620 Ingenieurwissenschaften und zugeordnete Tätigkeiten
Refine
Document Type
- Article (143) (remove)
Institute
- Professur Informatik im Bauwesen (129)
- Professur Baubetrieb und Bauverfahren (5)
- Professur Bauphysik (3)
- Professur Informatik in der Architektur (3)
- Professur Modellierung und Simulation - Konstruktion (2)
- Juniorprofessur Urban Energy Systems (1)
- Professur Bauchemie und Polymere Werkstoffe (1)
- Professur Grundbau (1)
- Professur Intelligentes Technisches Design (1)
Keywords
- Bautechnik (21)
- Simulation (21)
- Produktmodell (20)
- Finite-Elemente-Methode (17)
- Lernendes System (15)
- Mehragentensystem (14)
- Modellierung (13)
- CAD (11)
- Physikalisches Verfahren (11)
- Bauwerk (9)
- Forschungskooperation (6)
- Dynamische Belastung (5)
- Optimierung (5)
- Verkehrsplanung (5)
- Virtuelle Realität (5)
- Baukonstruktion (4)
- Framework <Informatik> (4)
- Geoinformationssystem (4)
- Stadtplanung (4)
- Stahlbau (4)
- Wissensmanagement (4)
- API (3)
- Baubetriebslehre (3)
- Bauwesen (3)
- Bauzeichnung (3)
- Building Information Modeling (3)
- Computerunterstütztes Verfahren (3)
- Datenmodell (3)
- Dreidimensionales Modell (3)
- Facility-Management (3)
- Fuzzy-Logik (3)
- Graphentheorie (3)
- Ingenieurbau (3)
- Tragwerk (3)
- Anwendung (2)
- Architektur (2)
- BIM (2)
- Balken (2)
- Baubetrieb (2)
- Bauindustrie (2)
- Bauschaden (2)
- Baustatik (2)
- Baustelle (2)
- Brückenbau (2)
- Datenaustausch (2)
- Dialogsystem (2)
- Elastoplastizität (2)
- Energiebedarf (2)
- Entscheidungsunterstützungssystem (2)
- Europa (2)
- Festkörpermechanik (2)
- Forschung (2)
- Freie Schwingung (2)
- Gebäudehülle (2)
- Gebäudesimulation (2)
- Geschichtetes Medium (2)
- IFC-basierte Gebäudesimulation (2)
- Informationstechnik (2)
- Instandhaltung (2)
- Internet (2)
- Langzeitverhalten (2)
- Mathematisches Modell (2)
- Monitoring (2)
- Raumklima (2)
- Schnittstelle (2)
- Skelettbau (2)
- Stabilität (2)
- Standardisierung (2)
- Straßenbau (2)
- Temperatur (2)
- Visualisierung (2)
- Weimar / Bauhaus-Universität / Professur Baubetrieb und Bauverfahren (2)
- Wissensverarbeitung (2)
- building simulation (2)
- thermische Gebäudehülle (2)
- virtual construction site (2)
- Öffentlicher Personennahverkehr (2)
- 4D Modeling (1)
- Ablaufplanung (1)
- Air tightness (1)
- Arbeitsschutz (1)
- Ausschreibung (1)
- Autobahn (1)
- Bandmatrix (1)
- Bauaufnahme (1)
- Bauausführung (1)
- Baumaschinen (1)
- Bauplanung (1)
- Baustelleneinrichtung (1)
- Bauteil (1)
- Bauwerksplanung (1)
- Bauzustand (1)
- Bedarfsforschung (1)
- Belastung (1)
- Beltrami-Gleichung (1)
- Beschränkung (1)
- Bewertung (1)
- Bildanalyse (1)
- Boden-Bauwerk-Wechselwirkung (1)
- Bodenmechanik (1)
- Brandschutz (1)
- Bruchmechanik (1)
- Brücke (1)
- Building monitoring (1)
- CAD 3D <Programm> (1)
- Computational Design (1)
- Computer Supported Cooperative Work (1)
- Computergraphik (1)
- Computerspiel (1)
- Construction Sequence (1)
- Dammbau (1)
- Datenbank (1)
- Datenbanksystem (1)
- Datenbankverwaltung (1)
- Dichte Packung (1)
- Diskrete Optimierung (1)
- EXPRESS <Programmiersprache> (1)
- Eigenwert (1)
- Elastomer (1)
- Entscheidung bei mehrfacher Zielsetzung (1)
