Refine
Document Type
- Conference Proceeding (286) (remove)
Institute
- In Zusammenarbeit mit der Bauhaus-Universität Weimar (174)
- Graduiertenkolleg 1462 (31)
- Institut für Strukturmechanik (ISM) (22)
- Professur Informatik im Bauwesen (21)
- Professur Angewandte Mathematik (18)
- Institut für Konstruktiven Ingenieurbau (IKI) (8)
- Professur Stahlbau (4)
- Institut für Bauinformatik, Mathematik und Bauphysik (IBMB) (3)
- Professur Informatik in der Architektur (3)
- Professur Stochastik und Optimierung (3)
Keywords
- Computerunterstütztes Verfahren (286) (remove)
The present paper is part of a comprehensive approach of grid-based modelling. This approach includes geometrical modelling by pixel or voxel models, advanced multiphase B-spline finite elements of variable order and fast iterative solver methods based on the multigrid method. So far, we have only presented these grid-based methods in connection with linear elastic analysis of heterogeneous materials. Damage simulation demands further considerations. The direct stress solution of standard bilinear finite elements is severly defective, especially along material interfaces. Besides achieving objective constitutive modelling, various nonlocal formulations are applied to improve the stress solution. Such a corrective data processing can either refer to input data in terms of Young's modulus or to the attained finite element stress solution, as well as to a combination of both. A damage-controlled sequentially linear analysis is applied in connection with an isotropic damage law. Essentially by a high resolution of the heterogeneous solid, local isotropic damage on the material subscale allows to simulate complex damage topologies such as cracks. Therefore anisotropic degradation of a material sample can be simulated. Based on an effectively secantial global stiffness the analysis is numerically stable. The iteration step size is controlled for an adequate simulation of the damage path. This requires many steps, but in the iterative solution process each new step starts with the solution of the prior step. Therefore this method is quite effective. The present paper provides an introduction of the proposed concept for a stable simulation of damage in heterogeneous solids.
Advanced finite elements are proposed for the mechanical analysis of heterogeneous materials. The approximation quality of these finite elements can be controlled by a variable order of B-spline shape functions. An element-based formulation is developed such that the finite element problem can iteratively be solved without storing a global stiffness matrix. This memory saving allows for an essential increase of problem size. The heterogeneous material is modelled by projection onto a uniform, orthogonal grid of elements. Conventional, strictly grid-based finite element models show severe oscillating defects in the stress solutions at material interfaces. This problem is cured by the extension to multiphase finite elements. This concept enables to define a heterogeneous material distribution within the finite element. This is possible by a variable number of integration points to each of which individual material properties can be assigned. Based on an interpolation of material properties at nodes and further smooth interpolation within the finite elements, a continuous material function is established. With both, continuous B-spline shape function and continuous material function, also the stress solution will be continuous in the domain. The inaccuracy implied by the continuous material field is by far less defective than the prior oscillating behaviour of stresses. One- and two-dimensional numerical examples are presented.
In this paper an adaptive heterogeneous multiscale model, which couples two substructures with different length scales into one numerical model is introduced for the simulation of damage in concrete. In the presented approach the initiation, propagation and coalescence of microcracks is simulated using a mesoscale model, which explicitly represents the heterogeneous material structure of concrete. The mesoscale model is restricted to the damaged parts of the structure, whereas the undamaged regions are simulated on the macroscale. As a result an adaptive enlargement of the mesoscale model during the simulation is necessary. In the first part of the paper the generation of the heterogeneous mesoscopic structure of concrete, the finite element discretization of the mesoscale model, the applied isotropic damage model and the cohesive zone model are briefly introduced. Furthermore the mesoscale simulation of a uniaxial tension test of a concrete prism is presented and own obtained numerical results are compared to experimental results. The second part is focused on the adaptive heterogeneous multiscale approach. Indicators for the model adaptation and for the coupling between the different numerical models will be introduced. The transfer from the macroscale to the mesoscale and the adaptive enlargement of the mesoscale substructure will be presented in detail. A nonlinear simulation of a realistic structure using an adaptive heterogeneous multiscale model is presented at the end of the paper to show the applicability of the proposed approach to large-scale structures.
