Refine
Document Type
- Conference Proceeding (336)
- Article (130)
- Doctoral Thesis (12)
- Master's Thesis (2)
- Working Paper (2)
- Preprint (1)
- Study Thesis (1)
Institute
- Professur Informatik im Bauwesen (484) (remove)
Keywords
- Modellierung (62)
- Bauwerk (48)
- Finite-Elemente-Methode (41)
- CAD (40)
- Verteiltes System (38)
- Bautechnik (30)
- Computerunterstütztes Verfahren (24)
- Produktmodell (24)
- Architektur (23)
- Simulation (22)
The management of resources is an essential task in each construction company. Today, ERP systems and e-Business systems are available to assist construction companies to efficiently organise the allocation of their personnel and equipment within the company, but they cannot provide the company with the idle resources for every single task that has to be performed during a construction project. Therefore, companies should have an alternative solution to better exploit expensive resources and compensate their fixed costs, but also have them available at the right time for their own business activities. This paper outlines the approach taken by the EU funded project “e-Sharing” (IST-2001-33325) to support resource management between construction companies. It will describe requirements for the management of construction resources, its core features, and the integration approach. Therefore, we will outline the approach of an integrated resource type model supporting the management and classification of construction equipment, construction tasks and qualification profiles. The development is based on a cross-domain analysis and evaluation of existing models. ...
Recently, many reseraches on active control systems of building structures are preformed based on modern control theory and are installed real buildings. The authors have already proposed intelligent fuzzy optimal active control (IFOAC) systems. IFOAC systems imitate intelligent activities of human brains such as prediction, adaptation, decision-kaking and so on. In IFOAC systems, objective and subjective judgements on the active control can be taken into account. However, IFOAC systems are considered to be suitable for far-field erathquake and control effect becomes small in case of near-field earthqaukes which include a few velosity pules with large amplitudes. To improve control effect in case of near-souece earthquakes, the authors have also proposed hybrid control (HC) systems, in which IFOAC systems and fuzzy control system are combined. In HC systems, the fuzzy control systems are introduced as a reflective fuzzy active control (RFAC) system and imitates spinal reflection of human. In HC systems, active control forces are activated to buildings in accordance with switching rules on active control forces. In this paper, optimizations on fuzzy control rules in RFAC system and switching rules of active control forces in HC system are performed by Parameter-Free Genetic Algorithms (PfGAs). Here, the optimization is performed by using different earthquake inputs. The results of digital simulations show that the HC system can reduce maximal response displacements under restrictions on strokes of the actuator effectively in case of a near-source earthquake and the effectiveness of the proposed HC system is discussed and clarified.
Research on Establishment of a Standard of Traffic Impact Assessment with Integrated Database System
(2004)
Planning support systems, such as geographical information system (GIS) and traffic flow simulation models, are widely in use in recent urban planning research. In this paper we propose a method to apply traffic impact assessment (TIA) to large-scale, commercial developments. In TIA research we often encounter the problem of increasing amount of data that is necessary for detailed investigation and analysis, as the scale of commercial developments become larger and more complex. As a result, TIA presents two problems. The first problem is the difficulty of data acquisition. The second problem is the reliability of data. As a solution, we developed an integrated database system.
A multicriterial statement of the above mentioned problem is presented. It differes from the classical statement of Spanning Tree problem. The quality of solution is estimated by vector objective function which contains weight criteria as well as topological criteria (degree and diameter of tree). Many real processes are not determined yet. And that is why the investigation of the stability is very important. Many errors are connected with calculations. The stability analysis of vector combinatorial problems allows to discover the value of changes in the initial data for which the optimal solution is not changed. Furthermore, the investigation of the stability allows to construct the class of the problems on base of the one problem by means of the parameter variations. Analysis of the problems with belong to this class allows to obtaine axact and adecuate discription of model
The technological processes, schedules, parallel algorithms, etc., having some technological limitations and exacting increases of efficiency of their execution can be described through digraphs, on which the appropriate optimization problem (construction of optimal scheduling of tops of digraph) can be solved. The problems, researched in the given operation, have a generally following statement: The problem 1: Under the given graph G and option value h to construct parallel scheduling of tops of digraph of minimum length. Let's designate the problem S(G, h, l). The problem 2: Under the given graph G and option value l to construct parallel scheduling of tops of digraph of minimum width. Let's designate the problem S(G, l, h). The problem 3: Under the given graph G, option value h and periods of execution of operations di, i=1, …, n to construct parallel scheduling of tops of digraph of minimum length. Let's designate the problem S(G, h, di, l). The problems 1,2,3 in a case when h-arbitrary have exponential complexity. In operation the method of solution of the problem S(T, h, di, l) is offered on the basis of choice of tops having greatest weight. The approach to solution of the problem S(G, 3, l) is offered, where G the graph satisfying property : S[i] =S [i], i=1, …, l. For obtaining a rating of width of scheduling on an available estimator of length, we offer to use iterative algorithm of polynomial complexity, on which each step the current value of width of scheduling is set, which is used for specification of length of scheduling.
