Cost and Schedule Controlling in Relation to Liquidity Management during Construction Projects
(2004)
The present paper describes a software application which can be used for relating the scheduled events of a construction project with the respective financial parameters, leading to an overall improvement in general controlling and liquidity management. For this purpose, existing construction schedules are taken and details of the assignment are recorded. Thus it becomes possible to assess a future payment status should changes in the designated schedule occur.
The management of resources is an essential task in each construction company. Today, ERP systems and e-Business systems are available to assist construction companies to efficiently organise the allocation of their personnel and equipment within the company, but they cannot provide the company with the idle resources for every single task that has to be performed during a construction project. Therefore, companies should have an alternative solution to better exploit expensive resources and compensate their fixed costs, but also have them available at the right time for their own business activities. This paper outlines the approach taken by the EU funded project “e-Sharing” (IST-2001-33325) to support resource management between construction companies. It will describe requirements for the management of construction resources, its core features, and the integration approach. Therefore, we will outline the approach of an integrated resource type model supporting the management and classification of construction equipment, construction tasks and qualification profiles. The development is based on a cross-domain analysis and evaluation of existing models. ...
One of the most promising and recent advances in computer-based planning is the transition from classical geometric modeling to building information modeling (BIM). Building information models support the representation, storage, and exchange of various information relevant to construction planning. This information can be used for describing, e.g., geometric/physical properties or costs of a building, for creating construction schedules, or for representing other characteristics of construction projects. Based on this information, plans and specifications as well as reports and presentations of a planned building can be created automatically. A fundamental principle of BIM is object parameterization, which allows specifying geometrical, numerical, algebraic and associative dependencies between objects contained in a building information model. In this paper, existing challenges of parametric modeling using the Industry Foundation Classes (IFC) as a federated model for integrated planning are shown, and open research questions are discussed.
Seit die Datenverarbeitung in ihrer Komplexität sich der Thematik des Computer Integrated Manufacturing widmet gehört die Produktionsplanung und Steuerung zu jenen Bereichen, in denen eine Computerunterstützung am vordringlichsten erschien. Später sind betriebswirtschaftliche Gesamtlösungen entstanden, die (bis heute recht unpräzise) als Enterprise Resource Planning (ERP)-Systeme bezeichnet werden und in ihren Logistik-Modulen auch Funktionen der Produktionsplanung abdecken. Alle bekannten MRP-, PPS- und auch ERP-Systeme beruhen auf einer Sukzessivplanung. Advanced Planning and Scheduling (APS) Systems finden seit etwa 1995 zunehmend Interesse. Neben Demand Planning, Production Planning and Scheduling, Distribution Planning, Transportation Planning und Supply Chain Planning werden Lösungen für Anzahl und Standorte von Produktionsstätten und Auslieferungslagern, Zuordnung zu Produktionsstätten, Kapazitätsbestimmung für Arbeitskräfte und Betriebsmittel je Standort, Lagerhaltung je Teil und Lager, Bestimmung benötigter Transportmittel und Häufigkeit ihres Einsatzes, Zuordnung von Lagern zu Produktionsstätten von Märkten zu Lagern u.a.m. von APS-Systemen erwartet. D.h. APS-Systeme ergänzen ERP-Lösungen, nutzen die bereits durch das ERP-System vorhandenen Daten und benötigen neuartige Algorithmen und (Meta-) Heuristiken. Im Rahmen des Vortrages werden Modelle und Echtzeitalgorithmen zur Optimierung der Logistik für Prozesse mit kurzfristigen Anforderungen, geographisch verteilter Produktion, Lagerhaltung der Ausgangs-, Zwischen- und Endprodukte und wechselnden Transport-Bedingungen aus der Sicht der praktischen Umsetzung und Anwendung in Form einer ASP-Lösung aufgezeigt und diskutiert.
