Refine
Document Type
- Article (35) (remove)
Institute
- Institut für Strukturmechanik (ISM) (14)
- Professur Stochastik und Optimierung (11)
- In Zusammenarbeit mit der Bauhaus-Universität Weimar (6)
- Junior-Professur Computational Architecture (4)
- F. A. Finger-Institut für Baustoffkunde (FIB) (3)
- Materialforschungs- und -prüfanstalt an der Bauhaus-Universität (2)
- Professur Verkehrsplanung und Verkehrstechnik (2)
- Dozentur Film- und Medienwissenschaft (1)
- Internationales Kolleg für Kulturtechnikforschung und Medienphilosophie (IKKM) (1)
- Juniorprofessur Urban Energy Systems (1)
Keywords
- Angewandte Mathematik (11)
- Stochastik (11)
- Strukturmechanik (11)
- Controlling (2)
- Entscheidungsunterstützung (2)
- Kosten-Nutzen-Analyse (2)
- Silicate (2)
- Stadt (2)
- Verkehrssicherheit (2)
- Wasserglas (2)
Year of publication
- 2016 (35) (remove)
Previous publications about biochar in anaerobic digestion show encouraging results with regard to increased biogas yields. This work investigates such effects in a solid-state fermentation of bio-waste. Unlike in previous trials, the influence of biochar is tested with a setup that simulates an industrial-scale biogas plant. Both the biogas and the methane yield increased around 5% with a biochar addition of 5%-based on organic dry matter biochar to bio-waste. An addition of 10% increased the yield by around 3%. While scaling effects prohibit a simple transfer of the results to industrial-scale plants, and although the certainty of the results is reduced by the heterogeneity of the bio-waste, further research in this direction seems promising.
In Zeiten volatiler Immobilienmärkte und einer hohen Wettbewerbsintensität sind leistungsfähige Systeme der Analyse und Entscheidungsunterstützung unverzichtbar. Entscheidungen zu Investitionsstrategien und Einzelinvestitionen basieren zumeist auf mehreren entscheidungsrelevanten Kriterien. Unterschiedliche immobilienwirtschaftliche Entscheidungsalternativen können dabei durchaus Kriterienausprägungen aufweisen, die eine bestimmte Alternative nicht als stets besser bzw. stets schlechter ausweisen. Klassische finanzwirtschaftliche Modelle oder verbreitete qualitative Verfahren wie das Scoring können die gegebene Komplexität meist nicht angemessen berücksichtigen. Eine Weiterentwicklung immobilienwirtschaftlicher Entscheidungsmodelle ist durch die Übertragung und Spezifizierung multikriterieller Verfahren der Entscheidungsunterstützung möglich. Speziell die Untergruppe des Outranking beschäftigt sich mit der schrittweisen Strukturierung, Ordnung und Priorisierung von komplexen Auswahlalternativen. Als spezifische immobilienwirtschaftliche Fragestellung dient hier die Auswahl und Priorisierung von Zielmärkten im taktischen Portfoliomanagement eines institutionellen Immobilienportfoliosmit internationaler Ausrichtung. Die Formalisierung des Entscheidungsproblems „Priorisierung von Zielmärkten“ erfolgt mit dem ELECTRE-Verfahren.
Purpose of this study is to evaluate safety impact of the deceleration lane at the Upstream Zone of at-grade U-turns on 4-lane divided Thai highways. A substantial speed reduction is required by vehicles for diverging and making U-turn, and the deceleration lanes are provided for this purpose. These lanes are also providing a storage space for the U-turning vehicles to avoid unnecessary blockage of through lanes and reduce the potential of rear-end collisions. The safety at the U-turn is greatly influenced by the proper or improper use of the deceleration lanes. Subject to their length, full or partial speed adjustment can occur within the deceleration lane also the road users’ behavior is influenced. To assess the safety impact, the four groups of U-turns with the varying length of deceleration lanes were identified. Owing to limitation of availability and reliability of road crash data in Thailand, widely accepted Traffic Conflict Technique (TCT) was used as an alternative and proactive methodology. The U-turns’ geometric data, traffic conflicts and volume data were recorded in the field at 8 locations, 8 hours per location. Severity Conflict Rate (SCR) was assessed by applying a weighing factor (based on the severity grades according to the Czech TCT) to the observed conflicts related to the conflicting traffic volumes. A comparative higher value of SCR represents a lower level of safety. According to the results, increase in the functional length of the deceleration lane yields a lower value of SCR and a higher level of the road safety.
To assess the safety impact of auxiliary lanes at downstream locations of U-turns, the Traffic Conflict Technique was used. On the basis of the installed components at those locations, four types of U-turns were identified: those without any auxiliary lane, those with an acceleration lane, those with outer widening, and those with both an acceleration lane and outer widening. The available crash data is unreliable, therefore to assess the level of road safety, Conflict Indexes were formulated to put more emphasis on severe crashes than on slight ones by using two types of weighting coefficients. The first coefficient was based on the subjective assessment of the seriousness of the conflict situation and the second was based on the relative speed and angle between conflicting streams. A comparatively higher Conflict Index value represents a lower level of road safety. According to the results, a lower level of road safety occurs if two components apply or if a location is without any auxiliary lane. The highest level of road safety occurs if the layout includes only a single component, either an acceleration lane or outer widening.