International Conference on Computing in Civil and Building Engineering, ICCCBE, Weimar 10. 2004
Refine
Document Type
- Article (62) (remove)
Institute
Keywords
- Bautechnik (21)
- Produktmodell (20)
- Simulation (18)
- Lernendes System (14)
- Mehragentensystem (14)
- Finite-Elemente-Methode (12)
- Physikalisches Verfahren (11)
- Forschungskooperation (6)
- Verkehrsplanung (5)
- Baukonstruktion (4)
Particle Simulation and Evaluation of Personal Exposure to Contaminant Sources in an Elevation Space
(2004)
An elevator, which figures a small volume, is normally used by everyone for a short period of time and equipped with simple ventilation system..Any contaminant released within it may cause serious problem. This research adapt a fire and smoke simulation software (FDS) into non-fire indoor airflow scario. Differently from previous research, particles are chosen as a risk evalution unit. A personal and multi-personal exposure model is proposed. The model takes the influence of the human thermal boundary, coughing, inhalation, exhalation, standing position, and the fan factor into account. The model is easy-to-use and suitable for the design of elevator system in practice.
Current building product models explicitly represent components, attributes of components, and relationships between components. These designer-focused product models, however, do not represent many of the design conditions that are important for construction, such as component similarity, uniformity, and penetrations. Current design and construction tools offer limited support for detecting these construction-specific design conditions. This paper describes the ontology we developed using the manufacturing concept of features to represent the design conditions that are important for construction. The feature ontology provides the blueprint for the additions and changes needed to transform a standard product model into a constructionspecific product model. The ontology formalizes three classes of features, defines the attributes and functions of each feature type, and represents the relationships between features explicitly. The descriptive semantics of the ontology allows practitioners to represent their varied preferences for naming features, specifying features that result from component intersections and the similarity of components, and grouping features that affect a specific construction domain. A software prototype that implements the ontology enables practitioners to transform designer-focused product models into feature-based product models that represent the construction perspective.
Recently, many reseraches on active control systems of building structures are preformed based on modern control theory and are installed real buildings. The authors have already proposed intelligent fuzzy optimal active control (IFOAC) systems. IFOAC systems imitate intelligent activities of human brains such as prediction, adaptation, decision-kaking and so on. In IFOAC systems, objective and subjective judgements on the active control can be taken into account. However, IFOAC systems are considered to be suitable for far-field erathquake and control effect becomes small in case of near-field earthqaukes which include a few velosity pules with large amplitudes. To improve control effect in case of near-souece earthquakes, the authors have also proposed hybrid control (HC) systems, in which IFOAC systems and fuzzy control system are combined. In HC systems, the fuzzy control systems are introduced as a reflective fuzzy active control (RFAC) system and imitates spinal reflection of human. In HC systems, active control forces are activated to buildings in accordance with switching rules on active control forces. In this paper, optimizations on fuzzy control rules in RFAC system and switching rules of active control forces in HC system are performed by Parameter-Free Genetic Algorithms (PfGAs). Here, the optimization is performed by using different earthquake inputs. The results of digital simulations show that the HC system can reduce maximal response displacements under restrictions on strokes of the actuator effectively in case of a near-source earthquake and the effectiveness of the proposed HC system is discussed and clarified.
Individual views on a building product of people involved in the design process imply different models for planning and calculation. In order to interpret these geometrical, topological and semantical data of a building model we identify a structural component graph, a graph of room faces, a room graph and a relational object graph as aids and we explain algorithms to derive these relations. The application of the technique presented is demonstrated by the analysis and discretization of a sample model in the scope of building energy simulation.
The presented work focuses on the presentation of a discrete event simulator which can be used for automated sequencing and optimization of building processes. The sequencing is based on the commonly used component–activity–resource relations taking structural and process constraints into account. For the optimization a genetic algorithm approach was developed, implemented and successfully applied to several real life steel constructions. In this contribution we discuss the application of the discrete event simulator including its optimization capabilities on a 4D process model of a steel structure of an automobile recycling facility.
Pre-stressed structural elements are widely used in large-span structures. As a rule, they have higher stiffness characteristics. Pre-stressed rods can be applied as girders of different purpose, and as their separate parts, e.g. rods of trusses and frames. Among numerous ways of prestressing the compression of girders, trusses, and frames by tightenings from high-strength materials is under common application.
Many problems related to data integration in AEC can be better tackled by an approach that takes into account the heterogeneity of tasks, models and applications but does not require continuous consistency of the evolving design data, at each data management operation. Such an approach must incorporate adequate services that can facilitate reintegration of concurrently modified data at reasonably selected coordination points. In this paper we present a set of methods which, used in combination, can achieve that goal. After a description of the principal envisaged cooperative work scenario each of these methods is discussed in detail and current observations drawn from their software realisation are given. Whilst the suggested approach is valid for any EXPRESS-based data model, the practical focus of work has been on facilitating IFC-driven integration.
The processes in the life cycle of buildings are characterised by highly distinct teamwork. The integration of all the distributed working participants, by providing an environment, which especially supports the communication and collaboration between the actors, is a fundamental step to improve the efficiency of the involved processes and to reduce the total costs. In this article, a link based modelling approach and its “intelligent” link management is introduced (1). This approach realises an integration environment based on a special building model that acts as a decision support system. The link-based modelling is characterised by the definition and specialisation of links between partial models. These intelligent managed links enable a very flexible and task specific data access and exchange between all the different views and partial models of the participants.
This paper presents a new design environment based on Multi-Agents and Virtual Reality (VR). In this research, a design system with a virtual reality function was developed. The virtual world was realized by using GL4Java, liquid crystal shutter glasses, sensor systems, etc. And the Multi-Agent CAD system with product models, which had been developed before, was integrated with the VR design system. A prototype system was developed for highway steel plate girder bridges, and was applied to a design problem. The application verified the effectiveness of the developed system.
This paper presents an evaluation system for steel structures of hydroelectric power stations, including hydraulic gates and penstocks, based on Fault Tree Analyasis (FTA) and performance maps. This system consists of fault tree diagrams of FTA, performance maps, design and analysis systems, and engineerin databases. These four modules are integrated by appropriate hyperlinks so that the user of this system can use it easily and seamlessly. A well developed system was applied to some illustrative example cases, and they showed that the developed methodology and system worked well and the users found the system useful and effective for their maintenance tasks at powerstations.