A fast solver method called the multigrid preconditioned conjugate gradient method is proposed for the mechanical analysis of heterogeneous materials on the mesoscale. Even small samples of a heterogeneous material such as concrete show a complex geometry of different phases. These materials can be modelled by projection onto a uniform, orthogonal grid of elements. As one major problem the possible resolution of the concrete specimen is generally restricted due to (a) computation times and even more critical (b) memory demand. Iterative solvers can be based on a local element-based formulation while orthogonal grids consist of geometrical identical elements. The element-based formulation is short and transparent, and therefore efficient in implementation. A variation of the material properties in elements or integration points is possible. The multigrid method is a fast iterative solver method, where ideally the computational effort only increases linear with problem size. This is an optimal property which is almost reached in the implementation presented here. In fact no other method is known which scales better than linear. Therefore the multigrid method gains in importance the larger the problem becomes. But for heterogeneous models with very large ratios of Young's moduli the multigrid method considerably slows down by a constant factor. Such large ratios occur in certain heterogeneous solids, as well as in the damage analysis of solids. As solution to this problem the multigrid preconditioned conjugate gradient method is proposed. A benchmark highlights the multigrid preconditioned conjugate gradient method as the method of choice for very large ratio's of Young's modulus. A proposed modified multigrid cycle shows good results, in the application as stand-alone solver or as preconditioner.
Summer overheating in buildings is a common problem, especially in office buildings with large glazed facades, high internal loads and low thermal mass. Phase change materials (PCM) that undergo a phase transition in the temperature range of thermal comfort can add thermal mass without increasing the structural load of the building. The investigated PCM were micro-encapsulated and mixed into gypsum plaster. The experiments showed a reduction of indoor-temperature of up to 4 K when using a 3 cm layer of PCM-plaster with micro-encapsulated paraffin. The measurement results could validate a numerical model that is based on a temperature dependent function for heat capacity. Thermal building simulation showed that a 3 cm layer of PCM-plaster can help to fulfil German regulations concerning heat protection of buildings in summer for most office rooms.
In this paper we study the structure of the solutions to higher dimensional Dirac type equations generalizing the known λ-hyperholomorphic functions, where λ is a complex parameter. The structure of the solutions to the system of partial differential equations (D- λ) f=0 show a close connection with Bessel functions of first kind with complex argument. The more general system of partial differential equations that is considered in this paper combines Dirac and Euler operators and emphasizes the role of the Bessel functions. However, contrary to the simplest case, one gets now Bessel functions of any arbitrary complex order.
The modeling of crack propagation in plain and reinforced concrete structures is still a field for many researchers. If a macroscopic description of the cohesive cracking process of concrete is applied, generally the Fictitious Crack Model is utilized, where a force transmission over micro cracks is assumed. In the most applications of this concept the cohesive model represents the relation between the normal crack opening and the normal stress, which is mostly defined as an exponential softening function, independently from the shear stresses in tangential direction. The cohesive forces are then calculated only from the normal stresses. By Carol et al. 1997 an improved model was developed using a coupled relation between the normal and shear damage based on an elasto-plastic constitutive formulation. This model is based on a hyperbolic yield surface depending on the normal and the shear stresses and on the tensile and shear strength. This model also represents the effect of shear traction induced crack opening. Due to the elasto-plastic formulation, where the inelastic crack opening is represented by plastic strains, this model is limited for applications with monotonic loading. In order to enable the application for cases with un- and reloading the existing model is extended in this study using a combined plastic-damage formulation, which enables the modeling of crack opening and crack closure. Furthermore the corresponding algorithmic implementation using a return mapping approach is presented and the model is verified by means of several numerical examples. Finally an investigation concerning the identification of the model parameters by means of neural networks is presented. In this analysis an inverse approximation of the model parameters is performed by using a given set of points of the load displacement curves as input values and the model parameters as output terms. It will be shown, that the elasto-plastic model parameters could be identified well with this approach, but require a huge number of simulations.
Die effektive Kooperation aller beteiligten Fachplaner im Bauplanungsprozess ist die Voraussetzung für wirtschaftliches und qualitativ hochwertiges Bauen. Bauprojektorganisationen bestehen in der Regel aus zahlreichen unabhängigen Planungspartnern, die örtlich verteilt spezifische Planungsaufgaben bearbeiten und die Ergebnisse in Teilproduktmodellen ablegen. Da Planungsprozesse im Bauwesen stark arbeitsteilig ablaufen, sind die Teilproduktmodelle der einzelnen Fachplanungen in hohem Maße voneinander abhängig. Ziel des hier vorgestellten Ansatzes ist die Integration der Teilproduktmodelle der Gebäudeplanung in einem netzwerkbasierten Modellverbund am Beispiel der Brandschutzplanung. Im Beitrag werden die Probleme der Verteiltheit und insbesondere der semantischen Heterogenität der involvierten Teilproduktmodelle betrachtet. Der verteilte Zugriff wird mithilfe mobiler Software-Agenten realisiert. Die Agenten können sich dabei frei im netzwerkbasierten Planungsverbund bewegen und agieren als Vertreter der Fachplaner. Das Problem der semantischen Heterogenität der Teilproduktmodelle wird auf der Basis von Ontologien gelöst. Dazu werden erstens Domänenontologien entwickelt, die Objekte der realen Welt einer abgeschlossenen Domäne, hier des Brandschutzes, abbilden. Zweitens werden Applikationsontologien entwickelt, die die einzelnen proprietären Datenhaltungen (im Sinne von Teilproduktmodellen) der jeweiligen Fachplanungen repräsentieren. Beide Ontologien werden mit einem regelbasierten Ansatz verknüpft. Im vorgestellten Anwendungsfall Brandschutz dient die Domänenontologie als einheitliche Schnittstelle für den Zugriff auf die verteilten Modelle und abstrahiert dabei von deren Datenbankspezifika und proprietären Schemata. Mithilfe von mobilen Agenten und semantischen Technologien kann so eine Plattform zur Verfügung gestellt werden, die erstens die dynamische Integration von Ressourcen in den Planungsverbund erlaubt und zweitens auf deren Basis unabhängig von der Verteiltheit und Heterogenität der eingebundenen Ressourcen ingenieurgerechte Verarbeitungsmethoden realisiert werden können.