- Evolutions-Strategie (1)
- Fraktal (1)
- Freac. (1)
- Game Engine (1)
- Genetischer Algorithmus (1)
- Gittererzeugung (1)
- Gleichgewicht (1)
- Green-Funktion (1)
- Grenzzustand (1)
- Grundrissgenerierung (1)
- Halbraum (1)
- Heuristik (1)
- Himalaja (1)
- Himalaya (1)
- Hochhaus (1)
- Holzbau (1)
- Hängebrücke (1)
- Indoor climate (1)
- Informationsmanagement (1)
- Infrastruktur (1)
- Ingenieurholzbau (1)
- Inspektion (1)
- Integrierte Planung (1)
- Isotropie (1)
- Kalkulation (1)
- Kalkulationsverfahren (1)
- Kartierung (1)
- Katastrophenmanagement (1)
- Kennzahl (1)
- Kette (1)
- Klein- und Mittelbetrieb (1)
- Klimaänderung (1)
- Kollaboratives Entwerfen (1)
- Kollisionserkennung (1)
- Kommunikationsprotokoll (1)
- Konzipieren <Technik> (1)
- Krankollision (1)
- Kremlas (1)
- Lebenszyklus (1)
- Lebenszyklus <Wirtschaft> (1)
- Literaturrecherche (1)
- Luft (1)
- Luftdichtheit (1)
- Lüftung (1)
- Managementinformationssystem (1)
- Markowschke (1)
- Mehrdimensionalität (1)
- Multikriterielle Optimierung (1)
- Mustererkennung (1)
- Nachtragsvereinbarung (1)
- Nichtlineares Phänomen (1)
- Numerisches Verfahren (1)
- Objektmodell (1)
- Objektorientiertes Datenbanksystem (1)
- Parallelverarbeitung (1)
- Parameteridentifikation (1)
- Pflasterungen (Mathematik) (1)
- Photogrammetrie (1)
- Plastizitätstheorie (1)
- Platte (1)
- Produktinformation (1)
- Programm (1)
- Projektdokumentation (1)
- Prozesslogik (1)
- Prozessmanagement (1)
- Prozesssimulation (1)
- QUEST3D (1)
- Quantenphysik (1)
- Quaternion (1)
- Rekonstruktion (1)
- Ressourcenallokation (1)
- Rissbildung (1)
- STEP (1)
- Schadstoffkonzentration (1)
- Schulgebäude (1)
- Schwingung (1)
- Setzung (1)
- Shore Spacing (1)
- Shore Stiffness (1)
- Shoring System (1)
- Sicherheit (1)
- Software (1)
- Spannender Baum (1)
- Spannung (1)
- Stabwerk (1)
- Stadtverkehr (1)
- Stahlbeton (1)
- Stahlbrücke (1)
- Stahlkonstruktion (1)
- Standard (1)
- Stapelproblem (1)
- Statik (1)
- Stochastisches Modell (1)
- Stoffgesetz (1)
- Stokes-Problem (1)
- Straße (1)
- Straßenbrücke (1)
- Straßenkarte (1)
- Strukturanalyse (1)
- Strömung (1)
- Teamwork (1)
- Tragwerk / Vorspannung (1)
- Trajektorie (Mathematik) (1)
- Transport (1)
- Transportproblem (1)
- Trägheit (1)
- Tunnel (1)
- Turmdrehkran (1)
- U-value (1)
- Vektorfunktion (1)
- Verbundtragwerk (1)
- Verkehrsaufkommen (1)
- Verkehrsmittelwahl (1)
- Verkehrsnetz (1)
- Versionierung (1)
- Versionsverwaltung (1)
- Versorgungsnetz (1)
- Verteiltes Datenverarbeitungssystem (1)
- Verteiltes System (1)
- Virtuelle Baustelle (1)
- Viskoplastizität (1)
- Vorgespannte Konstruktion (1)
- Vorspannung (1)
- Wartezeit (1)
- Wasserkraftwerk (1)
- Wechselwirkung (1)
- Wirtschaftlichkeit (1)
- Wärmedurchgangszahl (1)
- Zufallsvariable (1)
- Zuverlässigkeit (1)
- Zuverlässigkeitstheorie (1)
- cable force (1)
- cable stayed bridge (1)
- cellular automata (1)
- computational fluid dynamics (1)
- computerbasierte Entwurfsprozesse (1)
- crane collision (1)
- diffusion limited aggregation (1)
- diffusion-contact model (1)
- digitale Produktmodellierung (1)
- game engine (1)
- generative design system (1)
- initial equilibrium state (1)
