktionen eines Finiten Elements in den Zellkoordinaten der geometrischen Zelle. Finite Elemente auf der Basis geometrischer Zellen werden als Bestandteile Finiter Element Zerlegungen in Finiten Element Interpolationen und Finiten Element Approximationen verwendet. Die Finiten Element Approximationen werden am Beispiel der 2-dimensionalen Diffusionsgleichung über das Standard-Galerkin-Verfahren ermittelt.
This paper describes a couple of new truss structures based on fractal geometry. One is the famous Sierpinski Gasket and another is a fractal triangle derived by means of applying a process forming leaves of a cedar tree using M. F. Barnsley’s contraction mapping theory. Therefore a pair of x-y coordinates of an arbitrary nodal point on the structures are generated easily if IFS(Iterated Function System) codes and a scale of them are specified. Structural members are defined similarly. Thus data for frame analysis can be generated automatically, which is significant if the objective structure has complex configuration. Next analytical results under vertical and wind loadings in Japanese Building Code are shown. Here members are assumed to be timber and to have cross section of 15cm×15cm. Finally authors conclude that geometrically new truss structures were developed and automatic data generation for frame analysis was attained using IFS. Analytical results show they contribute to saving material when compared it with King-post truss.
Die verteilte Bearbeitung gemeinsamer Produktmodelle ist im Bauwesen Gegenstand der aktuellen Forschung. Der vorgestellte Lösungsansatz bewegt sich in einem Spannungsfeld: Zum einen sollen die zu bearbeitenden Teilmengen des Produktmodells sehr flexibel durch die Planer zu bilden sein, zum anderen müssen Revisions- und Freigabestände dauerhaft und unveränderlich definiert werden. In einer versionierten Umgebung mit vielen Abhängigkeiten sind diese Anforderungen schwierig zu erfüllen. Der vorgestellte Lösungsansatz zeigt die Bildung von Revisions- und Freigabeständen, ohne die flexible verteilte Bearbeitung einzuschränken. Die Freigabestände müssen bestimmte Eigenschaften erfüllen: Es darf beispielsweise nur eine Version eines Objekts enthalten sein und es müssen die Bindungen zu anderen Objektversionen in einer konsistenten Weise berücksichtigt werden. Es wird eine mathematische Beschreibung gewählt, die auf der Mengenlehre und der Graphentheorie basiert.
Der Bauablauf unterliegt vielen Unwägbarkeiten. Von besonderer Bedeutung ist dieses Problem im Umfeld der Revitalisierung von Bauwerken. In weiten Teilen sind die auszuführenden Arbeiten nur schwer im Vorfeld planbar. Die Ursachen hierfür liegen großteils in der Problematik des Bauens im Bestand und dem aus wirtschaftlichen Gründen geringen Umfang von Analysen. Häufig treten verdeckte, im Vorfeld der Baumaßnahme nicht erkannte Schäden auf oder Materialstrukturen und Bauteilqualitäten wurden in der Planung unzureichend berücksichtigt. Alte Ausführungsunterlagen sind oft nicht verfügbar. Viele zur Ausführung bestimmter Arbeiten nötige Informationen fehlen und werden erst zum unmittelbaren Ausführungszeitpunkt bekannt. Einzelne Arbeiten sind nur schwer kalkulierbar bzw. planbar. Sie sind in Art und Umfang zunächst nicht bekannt und müssen gegebenenfalls als neue Vorgänge im Plan berücksichtigt werden. Diese besondere Situation bedarf einer gezielten Berücksichtigung. Die Planung des Bauablaufes muss in einer flexiblen und leicht anpassbaren Art und Weise erfolgen. Im folgenden Beitrag wird ein Ansatz zur Entwicklung eines solchen Prozessmodells vorgestellt, der im Rahmen des SFB 524 >Werkstoffe und Konstruktionen für die Revitalisierung von Bauwerken< an der Bauhaus-Universität Weimar untersucht und vorangetrieben wurde und wird. Das vorgestellte Modell kann kurzfristig flexibel auf die realen Gegebenheiten reagieren und ermöglicht trotzdem eine Planung und Steuerung des gesamten Ablaufs. Es enthält nicht wie bisher üblich deterministische Daten in starren Anordnungsbeziehungen. Vielmehr werden die Daten der Prozesse und die Beziehungen der Prozesse untereinander in einer nichtdeterministischen, unscharfen Form modelliert....
Bei der Kopplung unterschiedlicher Bussysteme oder der Anbindung von Geräten an externe Netzwerke (z.B. an das Internet) stellt sich oft heraus, dass für diesen Anwendungszweck grundlegende Sicherheitsmechanismen fehlen. Durch intelligente Zusatzkomponenten, z.B. Residential Gateways, können bestehende Netzwerke erfolgreich miteinander gekoppelt werden, auch wenn sie sehr unterschiedliche Eigenschaften aufweisen. Die erforderlichen Anpassungen, Dienstekonversionen und Protokollumsetzungen können in die Gateways integriert werden, so dass gewohnte Betriebsarten, besonders bei der Konfiguration oder der Diagnose, beibehalten werden können. Bei der Nutzung vorhandener Hausbus-Infrastrukturen für sicherheitsrelevante Zusatzfunktionen wie Zugangskontrollen, Zeiterfassungen oder Alarmanlagen hingegen stellt dieser Ansatz keine Lösung dar, da hier die Sicherheit innerhalb des Systems erhöht werden muss. Daher wird für solche sicherheitsrelevanten Anwendungen oft eine separate Kommunikationsinfrastruktur verwendet, obwohl ein Gebäudebus, z.B. ein EIB-System, zur Verfügung steht. Eine praktikable Lösung stellt hierbei die Verwendung der Standard-Übertragungsmechanismen des EIB dar, bei denen jedoch die eigentlichen Nettodaten verschlüsselt werden. Auf diese Weise kann normaler Datenverkehr mit gesichertem Datenverkehr gemischt werden, wobei natürlich die sicherheitsrelevanten Teilnehmer erweiterte Funktionalitäten wie Ver- und Entschlüsselung aufweisen müssen. Dem Residential Gateway kommt in solchen Systemen neben der Kopplung der internen Netzwerke und deren Anbindung an das Internet auch das intelligente Management der Schlüssel zu. ...
Im Rahmen des Sonderforschungsbereiches 524 “Konstruktionen und Werkstoffe für die Revitalisierung von Bauwerken“1 ist das primäre Anliegen des Teilprojektes D2 „Bauplanungsrelevantes digitales Gebäudeaufnahme- und Informationssystem“ die Entwicklung von Methoden und Techniken zur Aufnahme von Bestandsdaten vor Ort oder durch Auswertung vorhandener Dokumentationen und deren direkte Integration in ein Bauwerksmodell [11]. Das Vorhaben erarbeitet Grundlagen zu Aspekten der fachplanerischen Nutzung und der wissenschaftlichen Auswertungen arbeitsmethodischer Vorgehensweisen in der Bestandsaufnahme unter Einbeziehung softwaretechnischer Methoden. Dabei finden Sachverhalte der Strukturierung, die Herausarbeitung von Systematiken der wesentlichen Informations-/Datenmengen, die Ableitung von Methoden zur zerstörungsfreien Erfassung und die Darstellung planungsrelevanter Gebäudeinformationen in digitalen Systemen Berücksichtigung. In diesem Artikel werden ausgehend von Anforderungen der planungsrelevanten architektonischen Bauaufnahme eine Konzeption und die prototypische Realisierung zur flexiblen geometrischen Erfassung – dem Bauaufmaß – vorgestellt. Planungsrelevante Bauaufnahme Die Bauaufnahme dient der Modellbildung durch Erfassung und Wiedergabe eines real existenten Bauwerkes in seinem zum Zeitpunkt der Aufnahme angetroffenen Zustand. Die quasi vollständige Aufnahme ist aufgrund der großen zu ermittelnden Datenmengen und den hierdurch entstehenden Aufwendungen und Kosten nicht möglich [8]. Vielmehr muß eine Auswahl und Abstrahierung der aufzunehmenden Daten, ihrer Repräsentation und die Wahl ihrer Genauigkeit nach den Erfordernissen des jeweiligen Verwendungszweckes der Bauaufnahme erfolgen. So vielfältig die Erfordernisse einer Bauaufnahme ausfallen, so vielfältig sind auch die jeweiligen Forderungen und Auswahlen der aufzunehmenden Daten. In der überwiegenden Mehrheit aller Fälle ist auch die Wiedergabe der vorgefundenen geometrischen Ausprägung des Bauwerkes gewünscht oder erforderlich. Dabei werden unterschiedliche Genauigkeitsanforderungen an verschiedene Bereiche des Bauwerkes gestellt [9] [10]. So reicht vielleicht im Einzelfall eine skizzenhafte Wiedergabe des Umfeldes eines geplanten Ladenbereiches, während die umzunutzenden Bereiche in Ausführungsgenauigkeit zu erfassen sind. Die exakte geometrische Ausprägung eingebauter Bauelemente ist oft nur teilweise bekannt. In der Bauaufnahme muß ein enger Zusammenhang zwischen Geometrie und bauteilorientierter Konstruktion, sowie den verwendeten Ordnungssystemen bestehen. Um diesen Ansprüchen genüge zu tragen, werden entsprechende Aufnahmetechniken, rechnerinterne Abbildungen und Funktionalität zur Interaktion Nutzer - Modell gesucht.