In classical complex function theory the geometric mapping property of conformality is closely linked with complex differentiability. In contrast to the planar case, in higher dimensions the set of conformal mappings is only the set of Möbius transformations. Unfortunately, the theory of generalized holomorphic functions (by historical reasons they are called monogenic functions) developed on the basis of Clifford algebras does not cover the set of Möbius transformations in higher dimensions, since Möbius transformations are not monogenic. But on the other side, monogenic functions are hypercomplex differentiable functions and the question arises if from this point of view they can still play a special role for other types of 3D-mappings, for instance, for quasi-conformal ones. On the occasion of the 16th IKM 3D-mapping methods based on the application of Bergman's reproducing kernel approach (BKM) have been discussed. Almost all authors working before that with BKM in the Clifford setting were only concerned with the general algebraic and functional analytic background which allows the explicit determination of the kernel in special situations. The main goal of the abovementioned contribution was the numerical experiment by using a Maple software specially developed for that purpose. Since BKM is only one of a great variety of concrete numerical methods developed for mapping problems, our goal is to present a complete different from BKM approach to 3D-mappings. In fact, it is an extension of ideas of L. V. Kantorovich to the 3-dimensional case by using reduced quaternions and some suitable series of powers of a small parameter. Whereas until now in the Clifford case of BKM the recovering of the mapping function itself and its relation to the monogenic kernel function is still an open problem, this approach avoids such difficulties and leads to an approximation by monogenic polynomials depending on that small parameter.
The Element-free Galerkin Method has become a very popular tool for the simulation of mechanical problems with moving boundaries. The internally applied Moving Least Squares approximation uses in general Gaussian or cubic weighting functions and has compact support. Due to the approximative character of this method the obtained shape functions do not fulfill the interpolation condition, which causes additional numerical effort for the imposition of the essential boundary conditions. The application of a singular weighting function, which leads to singular coefficient matrices at the nodes, can solve this problem, but requires a very careful placement of the integration points. Special procedures for the handling of such singular matrices were proposed in literature, which require additional numerical effort. In this paper a non-singular weighting function is presented, which leads to an exact fulfillment of the interpolation condition. This weighting function leads to regular values of the weights and the coefficient matrices in the whole interpolation domain even at the nodes. Furthermore this function gives much more stable results for varying size of the influence radius and for strongly distorted nodal arrangements than classical weighting function types. Nevertheless, for practical applications the results are similar as these obtained with the regularized weighting type presented by the authors in previous publications. Finally a new concept will be presented, which enables an efficient analysis of systems with strongly varying node density. In this concept the nodal influence domains are adapted depending on the nodal configuration by interpolating the influence radius for each direction from the distances to the natural neighbor nodes. This approach requires a Voronoi diagram of the domain, which is available in this study since Delaunay triangles are used as integration background cells. In the numerical examples it will be shown, that this method leads to a more uniform and reduced number of influencing nodes for systems with varying node density than the classical circular influence domains, which means that the small additional numerical effort for interpolating the influence radius leads to remarkable reduction of the total numerical cost in a linear analysis while obtaining similar results. For nonlinear calculations this advantage would be even more significant.
In this paper we consider three different methods for generating monogenic functions. The first one is related to Fueter's well known approach to the generation of monogenic quaternion-valued functions by means of holomorphic functions, the second one is based on the solution of hypercomplex differential equations and finally the third one is a direct series approach, based on the use of special homogeneous polynomials. We illustrate the theory by generating three different exponential functions and discuss some of their properties. Formula que se usa em preprints e artigos da nossa UI&D (acho demasiado completo): Partially supported by the R\&D unit \emph{Matem\'atica a Aplica\c\~es} (UIMA) of the University of Aveiro, through the Portuguese Foundation for Science and Technology (FCT), co-financed by the European Community fund FEDER.