- initial shape (1)
- monitoring (1)
- multi-agent systems (1)
- personalisierte Lüftung (1)
- personalized ventilation (1)
- radiological and chemical properties (1)
- thermisches Empfinden (1)
- uranium tailing deposit (1)
- urban modeling (1)
- virtual environment (1)
- virtuelle Baustelle (1)
- äquivalente Temperatur (1)
In Germany, bridges have an average age of 40 years. A bridge consumes between 0.4% and 2% of its construction cost per year over its entire life cycle. This means that up to 80% of the construction cost are additionally needed for operation, inspection, maintenance, and destruction. Current practices rely either on paperbased inspections or on abstract specialist software. Every application in the inspection and maintenance sector uses its own data model for structures, inspections, defects, and maintenance. Due to this, data and properties have to be transferred manually, otherwise a converter is necessary for every data exchange between two applications. To overcome this issue, an adequate model standard for inspections, damage, and maintenance is necessary. Modern 3D models may serve as a single source of truth, which has been suggested in the Building Information Modeling (BIM) concept. Further, these models offer a clear visualization of the built infrastructure, and improve not only the planning and construction phases, but also the operation phase of construction projects. BIM is established mostly in the Architecture, Engineering, and Construction (AEC) sector to plan and construct new buildings. Currently, BIM does not cover the whole life cycle of a building, especially not inspection and maintenance. Creating damage models needs the building model first, because a defect is dependent on the building component, its properties and material. Hence, a building information model is necessary to obtain meaningful conclusions from damage information. This paper analyzes the requirements, which arise from practice, and the research that has been done in modeling damage and related information for bridges. With a look at damage categories and use cases related to inspection and maintenance, scientific literature is discussed and synthesized. Finally, research gaps and needs are identified and discussed.
Personalisierte Lüftung (PL) kann die thermische Behaglichkeit sowie die Qualität der eingeatmeten Atemluft verbessern, in dem jedem Arbeitsplatz Frischluft separat zugeführt wird. In diesem Beitrag wird die Wirkung der PL auf die thermische Behaglichkeit der Nutzer unter sommerlichen Randbedingungen untersucht. Hierfür wurden zwei Ansätze zur Bewertung des Kühlungseffekts der PL untersucht: basierend auf (1) der äquivalenten Temperatur und (2) dem thermischen Empfinden. Grundlage der Auswertung sind in einer Klimakammer gemessene sowie numerisch simulierte Daten. Vor der Durchführung der Simulationen wurde das numerische Modell zunächst anhand der gemessenen Daten validiert. Die Ergebnisse zeigen, dass der Ansatz basierend auf dem thermischen Empfinden zur Evaluierung des Kühlungseffekts der PL sinnvoller sein kann, da bei diesem die komplexen physiologischen Faktoren besser berücksichtigt werden.