As a result of the pilot-project “Grundwasser-Online” the supervision and the active controlling of large monitoring- and catchment-areas are realised by a co-operative integration of all related institutions, a synchronisation-process to combine all distributed data into one central server database, and a high-level eGovernment-Service to provide evaluated information over the internet. Based on this software system the local authorities are able to supervise the groundwater-levels and to find adequate decisions, which finally result in official permissions for the usage of groundwater-reservoirs by the water supply companies.
There was suggested a phenomenological modified quadratic condition of the beginning of plasticity for plastic and quasifragile orthotropic materials. Limiting surface in the shape of a paraboloid with an axis bend over hydrostatic axis corresponds to the condition. The equations of theory of current with the isotropic and anisotropic hardenings, associated with the suggested yield condition, modified into the version of determining equations of strain theory of plasticity are received. These defining equations formed the basis of highlyprecise non-classic continual (along thickness) theory of non-linear deformation of thick sandwich plates and sloping shells. In the approximations along the cross coordinate the specificity of flexural and non-flexural deformations is taken into account. The necessity of introducing the approximations of higher order, as well as accounting for the cross compression while decreasing of the relatively cross normal and shear layer rigidness is shown. The specifications, obtained in comparison with the known physically nonlinear specified model of the bending of plates with orthotropic layers are distinguished. An effective procedure of linearization of the solving equations and getting the solutions in frames of the discrete-continual scheme of the finite-element method is suggested. The approximations of higher order let to model the appearance of the cracs of layers being split by the introducing of slightly hard thin layers into the finite element, not violating the idea of continuality of theory. Calculation of a threelayer plate with rigid face diaphragms on the contour is considered
This article discusses how the failures of construction projects could be prevented. The focus is on using IT tools in communication. The article is based on the findings of the PROLABproject. The project seeks to find solutions for how the information can effectively be used in project management, specially in construction projects, what kind of procedures help the management of the knowledge and how the obstacles for efficient ways of administrating the information can be removed. These obstacles can be either related to use of new technology or to organization culture. The paper discusses e-mail as a medium of communication with the media richness framework (Fulk & Boyd 1991) based on the interviews done with the participants of construction projects. We found out that the emails were used in both rich way and not so rich way. Obstacles of rich use of IT communication were partly technical and partly psychological. Technology acceptance model (TAM) is used to study the actual use of emails in communication. Obstacles of the use of emails were mostly individual differences like the skills to use the system or external variables like they did not have proper software to open the attachments. Also people talked about information overload. Emails often push too much information. Keywords: IT tools, Communication, Knowledge management, Construction
Hyperbolic Qp-scales
(2003)
The Qp-scales were first introduced in [1] as interpolation spaces between the Bloch and Dirichlet spaces in the complex space. ... However, such treatment presents the disadvantage of only considering the Euclidean case. In order to obtain an approach to homogeneous hyperbolic manifolds, the projective model of Gel'fand was retaken in [2]. With the help of a convenient fundamental solution for the hyperbolic (homogeneous of degree ®) D® (see [5]) it was introduced in [7] and [3] equivalent Qp scales for homogeneous hyperbolic spaces. In this talk we shall present and study some properties of this hyperbolic scale.
Organisational and human issues have been highlighted, among other issues (ICT infrastructures, legal and contractual, etc.), as key elements in enhancing the competitiveness of the construction sector. More specifically, the importance of human resources has been recognised, especially training and professional development, in order to cultivate a stable workforce. The paper provides a review of the key training needs for the construction sector with particular reference to the uptake and exploitation of new technologies and working practices, presents an action plan to address learning and training needs, and proposes an eight-stage iterative learning and training methodology. The results will be of particular interest to managers in stakeholder organisations of all sizes throughout the sector, plus academic and research bodies intending to continue construction ICT research.
It has been shown that symmetries of moment functions of stochastic processes play an important role in identification of systems. They provide the group-theoretic method of choice of the model structure and model parameters. In the first stage the group-theoretic analysis of some fundamental concepts of stochastic dynamics: stochastic processes and functional series of Volterra-Wiener type has been undertaken. The analysis of group representations of the moment functions of order m for stochastic processes is the basic, original concept of the work. The following groups: symmetric Sm, special affine SAff(m), general linear GL(n, R), GL(n,C) and their subgroups play the main role in the models. In the second stage the informational entropy has been introduced as a measure of the randomness in the identified models. The group-theoretic approach underlines the unity of the nonlinear system identification and leads to useful engineering results in the range of the second-order (stochastic) theory.
IFC-BASED MONITORING INFORMATION MODELING FOR DATA MANAGEMENT IN STRUCTURAL HEALTH MONITORING
(2015)
This conceptual paper discusses opportunities and challenges towards the digital representation of structural health monitoring systems using the Industry Foundation Classes (IFC) standard. State-of-the-art sensor nodes, collecting structural and environmental data from civil infrastructure systems, are capable of processing and analyzing the data sets directly on-board the nodes. Structural health monitoring (SHM) based on sensor nodes that possess so called “on-chip intelligence” is, in this study, referred to as “intelligent SHM”, and the infrastructure system being equipped with an intelligent SHM system is referred to as “intelligent infrastructure”. Although intelligent SHM will continue to grow, it is not possible, on a well-defined formalism, to digitally represent information about sensors, about the overall SHM system, and about the monitoring strategies being implemented (“monitoring-related information”). Based on a review of available SHM regulations and guidelines as well as existing sensor models and sensor modeling languages, this conceptual paper investigates how to digitally represent monitoring-related information in a semantic model. With the Industry Foundation Classes, there exists an open standard for the digital representation of building information; however, it is not possible to represent monitoring-related information using the IFC object model. This paper proposes a conceptual approach for extending the current IFC object model in order to include monitoring-related information. Taking civil infrastructure systems as an illustrative example, it becomes possible to adequately represent, process, and exchange monitoring-related information throughout the whole life cycle of civil infrastructure systems, which is referred to as monitoring information modeling (MIM). However, since this paper is conceptual, additional research efforts are required to further investigate, implement, and validate the proposed concepts and methods.
This paper introduces the current development of electronic catalogues of construction products. The common system architecture of Web-based electronic products catalogues are discussed, followed by a discussion on construction products information standardization and latest distributed-systems technologies for communicating construction products information. Finally, this paper presents an implementation of Web service in e-commerce systems to enable sharing of construction products information.
Die Bauwerksüberwachung gewinnt aus sicherheitstechnischen sowie aus wirtschaftlichen Gründen zunehmend an Bedeutung. Nicht nur die Bauwerkssicherheit kann durch leistungsfähige Monitoring-Systeme angemessen beurteilt, auch die Nutzungsdauer bestehender Bauwerke kann durch die gewonnenen Informationen deutlich verlängert werden. Das vorliegende Papier beschreibt die Entwicklung eines webbasierten Talsperren-Monitoring-Systems, das die automatisierte Erfassung von Daten vor Ort sowie die computergestützte Aufbereitung und Analyse der gesammelten Messdaten ermöglicht. Das Monitoring-System ist durch seinen modularen Aufbau nicht auf die Talsperren-Überwachung beschränkt, sondern kann ohne großen Aufwand an andere Überwachungsaufgaben angepasst werden. Das System besteht aus drei wesentlichen Modulen: (i) einer erweiterbaren Klassenbibliothek, die die Steuerung der im Bauwerk installierten Messelektronik ermöglicht, (ii) einem webbasierten Datenerfassungsmodul, das neben der automatischen Datenerfassung eine Fernsteuerung der Messelektronik erlaubt und Funktionen zur Verwaltung der Überwachungsaufgaben bereitstellt, sowie (iii) einem webbasierten Visualisierungs- und Auswertungsmodul zur Aufbereitung und Analyse der gesammelten Daten. Alle an der Überwachung beteiligten Mitarbeiter können mit einem üblichen Web-Browser über das Internet auf das entwickelte System zugreifen; ein Zugriff mittels Mobiltelefon ist alternativ möglich. Das implementierte Talsperren-Monitoring-System begleitet die beteiligten Fachleute von der Erfassung der Daten vor Ort bis hin zur Aufbereitung und Analyse der Messdaten an zentraler Stelle: Die Mitarbeiter werden durch einen einfachen Zugriff auf die installierte Messelektronik, automatisierte Messungen und umfangreiche Analysefunktionalitäten bei ihren spezifischen Aufgaben unterstützt. Der bisherige manuelle Arbeitsaufwand für Datenerfassung, -transfer und Analyse wird somit deutlich reduziert.
