620 Ingenieurwissenschaften und zugeordnete Tätigkeiten
Refine
Document Type
- Doctoral Thesis (13) (remove)
Institute
- F. A. Finger-Institut für Baustoffkunde (FIB) (2)
- Institut für Strukturmechanik (ISM) (2)
- Professur Informatik im Bauwesen (2)
- Institut Geotechnik Weimar (1)
- Institut für Konstruktiven Ingenieurbau (IKI) (1)
- Juniorprofessur Polymere Bindemittel und Baustoffe im Bauwesen (1)
- Professur Aufbereitung von Baustoffen und Wiederverwertung (1)
- Professur Bauklimatik (1)
- Professur Experimentelle Konstruktions- und Materialanalyse (1)
- Professur Informations- und Wissensverarbeitung (1)
Keywords
- Beton (3)
- Bauplanung (2)
- Mehrskalenanalyse (2)
- Mehrskalenmodell (2)
- Schwinden (2)
- Versionsverwaltung (2)
- 4D-Simulation (1)
- Adaptives Verfahren (1)
- Adhäsion (1)
- Animation (1)
Year of publication
- 2009 (13) (remove)
Seit Anfang der 80er Jahre stehen Zusatzmittel (engl. Shrinkage Reducing Admixture – SRA) der bauchemischen Industrie zur Verfügung, die das Schwinden von Zementstein und Beton reduzieren können. In der vorliegenden Arbeit wurden die Wirkungsmechanismen schwindreduzierender Zusatzmittel (SRA) und darin enthaltener Wirkstoffe in Zementstein systematisch untersucht. Es hat sich gezeigt, dass das autogene Schwinden von Zementstein wurde durch handelsübliche Schwindreduzierer und darin enthaltene Wirkstoffe im Alter von einem halben Jahr um bis zu 77 % reduziert. Durch Schwindreduzierer wurden in Bezug auf die jeweiligen Referenzproben ohne SRA die Anteile an Gelporen im Zementstein erhöht und die Anteile an Kapillarporen verringert. Gleichzeitig stellte sich in den Zementsteinen mit Schwindreduzierer bzw. den darin enthaltenen Wirkstoffen bei konservierender Lagerung eine höhere innere Ausgleichsfeuchte ein als in den jeweiligen Referenzproben ohne SRA. Die bisherige Annahme, die Abminderung des Schwindens durch SRA sei nur auf die Reduzierung der Oberflächenspannung der Porenlösung zurückzuführen, ist nur bedingt zutreffend. Während der Hydratation des Zements wird Wasser verbraucht und in Hydratphasen eingebaut. Hierbei reichern sich die SRA-Moleküle in der Porenlösung des Zementsteins an und verstärken die Spaltdruckwirkung der Porenlösung zwischen den Gelpartikeln. Dadurch wird das autogene Schwinden des Zementsteins vermindert.
Für die Sanierung von Bauwerken werden meist Informationen über die innere Struktur und den Aufbau, Belastungszustände, Feuchte- und Salzgehalte benötigt. Die Untersuchung mit zerstörungsarmen und -freien Methoden minimieren die dazu nötigen Eingriffe. Ebenfalls bieten die ZfP-Verfahren die Möglichkeit, den Erfolg einer Maßnahme zu kontrollieren sowie Prozesse über einen langen Zeitraum zu beobachten (Monitoring). Die vorliegende Arbeit befasst sich mit der zerstörungsfreien Untersuchung von inneren Strukturen und des Aufbaus von Mauerwerk mittels Ultraschall und Radar. Der untersuchte Querschnitt wird tomografisch rekonstruiert. Diese Darstellungsart bietet den Vorteil der Tiefenbestimmung von Objekten und der besseren Visualisierung für Auftraggeber und/oder Laien. Es wurden die Laufzeiten der Longitudinalwellen rekonstruiert. Die Frequenzen der Ultraschalluntersuchungen lagen bei 25 kHz sowie 85 kHz und der Radaruntersuchungen bei 900 MHz sowie 1,5 GHz. Die Rekonstruktion erfolgte mit dem Tomografieprogramm “Geo-Tom“, welches auf der Grundlage des SIRT-Algorithmus arbeitet. Die untersuchten Querschnitte beinhalteten Anomalien bestehend aus Luft, Granit, Holz und Mörtel. Die Abmaße der Anomalien lagen zwischen 10-27 cm bezogen auf einen Querschnitt von 0,76 x 1,0 m. Eine Ortung der Anomalien war möglich, wenn diese eine Laufzeitveränderung von mindestens der Größe des Messfehlers bewirken. Die Größe dieser Laufzeitdifferenz ist abhängig von den Abmaßen der Anomalie und dem Kontrast der elektromagnetischen bzw. akustischen Eigenschaften zwischen Anomalie und umgebenden Material. Eine Aussage über die Größe der Anomalie ist möglich, jedoch kann auf die Form nur bedingt geschlussfolgert werden. Des Weiteren kann durch den Vergleich der beiden Verfahren ein Rückschluss auf die möglichen Materialien der Anomalie gezogen werden.
