620 Ingenieurwissenschaften
Refine
Document Type
- Article (31)
- Doctoral Thesis (7)
- Master's Thesis (2)
- Report (1)
Institute
- Institut für Strukturmechanik (ISM) (29)
- F. A. Finger-Institut für Baustoffkunde (FIB) (3)
- Professur Bauphysik (3)
- Graduiertenkolleg 1462 (1)
- Materialforschungs- und -prüfanstalt an der Bauhaus-Universität (1)
- Professur Abfallwirtschaft (1)
- Professur Baubetrieb und Bauverfahren (1)
- Professur Raumplanung und Raumforschung (1)
- Professur Siedlungswasserwirtschaft (1)
- Professur Stochastik und Optimierung (1)
Keywords
- Angewandte Mathematik (28)
- Strukturmechanik (28)
- Beton (2)
- Stochastik (2)
- Alkali-Kieselsäure-Reaktion (1)
- Alkali-Kieselsäure-Reaktion; Fahrbahndecken; Flugbetriebsflächen; äußere Alkalizufuhr; Enteisungsmittel; Natriumchlorid; Alkaliacetate; Alkaliformiate; AKR-Performance-Prüfung; FIB-Klimawechsellagerung (1)
- Alterung (1)
- Alterungsdihydrat (1)
- Anhydrit III (1)
- BIM (1)
Year of publication
- 2013 (41) (remove)
Das Bauwesen hat sich in den letzten Jahren durch die Globalisierung des Marktes verbunden mit einer verstärkten Nutzung moderner Technologien stark gewandelt. Die Planung und die Durchführung von Bauvorhaben werden zunehmend komplexer und sind mit erhöhten Risiken verbunden. Geld- und Zeitressourcen werden bei einem immer härter werdenden Konkurrenzkampf knapper.
Das Projektmanagement stellt Lösungsansätze bereit, um Bauvorhaben auch unter erschwerten Bedingungen und erhöhten Risiken erfolgreich zum Abschluss zu bringen. Dabei hat ein systematisches Risikomanagement beginnend bei der Projektentwicklung bis zum Projektabschluss eine für den Projekterfolg entscheidende Bedeutung.
Ziel der Arbeit ist es, eine quantitative Risikoerfassung für Projektmanager als professionelle Bauherrenvertretung und die Simulation der Risikoauswirkungen auf den Verlauf eines Projektes während der Planungs- und Bauphase zu ermöglichen. Mit Hilfe eines abstrakten Modells soll eine differenzierte, praxisnahe Simulation durchführbar sein, die die verschiedenen Arten der Leistungs- und Kostenentstehung widerspiegelt. Parallel dazu soll die Beschreibung von Risiken so abstrahiert werden, dass beliebige Risiken quantitativ erfassbar und anschließend ihre Auswirkungen inklusive mögliche Gegenmaßnahmen in das Modell integrierbar sind.
Anhand zweier Beispiele werden die unterschiedlichen Einsatzmöglichkeiten der quantitativen Erfassung von Projektrisiken und der anschließenden Simulation ihrer Auswirkungen aufgezeigt. Bei dem ersten Beispiel, einem realen, bereits abgeschlossenen Schieneninfrastrukturprojekt, wird die Wirksamkeit einer vorbeugenden Maßnahme gegen ein Projektrisiko untersucht. Im zweiten Beispiel wird ein Planspielansatz zur praxisnahen Aus- und Weiterbildung von Projektmanagern entwickelt. Inhalt des Planspiels ist die Planung und Errichtung eines privatfinanzierten, öffentlichen Repräsentationsbaus mit teilweiser Fremdnutzung.
In dieser Arbeit werden die Ergebnisse von experimentellen Untersuchungen an unbewehrten und bewehrten modifizierten Betonen unter monoton steigender Belastung bis zum Bruch, einfacher Kurzzeitbelastung im Grenzbereich der Tragfähigkeit und mehrfach wiederholter Belastung mit kontinuierlicher Be- und Entlastungsgeschwindigkeit vorgestellt und ausgewertet. Für die Modifizierung der Betone wurden zwei grundsätzliche Vorgehens¬weisen angewendet: die Variation der Gesteinskörnung und die Modifizierung der Bindemittelphase mit thermoplastischen Polymeren. Die Auswirkungen der Modifikationen auf die Festigkeitseigenschaften und das Formänderungsverhalten des Betons bei Kurzzeitbelastung waren dabei von besonderem Interesse.
Die beobachteten Veränderungen der Festbetoneigenschaften sowie der nichtlineare Zu-sammenhang zwischen den elastischen und nichtelastischen Verformungsanteilen signali-sieren, dass derartige Modifizierungen das Verformungs- und Bruchverhalten von Beton sig-nifikant beeinflussen und somit beim Nachweis der Tragfähigkeit und Gebrauchstauglichkeit berücksichtigt werden müssen. Neben der Evaluierung des beanspruchungsabhängigen Formänderungsverhaltens werden die etablierten Ansätze zur Beschreibung der Gefügezu-standsbereiche bei Druckbelastung weiter entwickelt, so dass die Übergänge zwischen den Bereichen exakt ermittelt und die Ausprägung der Bereiche quantifiziert werden können. Damit ist ein genauerer Vergleich der durch die Modifizierungen hervorgerufenen Verände-rungen möglich.