In engineering science the modeling and numerical analysis of complex systems and relations plays an important role. In order to realize such an investigation, for example a stochastic analysis, in a reasonable computational time, approximation procedure have been developed. A very famous approach is the response surface method, where the relation between input and output quantities is represented for example by global polynomials or local interpolation schemes as Moving Least Squares (MLS). In recent years artificial neural networks (ANN) have been applied as well for such purposes. Recently an adaptive response surface approach for reliability analyses was proposed, which is very efficient concerning the number of expensive limit state function evaluations. Due to the applied simplex interpolation the procedure is limited to small dimensions. In this paper this approach is extended for larger dimensions using combined ANN and MLS response surfaces for evaluating the adaptation criterion with only one set of joined limit state points. As adaptation criterion a combination by using the maximum difference in the conditional probabilities of failure and the maximum difference in the approximated radii is applied. Compared to response surfaces on directional samples or to plain directional sampling the failure probability can be estimated with a much smaller number of limit state points.
At the 16th IKM Bock, Falcão and Gürlebeck presented examples of the application of some specially developed Maple-Software in hypercomplex analysis. Other papers of those authors continued this work and showed the efficiency of such tools for concrete numerical calculations as well as for numerical experiments, supporting the detection of new relationships and even theorems in a highly technical theoretical work. The mentioned software has been developed mainly for the use on mapping problems in the Euclidean spaces of dimension 3 and 4 by means of Bergman kernel methods (BKM), which are related to monogenic functions as solutions of generalized Cauchy-Riemann equations with respect to the Euclidean metric (Riesz system). The developed procedures concerning generalized powers of totally regular variables and the corresponding homogeneous polynomials basically rely on results and conventions introduced in the paper "Power series representation for monogenic functions in Rm+1 based on a permutational product", Complex Variables, 15, No.3, 181-191 (1990) by H. Malonek. Since 1992 H. Leutwiler, S. L. Eriksson and others developed in a number of papers a modified Clifford analysis and, particularly, a modified quaternionic analysis. The modification mainly consists in considering generalized Cauchy-Riemann equations with respect to a hyperbolic metric in a half space. The aim of this contribution is to show how through a change of the basic combinatorial relations used in the modified quaternionic analysis the aforementioned Maple-software (that has been recently published on CD-Rom as integrated part of the text book "Funktionentheorie in der Ebene und im Raum" by K. Gürlebeck, K. Habetha, and W. Sprössig, in the series "Grundstudium Mathematik" of Birkhäuser Verlag, 2006) can directly be used for numerical calculations in the modified theory.
Am Beispiel eines 3-feldrigen Durchlaufträgers wird die Versagenswahrscheinlichkeit von wechselnd belasteten Stahlbetonbalken bezüglich des Grenzzustandes der Adaption (Einspielen, shakedown) untersucht. Die Adaptionsanalyse erfolgt unter Berücksichtigung der beanspruchungschabhängigen Degradation der Biegesteifigkeit infolge Rissbildung. Die damit verbundene mechanische Problemstellung kann auf die Adaptionsanalyse linear elastisch - ideal plastischer Balkentragwerke mit unbekannter aber begrenzter Biegesteifigkeit zurückgeführt werden. Die Versagenswahrscheinlichkeit wird unter Berücksichtigung stochastischer Tragwerks- und Belastungsgrößen berechnet. Tragwerkseigenschaften und ständige Lasten gelten als zeitunabhängige Zufallsgrößen. Zeitlich veränderliche Lasten werden als nutzungsdauerbezogene Extremwerte POISSONscher Rechteck-Pulsprozesse unter Berücksichtigung zeitlicher Überlagerungseffekte modelliert, so dass die Versagenswahrscheinlichkeit ebenfalls eine nutzungsdauerbezogene Größe ist. Die mechanischen Problemstellungen werden numerisch mit der mathematischen Optimierung gelöst. Die Versagenswahrscheinlichkeit wird auf statistischem Weg mit der Monte-Carlo-Methode geschätzt.
ON THE NAVIER-STOKES EQUATION WITH FREE CONVECTION IN STRIP DOMAINS AND 3D TRIANGULAR CHANNELS
(2006)
The Navier-Stokes equations and related ones can be treated very elegantly with the quaternionic operator calculus developed in a series of works by K. Guerlebeck, W. Sproeossig and others. This study will be extended in this paper. In order to apply the quaternionic operator calculus to solve these types of boundary value problems fully explicitly, one basically needs to evaluate two types of integral operators: the Teodorescu operator and the quaternionic Bergman projector. While the integral kernel of the Teodorescu transform is universal for all domains, the kernel function of the Bergman projector, called the Bergman kernel, depends on the geometry of the domain. With special variants of quaternionic holomorphic multiperiodic functions we obtain explicit formulas for three dimensional parallel plate channels, rectangular block domains and regular triangular channels. The explicit knowledge of the integral kernels makes it then possible to evaluate the operator equations in order to determine the solutions of the boundary value problem explicitly.
