Heutige Methoden zur Soll-Spezifikation von Bauleistungen (Kostenermittlung und zeitliche Ablaufplanung) gehen von einer abstrahierten und vereinfachten Betrachtung der Zusammenhänge bei Bauprojekten aus. Leistungsverzeichnisse, Kostenermittlungen und Bauzeitpläne orientieren sich nur indirekt an der Geometrie des Bauwerks und der Baustelle. Die dabei verwendeten Medien wie Papier, 2D-Dateien, digitale Leistungsbeschreibungen oder 3D-Darstellungen lassen die Suche nach Informationen auf der Baustelle zu einem zeitaufwändigen und in Anbetracht existierender Medientechnologien ineffizienten Prozess werden. Interaktive virtuelle Umgebungen erlauben die Auflösung starrer Zusammenhänge durch interaktive Eingriffe des Anwenders und visualisieren komplexe bauproduktionstechnische Vorgänge. Das Konzept der visuellen interaktiven Simulation der Bauproduktion sieht vor, die Soll-Spezifikation anhand eines interaktiven 3D-Modells zu entwickeln, um räumliche Veränderungen und parallele Prozesse auf der virtuellen Baustelle im Rahmen der Entscheidungsfindung zum Bauablauf besser berücksichtigen zu können. Verlangt man einen hohen Grad an Interaktivität mit dem 3D-Modell, dann bieten sich Computerspieltechnologien sehr gut zu Verifikationszwecken an. Die visuelle interaktive Simulation der Bauproduktion ist damit als eine 3D-modellbasierte Methode der Prozessmodellierung zu verstehen, die Entscheidungen als Input benötigt und die Kostenermittlung sowie die zeitliche Ablaufplanung als Output liefert.
A Flexible Model for Incorporating Construction Product Data into Building Information Models
(2006)
When considering the integration and interoperability between AEC-FM software applications and construction products' data, it is essential to investigate the state-of-the-art and conduct an extensive review in the literature of both Building Information Models and electronic product catalogues. It was found that there are many reasons and key-barriers that hinder the developed solutions from being implemented. Among the reasons that are attributed to the failure of many previous research projects to achieve this integration aim are the proprietary developments of CAD vendors, the fragmented nature of construction product data i.e. commercial and technical data, the prefabrication versus on-site production, marketing strategies and brand-naming, the referencing of a product to the data of its constituents, availability of life-cycle data in a single point in time where it is needed all over the whole life-cycle of the product itself, taxonomy problems, the inability to extract search parameters from the building information model to participate in the conduction of parametric searches. Finally and most important is keeping the product data in the building information model consistent and up-to-date. Hence, it was found that there is a great potential for construction product data to be integrated to building information models by electronic means in a dynamic and extensible manner that prevents the model from getting obsolete. The study has managed to establish a solution concept that links continually updated and extensible life-cycle product data to a software independent building information model (IFC) all over the life span of the product itself. As a result, the solution concept has managed to reach a reliable building information model that is capable of overcoming the majority of the above mentioned barriers. In the meantime, the solution is capable of referencing, retrieving, updating, and merging product data at any point in time. A distributed network application that represents all the involved parties in the construction product value chain is simulated by real software tools to demonstrate the proof of concept of this research work.
Erfassung der Zeitparameter eines in einer VR-Umgebung simulierten Arbeitsprozesses aus dem Bauwesen
(2005)
Thema dieser Arbeit ist die Erstellung einer Prozess-Simulation in einer Echtzeit VR-Umgebung. Besonderes Augenmerk wird dabei der Erfassung des Zeitparameters einzelner Prozessabschnitte geschenkt. Mittels einer Datenbankanbindung können somit Daten zwischen einer externen Datenbank und der Simulation ausgetauscht werden. Neben der Realisierung des Datenzugriffes wurde eine Uhr in der virtuellen Umgebung realisiert un somit das Wechselspiel zwischen Erdbaumaschiene und Transportgerät modelliert. Im schriftlichen Teil dieser Arbeit werden die Grundlagen dazu behandelt, das baubetriebliche Anliegen untersucht und die Erstellung in der Software Quest3D dokumentiert.
Als Folge des hohen Termindrucks während des Bauablaufes, ist es besonders wichtig den Fortschritt eines Bauvorhabens zeitnah zu überwachen. Auf Großbaustellen kann die effektive Kontrolle nicht mehr ohne technische Hilfsmittel durchgeführt werden. Die Arbeit stellt verschiedene Szenarien für die verteilte Fortschrittserfassung vor und untersucht welche Anforderungen an ein System für die verteilte Erfassung gestellt werden. Dazu wird zuerst das bestehende CVS-System analysiert, um anschließend daraus ein Konzept für die Versionierung von Objekten und den automatischen Abgleich von Objektversionen zu entwickeln. Später wird gezeigt, wie dieses Konzept mit Hilfe von C# und dem Microsoft®-.NET-Framework umgesetzt werden kann.