Re-examination of the behaviour of structures can be necessary due to deterioration or changes in the traffic situation during their lifetime. The Finite Element Method (FEM) is widely used in order to accomplish numerical analysis. Considering the development of computer performance, more detailed FEM models can be analyzed, even on site, with mobile computers. To compensate the increasing amount of data needed for the model input, measures need to be taken to save time, by distributing the work. In order to provide consistency to the model, fedback data must be checked upon reception. A local wireless computer network of ultra-portable devices linked together with a computer can provide the coordination necessary for efficient parallel working. Based on a digital model consisting of all data gathered, structural modelling and numerical analysis are performed automatically. Thus, the user is released from the work that can be automatized and the time needed for the overall analysis of a structure is decreased.
Construction is a conservative industry that over the last twenty ye ars has experienced drastic changes in the way that interdisciplinary teams interact to design and execute a project. In this article we offer a general overview of how the main participants cooperate in the different phases of a construction project, and which are some of the main areas for communication improvement. We also explore the communication tools used in the exchange of information, and identify the main causes of information breakdown. The general framework of this study is of application to both standard and green projects. At the end of the article we discuss the peculiarities of green buildings. Our goal is to offer a series of industry insights derived from the perspective of a general contractor aimed at identifying the areas where contributions in computing and information exchange could have a greater impact on the successful completion of a project.
Former achievements for integrated information management have concentrated on interoperability of applications like e.g. CAD, structural analysis or facility management, based on product models introducing additional application independent model layers (core models). In the last years it has become clear, that besides interoperability of autonomous applications, the concurrent processes of model instantiation and evolution have to be modeled, including the relationship to available project resources, persons, legal requirements and communication infrastructure. This paper discusses some basic concepts for an emerging methodology relating the fields of product modeling, project management and workflow systems by elaborating the concept of a process model, which gives a decomposition of the project goals into executable activities. Integrated information management systems should be related to process models to detect pending activities, deadlocks and alternatives of execution. According to the heterogeneous nature of project communication processes, a method for dynamic classification of ad-hoc activities is suggested, that complements predefined highlevel process definitions. In a brief outline of the system architecture, we show how sophisticated information management systems can be broadly made available by using conventional Internet technologies.
With the speedy development of transportation of China, especially construction of many high-grade highways, some information technology successes have been achieved in the highway and bridge engineering, such as survey, design, construction and maintenance etc. In this paper, some applications about information technology in the highway engineering were introduced and some bridge professional software developed by RIOH (Research Institute Of Highways) in recent years was also introduced.
Integrated Engineering Workflow focused on the Structural Engineering in the Industrial Environment
(2004)
The engineering and construction industry has been slow to exploit the full potential of information technology. The industry is highly fragmented, price sensitive, risk-adverse, and profit margins are small. Each project is unique with a small amount of technological innovation opportunities to capitalise on from one project to the next. Technological innovations that have been taking place are just simulating the old traditional paper workflow. Engineering information in digital form is being conveyed using traditional paper representations, which have to be interpreted by humans before the information can be used in other applications, thereby creating ‘islands of information’. It can be seen that poorly implemented IT strategies are duplicating paperwork, rather than reducing or eliminating it (Crowley et al., 2000). This paper will introduce the Integrated Engineering Workflow (IEW) concept to re-organise a structural discipline working on multi-disciplinary projects so as to maximise the advantages offered by new information technology.
The increasing demands in building and civil engineering – with regard to the growing amount of legal requirements and the needs of a flexible usage of the building - requires an optimisation of all processes during the planning and construction phases. This aim can be only reached by transferring of innovative information and communication technologies in the field of cooperation of all partners in a building project. In this article the enhancement of the existing planning processes based on an improved information management is introduced. Since the late 90ies the availability of hardware and software infrastructures for a networkbased cooperation, e.g. email, in small and middle-sized companies increased the problems of an unstructured communication in the planning and construction processes. These problems have not been solved by the usage of the upcoming project communication systems either, which are often used as a simple medium for data transfer. Because of the easy way of distributing documents to all planning partners a huge amount of files and subsequent versions can be stored so that the planners often have to scope with an information overflow. The underlying hierarchical structures based on simple files stored in tree views are not sufficient for an adequate representation of the different specific views of the planners and the management of relationships between the three information domains building structure, costs and time schedules. ..
Die digitale Unterstützung der Planungsprozesse ist ein aktueller Forschungs- und Arbeitsschwerpunkt der Professur Informatik in der Architektur (InfAR) und der Juniorprofessur Architekturinformatik der Fakultät Architektur an der Bauhaus-Universität Weimar. Verankert in dem DFG Sonderforschungsbereich 524 >Werkzeuge und Konstruktionen für die Revitalisierung von Bauwerken< werden Konzepte und Prototypen für eine fachlich orientierte Planungsunterstützung entwickelt. Im Rahmen unseres Forschungsschwerpunkt zur digitalen Unterstützung der Planungsprozessen, das folgende Forschungsprojekt namens, >Integrated Planning Support System for Low-Income Housing< (IPSS) konzentriert sich auf die Entwicklung einer Sammlung von computergestützten Werkzeugen, um Benutzer-entworfene Wohnungen zu unterstützen, mittels der integrativen Kombinierung von Information Systems Leistungen, Computer Assisted Designwerkzeugen und online Kommunikationstechniken. Mit diesem Set von integrierten Planungswerkzeugen erwarten wir, Bewohnern von ressourcenmangelnden Gemeinden zu ermöglichen, ihre Wohnungen-Ausdehnung effizient zu planen. In diesem Sinne, ist es auch unser Ziel die räumliche, funktionale und vielleicht auch die konstruktive Qualität Benutzer-entworfener Wohnungen zu verbessern.
The uniqueness and the long life cycle of buildings imply a dynamically modifiable building model. The technological foundation for the management of digital building models, a dynamic model management system (MMS), developed by our research group, allows to explicitly access and to modify the object model of the stored planning data. In this paper, the integration of constraints in digital building models will be shown. Constraints are conditions, which apply to the instances of domain model classes, and are defined by the user at runtime of the information system. For the expression of constraints, the Constraint Modelling Language (CML) has been developed and will be described in this paper. CML is a powerful, intuitively usable object-oriented language, which allows the expression of constraints at a high semantic level. A constrained-enabled MMS can verify, whether an instance fulfils the applying constraints. To ensure flexibility, the evaluation of constraints is not implicitly performed by the systems, but explicitly initiated by the user. A classification of constraint types and example usage scenarios are given.
This paper deals with two different agent-based approaches aimed at the incorporation of complex design information into multi-agent planning systems. The first system facilitates collaborative structural design processes, the second one supports fire engineering in buildings. Both approaches are part of two different research projects that belong to the DFG1 priority program 1103 entitled “Network-based Co-operative Planning Processes in Structural Engineering“ (DFG 2000). The two approaches provide similar database wrapper agents to integrate relevant design information into two multi-agent systems: Database wrapper agents make the relevant product model data usable for further agents in the multi-agent system, independent on their physical location. Thus, database wrapper agents act as an interface between multi-agent system and heterogeneous database systems. The communication between the database wrapper agents and other requesting agents presumes a common vocabulary: a specific database ontology that maps database related message contents into database objects. Hereby, the software-wrapping technology enables the various design experts to plug in existing database systems and data resources into a specific multi-agent system easily. As a consequence, dynamic changes in the design information of large collaborative engineering projects are adequately supported. The flexible architecture of the database wrapper agent concept is demonstrated by the integration of an XML and a relational database system.
Während des Entwurfs- und Herstellungsprozesses eines architektonischen Objektes wird eine Menge organisatorischer, projektbezogener Daten zusammengetragen (z.B. Namen und Adressen von Bauherren, Firmen, Architekten, Ingenieuren, Behörden, die Art ihrer Beteiligung, Schriftverkehr). Diese Daten werden während dieses Prozesses mehrere Male verwendet, jedoch in unterschiedlichen Zusammenhängen, durch unterschiedliche Nutzer und von verschiedenen Anwendungen. Demzufolge ist eine geeignete Datenmodellierung und Datenverwaltung erforderlich, die diesen Aspekten gerecht wird. Der vorliegende Beitrag beschreibt ein Programm, welches die verschiedenen Formen der Projektdaten integriert, die Adreß-, Projekt- und Dokumentenverwaltung übernimmt, Projektinformationsdienstleistungen anbietet und Büroabläufe unterstützt.