Keramische Werkstoffe stellen bewährte, ästhetisch ansprechende und dauerhafte Baustoffe dar. Sie können als ökologisch wertvoll, gesund und wirtschaftlich eingestuft werden (Wagner et al. 1998)... Zum Einsatz von Sekundärrohstoffen in keramische Massen, d.h. zur Herstellung keramischer Erzeugnisse wurden bereits zahlreiche Untersuchungen durchgeführt. ... Die Zielstellung der vorliegenden Arbeit liegt daher in der umfassenden Beurteilung des Einsatzes von Sekundärrohstoffen in silikatkeramische Massen. Als Sekundärrohstoffe wurden Gesteins- sowie Glas- bzw. glashaltige Reststoffe unterschiedlicher Zusammensetzungen gewählt. ...
Die betriebsfeste Auslegung von Hochdruckbauteilen ist technisch-wirtschaftlich notwendig. In dieser Arbeit werden die wissenschaftlichen Grundlagen dafür erarbeitet. Die technische Entwicklung der Hochdruckbauteile führt insbesondere bei Dieselmotoren zu stetig steigenden Drücken und damit zu einer wachsenden Herausforderung bei der Festigkeitsauslegung. Bei Hochdruckbauteilen sind die Möglichkeiten der Schwingfestigkeitssteigerung, z. B. durch Wanddickenvergrößerung oder durch den Einsatz höherfester Werkstoffe, begrenzt. Eine breite industrielle Anwendung findet derzeit die Autofrettage. Bei diesem Verfahren erzeugt eine einmalige statische Überlast tief in das Bauteil reichende Druckeigenspannungsfelder, die zu einer erheblichen Schwingfestigkeitssteigerung, insbesondere in der Rissfortschrittsphase, führen. Zuverlässige Lebensdauervorhersageverfahren für diese Phase existieren derzeit nicht. Sie werden in der vorliegenden Arbeit entwickelt und anhand experimenteller Ergebnisse verifiziert. Für das Berechnungsverfahren fand ein ingenieurmäßiger Ansatz Verwendung. Darin sollten zwar alle relevanten Effekte abgebildet werden, jedoch Komplexität und Modellierungsaufwand so gering wie möglich gehalten werden. Die gewählten Berechnungsmodule sind nach erfolgter Analyse der Literatur entnommen. Sie umfassen die Berechnung der Autofrettageeigenspannungen, der Spannungsintensität, des Rissöffnungs- und Rissschließverhalten und des Rissfortschrittes. Das Modul Eigenspannungsberechnung für die Autofrettage basiert auf der Superposition von Autofrettagebe- und -entlastung und ermöglicht die notwendige Berücksichtung des Bauschinger-Effektes. Spannungsintensitäten werden mit einer 3D-Gewichtsfunktion für einen ebenen Riss unter Mode I Beanspruchung ermittelt, weil aufgrund der Symmetrie der meisten Hochdruckbauteile das stabile Langrisswachstum ausschließlich unter Mode I Beanspruchung stattfindet. Die Rissöffnungs- und -schließeffekte werden über Näherungsformeln abgebildet. In der Anwendung dieser Näherungsformeln hat sich die Rissöffnungsbeziehung nach Ibrahim et. al. durch den Vergleich mit von rechnerischen mit experimentellen Lebensdaueren als am Besten geeignet erwiesen. Bei dem untersuchten Werkstoff 42CrMo4 spielen die Reihenfolgeeffekte eine untergeordnete Bedeutung und werden deshlab nicht modelliert. Für die Rissfortschrittsbeziehung konnte auf die Formulierung der Paris-Erdogan Beziehung für effektive Schwingweiten zurückgegriffen werden. Die gewählten Berechnungsmodule sind nach erfolgter Analyse der Literatur entnommen, aber in dieser Zusammenstellung ein neuer Ansatz. Da die Einzelmodule nur in geringem Umfang zu verifizieren sind, kann das Berechnungsverfahren nur in seiner Gesamtheit durch den Vergleich von experimentellen zu vorhergesagten Lebensdauern und Dauerfestigkeiten überprüft werden. In verschiedenen Sensitivitätsanalysen konnten für die Berechnungsparameter Rissöffnungsbeziehung, Anfangsrisslänge, Bruchzähigkeit, Rissfortschrittsgleichung und Schwellwert der Spannungsintensität der Einfluss auf die berechnete Rissfortschrittslebensdauer und -dauerfestigkeit aufgezeigt werden. So hat der Schwellwert der Spannungsintensität einen geringen Einfluss auf die Vorhersage der Rissstillstandsdauerfestigkeit autofrettierter Kreuzbohrungen, weil der Rissöffnungsdruck sehr nahe am Maximaldruck ist. Eine andere Sensitivitätsanalyse zeigt beispielsweise, dass sich die längsten Rissfortschrittslebensdauern bei