In this paper we evaluate 2D models for soil-water characteristic curve (SWCC), that incorporate the hysteretic nature of the relationship between volumetric water content Θ and suction Ψ. The models are based on nonlinear least squares estimation of the experimental data for sand. To estimate the dependent variable Θ the proposed models include two independent variables, suction and sensors reading position (depth d in the column test). The variable d represents not only the position where suction and water content are measured but also the initial suction distribution before each of the hydraulic loading test phases. Due to this the proposed 2D regression models acquire the advantage that they: (a) can be applied for prediction of Θ for any position along the column and (b) give the functional form for the scanning curves.
The quaternionic operator calculus can be applied very elegantly to solve many important boundary value problems arising in fluid dynamics and electrodynamics in an analytic way. In order to set up fully explicit solutions. In order to apply the quaternionic operator calculus to solve these types of boundary value problems fully explicitly, one has to evaluate two types of integral operators: the Teodorescu operator and the quaternionic Bergman projector. While the integral kernel of the Teodorescu transform is universal for all domains, the kernel function of the Bergman projector, called the Bergman kernel, depends on the geometry of the domain. Recently the theory of quaternionic holomorphic multiperiodic functions and automorphic forms provided new impulses to set up explicit representation formulas for large classes of hyperbolic polyhedron type domains. These include block shaped domains, wedge shaped domains (with or without additional rectangular restrictions) and circular symmetric finite and infinite cylinders as particular subcases. In this talk we want to give an overview over the recent developments in this direction.
TOOL TO CHECK TOPOLOGY AND GEOMETRY FOR SPATIAL STRUCTURES ON BASIS OF THE EXTENDED MAXWELL'S RULE
(2006)
One of the simplest principle in the design of light-weight structures is to avoid bending. This can be achieved by dissolving girders into members acting purely in axial tension or compression. The employment of cables for the tensioned members leads to even lighter structures which are called cable-strut structures. They constitute a subclass of spatial structures. To give fast information about the general feasibility of an architectural concept employing cable-strut structures is a challenging task due to their sophisticated mechanical behavior. In this regard it is essential to control if the structure is stable and if pre-stress can be applied. This paper presents a tool using the spreadsheet software Microsoft (MS) Excel which can give such information. Therefore it is not necessary to purchase special software and the according time consuming training is much lower. The tool was developed on basis of the extended Maxwell's rule, which besides topology also considers the geometry of the structure. For this the rank of the node equilibrium matrix is crucial. Significance and determination of the rank and the implementation of the corresponding algorithms in MS Excel are described in the following. The presented tool is able to support the structural designer in an early stage of the project in finding a feasible architectural concept for cable-strut structures. As examples for the application of the software tool two special cable-strut structures, so called tensegrity structures, were examined for their mechanical behavior.
The management of resources is an essential task in each construction company. Today, ERP systems and e-Business systems are available to assist construction companies to efficiently organise the allocation of their personnel and equipment within the company, but they cannot provide the company with the idle resources for every single task that has to be performed during a construction project. Therefore, companies should have an alternative solution to better exploit expensive resources and compensate their fixed costs, but also have them available at the right time for their own business activities. This paper outlines the approach taken by the EU funded project “e-Sharing” (IST-2001-33325) to support resource management between construction companies. It will describe requirements for the management of construction resources, its core features, and the integration approach. Therefore, we will outline the approach of an integrated resource type model supporting the management and classification of construction equipment, construction tasks and qualification profiles. The development is based on a cross-domain analysis and evaluation of existing models. ...
The planning of projects in building engineering is a complex process which is characterized by a dynamical composition and many modifications during the definition and execution time of processes. For a computer-aided and network-based cooperation a formal description of the planning process is necessary. In the research project “Relational Process Modelling in Cooperative Building Planning” a process model is described by three parts: an organizational structure with participants, a building structure with states and a process structure with activities. This research project is part of the priority program 1103 “Network-Based Cooperative Planning Processes in Structural Engineering” promoted by the German Research Foundation (DFG). Planning processes in civil engineering can be described by workflow graphs. The process structure describes the logical planning process and can be formally defined by a bipartite graph. This structure consists of activities, transitions and relationships between activities and transitions. In order to minimize errors at execution time of a planning process a consistent and structurally correct process model must be guaranteed. This contribution considers the concept and the algorithms for checking the consistency and the correctness of the process structure.