Für eine Abschätzung des Heizwärmebedarfs von Gebäuden und Quartieren können thermisch-energetische Simulationen eingesetzt werden. Grundlage dieser Simulationen sind geometrische und physikalische Gebäudemodelle. Die Erstellung des geometrischen Modells erfolgt in der Regel auf Basis von Bauplänen oder Vor-Ort-Begehungen, was mit einem großen Recherche- und Modellierungsaufwand verbunden ist. Spätere bauliche Veränderungen des Gebäudes müssen häufig manuell in das Modell eingearbeitet werden, was den Arbeitsaufwand zusätzlich erhöht. Das physikalische Modell stellt die Menge an Parametern und Randbedingungen dar, welche durch Materialeigenschaften, Lage und Umgebungs-einflüsse gegeben sind. Die Verknüpfung beider Modelle wird innerhalb der entsprechenden Simulations-software realisiert und ist meist nicht in andere Softwareprodukte überführbar. Mithilfe des Building Information Modeling (BIM) können Simulationsdaten sowohl konsistent gespeichert als auch über Schnittstellen mit entsprechenden Anwendungen ausgetauscht werden. Hierfür wird eine Methode vorgestellt, die thermisch-energetische Simulationen auf Basis des standardisierten Übergabe-formats Industry Foundation Classes (IFC) inklusive anschließender Auswertungen ermöglicht. Dabei werden geometrische und physikalische Parameter direkt aus einem über den gesamten Lebenszyklus aktuellen Gebäudemodell extrahiert und an die Simulation übergeben. Dies beschleunigt den Simulations-prozess hinsichtlich der Gebäudemodellierung und nach späteren baulichen Veränderungen. Die erarbeite-te Methode beruht hierbei auf einfachen Modellierungskonventionen bei der Erstellung des Bauwerksinformationsmodells und stellt eine vollständige Übertragbarkeit der Eingangs- und Ausgangswerte sicher.
Thermal building simulation based on BIM-models. Thermal energetic simulations are used for the estimation of the heating demand of buildings and districts. These simulations are based on building models containing geometrical and physical information. The creation of geometrical models is usually based on existing construction plans or in situ assessments which demand a comparatively big effort of investigation and modeling. Alterations, which are later applied to the structure, request manual changes of the related model, which increases the effort additionally. The physical model represents the total amount of parameters and boundary conditions that are influenced by material properties, location and environmental influences on the building. The link between both models is realized within the correspondent simulation soft-ware and is usually not transferable to other software products. By Applying Building Information Modeling (BIM) simulation data is stored consistently and an exchange to other software is enabled. Therefore, a method which allows a thermal energetic simulation based on the exchange format Industry Foundation Classes (IFC) including an evaluation is presented. All geometrical and physical information are extracted directly from the building model that is kept up-to-date during its life cycle and transferred to the simulation. This accelerates the simulation process regarding the geometrical modeling and adjustments after later changes of the building. The developed method is based on simple conventions for the creation of the building model and ensures a complete transfer of all simulation data.
Für eine Abschätzung des Heizwärmebedarfs von Gebäuden und Quartieren können thermisch-energetische Simulationen eingesetzt werden. Grundlage dieser Simulationen sind geometrische und physikalische Gebäudemodelle. Die Erstellung des geometrischen Modells erfolgt in der Regel auf Basis von Bauplänen oder Vor-Ort-Begehungen, was mit einem großen Recherche- und Modellierungsaufwand verbunden ist. Spätere bauliche Veränderungen des Gebäudes müssen häufig manuell in das Modell eingearbeitet werden, was den Arbeitsaufwand zusätzlich erhöht. Das physikalische Modell stellt die Menge an Parametern und Randbedingungen dar, welche durch Materialeigenschaften, Lage und Umgebungs-einflüsse gegeben sind. Die Verknüpfung beider Modelle wird innerhalb der entsprechenden Simulations-software realisiert und ist meist nicht in andere Softwareprodukte überführbar.