Verwendung der Rissöffnungsbeziehung nach Ibrahim et. al. ergeben, weil diese Beziehung die größten Rissöffnungsdrücke vorhersagt. Für die Verifikation des Berechnungsverfahrens sind Innendruckschwellversuche an insgesamt 14 Versuchsreihen mit Kreuzbohrungen durchgeführt worden. Die allgemeine Anwendbarkeit des Berechnungsverfahrens konnte durch die Anwendung auf Kreuzbohrungen aus den Forschungsvorhaben Autofrettage I-III, auf Railstücke und auf Hochdruckverteilerleisten nachgewiesen werden. Auch hier stützt sich die Verifikation auf umfangreiche experimentelle Ergebnisse. Die statistische Auswertung des Verhältnisses der vorhergesagten zu experimentellen Lebensdauern und Schwingfestigkeiten aller untersuchten Bohrungsverschneidungen zeigt eine gute mittlere Vorhersagegüte bei geringer Streuung. Damit ist die Leistungsfähigkeit der vorgestellten Lebensdauervorhersagemethode nachgewiesen.
Ziel der Arbeit ist es, eine neue Methode der seismischen Gefährdungsabschätzung vorzustellen. Es wird die Abschätzung der seismischen Gefährdung ohne die häufig angewandten Einteilungen in seismische Quellzonen beschrieben. Die vorgestellte Methode basiert auf Nachbarschaftsanalysen von Epizentren. Diese Nachbarschaftsanalysen ermöglichen ein selbst generierendes seismisches Quellenmodell. Entwicklung, Parameterstudien und Anwendung der Methode werden gezeigt.
From a macroscopic point of view, failure within concrete structures is characterized by the initiation and propagation of cracks. In the first part of the thesis, a methodology for macroscopic crack growth simulations for concrete structures using a cohesive discrete crack approach based on the extended finite element method is introduced. Particular attention is turned to the investigation of criteria for crack initiation and crack growth. A drawback of the macroscopic simulation is that the real physical phenomena leading to the nonlinear behavior are only modeled phenomenologically. For concrete, the nonlinear behavior is characterized by the initiation of microcracks which coalesce into macroscopic cracks. In order to obtain a higher resolution of this failure zones, a mesoscale model for concrete is developed that models particles, mortar matrix and the interfacial transition zone (ITZ) explicitly. The essential features are a representation of particles using a prescribed grading curve, a material formulation based on a cohesive approach for the ITZ and a combined model with damage and plasticity for the mortar matrix. Compared to numerical simulations, the response of real structures exhibits a stochastic scatter. This is e.g. due to the intrinsic heterogeneities of the structure. For mesoscale models, these intrinsic heterogeneities are simulated by using a random distribution of particles and by a simulation of spatially variable material parameters using random fields. There are two major problems related to numerical simulations on the mesoscale. First of all, the material parameters for the constitutive description of the materials are often difficult to measure directly. In order to estimate material parameters from macroscopic experiments, a parameter identification procedure based on Bayesian neural networks is developed which is universally applicable to any parameter identification problem in numerical simulations based on experimental results. This approach offers information about the most probable set of material parameters based on experimental data and information about the accuracy of the estimate. Consequently, this approach can be used a priori to determine a set of experiments to be carried out in order to fit the parameters of a numerical model to experimental data. The second problem is the computational effort required for mesoscale simulations of a full macroscopic structure. For this purpose, a coupling between mesoscale and macroscale model is developed. Representative mesoscale simulations are used to train a metamodel that is finally used as a constitutive model in a macroscopic simulation. Special focus is placed on the ability of appropriately simulating unloading.