Integrated Engineering Workflow focused on the Structural Engineering in the Industrial Environment
(2004)
The engineering and construction industry has been slow to exploit the full potential of information technology. The industry is highly fragmented, price sensitive, risk-adverse, and profit margins are small. Each project is unique with a small amount of technological innovation opportunities to capitalise on from one project to the next. Technological innovations that have been taking place are just simulating the old traditional paper workflow. Engineering information in digital form is being conveyed using traditional paper representations, which have to be interpreted by humans before the information can be used in other applications, thereby creating ‘islands of information’. It can be seen that poorly implemented IT strategies are duplicating paperwork, rather than reducing or eliminating it (Crowley et al., 2000). This paper will introduce the Integrated Engineering Workflow (IEW) concept to re-organise a structural discipline working on multi-disciplinary projects so as to maximise the advantages offered by new information technology.
Applications for civil engineering tasks usually contain graphical user interfaces for the engineering processes. Persistent objects of the applications are stored to data bases. The influence of the interaction between a graphical user interface and a data base for the development of an civil engineering application is investigated in this paper. A graphic application for the linear elastic analysis of plane frames, which was previously developed with standard tools of the Java platform, is compared to a redesigned implementation using a generalized data base for persistent objects. The investigation leads to the following results : - A strict distinction between persistent and transient objects influences the class structure of an application, in particular the class structure of a graphical user interface. - The structure of an application depends on the logic for updating of references to persistent and transient graphical objects after an application is read from a file. - The complexity of the reference management can usually be handled better by just in time referencing associated with String - identifiers rather than by automated referencing associated with Name - identifiers.
The design of building projects involves several types of resources such as architects, structural engineers, mechanical engineers, electrical engineers, and draftsmen, among others. For design firms to stay in business in this very competitive market, they need to manage their resources in a way that improves productivity and cost effectiveness. This task, however, is not simple and requires thorough analysis of process-level operations, resource use, and productivity. Typically, these operational aspects are the responsibility of the design office manager who assigns available resources to the different design projects to save time and lower design expenses. It is noted that limited studies have been carried out in the literature to model overall organizational operations and behavioral aspects, particularly in firms specialized in the design of building projects. In an effort to simplify the modeling process, a simplified modeling and simulation tool is used in this research. A simulation model representing an actual design office was developed assuming that the office performs designs for small, medium, and large size building projects. The developed model was used to simulate several alternatives and examine various resource assignment strategies. The simulation was conducted over ten years and the resulting productivity and income was measured.
This paper presents a specific modeling technique that is focused on preparing planning processes in civil engineering. Planning processes in civil engineering are characterized by some peculiarities so that the sequence of planning tasks needs to be determined for each planning project. Neither the use of optimized partial processes nor the use of lower detailed and optimized processes guarantee an optimal overall planning process. The modeling technique considers these peculiarities. In a first step, it is focused on the logic of the planning process. Algorithms based on the graph theory determine that logic. This approach ensures consistency and logical correctness of the description of a planning process at the early beginning in its preparation phase. Sets of data – the products of engineers like technical drawings, technical models, reports, or specifications – form the core of the presented modeling technique. The production of these sets of data requires time and money. This is expressed by a specific weighting of each set of data in the presented modeling technique. The introduction of these weights allows an efficient progress measurement and controlling of a planning project. For this purpose, a link between the modeling technique used in the preparation phase and the execution phase is necessary so that target and actual values are available for controlling purposes. The present paper covers the description of this link. An example is given to illustrate the use of the modeling technique for planning processes in civil engineering projects.
Available construction time-cost trade-off analysis models can be used to generate trade-offs between these two important objectives, however, their application is limited in large-scale construction projects due to their impractical computational requirements. This paper presents the development of a scalable and multi-objective genetic algorithm that provides the capability of simultaneously optimizing construction time and cost large-scale construction projects. The genetic algorithm was implemented in a distributed computing environment that utilizes a recent standard for parallel and distributed programming called the message passing interface (MPI). The performance of the model is evaluated using a set of measures of performance and the results demonstrate the capability of the present model in significantly reducing the computational time required to optimize large-scale construction projects.