Mithilfe des Building Information Modeling (BIM) können Simulationsdaten sowohl konsistent gespeichert als auch über Schnittstellen mit entsprechenden Anwendungen ausgetauscht werden. Hierfür wird eine Methode vorgestellt, die thermisch-energetische Simulationen auf Basis des standardisierten Übergabe-formats Industry Foundation Classes (IFC) inklusive anschließender Auswertungen ermöglicht. Dabei werden geometrische und physikalische Parameter direkt aus einem über den gesamten Lebenszyklus aktuellen Gebäudemodell extrahiert und an die Simulation übergeben. Dies beschleunigt den Simulations-prozess hinsichtlich der Gebäudemodellierung und nach späteren baulichen Veränderungen. Die erarbeite-te Methode beruht hierbei auf einfachen Modellierungskonventionen bei der Erstellung des Bauwerksinformationsmodells und stellt eine vollständige Übertragbarkeit der Eingangs- und Ausgangswerte sicher.
Thermal building simulation based on BIM-models. Thermal energetic simulations are used for the estimation of the heating demand of buildings and districts. These simulations are based on building models containing geometrical and physical information. The creation of geometrical models is usually based on existing construction plans or in situ assessments which demand a comparatively big effort of investigation and modeling. Alterations, which are later applied to the structure, request manual changes of the related model, which increases the effort additionally. The physical model represents the total amount of parameters and boundary conditions that are influenced by material properties, location and environmental influences on the building. The link between both models is realized within the correspondent simulation soft-ware and is usually not transferable to other software products.
By Applying Building Information Modeling (BIM) simulation data is stored consistently and an exchange to other software is enabled. Therefore, a method which allows a thermal energetic simulation based on the exchange format Industry Foundation Classes (IFC) including an evaluation is presented. All geometrical and physical information are extracted directly from the building model that is kept up-to-date during its life cycle and transferred to the simulation. This accelerates the simulation process regarding the geometrical modeling and adjustments after later changes of the building. The developed method is based on simple conventions for the creation of the building model and ensures a complete transfer of all simulation data.
Traditionally, buildings in the Inner Himalayan valleys of Bhutan were constructed from rammed earth in the western regions and quarry stone in the central and eastern regions. Whilst basic architectural design elements have been retained, the construction methods have however changed over recent decades alongside expectations for indoor thermal comfort. Nevertheless, despite the need for space heating, thermal building performance remains largely unknown. Furthermore, no dedicated climate data is available for building performance assessments. This paper establishes such climatological information for the capital Thimphu and presents an investigation of building physics properties of traditional and contemporary building types. In a one month field study 10 buildings were surveyed, looking at building air tightness, indoor climate, wall U-values and water absorption of typical wall construction materials. The findings highlight comparably high wall U-values of 1.0 to 1.5 W/m²K for both current and historic constructions. Furthermore, air tightness tests show that, due to poorly sealed joints between construction elements, windows and doors, many buildings have high infiltration rates, reaching up to 5 air changes per hour. However, the results also indicate an indoor climate moderating effect of more traditional earth construction techniques. Based on these survey findings basic improvements are being suggested.
This work is based on the concept that the structure of a city can be defined by six basic urban patterns. To enable more complex urban planning as a long-term objective I have developed a simulation method for generating these basic patterns and for combining them to form various structures. The generative process starts with the two-dimensional organisation of streets followed by the parceling of the remaining areas. An agent-based diffusion-contact model is the basis of these first two steps. Then, with the help of cellular automata, the sites for building on are defined and a three-dimensional building structure is derived. I illustrate the proposed method by showing how it can be applied to generate possible structures for an urban area in the city of Munich.