In intelligente Gebäudesysteme wird Informationstechnik in systematisch geplanter Form eingesetzt, um die Eigenschaften von Gebäuden in den Bereichen Betriebskosten, Sicherheit und Flexibilität begl. der Nutzung zu verbessern. So müssen Gebäude während ihres Lebenszyklus Nutzer- und Nutzungsänderungen bewältigen. Dies gilt nicht nur für Zweckbauten, sondern auch für Wohngebäude, die früher auf den klassischen Familientyp (4-köpfige Familie) hin optimiert wurden. Heute ist mehr eine nutzungsneutrale, funktionsoptimierbare Gestaltung von Gebäuden gefordert. Die Kleinfamilie löst sich mehr und mehr zugunsten anderer Haushaltsformen auf, ein Gebäude soll auch für Single- oder Zweipersonenhaushalte gut geeignet sein, es soll eine optimale Verbindung von Wohnen und Arbeiten zulassen oder später älteren, pflegebedürftigen Personen ein möglichst langes selbstbestimmtes Leben ermöglichen. Das System intelligentes Gebäude besteht aus der Gebäudehülle und einer Kommunikations- und Informationsverarbeitungs-Infrastruktur, zu der alle im Gebäude eingebauten Geräte gehören, die zum Betrieb des Gebäudes erforderlich sind. Die Koordination der Funktion von Einzelkomponenten erfolgt dabei weniger durch den Nutzer, sondern durch eine spezielle Software, die auf die Knoten im System verteilt ist. Diese Architektur ist Grundlage der Verbesserung der Gebäudeeigenschaften in den genannten Bereichen, die möglichen Funktionen und die damit verbundene Flexibilität in der Nutzung wird mit dem Ausdruck Intelligenz des Gebäudes assoziiiert. Der Beitrag versucht zunächst, auf Basis der Konzepte und Erfahrungen des Innovationszentrums Intelligentes Haus Duisburg, kurz inHaus, und des vom Fraunhofer-Institut IMS seit 1993 gewonnenen einschlägigen Know-Hows einen Überblick über den aktuellen Entwicklungsstand bei Systemintegrations-Technologien und -funktionen für ganzheitliche, intelligente Haus- und Gebäudesysteme zu geben, insbesondere für den Bereich der integrierten Bedienung und der Nutzung der Internet-Anbindung
Bauprojekte sind in immer stärkerem Maße durch räumlich verteilt und zeitlich variant tätige hochspezialisierte Fachplaner auf Basis stark differenzierter Hard- und Softwaresysteme gekennzeichnet. Daraus ergibt sich die Notwendigkeit einer durchgängig computergestützten prozeßübergreifenden Informationsbereitstellung. Eine deklarativ orientierte integrierte Arbeits- und Planungsumgebung auf Basis eines digitalen Bauwerksmodells bietet das Potential zur Realisierung des erforderlichen Informationsaustausches. Der im Sonderforschungsbereich 524 entwickelte verknüpfungsbasierte Bauwerksmodellierungsansatz stellt einen derartigen Ansatz dar und bietet adäquate Möglichkeiten zur Modellintegration und zur modellübergreifenden Navigation im Gesamtdatenbestand auf Basis dynamisch manipulierbarer Verknüpfungen zwischen Modellelementen. Die Erstellung von Verknüpfungen stellt einen komplizierten Prozeß dar. Um ein effizientes dynamisches Definieren von Verknüpfungstypen zu gewährleisten sind unterstützende Tools im Sinne eines intelligenten Verknüpfungsmanagements notwenig. Die Hauptaufgabe dieser Hilfsmittel besteht darin, die Partialmodelle zielgerichtet zu analysieren und entsprechende Vorschläge für die Elemente eines Verknüpfungstyps zu generieren und diese auch entsprechend zu verarbeiten. Hierzu wird ein regelbasierter Ansatz mit Visualisierungsmethoden zur Erhöhung der Transparenz des Verknüpfungsmanagements kombiniert. Die Wissensbasis stellt dabei das objektorientiert strukturiert vorgehaltene Domänenwissen in den jeweiligen Partialmodellen dar. Der deklarativen Wissensabbildung folgend steht zur Erkennung von Zusammenhängen zwischen Elementen verschiedener Partialmodelle ein explizit definierter und extern vorgehaltener Regelapparat zur Verfügung. Am Beispiel einer 3D-Visualiserung der Elemente eines Partialmodells Architektur werden die entwickelten Konzepte evaluiert.
Applications for civil engineering tasks usually contain graphical user interfaces for the engineering processes. Persistent objects of the applications are stored to data bases. The influence of the interaction between a graphical user interface and a data base for the development of an civil engineering application is investigated in this paper. A graphic application for the linear elastic analysis of plane frames, which was previously developed with standard tools of the Java platform, is compared to a redesigned implementation using a generalized data base for persistent objects. The investigation leads to the following results : - A strict distinction between persistent and transient objects influences the class structure of an application, in particular the class structure of a graphical user interface. - The structure of an application depends on the logic for updating of references to persistent and transient graphical objects after an application is read from a file. - The complexity of the reference management can usually be handled better by just in time referencing associated with String - identifiers rather than by automated referencing associated with Name - identifiers.
Thin-walled spatial structures are broadly used in the modern technician and building. In fuel industry for long-term keeping of oil and gas are used reservoirs of various capacity, which on technological reasons can be shipped under the soil. Shells of reservoirs combine in itself high toughness and low specific consumption of materials. At the same time, being under the soil, they feel steady-state and dynamic loads from ambiance, which particularly in the event, when reservoir is empty, can bring about the loss of stability of its form. On the other hand contact interactions of shell and soil greatly depend on features of ambiance and its saturating of liquid. For building generalized porous springy ambiance models, saturated by the liquid, it is possible to use Bio equations of motion for displacement of hard and fluid phases. Elaboration of mathematical specified interaction models and theirs realization by means of modern computing software allows to study behaviour of spatial thin-walled designs on base of geometric nonlinear theory of shells
This paper describes a didactic application that is part of a research project whose main aim is to develop a computer-aided system which will assist design and construction processes. It is based on the visual simulation of construction activities. Geometric modeling and virtual reality techniques are used in the visualization of the design process and to define user-friendly interfaces in order to access construction information, which could prove useful to Civil Engineering professionals. As a first step, was developed a prototype that serves as a didactic tool for Civil Engineering students of disciplines concerned with building construction. The construction of a double brick wall is the case studied. The wall is defined as a three dimensional model formed with the several components needed to edify it. Using the wall's virtual model it is possible to show, in an interactive way, the sequence of the construction process and observe from any point of view the configurations in detail of the building components. This is then a didactic tool application in construction processes domain of great interest to Civil Engineering students.
Durch Modifizierung des bekannten Savingsalgorithmus mittels fester bzw. variabler Savingsparameter läßt sich ein interaktiver Zugang zur Lösung des Tourenproblems begründen. Die Resultate des Savingsalgorithmus können dadurch um ca. 8,5% verbessert werden. Durch die interaktive Arbeitsweise ist es möglich, daß spezielle Vorgaben eines Nutzers und Erfahrungen des Bearbeiters Berücksichtigung finden. Die durchgeführten Rechnungen lassen erwarten, daß bei der Wahl der Savingsparameter noch Reserven für eine weitere Effizienzerhöhung liegen. Vermutlich spielt die Anpassung der Parameter an die Problemstruktur der gestellten Aufgabe eine Rolle. Durch lokale Suche läßt sich die Vielfalt der interaktiven Entscheidungsmöglichkeiten ein-grenzen und automatisieren.
The contribution describes the didactical integration of wireless access networks for the campus of the University of Karlsruhe in the education of architects and engineers. It focuses on the development of an interdisciplinary communication network to encourage and promote the communication and collaboration between students. The project assumes that significant learning progresses in net-based learning scenarios are based upon the synchronous and asynchronous cooperation between the students themselves. The remote cooperation across borders of disciplines makes high demands on capacity in communicating and cooperating of the involved persons as well as on the supporting tools. Therefore, the collective acquisition of knowledge and cooperation has to be trained intensively during the studies. Based on the design and project oriented cooperation platform netzentwurf.de the authors developed the tools “Jobadmin“ to administrate multidisciplinary workgroups, the “Swarm Knowledge Catalogue“ to collect and store knowledge and “LivingCampus“, an instrument providing basic services for dynamic communication.
The 20th International Conference on the Applications of Computer Science and Mathematics in Architecture and Civil Engineering will be held at the Bauhaus University Weimar from 20th till 22nd July 2015. Architects, computer scientists, mathematicians, and engineers from all over the world will meet in Weimar for an interdisciplinary exchange of experiences, to report on their results in research, development and practice and to discuss. The conference covers a broad range of research areas: numerical analysis, function theoretic methods, partial differential equations, continuum mechanics, engineering applications, coupled problems, computer sciences, and related topics. Several plenary lectures in aforementioned areas will take place during the conference.
We invite architects, engineers, designers, computer scientists, mathematicians, planners, project managers, and software developers from business, science and research to participate in the conference!
The growing competition pressure in the building industry increases the demands on the design and construction processes in respect to economical, technical and time aspects. These demands require efficient improvements of the value-added chain, which can be realized mainly with the usage of innovative information- and communication-technologies. To support the collaboration of all participants involved in a certain building project the Workflow-Management-System “BauKom-Online” has been developed. In the focus of the system is to support the coordination of the participants and their information exchange. Such a software-method is well suited to ensure a high quality planning process. The modelling of business-processes enables a better self-comprehension of the participants work and helps to enhance the project performance. The system architecture of BauKom-Online contains two basic components: the processmodelling tool and the workflow-engine. The process-model contains of activities and states of the planning and construction processes and their relations. These connected processes compose the workflow. Such a process-model for engineering purposes has to satisfy several needs, e.g., the consideration of planning and building alternatives, dynamic changes of the model during execution of the project and the linkage to further technical objects like costs, building structure, specifications and documentmanagement. Furthermore, the scheduling of the project can be done within the process-model and can be visualized as a Gantt-diagram. ...
