Refine
Document Type
- Conference Proceeding (336)
- Article (130)
- Doctoral Thesis (12)
- Master's Thesis (2)
- Working Paper (2)
- Preprint (1)
- Study Thesis (1)
Institute
- Professur Informatik im Bauwesen (484) (remove)
Keywords
- Modellierung (62)
- Bauwerk (48)
- Finite-Elemente-Methode (41)
- CAD (40)
- Verteiltes System (38)
- Bautechnik (30)
- Computerunterstütztes Verfahren (24)
- Produktmodell (24)
- Architektur (23)
- Simulation (22)
Transport problems, as, for instance, the transport of sediment in hydraulic engineering and the transport of harmful substances through porous media, play an important role in many fields of civil engineering. Other examples include the dissipation of heat or sound as well as the simulation of traffic with macroscopic models. The contribution explains the analysis of the applicability of Voronoi-based finite volume methods for the approximation of solutions of transport problems. A special concern is the discretisation of the transport equation. Current limitations of the method as well as ideas for stabilisation are explained with examples.
Für die Gestaltung einer durchgängigen Unterstützung des Entwurfsprozesses stehen gegenwärtig deskriptive Modelle der Entwurfsobjekte im Mittelpunkt der Untersuchungen. Diese Modelle gestatten das Ableiten von Repräsentationen sowie eine Weitergabe von Entwurfsergebnissen. Pragmatische Gliederungen des Entwurfsprozesses unterteilen diesen nach organisatorischen und betriebswirtschaftlichen Aspekten (Planbarkeit und Abrechenbarkeit) in eine Sequenz von Entwurfsphasen (HOAI). Diese Gliederungen berücksichtigen nicht das WIE des eigentlichen modellkreierenden Schaffensprozesses. Für ein echtes CADesign bildet dessen Klärung jedoch die erforderliche Voraussetzung. Im Beitrag wird dazu von einem vereinheitlichten Set generischer Entwurfsaktionen ausgegangen. Auch dann, wenn die verschiedenen Entwurfsphasen und die Entwurfshandlungen der einzelnen Ingenieurgewerke mit spezifische Entwurfsmodellen verbunden werden, besteht damit eine Grundlage zur methodischen Fundierung entsprechender CAD-Tools. Die methodische Verfahrensweise ähnelt der, die in Form von Styleguides zur Gestaltung von 'Graphical User Interfaces' vorgeschlagen wird. Wesentliche praktische Benutzungen solche Basisaktivitäten ergeben sich für: die Systematisierung computergestützter Entwurfshandlungen, insbesondere durch Erweiterung des deskriptiven um ein operationales Modell sowie deren erweiterte Interpretierbarkeit die Erzeugung wissensbasierter Werkzeuge zur automatischen Modellgenerierung/-konfiguration die Implementation von leistungsfähigen UNDO- bzw. TMS-Mechanismen.
Nichtstationäre Baustellenprozesse sind dadurch gekennzeichnet, daß ihr Ablauf nicht vollständig vorhersehbar ist, sondern einer Vielzahl von Störungen unterworfen sein kann. Zur Planung und Steuerung dieser Prozesse sind daher Methoden erforderlich, welche u.a. eine große Anpassungsfähigkeit, die Darstellung paralleler Vorgänge, die Erfassung plötzlicher Störungen sowie stochastische bzw. unscharfe Parameter zulassen. Hiervon ausgehend wurden spezielle Simulationssysteme entwickelt. In der Praxis dient jedoch in den meisten Fällen das Balkendiagramm bzw. die Netzplantechnik als Planungshilfsmittel. Dabei ist der Informationsgehalt der Netzplantechnik eindeutig geringer gegenüber der Simulation. Auch fallen deterministische Berechnungen in der Regel zu optimistisch aus. Ein Wechsel von der Netzplantechnik zur Simulation ist möglich, indem zunächst Netzpläne auf der Grundlage von Petri-Netzen dargestellt werden und somit ein schrittweiser Übergang zur Simulation erfolgt. Neben der Modellbildung kommt der Bereitstellung realitätsnaher Parameter, die den Berechnungen zugrunde gelegt werden, eine große Bedeutung zu. Bei der Terminplanung sind Kenntnisse zu bestimmten äußeren Einflüssen (z. B. Niederschlag) oft nur in unscharfer Weise vorhanden. Hier bietet sich der Einsatz von Fuzzy-Verfahren an. Mit ihrer Hilfe lassen sich unscharfe Faktoren erfassen und in die Planung einbeziehen. Sowohl zur Darstellung von Petri-Netzen als zur Berechnung (Simulation) auf deren Grundlage sowie zur Aufbereitung der Daten mittels Fuzzy-Verfahren liegen entsprechende Rechenprogramme vor.