Der vorliegende Text beschreibt ein computerbasiertes Verfahren zur Lösung von Layout-problemen in Architektur und Städtebau, welches mit möglichst wenig Problemwissen auskommt und schnell brauchbare Ergebnisse liefert, die durch schrittweises Hinzufügen von Problemwissen interaktiv weiter ausgearbeitet werden können. Für das generative Verfahren wurde eine Evolutions-Strategie verwendet, die mit Mechanismen zur Kollisionserkennung und virtuellen Federn zu einem hybriden Algorithmus kombiniert wurde. Dieser dient erstens der Lösung des Problems der Dichten Packung von Rechtecken sowie zweitens der Herstellung bestimmter topologischer Beziehungen zwischen diesen Rechtecken. Die Bearbeitung beider Probleme wird durch schrittweise Erweiterung grundlegender Verfahren untersucht, wobei die einzelnen Schritte anhand von Performancetests miteinander verglichen werden. Am Ende wird ein iterativer Algorithmus vorgestellt, der einerseits optimale Lösungen garantiert und andererseits diese Lösungen in einer für eine akzeptable Nutzerinteraktion ausreichenden Geschwindigkeit generiert.
Entwerfen Versionieren: Probleme und Lösungsansätze für die Organisation verteilter Entwurfsprozesse
(2011)
Entwerfen ist ein komplexer Vorgang. Soll dieser Vorgang nicht allein, sondern räumlich verteilt mit mehreren Beteiligten gemeinsam stattfinden, so sind digitale Werkzeuge zur Unterstützung dieses Prozesses unumgänglich. Die Verwendung von Werkzeugen für Ent-wurfsprozesse bedeutet jedoch immer auch eine Manipulation des zu unterstützenden Prozesses selbst. Im Falle von Werkzeugen zur Unterstützung der Kollaboration mehrerer Beteiligter stellen die implementierten Koordinationsmechanismen solche prozessbeeinflussenden Faktoren dar. Damit diese Mechanismen, entsprechend der Charakteristika kreativer Prozesse, so flexibel wie möglich gestaltet werden können, liegt die Anforderung auf technischer Ebene darin, ein geeignetes Konzept für eine nachvollziehbare Speicherung (Versionierung) der stattfindenden Entwurfshandlungen zu schaffen. Der vorliegende Artikel beschäftigt sich mit dem Thema der Entwurfsversionierung in computergestützten kollaborativen Arbeitsumgebungen. Vor dem Hintergrund, dass die Versionierung den kreativen Entwurfsprozess möglichst wenig manipulieren soll, werden technische sowie konzeptionelle Probleme der diskutiert und Lösungsansätze für diese vorgestellt.
Monitoring systems usually used to control tailings, primarily pore water pressure gages and observation wells, are not self evidently representative for mechanical considerations. Therefore an effective risk assessment and risk management is necessary to get additional information to determine indicators for critical situations. Several tailings observations showed an alteration in chemical and radiological parameters during rising saturation induced by climatic changes. These parameters are appropriate to stress indices. A systematically research on correlations between changes in stress indices and the phreatic surface is part of the research activities of the Bauhaus University in Weimar. The contribution presents the principle of this kind of monitoring, the soil mechanical background, details of the equipment and first results.
The paper analyses the application of 3D gaming technologies in the simulation of processes associated with human resources and machinery on construction sites in order to determine process costs. It addresses the problem of detailing in process simulation. The authors outline special boundary conditions for the simulation of cost-relevant resource processes on virtual construction sites. The approach considers different needs for detailing in process simulation during the planning and building phase. For simulation of process costs on a construction site (contractors view) the level of detail has to be set to high. A prototype for determination of process durations (and hereby process costs) developed at the Bauhaus University Weimar is presented as a result of ongoing researches on detailing in process simulation. It shows the method of process cost determination on a high level of detail (game between excavator and truck) through interaction with the virtual environment of the site.