Bauwerke sind in der Regel Unikate, für die meist eine komplette und aufwändige Neuplanung durchzuführen ist. Der Umfang und die Verschiedenartigkeit der einzelnen Planungsaufgaben bedingen ein paralleles Arbeiten der beteiligten Fachplaner. Darüber hinaus ist die Bauplanung ein kreativer und iterativer Prozess, der durch häufige Änderungen des Planungsmaterials und Abstimmungen zwischen den Fachplanern gekennzeichnet ist. Mithilfe von speziellen Fachanwendungen erstellen die Planungsbeteiligten verschiedene Datenmodelle, zwischen denen fachliche Abhängigkeiten bestehen. Ziel der Arbeit ist es, die Konsistenz der einzelnen Fachmodelle eines Bauwerks sicherzustellen, indem Abhängigkeiten auf Basis von Objektversionen definiert werden. Voraussetzung dafür ist, dass die Fachanwendungen nach dem etablierten Paradigma der objektorientierten Programmierung entwickelt wurden. Das sequentielle und parallele Arbeiten mehrerer Fachplaner wird auf Basis eines optimistischen Zugriffsmodells unterstützt, das ohne Schreibsperren auskommt. Weiterhin wird die Historie des Planungsmaterials gespeichert und die Definition von rechtsverbindlichen Freigabeständen ermöglicht. Als Vorbild für die Systemarchitektur diente das Softwarekonfigurationsmanagement, dessen Versionierungsansatz meist auf einem Client-Server-Modell beruht. Die formale Beschreibung des verwendeten Ansatzes wird über die Mengenlehre und Relationenalgebra vorgenommen, so dass er allgemeingültig und technologieunabhängig ist. Auf Grundlage dieses Ansatzes werden Konzepte für den Einsatz versionierter Objektmodelle im Bauwesen erarbeitet und mit einer Pilotimplementierung basierend auf einer Open-Source-Ingenieurplattform an einem praxisnahen Szenario verifiziert. Beim Entwurf der Konzepte wird besonderer Wert auf die Handhabbarkeit der Umsetzung gelegt. Das betrifft im Besonderen die hierarchische Strukturierung des Projektmaterials, die ergonomische Gestaltung der Benutzerschnittstellen und der Erzielung von geringen Anwortzeiten. Diese Aspekte sind eine wichtige Voraussetzung für die Effizienz und Akzeptanz von Software im praktischen Einsatz. Bestehende Fachanwendungen können durch geringen Entwicklungsaufwand einfach in die verteilte Umgebung integriert werden, ohne sie von Grund auf programmieren zu müssen.
Im Rahmen des sich derzeit vollziehenden Wandels von der segmentierten, zeichnungsorientierten zur integrierten, modellbasierten Arbeitsweise bei der Planung von Bauwerken und ihrer Erstellung werden Computermodelle nicht mehr nur für die physikalische Simulation des Bauwerksverhaltens, sondern auch zur Koordination zwischen den einzelnen Planungsdisziplinen und Projektbeteiligten genutzt. Die gemeinsame Erstellung und Nutzung dieses Modells zur virtuellen Abbildung des Bauwerks und seiner Erstellungsprozesse, das sog. Building Information Modeling (BIM), ist dabei zentraler Bestandteil der Planung. Die Integration der Terminplanung in diese Arbeitsweise erfolgt bisher jedoch nur unzureichend, meist lediglich in der Form einer nachgelagerten 4D-Simulation zur Kommunikation der Planungsergebnisse. Sie weist damit im Verhältnis zum entstehenden Zusatzaufwand einen zu geringen Nutzen für den Terminplaner auf. Gegenstand der vorliegenden Arbeit ist die tiefere Einbettung der Terminplanung in die modellbasierte Arbeitsweise. Auf Basis einer umfassende Analyse der Rahmenbedingungen und des Informationsbedarfs der Terminplanung werden Konzepte zur effizienten Wiederverwendung von im Modell gespeicherten Daten mit Hilfe einer Verknüpfungssprache, zum umfassenden Datenaustausch auf Basis der Industry Foundation Classes (IFC) und für das Änderungsmanagement mittels einer Versionierung auf Objektebene entwickelt.Die für die modellbasierte Terminplanung relevanten Daten und ihre Beziehungen zueinander werden dabei formal beschrieben sowie die Kompatibilität ihrer Granularität durch eine Funktionalität zur Objektteilung sichergestellt. Zur zielgenauen Extraktion von Daten werden zudem Algorithmen für räumliche Anfragen entwickelt. Die vorgestellten Konzepte und ihre Anwendbarkeit werden mittels einer umfangreichen Pilotimplementierung anhand von mehreren Praxisbeispielen demonstriert und somit deren praktische Relevanz und Nutzen nachgewiesen.