The growing competition pressure in the building industry increases the demands on the design and construction processes in respect to economical, technical and time aspects. These demands require efficient improvements of the value-added chain, which can be realized mainly with the usage of innovative information- and communication-technologies. To support the collaboration of all participants involved in a certain building project the Workflow-Management-System “BauKom-Online” has been developed. In the focus of the system is to support the coordination of the participants and their information exchange. Such a software-method is well suited to ensure a high quality planning process. The modelling of business-processes enables a better self-comprehension of the participants work and helps to enhance the project performance. The system architecture of BauKom-Online contains two basic components: the processmodelling tool and the workflow-engine. The process-model contains of activities and states of the planning and construction processes and their relations. These connected processes compose the workflow. Such a process-model for engineering purposes has to satisfy several needs, e.g., the consideration of planning and building alternatives, dynamic changes of the model during execution of the project and the linkage to further technical objects like costs, building structure, specifications and documentmanagement. Furthermore, the scheduling of the project can be done within the process-model and can be visualized as a Gantt-diagram. ...
As a result of the pilot-project “Grundwasser-Online” the supervision and the active controlling of large monitoring- and catchment-areas are realised by a co-operative integration of all related institutions, a synchronisation-process to combine all distributed data into one central server database, and a high-level eGovernment-Service to provide evaluated information over the internet. Based on this software system the local authorities are able to supervise the groundwater-levels and to find adequate decisions, which finally result in official permissions for the usage of groundwater-reservoirs by the water supply companies.
The methods currently used for scheduling building processes have some major advantages as well as disadvantages. The main advantages are the arrangement of the tasks of a project in a clear, easily readable form and the calculation of valuable information like critical paths. The main disadvantage on the other hand is the inflexibility of the model caused by the modeling paradigms. Small changes of the modeled information strongly influence the whole model and lead to the need to change many more details in the plan. In this article an approach is introduced allowing the creation of more flexible schedules. It aims towards a more robust model that lowers the need to change more than a few information while being able to calculate the important propositions of the known models and leading to further valuable conclusions.
Let the information of a civil engineering application be decomposed into objects of a given set of classes. Then the set of objects forms the data base of the application. The objects contain attributes and methods. Properties of the objects are stored in the attributes. Algorithms which the objects perform are implemented in the methods of the objects. If objects are modified by a user, the consistency of data in the base is destroyed. The data base must be modified in an update to restore its consistency. The sequence of the update operations is not arbitrary, but is governed by dependence between the objects. The situation can be described mathematically with graph theory. The available algorithms for the determination of the update sequence are not suitable when the data base is large. A new update algorithm for large data bases has been developed and is presented in this paper.
Cost and Schedule Controlling in Relation to Liquidity Management during Construction Projects
(2004)
The present paper describes a software application which can be used for relating the scheduled events of a construction project with the respective financial parameters, leading to an overall improvement in general controlling and liquidity management. For this purpose, existing construction schedules are taken and details of the assignment are recorded. Thus it becomes possible to assess a future payment status should changes in the designated schedule occur.
Seit die Datenverarbeitung in ihrer Komplexität sich der Thematik des Computer Integrated Manufacturing widmet gehört die Produktionsplanung und Steuerung zu jenen Bereichen, in denen eine Computerunterstützung am vordringlichsten erschien. Später sind betriebswirtschaftliche Gesamtlösungen entstanden, die (bis heute recht unpräzise) als Enterprise Resource Planning (ERP)-Systeme bezeichnet werden und in ihren Logistik-Modulen auch Funktionen der Produktionsplanung abdecken. Alle bekannten MRP-, PPS- und auch ERP-Systeme beruhen auf einer Sukzessivplanung. Advanced Planning and Scheduling (APS) Systems finden seit etwa 1995 zunehmend Interesse. Neben Demand Planning, Production Planning and Scheduling, Distribution Planning, Transportation Planning und Supply Chain Planning werden Lösungen für Anzahl und Standorte von Produktionsstätten und Auslieferungslagern, Zuordnung zu Produktionsstätten, Kapazitätsbestimmung für Arbeitskräfte und Betriebsmittel je Standort, Lagerhaltung je Teil und Lager, Bestimmung benötigter Transportmittel und Häufigkeit ihres Einsatzes, Zuordnung von Lagern zu Produktionsstätten von Märkten zu Lagern u.a.m. von APS-Systemen erwartet. D.h. APS-Systeme ergänzen ERP-Lösungen, nutzen die bereits durch das ERP-System vorhandenen Daten und benötigen neuartige Algorithmen und (Meta-) Heuristiken. Im Rahmen des Vortrages werden Modelle und Echtzeitalgorithmen zur Optimierung der Logistik für Prozesse mit kurzfristigen Anforderungen, geographisch verteilter Produktion, Lagerhaltung der Ausgangs-, Zwischen- und Endprodukte und wechselnden Transport-Bedingungen aus der Sicht der praktischen Umsetzung und Anwendung in Form einer ASP-Lösung aufgezeigt und diskutiert.