Der Einsatz von CAD-Applikationen hat die Planungsarbeit im Bauwesen entscheidend verändert. In der Entwurfsplanung sind die Änderungen bereits deutlich erkennbar. Seit der Anwendung von dreidimensionalen Planungswerkzeugen kann der Bauherr das Bauwerk in seiner virtuellen Gesamtheit am Computer betrachten und bewerten. Dies bietet viele Vorteile. So ist der Planer gezwungen alle wesentlichen Details a priori exakt zu planen, wodurch viele Fehler vermieden werden können. Dies bietet insbesondere für Planungen in Baubetrieben, z.B. im Rahmen der Arbeitsvorbereitung, neue Einsatzmöglichkeiten.
Eine der wichtigsten Aufgaben und Herausforderungen der Bauinformatik ist gegenwärtig die Realisierung des durchgängigen, fachübergreifenden Datenflusses im Planungsprozeß eines Bauvorhabens. Im Hinblick auf die internationale Wettbewerbsfähigkeit der deutschen Bauwirtschaft ist es unumgänglich, vorhandene Effizienzpotentiale in der Bauplanung auszuschöpfen, welche durch eine qualitative Verbesserung der Planung sowie durch eine Verringerung der Bearbeitungszeit aller beteiligten Fachplanern erreicht werden können. Nach dem gegenwärtigen Stand der Technik werden die Informationsobjekte standardisiert, damit sie durchgängig nutzbar sind. Diese werden in einem allgemeingültigen Format den speziellen Programmen der Fachplaner zur Verfügung gestellt. In dieser Arbeit wird der Ansatz verfolgt, eine Integration durch die Standardisierung der Kommunikation zwischen den Informationsobjekten und ihren Anwendungsprogrammen zu erreichen. Dabei kann auf die Standardisierung der zu übertragenden Objekte verzichtet werden. Ziel der Ausarbeitung ist die Definition von implementationstechnischen Regeln, die alle auszutauschenden Objekte sowie die Anwendungen, die solche Objekte aufnehmen wollen, erfüllen müssen. Die Bearbeitung der Objekte soll in den gewohnten Anwendungen in unveränderter Weise erfolgen.
For modeling of singular fields of stresses and deformations in elasters with a crack is offered to use of three-dimesional a special finite element. Weak compessible of elasters is taken into account on the basis of threefold approximation of fields of displacements, deformations and function of volume change. At intensive cyclic loading of the elastomer constructions with a crack it is necessary to take into account warming and large deformations at the crack top. The stress-deformed state elasters with a crack is determined from the decision of a nonlinear problem by a modified method Newton-Kantorovich. Account stress intensity factors for a rectangular plate with a various arrangement of a through crack is executed. Process of development of a surface crack and dissipative warming in prismatic a element of shift is investigated.
Die Gesamtheit der Produktinformationen im Bauwesen stellt sich als sehr inkonsistente und redundante Informationsmenge dar. Die Hersteller stehen vor der Aufgabe, diese Produktinformationen nicht nur in der üblichen Katalogform sondern auch in neuen Medien wie CD-ROM und WWW zu publizieren. Einmal betriebener Erfassungsaufwand muß sich dabei durch eine einfache Mehrfachverwendung der Daten rentieren. Wegen seiner technologischen Eigenschaften eignet sich das WWW sehr gut als primäre Quelle für Produktinformationen. Vor allem wegen der möglichen Aktualität sollte es Grundlage für Publikationen in den anderen Medien sein. Mit verhältnismäßig geringem Aufwand lassen sich die WWW-Präsentation von Produktdaten so strukturieren, daß eine automatisierte Erfassung und Verarbeitung dieser Daten vereinfacht wird. So kann die Datenkonsistenz von der visuellen Präsentation in herkömmlichen Katalogen bis zur automatisch erstellten Produktdatenbank durchgängig gesichert werden. Vor dem Hintergrund der von Schnittstellenproblemen, heterogener Softwarestruktur und unzureichender Ausnutzung der Möglichkeiten der Informatik gekennzeichneten Situation im Bauwesen wird in generalisierter Ansatz mittels SGML vorgestellt. Mit einem derartigen Datenangebot werden neue, verteilte und vernetzte Anwendungen auf Grundlage derselben Produktdaten ermöglicht.