This paper describes an Internet-enabled software model that could facilitate the development and utilization of nonlinear structural analysis programs. The software model allows users easy access to the analysis core program and the analysis results by using a web-browser or other application programs. In addition, new and legacy codes can be incorporated as distributed services and be integrated with the software framework from disparate sites. A distributed project management system, taking advantages of Internet and database technologies, is implemented to store and manage model information and simulation results. Nonlinear dynamic analysis and simulations of a bridge structure is performed to illustrate the facilities of the Internet-enabled software model.
Internetbasiertes Management von Bauprojekten auf der Basis eines dynamischen Workflow-Frameworks
(2003)
Die Baubranche zeichnet sich durch eine sehr starke Arbeitsteilung aus, die hohe Ansprüche an die Koordination der Prozesse und auch an die Qualität der auszutauschenden Informationen stellt. Trotz der gegenwärtigen informationstechnologischen Möglichkeiten gibt es in der Bauwirtschaft noch keine umfassende Lösung, um diesen Anforderungen gerecht zu werden. Insbesondere sind Modelle zur durchgängigen Koordinierung der Prozesse und Arbeitsabläufe (Workflows) im Informations- und Kommunikationsverbund für die baupraktischen Belange noch nicht entwickelt worden. Die Abbildung der dynamischen Aspekte der Workflows zwischen Bauherren, Projektleitung, Fachplanern, Bauaufsichtsbehörde und Bauunternehmen können zu einer Erhöhung der Termin- und Kostensicherheit führen. Vorhandene Software-Produkte im Bereich des Workflow-Managements erfüllen die Anforderungen der vernetzt-kooperativen Planung bzw. Ausführung im Bauwesen nicht durchgängig und sind nicht in einen internetbasierten Projektraum integrierbar. Die Grundlage des hier vorgestellten Systems bildet ein so genanntes Workflow-Framework, dem alle Fachinformationen, wie Kosten, Termine, Gebäudestruktur und (Plan-) Dokumente untergeordnet sind. Dieses Framework stellt eine auf die Anforderungen des Bauwesens ausgerichtete Anwendung dar, mit deren Hilfe die Beteiligten und deren Aktivitäten, die Fachinformationen und die zu verwendenden Fachapplikationen koordiniert und überwacht werden können. Mit dieser Anwendung, die in den internetbasierten Projektraum Baukom-Online integriert ist, kann zum einen die Projektleitung bzw. der Projektsteuerer bei der Koordination, Steuerung und Überwachung der Bauprojektabwicklung in technischer, rechtlicher und wirtschaftlicher Hinsicht unterstützt werden. Zum anderen ermöglicht es den Beteiligten in Planung, Genehmigung und Ausführung, ihre Arbeitsabläufe im Hinblick auf eine fristgerechte und wirtschaftliche Abwicklung effizienter zu gestalten.
The design of building projects involves several types of resources such as architects, structural engineers, mechanical engineers, electrical engineers, and draftsmen, among others. For design firms to stay in business in this very competitive market, they need to manage their resources in a way that improves productivity and cost effectiveness. This task, however, is not simple and requires thorough analysis of process-level operations, resource use, and productivity. Typically, these operational aspects are the responsibility of the design office manager who assigns available resources to the different design projects to save time and lower design expenses. It is noted that limited studies have been carried out in the literature to model overall organizational operations and behavioral aspects, particularly in firms specialized in the design of building projects. In an effort to simplify the modeling process, a simplified modeling and simulation tool is used in this research. A simulation model representing an actual design office was developed assuming that the office performs designs for small, medium, and large size building projects. The developed model was used to simulate several alternatives and examine various resource assignment strategies. The simulation was conducted over ten years and the resulting productivity and income was measured.
The pavement is one of the basic components of road infrastructure and, therefore, directly influences general levels of transport safety, as well as the quality of transportation services in human and cargo traffic. It also exerts a major influence on the final logistic costs of production and services in many aspects of everyday life. The continuity of transportation, which is closely tied to the development of a number of areas in the economy of every State, depends on the technical condition of the road pavement. Making proper investments in the complete course of life of the road pavement, a policy which makes sure that the conditions for continuous, safe, efficient, and economically optimised transportation are satisfied, is a priority for every administration managing municipal funds. If investments in the road pavement are not carried out properly, there usually are more and more road pavements the condition of which causes delays in transportation, and directly compromises traffic safety. Such a situation increases the running costs of vehicles, and decreases the transportation service levels and comfort of travelling. At the moment, the majority of pavements in Europe, (nearly 90% of all pavements) are flexible road pavements. Due to the prevalent number of flexible pavements in Europe, the author analyses investment in the course of full-time of life cycle of the pavements, with a stress on flexible pavements. The paper presents basic assumptions and definitions in the area of analysis of life cycle costs of a flexible road pavement, as well as profits associated with proper long range investment. The classification of damages to flexible road pavement has also been presented, and their influence on technical and use related assessment of road pavement conditions, basing on the traditional road pavement structures, with relation to the catalogue of typical flexible pavements used in Poland, as well as regarding French, British, and American experience in constructing long life road pavements. The second part of the paper discusses different investment strategies in the course of a full-time of life cycle of the road pavement, and proposes a procedure of evaluating investment strategies. The summary presents some assumptions for a global index of investment evaluation during the full-time of life cycle of a pavement, based on the Best Return Index (BRI).
IT support for field personnel is starting to appear on bridge inspection sites, construction sites, and on the manufacturing floor. ENR magazine now regularly advertises palm computing-based systems for recording data on a construction site. This support can, and should, take on many forms and functions and needs to be carefully designed and evaluated like any other important tool used in the field. With careful design and implementation, IT devices for the field should have tremendous impact on the productivity of field personnel. If the devices are not carefully designed to take account of the field context and the abilities and preferences of the field personnel, field workers will not use these tools.
Die Situation in der Immobilienwirtschaft hat sich in den letzten Jahren grundlegend verändert. Die Neubauaktivitäten in ganz Deutschland sind deutlich zurückgegangen. Das Bauen im Bestand mit den Tätigkeitsfeldern der Renovierung, Modernisierung und Instandsetzung rückt daher in den Mittelpunkt der Aktivitäten. Laut Bundesarbeitskreis Altbauerneuerungen werden im nächsten Jahr 74 Prozent des gesamten Bauvolumens auf die Modernisierung von alten Häusern entfallen, der Anteil der Neubaumaßnahmen geht auf 26 Prozent zurück. Dies gilt nicht nur für Wohn-, sondern auch für Gewerbeimmobilien. Die anhaltende Rezession und die Entzauberung der New Economy ziehen in diesem Bereich Leerstände und fallende Mieten nach sich. Auch die Wohnungswirtschaft hat vor allem in den neuen Ländern mit Leerständen zu kämpfen. Diese Tatsache zwingt Immobilienbetreiber zunehmend dazu, Methoden zu ergreifen und Werkzeuge einzusetzen, die die Effizienz im eigenen Unternehmen steigern. Die Aufgabenstellung lautet: Mehr Sanierungsprojekte in der selben Zeit abwickeln. Dies setzt eine prozessorientierte Vorgehensweise und unterstützende Werkzeuge voraus. Mit dem baucommunicator wurde ein Werkzeug entwickelt, dass es dem Gebäudemanager ermöglicht, bei der Abwicklung von Bau- und Sanierungsmaßnahmen im Aufgabenfeld der Koordination dieser Aufgabenstellung zu entsprechen. Die Kernfunktionen der Software sind das Termin-, Kosten und Qualitätsmanagement bei der Abwicklung von Bauprozessen. Die unternehmensübergreifende Konzeption erlaubt sowohl dem Auftraggeber, wie auch den ausführenden Betrieben den Zugriff auf die zentral abgelegten Projektinformationen. Die Workflow-Funktionalität des baucommunicator führt zu einer Reduktion der Prozessaktivitäten. Dadurch werden Kosten eingespart und die Ausführungsqualität gesteigert.
Anhand von Ergebnissen aus dem FABEL-Projekt wird gezeigt, welche Beiträge Methoden der Künstlichen Intelligenz, insbesondere der Wissensverarbeitung beim Entwurf komplexer Gebäude leisten können. Exemplarisch werden spezialisierte wissensintensive Methoden, und allgemeine fallbasierte Methoden zum Retrieval und zur Wiederverwendung früherer Entwürfe vorgestellt. Es werden Fragen der Integration von Wissen, Fällen und Daten diskutiert. Der Prototyp des FABEL-Projekts verwendet die Metapher der virtuellen Baustelle, um die verschiedenen Methoden als Planungswerkzeuge in einem CAD-System integriert anzubieten. Ein Planungsmodell dient der zusätzlichen Orientierung des Planers. Die Ergebnisse sind interessant für den Entwurf komplexer Unikate, dürften aber auch als Zusatz zu elektronisch angebotenen Katalogen relevant sein.