The paper introduced the research and application of the highway construction management information integrated system. Explained the development and application of highway survey applet run on mobile telephone supporting Java and the technique of transmitting engineering data by GPRS wireless network technology. And expounded the development and application of highway engineering construction field data collecting software run on Pocket-PC. Recommended the technique of engineering long distance data transmitting based on C/S structure adopting VPN (Virtual Private Networks) technology. Especially expatiated on the research on the platform of highway construction management information integrated system adopting geography information system (GIS) technique, database technique and network technique. And said all to subsystem about bid manage, contract management, engineering design drawing, engineering survey calculation, measure and pay, data processing on engineering experiment, quantity assessing, project plan and progress, engineering document management etc. Besides? proposed highway construction project visual analysis and inquiry system based on Web-GIS; Explained the research and application of highway engineering construction OA based on B/S structure; real-time workflow and information processing such as the management of administration, business and procedure of authorization and information distribution. At last, the author described the prospect of the application of C/S and B/S structure in trade software development in the highway construction management.
In current AEC practice client requirements are typically recorded in a building program, which, depending on the building type, covers various aspects from the overall goals, activities and spatial needs to very detailed material and condition requirements. This documentation is used as the starting point of the design process, but as the design progresses, it is usually left aside and changes are made incrementally based on the previous design solution. These incremental small changes can lead to a solution that may no longer meet the original requirements. In addition, design is by nature an iterative process and the proposed solutions often also cause evolution in the client requirements. However, the requirements documentation is usually not updated accordingly. Finding the latest updates and evolution of the requirements from the documentation is very difficult, if not impossible. This process can lead to an end result, which is significantly different from the documented requirements. Some important requirements may not be satisfied, and even if the design process was based on agreed-upon changes in the scope and requirements, differences in the requirements documents and in the completed building can lead to well-justified doubts about the quality of the design and construction process...
Die Verfügbarkeit und die sichere Beherrschung moderner und kostengünstiger Informations- und Kommunikationstechnologien gestattet es auch kleinen unternehmerischen Einheiten im Bauwesen sich in betriebsübergreifenden Netzwerken zu organisieren und sich besser in die Wertschöpfungskette am Bau zu integrieren. In sogenannten >Virtuellen Organisationen< (VO) können diese für die Volkswirtschaft wichtigen Unternehmen ihre Wettbewerbsvorteile wie höhere Flexibilität, schnelle Reaktion auf Kundenwünsche und Marktnähe nutzen und somit ihr langfristiges Bestehen in einem liberalen Wettbewerb auf einem erweiterten EU-Markt sichern und ausbauen. Die derzeit existierenden Hindernisse im Informationsfluss zwischen Baustelle und Büro können durch den Einsatz mobiler, funkvernetzter Endgeräte, wie beispielsweise >Smart-Phones<, und einer neu zu gestaltenden Infrastruktur zum Wissensmanagement und zur kontextsensitiven Informationsdarstellung abgebaut werden. Im Rahmen dieser Veröffentlichung werden konzeptionelle Ansätze eines integrierten Informationsmanagements zur Unterstützung von VO, die im Rahmen des BMBF-Projektes >IuK-System Bau< derzeit entwickelt werden, vorgestellt.
Renovation's peculiarities of industrial enterprises in conditions of economic selfsufficiency
(1997)
Probleme of recrienfation of building complex, to the sharp increase of share of reconstruction works, capital repair and modernisation of in-dustrial plants are concidered in this work. The conception of develop-ment and creation of unitified system of expluatation and renovation of industrial plants are worded out. This system is based on date-computer technology and taking into conciderations of real economic relations.
Die zunehmend erforderliche Kooperation verschiedener Beteiligter unterschiedlicher Fachbereiche und der Einsatz hochspezialisierter Fachapplikationen in heterogenen Systemumgebungen unterstreichen die Bedeutung und Notwendigkeit neuer Konzepte und Möglichkeiten zur Schaffung einer computergestützten Integrationsebene. Ziel einer computergestützten Integrationsebene ist die Verbesserung der Kooperation und Kommunikation unter den Beteiligten. Grundlage dafür ist die Etablierung eines effizienten und fehlerfreien Daten- und Informationsaustausches zwischen den verschiedenen Fachplanern und -applikationen. Die Basis für die Datenintegrationsebene bildet ein digitales Bauwerksmodell im Sinne eines >virtuellen Bauwerks<, welches alle relevanten Daten und Informationen über ein zu planendes oder real existierendes Bauwerk zur Verfügung stellt. Bei der Verwirklichung einer Bauwerksmodell-orientierten Datenintegrationsebene und deren Modellverwaltung erweist sich speziell die Definition des Bauwerksmodells also die Spezifikation der relevanten auszutauschenden Daten als äußerst komplex. Der hier vorzustellende Relationen-orientierte Ansatz, d.h. die Realisierung des Daten- und Informationsaustauschs mittels definierter Relationen und Beziehungen zwischen dynamisch modifizierbaren Domänenmodellen, bietet Ansätze zur: * Verringerung und Beherrschung der Komplexität des Bauwerksmodells (Teilmodellbildung) * Realisierung eines effizienten Datenaustauschs (Relationenmanagement) Somit stellt der Relationenorientierte Ansatz einen adäquaten Lösungsweg zur Modellierung eines digitalen Bauwerksmodells als Datenintegrationsebene für den Lebenszyklus eines Bauwerkes dar.