The planning process in civil engineering is highly complex and not manageable in its entirety.
The state of the art decomposes complex tasks into smaller, manageable sub-tasks. Due to the close interrelatedness of the sub-tasks, it is essential to couple them. However, from a software engineering point of view, this is quite challenging to do because of the numerous incompatible software applications on the market. This study is concerned with two main objectives: The first is the generic formulation of coupling strategies in order to support engineers in the implementation and selection of adequate coupling strategies. This has been achieved by the use of a coupling pattern language combined with a four-layered, metamodel architecture, whose applicability has been performed on a real coupling scenario. The second one is the quality assessment of coupled software. This has been developed based on the evaluated schema mapping. This approach has been described using mathematical expressions derived from the set theory and graph theory by taking the various mapping patterns into account. Moreover, the coupling quality has been evaluated within the formalization process by considering the uncertainties that arise during mapping and has resulted in global quality values, which can be used by the user to assess the exchange. Finally, the applicability of the proposed approach has been shown using an engineering case study.
Für anwendungsbezogene Lösungsansätze im Bereich der Siedlungswasserwirtschaft im urbanen Raum ist es wichtig, die Inhalte komplexer ineinander greifender Systeme zu begreifen. Ein Simulationsspiel kann hilfreich sein, um den Nutzer mit neuen Technologien und Möglichkeiten der Kombination vertraut zu machen. Aufgrund hoher Anforderungen an Komplexität und Detailliertheit der Modelle ist die Entwicklung eines solchen Spiels teuer und aufwändig. Diese Arbeit untersucht, inwieweit sich das kommerziell zu Unterhaltungszwecken entwickelte Spiel SimCity 5 (Version 2013) nutzen lässt bzw. wie es konfiguriert werden muss. Im Speziellen wird dies am Beispiel des naturnahen Regenwassermanagements im urbanen Raum erläutert.
Die Analyse von SimCity 5 zeigt, dass sich das Spiel durchaus als Werkzeug zur Entscheidungsunterstützung eignet. Die Teilsysteme der Siedlungswasserwirtschaft sind jedoch zu stark vereinfacht, sodass Verbesserungsbedarf besteht.
Um Szenarien des naturnahen Regenwassermanagements in das Spiel zu integrieren, wurde im Rahmen der Arbeit das Modell SimRegen entwickelt. Da derzeit keine Schnittstelle zur agentenbasierten Simulationsengine GlassBox freigegeben ist, wurden Teilaspekte des Modells mit Hilfe des agentenbasierten Simulationswerkzeugs NetLogo (Version 5.0.4) implementiert.
Das Hauptziel der Arbeit war es zu klären, ob alkalihaltige Enteisungsmittel eine Alkali-Kieselsäure-Reaktion (AKR) auslösen und/oder beschleunigen können und was die dabei ggf. zugrunde liegenden Mechanismen sind. Die Untersuchungen dazu ergaben, dass die auf Verkehrsflächen eingesetzten alkalihaltigen Enteisungsmittel auf Basis von Natriumchlorid (Fahrbahndecken) bzw. auf Basis der Alkaliacetate und -formiate (Flugbetriebsflächen) den Ablauf einer AKR in Betonen mit alkalireaktiven Gesteinskörnungen auslösen und mitunter stark beschleunigen können. Dabei nimmt die AKR-fördernde Wirkung der Enteisungsmittel in der Reihenfolge Natriumchlorid - Alkaliacetate - Alkaliformiate erheblich zu.
Es zeigte sich, dass im Fall der Alkaliacetate und -formiate nicht allein die Zufuhr von Alkalien von Bedeutung ist, sondern dass es außerdem zu einer Freisetzung von OH-Ionen aus dem Portlandit und folglich zu einem Anstieg des pH-Wertes in der Porenlösung kommt. Dadurch wird der Angriff auf alkalireaktives SiO2 in Gesteinskörnungen verstärkt und der Ablauf einer AKR beschleunigt. Unter äußerer NaCl-Zufuhr kommt es hingegen nicht zu einem Anstieg des pH-Wertes, was der Grund für die weniger stark AKR-fördernde Wirkung von NaCl ist. Von Bedeutung sind hier die zugeführten Na-Ionen und offenbar ein sich andeutender, direkter Einfluss von NaCl auf das SiO2-Löseverhalten. Sind pH-Wert und Na-Konzentration in der Porenlösung ausreichend hoch, wird sich thermodynamisch bedingt AKR-Gel bilden. Die Bildung von FRIEDEL’schem Salz ist dabei nur eine Begleiterscheinung, aber keine Voraussetzung für den Ablauf einer AKR unter äußerer NaCl-Zufuhr.
Es zeigte sich weiter, dass sich mit der FIB-Klimawechsellagerung als Performance-Prüfung das AKR-Schädigungspotential von Betonen für Fahrbahndecken und Flugbetriebsflächen zuverlässig beurteilen lässt. Die Vorteile der FIB-Klimawechsellagerung liegen in der Prüfung kompletter, projektspezifischer Betonzusammensetzungen unter Beachtung aller praxisrelevanten klimatischen Einwirkungen und vor allem in der Berücksichtigung einer äußeren Alkalizufuhr. Innerhalb von 36 Wochen kann das AKR-Schädigungspotential einer Betonzusammensetzung für eine Nutzungsdauer von 20-30 Jahren in der Praxis sicher beurteilt werden.