The management of resources is an essential task in each construction company. Today, ERP systems and e-Business systems are available to assist construction companies to efficiently organise the allocation of their personnel and equipment within the company, but they cannot provide the company with the idle resources for every single task that has to be performed during a construction project. Therefore, companies should have an alternative solution to better exploit expensive resources and compensate their fixed costs, but also have them available at the right time for their own business activities. This paper outlines the approach taken by the EU funded project “e-Sharing” (IST-2001-33325) to support resource management between construction companies. It will describe requirements for the management of construction resources, its core features, and the integration approach. Therefore, we will outline the approach of an integrated resource type model supporting the management and classification of construction equipment, construction tasks and qualification profiles. The development is based on a cross-domain analysis and evaluation of existing models. ...
The AEC industry is conscious of the potentials arising from the usage of mobile computer systems to increase productivity by streamlining their business processes. Discussions are no longer on whether or not to use a mobile computer solution, but rather, on how it should be used. However, the implantation process of this new technology in Architecture, Engineering and Construction (AEC) and Facility Management (FM) practise is very slow and should be improved. One way to encourage and ease the usage of mobile computer systems in AEC is a more process-oriented usability and context appropriateness of mobile computer solutions. Context-sensitivity is defined as a crucial feature to be taken into account for further research in the area of Mobile Computing. Context-sensitive, mobile IT-solutions depend on two features: (1) flexible definitions of (construction) processes describing the context and (2) tools for flexible, multi-dimensional information management representing the context. It is on this premise that the authors propose the n-dimensional data management approach for the implementation of mobile computing solutions. In this paper, we analyse working scenarios in the AEC and FM sector, defining context aspects which are transformed and formalized as dimension hierarchies of the envisaged context model.
The promise of lower costs for sensors that can be used for construction inspection means that inspectors will continue to have new choices to consider in creating inspection plans. However, these emerging inspection methods can require different activities, resources, and decisions such that it can be difficult to compare the emerging methods with other methods that satisfy the same inspection needs. Furthermore, the context in which inspection is performed can significantly influence how well certain inspection methods are suited for a given set of goals for inspection. Context information, such as weather, security, and the regulatory environment, can be used to understand what information about a component should be collected and how an inspection should be performed. The research described in this paper is aimed at developing an approach for comparing and selecting inspection plans. This approach consists of (1) refinement of given goals for inspection, if necessary, in order to address any additional information needs due to a given context and in order to reach a level of detail that can be addressed by an inspection activity; (2) development of constraints to describe how an inspection should be achieved; (3) matching of goals to available inspection methods, and generation of activities and resource plans in order to address the goals; and (4) selection of an inspection plan from among the possible plans that have been identified. The authors illustrate this approach with observations made at a local construction site.
The worldwide growth of communication networks and associated technologies provide the basic infrastructure for new ways of executing the engineering process. Collaboration amongst team members seperated in time and location is of particular importance. Two broad themes can be recognized in research pertaining to distributed collaboration. One theme focusses on the technical and technological aspects of distributed work, while the other emphasises human aspects thereof. The case of finite element structural analysis in a distributed collaboratory is examined in this paper. An approach is taken which has its roots in human aspects of the structural analysis task. Based on experience of how structural engineers currently approach and execute this task while utilising standard software designed for use on local workstations only, criteria are stated for a software architechture that could support collaborative structural analysis. Aspects of a pilot application and the results of qualitative performance measurements are discussed.
As computer programs become ever more complex, software development has shifted from focusing on programming towards focusing on integration. This paper describes a simulation access language (SimAL) that can be used to access and compose software applications over the Internet. Specifically, the framework is developed for the integration of tools for project management applications. The infrastructure allows users to specify and to use existing heterogeneous tools (e.g., Microsoft Project, Microsoft Excel, Primavera Project Planner, and AutoCAD) for simulation of project scenarios. This paper describes the components of the SimAL language and the implementation efforts required in the development of the SimAL framework. An illustration example bringing on-line weather forecasting service for project scheduling and management applications is provided to demonstrate the use of the simulation language and the infrastructure framework.
All construction project are constrained by their schedules, budgets and specifications, and safety and environmental regulations. These constraints made construction management more complex and difficult. At the same time, many historical data that can support the decisions in the future are kept in construction enterprises,. To use the historical data effectively and efficiently, it is essential to apply the data warehouse and data mining technologies. This paper introduces a research which aims to develop a data warehouse system according to the requirements of construction enterprises and use data mining technology to learn useful information and knowledge from the data warehouse system. The design, the development and the application of this system are detailedly introduced in this paper.
The planning of projects in building engineering is a complex process which is characterized by a dynamical composition and many modifications during the definition and execution time of processes. For a computer-aided and network-based cooperation a formal description of the planning process is necessary. In the research project “Relational Process Modelling in Cooperative Building Planning” a process model is described by three parts: an organizational structure with participants, a building structure with states and a process structure with activities. This research project is part of the priority program 1103 “Network-Based Cooperative Planning Processes in Structural Engineering” promoted by the German Research Foundation (DFG). Planning processes in civil engineering can be described by workflow graphs. The process structure describes the logical planning process and can be formally defined by a bipartite graph. This structure consists of activities, transitions and relationships between activities and transitions. In order to minimize errors at execution time of a planning process a consistent and structurally correct process model must be guaranteed. This contribution considers the concept and the algorithms for checking the consistency and the correctness of the process structure.
This paper describes monitoring of the in-valley discharge and underground water level at the place where the tunnel will be constructed and also, the numerical analysis for prediction applying the Tank Model and Linear Filter Method to calculate the prediction. The application of these analyses has actually allowed the change of underground water level to be grasped and more effective information system to be established by comparing the real-time monitoring data with the real-time calculation of prediction.
Information science researchers and developers have spent many years addressing the problem of retrieving the exact information needed and using it for analysis purposes. In informationseeking dialogues, the user, i.e. construction project manager or supplier, often asks questions about specific aspects of the tasks they want to perform. But most of the time it is difficult for the software systems to unambiguously understand their overall intentions. The existence of information tunnels (Tannenbaum 2002) aggravates this phenomenon. This study includes a detailed case study of the material management process in the construction industry. Based on this case study, the structure of a formal user model for information retrieval in construction management is proposed. This prototype user model will be incorporated into the system design for construction information management and retrieval. This information retrieval system is a user-centered product based on the development of a user configurable visitor mechanism for managing and retrieving project information without worrying too much about the underlying data structure of the database system. An executable UML model combined with OODB is used to reduce the ambiguity in the user's intentions and to achieve user satisfaction.
At the start of the conceptual design process, designers start to give tangible form to their thoughts by sketching. This helps with reasoning and communicates ideas to other members of the team. Sketches are gradually worked up into more formal drawings which are then passed to the other stages of the design process. There are however some problems with basing early ideas on sketching. For example, due to their ad-hoc nature, sketches tend only to be diagrammatic representations and so designers cannot be sure that their ideas are feasible and what is being proposed meets the constraints described in the client brief. This can result in designers wasting time working up ideas which prove to be unsuitable. Also the process of constraint checking is complex and time consuming and so designers tend limit their search of possible options and instead choose satisfying rather than good solutions. This paper describes the INTEGRA project which examines the role of sketching in early conceptual design and how this can be linked to other aspects of the process and particularly automated constraint checking using an IT based approach. The focus for the work is the design of framed buildings. A multi-disciplinary approach has been adopted and the work has been undertaken in close collaboration with practising designers and clients.