In der vorliegenden Arbeit wird das Tragverhalten und das Sicherheitsniveau axial belasteter Großbohrpfähle in den pleistozänen Kalkarenit der Küstenregion von Dubai untersucht. Zunächst wird auf der Grundlage von Ergebnissen umfangreicher Baugrundanalysen und Probebelastungen das Tragverhalten detailliert beschrieben. Anschließend wird ein auf der Finiten-Elemente-Methode basierendes Strukturmodell zur Simulation des Last-Setzungsverhaltens von Großbohrpfählen im Sinne eines numerischen Versuchsstandes entwickelt. Um herstellungsbedingte Veränderungen der Baugrundeigenschaften in der Kontaktzone Pfahl-Baugrund zu berücksichtigen, die mit boden- und felsmechanischen Elementversuchen gewöhnlich nicht erfassbar sind, werden die Größen der relevanten konstitutiven Parameterwerte iterativ mittels inverser Optimierungsstrategien bestimmt. Abschließend wird eine methodische Vorgehensweise aufgezeigt, wie das Sicherheitsniveau axial belasteter Großbohrpfählen unter Berücksichtigung der räumlichen Variabilität der Baugrundeigenschaften zuverlässig abgeschätzt werden kann.
Objektorientierte Bauwerksmodelle sind derzeit Gegenstand umfangreicher Foschungsaktivitäten zur rechnerinternen Verwaltung bauwerksbezogener Informationen. Ein in diesem Rahmen diskutierter Ansatz ist die Realisierung eines virtuellen rechnerinternen Bauwerks in Form eines variablen Verbundes fachspezifischer objektorientierter Modelle. Diese Organisationsform der rechnerinternen Repräsentation eignet sich einerseits aufgrund ihrer Flexibilität sehr gut für eine lebensphasenübergreifende Fortschreibung als digitale Bauwerksakte. Eine solche Bauwerksakte bildet eine wichtige Informationsgrundlage für die Planung von Instandhaltungs-, Modernisierungs-, \Umbau- oder Erweiterungsmaßnahmen in späteren Lebensphasen des Bauwerks. Andererseits erschwert die dezentrale Organisationsform des Modellverbundes jedoch die Informationssuche, was in erster Linie durch das Vorhandensein multipler Repräsentationen einzelner Realweltobjekte sowie die Komplexität der am Verbund beteiligten Modellschemata bedingt ist. Gegenstand der vorliegenden Arbeit ist die Entwicklung eines generischen Systemkerns als Basis für eine projektbezogen konfigurierbare Informationsumgebung, die insbesondere in frühen Projektphasen einen handhabbaren Zugang zu den im Modellverbund verwalteten Informationen bereitstellen kann. Der vorgeschlagene Lösungsansatz erweitert den Modellverbund um eine Erschließungsstruktur, in der die einzelnen Elemente der individuellen baulich-räumlichen Struktur durch eindeutige Identifikatoren vertreten werden. Mit den Identifikatoren werden jeweils die fachspezifischen Repräsentationen des Objektes verknüpft und sind somit von einem zentralen Einstiegspunkt aus erreichbar. Der generische Systemkern definiert eine objektorientierte Datenstruktur zur Verwaltung der jeweils projektbezogen auszuprägenden Erschließungsstruktur. Die Interaktion mit dem erschlossenen Informationsraum erfordert eine entsprechende Nutzerschnittstelle, die in der Lage ist, nicht vorhersehbaren, spontan entstehenden Informationsbedarf zu bedienen. Darüber hinaus soll sie konfigurierbar sein bezüglich der unterstützten Suchstrategien. Der Lösungsansatz sieht eine hierarchische Organisationstruktur der Nutzerschnittstelle vor, die eine modulare Erweiterung ermöglicht. Ein entsprechender Kern der Nutzerschnittstelle wird als objektorientiertes Framework spezifiziert. Die Erschließungsstruktur und die Nutzerschnittstelle werden unter Anwendung des objektorientierten Paradigmas entwickelt und mit Hilfe einer formalen Notation auf implementierungsunabhängiger Ebene beschrieben. Anhand exemplarischer Umsetzungen kritischer Systemteile wird die prinzipielle Realisierbarkeit des beschriebenen Systems nachgewiesen.