Vom Bauwerksinformationsmodell zur Terminplanung - Ein Modell zur Generierung von Bauablaufplänen
(2011)
Die effiziente und zielgerichtete Ausführung von Bauvorhaben wird in hohem Maße von der zugrunde liegenden Bauablaufplanung beeinflusst. Dabei ist unter Verwendung herkömmlicher Methoden und Modelle die Planung des Bauablaufs ein zumeist aufwändiger und fehlerträchtiger Prozess. Am Ende der gegenwärtig üblichen Vorgehensweise für die Planung eines Bauablaufs erfolgt lediglich die Dokumentation des Endergebnisses. Mögliche Ablaufalternativen, die im Verlauf der Planung betrachtet wurden, sind im resultierenden Bauablaufplan nicht enthalten und gehen verloren. Eine formale Kontrolle des geplanten Bauablaufs hinsichtlich seiner Vollständigkeit ist nur begrenzt möglich, da beispielsweise existierende Methoden der 4D-Visualisierung derzeit nicht ausreichend in den Prozess der Planung von Bauabläufen integriert sind. Gegenstand der vorliegenden Arbeit ist die Entwicklung eines neuen Modells für die Unterstützung der Bauablaufplanung. Dafür wird der größtenteils manuelle Vorgang der Bauablaufplanung auf Basis verfügbarer Bauwerksinformationsmodelle (BIM) weitestgehend automatisiert und die Methodik der 4D-Animation in den Prozess der Bauablaufplanung integriert. Ausgehend von in einer Erfahrungsdatenbank gespeicherten Informationen werden auf Basis einer Ähnlichkeitsermittlung Bauteilen des betrachteten BIM geeignete Vorgänge zugeordnet und mittels Algorithmen der Graphentheorie ein Workflowgraph aller mög\-lichen Bauablaufvarianten generiert. Aufgrund der vorgenommenen Kopplung des Bauablaufplans mit Bauteilen eines BIM und der visuellen Darstellung des Bauablaufs kann vom Planer im Rahmen der Modellierungsgenauigkeit des BIM auf die Vollständigkeit des Bauablaufplans geschlossen werden. Dies ermöglicht dem Anwender ein hohes Maß an Kontrolle des geplanten Bauablaufs bereits innerhalb der Planungsphase. Weiterhin unterstützt das entwickelte Modell die Integration von Ablaufvarianten, was deren Gegenüberstellung ermöglicht und die Wiederverwendbarkeit bereits geplanter Bauabläufe durch eine entsprechend ausgerichtete Abbildung des Modells. Die Anwendbarkeit des erarbeiteten Modells wird anhand einer prototypischen Implementierung nachgewiesen und anhand eines Praxisbeispiels verifiziert.
Die Planung komplexer Bauwerke erfolgt zunehmend mit rechnergestützten Planungswerkzeugen, die den Export von Bauwerksinformationen im STEP-Format auf Grundlage der Industry Foundation Classes (IFC) ermöglichen. Durch die Verfügbarkeit dieser Schnittstelle ist es möglich, Bauwerksinformationen für eine weiterführende applikationsübergreifende Verarbeitung bereitzustellen. Ein großer Teil der bereitgestellten Informationen bezieht sich auf die geometrische Beschreibung der einzelnen Bauteile. Um den am Bauprozess Beteiligten eine optimale Auswertung und Analyse der Bauwerksinformationen zu ermöglichen, ist deren Visualisierung unumgänglich. Das IFC-Modell stellt diese Daten mit Hilfe verschiedener Geometriemodelle bereit. Der vorliegende Beitrag beschreibt die Visualisierung von IFC-Objekten mittels Java3D. Er beschränkt sich dabei auf die Darstellung von Objekten, deren Geometrie mittels Boundary Representation (Brep) oder Surface-Model-Repräsentation beschrieben wird.
Die digitale Unterstützung der Planungsprozesse ist ein aktueller Forschungs- und Arbeitsschwerpunkt der Professur Informatik in der Architektur (InfAR) und der Juniorprofessur Architekturinformatik der Fakultät Architektur an der Bauhaus-Universität Weimar. Verankert in dem DFG Sonderforschungsbereich 524 >Werkzeuge und Konstruktionen für die Revitalisierung von Bauwerken< entstehen Konzepte und Prototypen für eine fachlich orientierte Planungsunterstützung. Als ein Teilaspekt wird in diesem Beitrag die Vision eines mitwachsenden Geometriemodells für das computergestützte Bauaufmaß gezeigt, welches den Aufnehmenden von der Erstbegehung an begleitet. Die bei jeder Phase der Bauaufnahme gewonnenen Geometrieinformationen sollen in den anschließenden Phasen wiederverwendet, konkretisiert bzw. korrigiert werden. Aufmaßtechniken und Geometriemodell sind dabei eng gekoppelt. Verschiedene Sichten auf ein gemeinsames Geometriemodell haben zum Ziel, den Nutzer die Vorteile planarer Abbildungen nutzen zu lassen, ohne die dreidimensionale Übersicht zu verlieren oder entsprechende räumliche Manipulationen zu missen. Das Geometriemodell ist dabei in ein dynamisches Bauwerksmodell eingebettet. Der folgende Beitrag bezieht sich auf die Bauaufnahme mit folgenden Vorgaben: - die Bauaufnahme dient der Vorbereitung der Bauplanung im Bestand - es wird nur eine Genauigkeitsstufe (im Bereich von +/- 10 cm) unterstützt - die Geometrieabbildung des aufzunehmenden Bauwerkes beruht ausschließlich auf ebenen Oberflächen
The paper presents a general map-based approach to prototyping of products in virtual reality environments. Virtual prototyping of products is considered as a consistent simulation and visualization process mapping the source product model into its target visual representations. The approach enables to interrelate formally the product and visual information models with each other by defining mapping rules, to specify a prototyping scenario as a composition of map instances, and then to explore particular product models in virtual reality environments by interpreting the composed scenario. Having been realized, the proposed approach provides for the strongly formalized method and the common software framework to build virtual prototyping applications. As a result, the applications gain in expressiveness, reusability and reliability, as well as take on additional runtime flexibility...