Die Bearbeitung von Bauprojekten erfordert ein hohes Maß an Fachwissen verschiedener Disziplinen. Dabei kommt eine Vielzahl spezialisierter Fachmodelle zum Einsatz. Zur Übernahme der Daten von anderen Planern in das eigene, neu zu erstellende Fachmodell sind die verfügbaren Inhalte aus verschiedenen Modellen vom Fachplaner entsprechend seiner Anforderungen anzupassen und um spezifische Inhalte zu ergänzen. Dabei ergeben sich Beziehungen, welche die Zusammenhänge und Abhängigkeiten der Fachmodelle untereinander aufzeigen. Eine zugleich allgemeingültige sowie vollständige Vordefinition des durch die Beziehungen beschriebenen Modellverbundes ist kaum möglich. Zur rechnerinternen Abbildung erfolgt aus diesem Grund eine Zerlegung des Modellverbundes in Partialmodelle und entsprechende Verknüpfungen. Die Beschaffenheit des Beziehungsgeflechtes hängt sowohl von der Qualität der Datenmodelle als auch von der Beschreibungsgüte der Verknüpfungstypen, deren Definition ein hohes Maß an Fachwissen erfordern, ab. Mit einem Konzept zur Strukturierung und Zerlegung der Verbindungen in Basiselemente sowie der Integrationsmöglichkeit zu komplexeren Elementen wird eine einfachere Erstellung, Wartung und Anpassung von umfassenden baufachlichen Inhalten ermöglicht. Zur Sicherung einer hochwertigen Beschreibung des Modellverbundes ist ein an die Fähigkeiten des Ingenieurs ausgerichteter Zugang zur Spezifikation und Anpassung der Beziehungsdefinitionen unverzichtbar.
This is a paper about knowledge in design and how to elicit knowledge from design processes. The paper is a preparation for an empirical study of interaction in the design process. Reasonings of three authors - Schön, Broadbent and Lundequist - on design processes is presented. They all have a pragmatic perspective in common, and regard the process as an activity without a definite form. Design is seen as an activity of creating models of forms and shapes, by addressing expert knowledge in a dialogic way to problematic situations. Due to the pragmatic approach I find the pragmatist Dewey´s understanding of knowledge and elecitation of knowledge appropiate for studying design processes. According to him it is possible to build up objectified descriptions of experiences, also of such, which are based on experiences of emotional and intuitive nature. There need not be a definite border, which separates tacit knowledge from explicit knowledge - when it comes to the question of the possibility of verbal descriptions. Tacit knowledge is possible to articulate within pragmatic thinking. The conclusion is, that it is possible to study the tacit knowledge of design processes, and get some qualitative insights useful for theory building. A study of design processes can look at three different forms of knowledge. It appears as a precognitive understanding of the design situation, as integrated in the design activity - seeing the situation as something known - and in the process of creating something new.
Die Kooperation zwischen Menschen und Computern gewinnt in zahlreichen Problemstellungen mehr und mehr an Bedeutung. Ein wesentlicher Grund hierfür ist die ständig wachsende Komplexität relevanter Problemstellungen. Dadurch bedingt sind weder der Mensch noch der Computer alleine in der Lage, zufriedenstellende Lösungen zu entwickeln. Die Kombination der individuellen Fähigkeiten hat sich in vielen Bereichen als gewinnbringend erwiesen. Genetische Algorithmen (GA) als Repräsentanten der >Evolutionary Computation< stellen einen Ansatz zur Lösung hochkomplexer Optimierungsaufgaben dar, der sich an den Vorgängen der Evolution orientiert. Im Gegensatz zu vielen anderen Optimierungsverfahren bringen sie einige Eigenarten mit, die kooperative Erweiterungen einfach und erfolg-versprechend machen. Der vorgestellte kommunizierende Genetische Algorithmus kombiniert die Vorteile der GA mit der Fähigkeit zur Kooperation. Es gelingt bei seiner Verwendung, gute externe Vorschläge aufzunehmen, während schlechte Vorschläge keinerlei negative Auswirkungen zeigen. Diese Robustheit gegen Irrtümer und Fehleingaben macht den KGA zu einer idealen Basis für Programme zur kooperativen Problemlösung.
Projektsteuerung gewinnt als Aufgabenfeld bei der Realisierung von Investitionsprojekten ständig an Bedeutung. Zur Bewältigung der umfangreichen und komplizierten Aufgaben des Projektsteuerers wird zunehmend Software angeboten und genutzt. Dabei ist feststellbar, daß von einer integrierten Projektsteuerung unter Berücksichtigung der Kriterien Leistung, Termin und Kosten nicht gesprochen werden kann, weil wesentliche theoretische und praktische Voraussetzungen fehlen. Im Beitrag werden Defizite der praktizierten Vorgehensweise und Lösungsansätze für eine integrierte rechnergestützte Projektsteuerung vorgestellt. Durch geeignete Formen der Projektstrukturierung und eine Kopplung auf dem Mark befindlicher Standardsoftware können geeignete Lösungen gefunden werden. Problempunkte dabei stellen die Schnittstellen zwischen den Anwenderprogrammen die Datenbeschaffung und -verwaltung sowie geeignete Verfahren zur Kostenermittlung und -verfolgung dar. Im Beitrag werden eine bereits praktizierte und eine in Entwicklung befindliche Lösung vorgestellt.
Berechnungsmethoden mit Berücksichtigung des physikalisch nichtlinearen Verhaltens von Stahlbetonkonstruktionen werden mit Einführung der europäischen und nationalen Normung verstärkten Einsatz in der Tragwerksplanung finden. Hierbei sind im Gegensatz zu linearen Berechnungen zeitliche Aspekte der Tragwerksbeanspruchung zu berücksichtigen. Ein Lösungsansatz zur Beherrschung von Lastfolgeeffekten kann auf der Grundlage der Theorie des adaptiven Tragwerkes abgeleitet werden. Unter Verwendung von Algorithmen der mathematischen Optimierung lassen sich derartige Probleme numerisch lösen. Von besonderem Interesse sind dabei spezielle Formulierungen zur Bestimmung von Grenzwiderständen, die zur Bemessung von Stahlbetontragwerken herangezogen werden können. Im Beitrag werden zwei Konzepte zur numerischen Bestimmung von adaptiven Grenzwiderständen auf der Basis der nichtlinearen Optimierung vorgestellt, diese sind: - Konzept des superponierten Restzustandes - Konzept der gekoppelten plastischen Antwort. Es wird von einem elastisch- plastischen Verhalten der untersuchten Struktur ausgegangen.
Information and Communication Technologies (ITC) in education have been extensively discussed nowadays. In this e-learning scenario, the construction and use of environments that support teaching and learning is a reality. Therefore, for time and general resource savings it is crucial the access to hypermedia contents with great interactivity and with high reusability. Substantial efforts have been centered in the search for a metadata proposal (metadata is a generic term used to describe data that can be used to identify and to describe common characteristics among different documents) that can be standardized and is system independent for the so called learning objects.
Der lebensdauerorientierte Entwurf von Stabbogenbrücken, mit Zuschnitt auf die Auslegung von Hängern, die durch Ermüdung infolge wirbelinduzierter Querschwingungen gefährdet sind, wird als stochastisches semi-infinites Optimierungsproblem formuliert. Zur Lösung dieses Problems sind mehrere Modellierungsebenen erforderlich, so dass ein Mehrebenenproblem entsteht. Es wird der derzeitige Entwicklungs- und Implementierungsstand bei der Umsetzung des Mehrebenenproblems in ein Entwurfsleitsystem (Software) aufgezeigt. Außerdem werden die Konzepte der noch ausstehenden Forschungsarbeit, die bereits erfolgreich beim lebensdauerorientierten Entwurf von Industriehallen mit Rahmensystem als Haupttragwerk eingesetzt wurden, diskutiert und ihre Einbildung in die bisher umgesetzte Forschungsarbeit erläutert.
The objective of the joint project 'Life cycle optimised system solutions for densified housing with massive wood technology', short form Basys, was the development and application of an open building system for sustainable construction in a virtual enterprise. Four partners coming from building economy and a university institute developed the building system in a comprehensive planning process. By applying massive wood technology, most requirements of densified housing can be met and individual buildings can be produced on demand.
Limit state design of hybrid structures with meshless methods using mathematical optimization
(2003)
The revitalization of existing structures belongs to the frequently tasks in urban reconstruction processes. The adaptation for new requirements will commonly affect substantial changes in the general configuration of structures. The resulting revitalized structures are characterized by a hybrid design, where old and new, identical or diverse materials and members will be coupled in different ways. In the planning stage the treatment of these systems leads to application of complex and hybrid mechanical models respectively. High performance numerical instruments have to be applied for solving not only analysis but also targeted design problems. Because of the hybrid character of mechanical models in revitalization planning processes the use of hybrid technologies is advantageous. In this paper mixed domain technique will be used for connecting EFG and FE. The models derived will be adopted for design purposes of non-linear loaded hybrid structures. The investigations show a good adaptability of the meshless methods to the design of hybrid structures by using optimization strategies. With this method the advantages of both finite element and meshless methods can be utilized most suitable. With the property of a minimum amount of unknowns by maintaining an adequate quality of the results the application of mixed finite element and meshless methods is a promising alternative to traditional methods in structural analysis and optimization.