In the rpocess of project construction organization under conditions of limited resources the problem of investor arises, which in onecriteria setting is as follows N invsted projects reindexed i=1,2,...,n are considered, initial parameters of the problem are:- duraion of iproject construction, - expected profit per unit of time from i project after putting it info operation ,-the time fixed , after the expiry of it a fine is paid for each overdued unit of time units in number. The investor resources are limited, i.e., at every moment of time investor can provid delivering of necessary resources only for one project .Any admissible problem decision of investor represents one of n! permutation of of numbers 1,2,..,n. X={x}-is the set of all admissible solutions (SAS) of this problem . In works of different authors the quality of decision is evaluated either by objective function (OF) of the type MINSUM where,by the objective function of the of the type MINMAX
Pseudorigidity method for solving the problem of limit equilibrium of rigid-plastic constructions
(1997)
1.Design calculations , based upon the theory elasticity , cannot completely satisfy engineers and designers , because cannot answer to basic question about overload capability . Only design calculations of limit equilibrium of rigid-plastic constructions can answer to this question completely enough. As a rule , such design calculations are made issue from hypothesis, that material of construction has rigid-plastic diagram Prandtl .This scheme of calculation gives qualitatively more correct results, then usual calculation, based upon law Hooke’s , and allows more really estimate ultimate strength of construction due to different loads. Universal algorithms for solving the problem of limit equilibrium have been created since the middle of the 60’s.These algorithms are based upon two basic theorems about limit analysis - static and kinetics. It was found , that with the help of above-mentioned theorems the problem of limit equilibrium can be formulated as a problem of linear programming (for linear yield) or nonlinear programming (for yield Guber-Mizes). The method of linear programming conformably to calculation of rod systems got the most development in the reports Prager W. [1] and Chiras A. [ 2 ]. The method of linear programming conformably to plates and shells was widely used by Rganizin A.[3]. [3[ contains more full bibliography about this problem. Calculation of limit equilibrium with the help of linear and nonlinear programming has a few significant lacks: - complexity and laboriousness preliminary preparation of problem for PC; - necessity to use special program means , which are not in usual program packet for strength analysis. Author worked out a new method about design calculation of limit equilibrium without above-mentioned lacks . The method is based upon analogy of relations between internal generalized efforts and generalized deformations in elastic system and between generalized efforts and velocities of change generalized deformations in rigid-plastic system. Because later rigid-plastic deformation would be treated as an elastic deformation in the system with special constructed rigidities , this method could be called >pseudorigidity method<.
Problem of discretic programming in conditions of manycriterial is considered. Set of work, being subject to fulfilment, is available. Are certain also: set of the executors; set, machines; set of resources (materials, semifinished items and etc.) and other set. As a functional complex name set, which will be formed, when on one representative of each of the specified sets is nominated to one working place. The allowable decision of a examined problem represents set of not crossed complexes provided that, for each working place one functional complex is certain in the accuracy. The elementary case of a formulated above problem is known under the name >a problem about purposes< [1], when the complex is defined as a pair >an executor - working place<. In case of three-element complexes we come to a problem about three-combinations. In a general case the complex consists from m of elements and the problem of formation of m-element complexes is formulated on the m-colour column.
Model of stressed-strained State of Multilayer Masses with regard for Non-Ideal Contact of Layers
(1997)
Thus, mathematical model stressed- strained of a condition of layered masses is constructed. The model has high accuracy. It allows to simulate slippery contact of layers without friction. Thus not the order of permitting system of the equations is increased, and at its realization the method of fenite elements does not increase quantity of required degrees freedom. The differential operators included in system the equations are similar known in the classical theory of shells. It facilitates construction of a finite element. Presence in system of the differential equations of derivative of external forces allows to use her for the decision of contact problems with a stain of contact commensurable with thickness of a masses.