SYSBAT - An Application to the Building ProductionBased on Computer Supported Cooperative Work
(2003)
Our proposed solution is to enable partners of a construction project to share all the technical data produced and handled during the building production process by building a system through the use of internet technology. The system links distributed databases and allows building partners to access remotely and manipulate specific information. It provides an updated building representation that is being enriched and refined all along the building production process. A recent collaboration with Nemetschek France (subsidiary company of Nemetschek AG, AEC CAD software leader) focus on a building product repository available in a web context. The aim is to help building project actors to choose a technical solution that fits its professional needs, and maintain our information system with up to date information. It starts with the possibility to build on line building product catalogs, in order to link Allplan CAD entities with building technical features. This paper presents the conceptual approaches on which our information system is built. Starting from a general organization diagram organization, we focus on the product and the description branches of construction works (including last IFC model specifications). Our aim is to add decisional support to the construction works selection process. To do so, we consider the actor's role upon the system and the pieces of information each one needs to achieve a given task.
Die Sicherung der Wettbewerbsfähigkeit im Bereich des Bauwesens, insbesondere kleinerer und mittelständischer Betriebe erfordert ein aktives Handeln als Antwort auf die sich ändernde Wettbewerbssituation. Einen wesentlichen Wettbewerbsvorteil können kleine unternehmerische Einheiten durch höhere Flexibilität, schnelle Reaktion auf Kundenwünsche oder aktuelle Situationen auf der Baustelle und Marktnähe erreichen. Dazu ist es nötig, die Informations- und Kommunikationsströme durch Einsatz standardisierter und kostengünstiger Hard- und Software wie z.B. Handhelds zu unterstützen und insbesondere die existierenden Hindernisse im Informationsfluss zwischen Baustelle und Büro zu beseitigen. Am Beispiel der Projekte >IuK - SystemBau< und >eSharing< wird eine Einführungsstrategie für >Mobile Computing< in kleinen unternehmerischen Einheiten des Bauwesens (KMU) basierend auf einer umfangreichen Anforderungsanalyse vorgestellt. Folgende Aspekte sollen beschrieben werden: durchgängiger Einsatz der Technik unter Beachtung der verschiedenen Qualifikationsniveaus, Einführungsunterstützung durch Schulungen, Prozessanalyse und mögliche Integration in bestehende Software-Umgebungen sowie Feldtests.
Die heutige Situation in der Tragwerksplanung ist durch das kooperative Zusammenwirken einer größeren Anzahl von Fachleuten verschiedener Disziplinen (Architektur, Tragwerksplanung, etc.) in zeitlich befristeten Projektgemeinschaften gekennzeichnet. Bei der Abstimmung der hierdurch bedingten komplexen, dynamischen und vernetzten Planungsprozesse kommt es dabei häufig zu Planungsmängeln und Qualitätseinbußen. Dieser Artikel zeigt auf, wie mit Hilfe der Agententechnologie Lösungsansätze zur Verbesserung der Planungssituation erreicht werden können. Hierzu wird ein Agentenmodell für die vernetzt-kooperative Tragwerksplanung vorgestellt und anhand der Planung einer Fußgängerbogenbrücke anschaulich demonstriert. Das Agentenmodell erfasst (1) die beteiligten Fachplaner und Organisationen, (2) die tragwerksspezifischen Planungsprozesse, (3) die zugehörigen (Teil-)Produktmodelle und (4) die genutzte (Ingenieur-)Software. Hieraus leiten sich die drei Teilmodelle (1) agentenbasiertes Kooperationsmodell, (2) agentenbasierte Produktmodellintegration und (3) Modell zur agentenbasierten Software-Integration ab. Der Fokus des Artikels liegt auf der Darstellung des agentenbasierten Kooperationsmodells.
Projektsteuerung gewinnt als Aufgabenfeld bei der Realisierung von Investitionsprojekten ständig an Bedeutung. Zur Bewältigung der umfangreichen und komplizierten Aufgaben des Projektsteuerers wird zunehmend Software angeboten und genutzt. Dabei ist feststellbar, daß von einer integrierten Projektsteuerung unter Berücksichtigung der Kriterien Leistung, Termin und Kosten nicht gesprochen werden kann, weil wesentliche theoretische und praktische Voraussetzungen fehlen. Im Beitrag werden Defizite der praktizierten Vorgehensweise und Lösungsansätze für eine integrierte rechnergestützte Projektsteuerung vorgestellt. Durch geeignete Formen der Projektstrukturierung und eine Kopplung auf dem Mark befindlicher Standardsoftware können geeignete Lösungen gefunden werden. Problempunkte dabei stellen die Schnittstellen zwischen den Anwenderprogrammen die Datenbeschaffung und -verwaltung sowie geeignete Verfahren zur Kostenermittlung und -verfolgung dar. Im Beitrag werden eine bereits praktizierte und eine in Entwicklung befindliche Lösung vorgestellt.