At the start of the conceptual design process, designers start to give tangible form to their thoughts by sketching. This helps with reasoning and communicates ideas to other members of the team. Sketches are gradually worked up into more formal drawings which are then passed to the other stages of the design process. There are however some problems with basing early ideas on sketching. For example, due to their ad-hoc nature, sketches tend only to be diagrammatic representations and so designers cannot be sure that their ideas are feasible and what is being proposed meets the constraints described in the client brief. This can result in designers wasting time working up ideas which prove to be unsuitable. Also the process of constraint checking is complex and time consuming and so designers tend limit their search of possible options and instead choose satisfying rather than good solutions. This paper describes the INTEGRA project which examines the role of sketching in early conceptual design and how this can be linked to other aspects of the process and particularly automated constraint checking using an IT based approach. The focus for the work is the design of framed buildings. A multi-disciplinary approach has been adopted and the work has been undertaken in close collaboration with practising designers and clients.
Maxwell's equations can be rewritten in terms of a Dirac operator D+a. The advantage is that in this setting Maxwell's equations are treated as a system of first order differential equations. To ensure the uniqueness of a non-homogeneous differential equation in the whole space additional conditions are needed.
Indentation experiments have been carried out over the past century to determine hardness of materials. Modern indentation machines have the capability to continuously monitor load and displacement to high precision and accuracy. In recent years, research interests have focussed on methods to extract material properties from indentation load-displacement curves. Analytical methods to interpret the indentation load-displacement curves are difficult to formulate due to material and geometric nonlinearities as well as complex contact interactions. In the present study, an artificial neural network model was constructed for interpretation of indentation load-displacement curves. Large strain-large deformation finite element analyses were first carried out to simulate indentation experiments. The data from finite element analyses were then used to train the artificial neural network model. The artificial neural network model was able to accurately determine the material properties when presented with load-displacement curves which were not used in the training process. The proposed artificial neural network model is robust and directly relates the characteristics of the indentation loaddisplacement curve to the elasto-plastic material properties.
On the basis of the little material available (an architecture plan and some photographs) a computer model is developed for a bullet shaped dome, part of the Belgian Congo pavilion, created by the architect Henry Lacoste for the International Colonial Exhibition of 1931 in Paris. The ingenious and elegant wooden skeleton of the dome is approximated in two stages. The first approximation focusses on the curves traced on the dome by the wooden laminae, which appear to be loxodromes, cutting the meridians by a constant angle. In a second approximation the very specific joints of the laminae are taken into consideration. The resulting computer image shows an astonishing resemblance with the photographs. Finally, the shapes and dimensions of all laminae are calculated, enabling a possible reconstruction of the dome.
The vibration control of complicated mechanical structures is impossible without proper mathematical models that allow to have a true apprehension of events occurring in structural member before the starting of the experiment and correct the diagnostic experiment in case of need. An approach that implies using of a discrete model reflecting all required features of a prototype system and permitting of an effective analytical and numerical investigation is proposed in the work. At first a discrete model of a bladed disk with flaw is considered. Taking into account the symmetry of the structure by utilization of mathematical tools of group presentation theory the number of degrees of freedom of the system is diminished. Small damage of the disk is regarded as perturbation of structure symmetry. The distinction of vibration characteristics such as natural frequencies and mode shapes of damaged and undamaged systems is determined theoretically with the help of perturbation theory and can be used as an effective diagnostic criterion of a small-scale damage of the structure. In the second part of the work a non-linear two-mass model of an acoustic emission in a damaged structure is proposed. On basis of the numerical integration of the nonlinear differential equations and expansion of the derived solution into a Fourier series free and forced vibrations of the model are investigated. It is shown that proposed model reflects all characteristic properties of vibrations of damaged structures: reduction of natural frequency, sub- and super-resonances, acoustic effects.
In this paper we consider modelling of composite material with inclusions where the elastic material properties of both matrix and inclusions are uncertain and vary within prescribed bounds. Such mechanical systems, involving interval uncertainties and modelled by finite element method, can be described by parameter dependent systems of linear interval equations and process variables depending on the system solution. A newly developed hybrid interval approach for solving parametric interval linear systems is applied to the considered model and the results are compared to other interval methods. The hybrid approach provides very sharp bounds for the process variables - element strains and stresses. The sources for overestimation when dealing with interval computations are demonstrated. Based on the element strains and stresses, we introduce a definition for the values of nodal strains and stresses by using a set-theoretic approach.
Die Technische Gediminas Universität Vilnius, Lehrstuhl Technologie der Bauproduktion und die Hochschule für Technik, Wirtschaft und Kultur Leipzig, Lehrbereich Baubetrieb, haben sich seit mehreren Jahren mit den Problemen der mehrkriteriellen Entscheidung im Bauwesen befasst. Auf Grund der unterschiedlichen Herangehensweise werden für numerische Lösungen auch unterschiedliche Methoden benutzt. Das gemeinsame Ziel war immer eine optimale Variantenauswahl für baubetriebliche Produktionsprozesse. Zur Unterstützung der numerischen Lösungen wurde gemeinsam das EDV-Programm LEVI entwickelt, welches heute wahlweise als deutschsprachige oder englischsprachige Version genutzt werden kann. Die Beschreibung der zu lösenden Probleme erfolgt in Form einer Matrix. Diese enthält die Varianten (Zeilen) und die Kriterien (Spalten). Dabei sind die Varianten Ausdruck einer Menge real existierender Situationen für ein Problem. Alle betrachteten Varianten werden durch die gleichen Kriterien bewertet. Da die Kriterien gewöhnlich unterschiedliche Dimensionen besitzen, ist ihre Wirksamkeit nicht direkt miteinander vergleichbar. Eine Ausnahme bildet die Bewertung mit einem Punktsystem. Diese beinhaltet jedoch in hohem Maße subjektive Einflüsse und sollte daher nur in Ausnahmefällen benutzt werden. Um die Schwierigkeiten der unterschiedlichen Dimensionen für die verschiedenen Kriterien zu umgehen, wird das Verhältnis zum jeweiligen Optimalwert gebildet. Damit werden gleichzeitig die Diskrepanzen, die durch die unterschiedlichen Größenordnungen der Optimalwerte entstehen, beseitigt. Für das Verhältnis des Funktionswertes zum Optimalwert existieren unterschiedliche Auffassungen. Es muss an dieser Stelle bemerkt werden, dass mit der Entscheidung über die Art des Verhältnisses zum Optimalwert auch die Lösung beeinflusst werden kann. Untersuchungen über solche Auswirkungen sind noch nicht abgeschlossen, so dass im Augenblick nur vorläufige Ergebnisse genannt werden können. Von den bekannten Transformationsmethoden benutzen die Verfasser die vektorwertige Transformation, die lineare Transformation, die relative Abweichung und eine nichtlineare Transformation. Dadurch erfolgt eine Abbildung auf das Intervall [1 ; 0 ] bzw. [ 1 ; ~ 0 ]. Für die Lösungsmethoden erfolgt eine Unterscheidung in eine einseitige oder zweiseitige Fragestellungen. Während die einseitige Fragestellung auf die Bestimmung einer Rangfolge orientiert, berechnet die zweiseitige Fragestellung ein spieltheoretisches Gleichgewicht als Ausdruck eines rationalen Verhaltens von zwei entgegengesetzten Interessengruppen und Lösungen für Spiele gegen die Natur. In Anlehnung an das statische Gleichgewicht messen die Verfasser dem spieltheoretischen Gleichgewicht für die Dimensionierung baubetrieblicher Produktionsprozesse eine besondere Bedeutung zu. Bisherige Anwendungen konzentrieren sich auf die optimale Auswahl im Wohnungsbau, die Auswahl von Konstruktionsvarianten, die Auswahl von Montagevarianten, den Einsatz von Wärmedämmstoffen u.a. Für die Dimensionierung von Produktionsprozessen mit Serienproduktion wurde eine Lösung mit einer gewichteten Matrix vorgeschlagen.