This paper presents a specific modeling technique that is focused on preparing planning processes in civil engineering. Planning processes in civil engineering are characterized by some peculiarities so that the sequence of planning tasks needs to be determined for each planning project. Neither the use of optimized partial processes nor the use of lower detailed and optimized processes guarantee an optimal overall planning process. The modeling technique considers these peculiarities. In a first step, it is focused on the logic of the planning process. Algorithms based on the graph theory determine that logic. This approach ensures consistency and logical correctness of the description of a planning process at the early beginning in its preparation phase. Sets of data – the products of engineers like technical drawings, technical models, reports, or specifications – form the core of the presented modeling technique. The production of these sets of data requires time and money. This is expressed by a specific weighting of each set of data in the presented modeling technique. The introduction of these weights allows an efficient progress measurement and controlling of a planning project. For this purpose, a link between the modeling technique used in the preparation phase and the execution phase is necessary so that target and actual values are available for controlling purposes. The present paper covers the description of this link. An example is given to illustrate the use of the modeling technique for planning processes in civil engineering projects.
In construction engineering, a schedule’s input data, which is usually not exactly known in the planning phase, is considered deterministic when generating the schedule. As a result, construction schedules become unreliable and deadlines are often not met. While the optimization of construction schedules with respect to costs and makespan has been a matter of research in the past decades, the optimization of the robustness of construction schedules has received little attention. In this paper, the effects of uncertainties inherent to the input data of construction schedules are discussed. Possibilities are investigated to improve the reliability of construction schedules by considering alternative processes for certain tasks and by identifying the combination of processes generating the most robust schedule with respect to the makespan of a construction project.
The methods currently used for scheduling building processes have some major advantages as well as disadvantages. The main advantages are the arrangement of the tasks of a project in a clear, easily readable form and the calculation of valuable information like critical paths. The main disadvantage on the other hand is the inflexibility of the model caused by the modeling paradigms. Small changes of the modeled information strongly influence the whole model and lead to the need to change many more details in the plan. In this article an approach is introduced allowing the creation of more flexible schedules. It aims towards a more robust model that lowers the need to change more than a few information while being able to calculate the important propositions of the known models and leading to further valuable conclusions.
Available construction time-cost trade-off analysis models can be used to generate trade-offs between these two important objectives, however, their application is limited in large-scale construction projects due to their impractical computational requirements. This paper presents the development of a scalable and multi-objective genetic algorithm that provides the capability of simultaneously optimizing construction time and cost large-scale construction projects. The genetic algorithm was implemented in a distributed computing environment that utilizes a recent standard for parallel and distributed programming called the message passing interface (MPI). The performance of the model is evaluated using a set of measures of performance and the results demonstrate the capability of the present model in significantly reducing the computational time required to optimize large-scale construction projects.
Der Beitrag beschreibt die Entwicklung eines Softwaresystems zur strukturierten Erfassung und Verwaltung bestehender Gebäude in der Architektur. Die Erfassung erfolgt durch die Aufnahme von geometrischen Daten und Sachdaten in unterschiedlichen Abstraktionsstufen unter Einbeziehung einer vorangehenden Dekomposition. Basis für die Entwicklung eines solchen Systems ist die Analyse und Systematik der Erfassungstechniken, -abläufe und der Gegenstand der architektonischen Bestandsaufnahme. Parallel hierzu erfolgt die Bewertung und Nutzung aktueller Techniken und Werkzeuge der applikativen Informatik. Schwerpunkte der Forschungsarbeit sind die Ableitung einer allgemeinen Gebäude- und Bauteilstruktur, die Einbeziehung aktueller informationstechnischer Verfahren und Werkzeuge und die Entwicklung eines entsprechenden Experimentalsystems. Auf eine Auswahl softwaretechnischer Entwicklungen wird näher eingegangen (objektspezifische Eigenschaften, flexible Geometrieerfassung und Benutzeroberflächen).
Applications for civil engineering tasks usually contain graphical user interfaces for the engineering processes. Persistent objects of the applications are stored to data bases. The influence of the interaction between a graphical user interface and a data base for the development of an civil engineering application is investigated in this paper. A graphic application for the linear elastic analysis of plane frames, which was previously developed with standard tools of the Java platform, is compared to a redesigned implementation using a generalized data base for persistent objects. The investigation leads to the following results : - A strict distinction between persistent and transient objects influences the class structure of an application, in particular the class structure of a graphical user interface. - The structure of an application depends on the logic for updating of references to persistent and transient graphical objects after an application is read from a file. - The complexity of the reference management can usually be handled better by just in time referencing associated with String - identifiers rather than by automated referencing associated with Name - identifiers.