Die Bewirtschaftung von Grundwasser umfasst zum einen die Nutzungserfordernisse und Versorgungsbedürfnisse und zum andern den Schutz des Grundwassers als Bestandteil des Naturhaushaltes. Die Verwendung von Informations- und Kommunikationsmethoden zur numerischen Grundwassermodellierung und zur Verwaltung von großflächigen qualitativen und quantitativen Grundwasserinformationen eröffnen die Möglichkeit einer nachhaltigen wasserwirtschaftlichen Planung sowie einer gezielten Steuerung der Auswirkungen von Grundwasserentnahmen und -versickerungen. Im Rahmen des Pilotprojektes Grundwasser-Online im Hessischen Ried (www.grundwasser-online.de) wurden gezielt die Arbeitsabläufe bei der Erfassung der Daten zur Grundwasserbewirtschaftung sowie der anschließenden Verarbeitung analysiert, bewertet und software-technisch umgesetzt. Ein wichtiger Aspekt dabei ist die Datenerfassung an den räumlich verteilten Grundwassermessstellen. Der vorliegende Beitrag zeigt auf, wie mobile EDV Geräte mit einer geeigneten Software die Arbeitsabläufe beim Einsatz vor Ort effizienter gestalten und die Einhaltung der Messvorgaben unterstützen können. Durch die Minimierung von Fehlerquellen kann dabei eine Qualitätsverbesserung des Datenbestandes erreicht werden. Es wird ein Konzept zur mobilen Erfassung von Grundwasserdaten unter Verwendung von GPS-Positionsdaten und Plausibilitätsprüfungen vorgestellt. Die Technologien und Herausforderungen bei der prototypischen Umsetzung werden aufgezeigt.
Mobile Software-Agenten für neuartige Funktionen und Nutzeffekte in intelligenten Gebäudesystemen
(2003)
Anwendungsbezogene Software innerhalb vernetzter Gebäude nimmt immer mehr zu. Neue Standards erlauben den einfachen Fernzugriff, um neue Services zu installieren oder um Updates aufspielen zu können. Zu diesem Thema wird der OSGi-Standard vorgestellt, der ein Management von Software während des Betriebs vornehmen kann. Außerdem nimmt die Netzlast der heterogenen Netze innerhalb und zu den Häusern stetig zu. Hier können mobile Softwareagenten ihre Vorteile gegenüber herkömmlichen, statischen Kommunikationsmechanismen hervorheben. Im folgenden Text wird die Integration solcher mobilen Softwareagenten in bestehende Standards intelligenter Häuser beschrieben und anhand des Innovationszentrum Intelligentes Haus Duisburg (www.inhaus-duisburg.de) beispielhaft erläutert. Nach der Einleitung wird in Kapitel 2 der aktuelle Stand der Technik beschrieben. Dabei wird vor allem auf den OSGi-Standard und die Technik der mobilen Softwareagenten eingegangen. Im Kapitel 3 wird stehen vor allem Voranalysen zur Fernwartung, Optimierungen von Regelungen und die Integration dynamischer Netzteilnehmer im Vordergrund, die durch die beschriebenen Mechanismen erleichtert werden. Im Kapitel 4 werden die Ergebnisse kurz zusammengefaßt und einen Ausblick gegeben.
Three-dimensional models of urban objects play an important role in the urban applications such as urban planning, environmental concerning, or urban disaster mitigations. While the modeling of urban objects is time consuming and storage costing. This paper presents solutions for this. Buildings with regular shapes and plane roofs are constructed into computer models by identifying of graphic elements from the digital maps of urban area to get building base plane and building heights. Buildings with irregular shapes and non-plane roofs are constructed into computer models by employment of a specific system developed by the authors. Road objects and topologies are constructed into computer models by employment of specific algorithms. The solutions presented in this paper has been used in the development of urban disaster mitigation system for Shantou, China.
>Virtual Organizations<, >Virtual Enterprises< und >Smart Organizations< werden immer häufiger als zukünftige Geschäftsform für des Bauwesens und insbesondere der Bauplanung gesehen. Ziel dieser Organisationsformen ist es, eine temporäre geschäftliche Zusammenarbeit zur Erschließung neuer Geschäftsfelder aufzubauen, ausgehend von einer strategischen Geschäftsverbindung. Insbesondere für kleine Planungsbüros können sich hieraus Möglichkeiten zur Durchführung größerer Projekte eröffnen, indem notwendige Ressourcen, wie z.B. Fachingenieure, jeder Zeit flexibel integriert werden können. Neben dem Auftreten als Projektmanager besteht für die Planungsbüros auch die Möglichkeit Spezialwissen sowie nicht benötigte Ressourcen in andere Projekte zu integrieren. Ziel ist es dabei, eine kontinuierliche Auslastung der Mitarbeiter sicherzustellen. Durch die Nutzung einer geeigneten und allgemein zugänglichen IT-Infrastruktur über das Internet können neue Partner ohne großen Aufwand in ein Projekt aufgenommen werden indem diesen Zugriffe auf alle notwendigen Projektinformationen gegeben wird. Mit der Bereitstellung passender IT-Werkzeuge für das Projektmanagement, Datenmanagement und Vertragsmanagement wird eine effektive Projektbearbeitung gewährleistet. In diesem Beitrag werden die konzeptionellen Grundlagen virtueller Organisation genauer betrachtet und deren Anwendbarkeit auf virtuelle Planungsteams im Bauwesen untersucht. Anschließend wird, aufbauend auf diese Erkenntnisse, der Aufbau und die Komponenten einer Softwareumgebung zur Unterstützung des virtuellen Planungsteams erörtert. Zum Schluss erfolgt eine Darstellung des durch das BmBF geförderte Projekt iCSS.
Modelle und Verfahren zur Planung von langfristigen Bauprojekten unter Kapitalwertgesichtspunkten
(2003)
Langfristige Bauprojekte stellen sowohl aus technischer Sicht als auch unter Planungsgesichtspunkten überaus komplexe Herausforderungen dar. Den laufenden Auszahlungen für Löhne, Materialien und fremdbezogene Dienstleistungen stehen dabei erst nach einiger Zeit Fortschrittszahlungen für abgeschlossene Teilprojekte gegenüber. Die Durchführung eines solchen Projekts kann mithin als Investition angesehen werden. Im Gegensatz zu herkömmlichen Investitionen liegen bei Investitionsprojekten die Zeitpunkte der Ein- und Auszahlungen nicht fest, sondern sind Gegenstand der Planung. Zur Lösung des Annahme- bzw. Auswahlproblems bei Investitionsprojekten unter Sicherheit erfreut sich die Kapitalwertmethode breiter Zustimmung. Nach einer Betrachtung bekannter Ansätze zur Maximierung des Kapitalwerts von Investitionsprojekten unter Annahme eines vollkommenen Kapitalmarktes wird aufgezeigt, wie das vorgestellte Modell zur Kapitalwertmaximierung für den Fall beschränkt verfügbarer Ressourcen bzw. eines beschränkten Kreditrahmens angepasst werden kann. Die Bewertung von Investitionsprojekten auf Grundlage des optimalen Projektkapitalwerts setzt die Kenntnis des anzuwendenden Kalkulationszinsfußes und der maximalen Projektdauer voraus. Da diese Größen a priori nicht bekannt sind, entwickeln wir ein Verfahren zur Bestimmung des Kapitalwerts von Investitionsprojekten als Funktion des Kalkulationszinsfußes und der maximalen Projektdauer. Abschließend zeigen wir, wie die erzielten Resultate zur Entscheidungsunterstützung eines Bauunternehmers genutzt werden können.
Die fachlichen Grundlagen der Aufgaben, die in einem Bauunternehmen zu bearbeiten sind, wurden in verschiedenen Disziplinen entwickelt. Maßgeblich waren der Baubetrieb und die Betriebswirtschaftslehre. Die parallele Entwicklung hat jedoch dazu geführt, dass grundlegende Begriff und Verfahren zwischen den Disziplinen nicht aufeinander abgestimmt sind. Die verschiedenen Aufgaben beeinflussen jedoch einander. Innerhalb der jeweiligen Disziplin wurden Informationssysteme entwickelt, mit denen sich die Aufgaben aus der jeweiligen Disziplin bearbeiten lassen. Zur Verbindung der "verschiedenen Welten" existieren zwar ausgewählte Schnittstellen, eine durchgängige verteilte Bearbeitung der verschiedenen Aufgaben wird jedoch noch nicht umfassend unterstützt. Im vorliegenden Beitrag wird ein Vorgehen vorgestellt, auf dessen Grundlage eine verteilte Bearbeitung der fachgebietsübergreifenden Aufgaben erfolgen kann. Das Vorgehen beruht auf der Modellierung der Prozesse sowie der zur Bearbeitung der als Bestandteil der Prozesse spezifizierten Aufgaben benötigten Informationen. Dieses Modell wird auf der Grundlage der Mengenlehre mit einem entsprechenden Werkzeug aufgebaut. Die Spezifikation der Informationen wird genutzt, um Datenbankschemata zu generieren, die Spezifikation der Aufgaben wird genutzt, um Werkzeuge zur Bearbeitung zu identifizieren. Diese Werkzeuge sind in Java als Applets implementiert und können über entsprechende Treiber auf die Datenbanken zugreifen. Das Prozessmodell wird in einem nächsten Schritt erweitert. Personen werden eingeführt. Diesen Personen werden Aufgaben zugewiesen, deren Bearbeitung sie ausführen sollen. Auf der Grundlage des erweiterten Prozessmodells werden die Applets, die eine Person benötigt, auf einer entsprechenden Internet-Seite zusammengestellt. Damit kann projektspezifisch ein Informationssystem zusammengestellt werden, das eine verteilte Bearbeitung der verschiedenartigen Aufgaben unterstützt.