Some key facts about the economic environment of construction industry are explained. It is shown that construction industry is very heterogeneous and has changed drastically during the recent years due to a rapidly moving commercial environment. Two examples of todays’s use of virtual construction tools in construction projects are presented. The first example is the document control for a large international project. The second is the application of 4D modelling in the preconstruction phase of a dam project. It is shown that virtual construction, is a major international trend that currently takes up speed. Some generic industry needs for Research and Development which aims at short and medium term results are presented.
Eine Bauunterlage ist in der Regel an mehreren Orten vorhanden. Sie wird von verschiedenen Personen an verschiedenen Orten zu verschiedenen Zeitpunkten geändert. Die Änderungen sind häufig und in vielen Fällen von geringem Umfang. Die Verteilung solcher Unterlagen in Computernetzen, sowie die Durchführung und die Verwaltung von Änderungen stellen hohe Anforderungen an die Informations- und Kommunikationstechnik. Insbesondere ist die Konsistenz der Unterlagen unter Berücksichtigung der typischen Merkmale des Arbeitsablaufes im Bauwesen zu sichern. Im Vortrag wird ein Konzept für die Bearbeitung von Bauunterlagen, insbesondere für Zeichnungen, in Computernetzen vorgestellt. Grundlage dieses Konzeptes ist die Norm ISO 10303 STEP (The standard for exchange of product model data). Das AP 201 >Explicit draughting< der ISO 10303 wurde als Austauschformat für Zeichnungen festgelegt. Im Rahmen des Vortrages wird ein Projektmodell vorgestellt. Das Projektmodell bildet den Informationsfluß während des Bauprozesses ab und ermöglicht die Sicherung der Konsistenz einer Zeichnung während der Bearbeitung der verschiedenen Fachleute. Bei Änderung einer Zeichnung wird ausschließlich die Differenzmenge als Information übertragen. Da die Arbeitsweise des Ingenieurs im Bauwesen eine Vollauthomatisierung des Datenaustausches nicht zuläßt, werden Änderungen nur nach Entscheidung des zuständigen Fachmanns in die ursprüngliche Fassung der Zeichnung übernommen. Werkzeuge für die Unterstützung der Auflösung von Widersprüchen in einem Dokument werden vorgestellt.
In modernen Gebäuden nimmt die Komplexität der Heizungstechnik ständig zu. Damit wird es auch immer schwieriger, ein ökologisch und ökonomisch vernünftiges Zusammenspiel der Komponenten zu gewährleisten. Die Vernetzung der verschiedenen Komponenten eines Heizsystems mittels Netzwerktechnik aus der EDV soll helfen, die Energieeffizienz zu erhöhen. Embedded Systems und Mikrocontroller fungieren als Regler für die Teilsysteme. Durch Kommunikation untereinander sollen sie ihr Regelverhalten aneinander anpassen. Eine Internetanbindung ermöglicht die Nutzung weiterer Informationen für die Betriebsführung. Außerdem kann der Internetanschluss für die Fernwartung der Anlage genutzt werden. Mit kleinen, im Webbrowser eines Rechners ausgeführten Java-Programmen, sogenannten Applets, können die Betriebszustände von Heizsystemen in Echtzeit visualisiert werden. Durch das Aufzeichnen von Betriebsdaten wird deren Analyse ermöglicht.
Der Beitrag basiert auf den Ansätzen und Ergebnissen des Forschungsprojekts >Prozessorientierte Vernetzung von Ingenieurplanungen am Beispiel der Geotechnik<, des DFG-Schwerpunktprogramms 1103 >Vernetzt-kooperative Planungsprozesse im Konstruktiven Ingenieurbau<. Ziel ist die Entwicklung einer netzwerkbasierten Kooperationsplattform zur Unterstützung von Ingenieurplanungen. Methodische Grundlagen hierfür stellen die Petri-Netze mit individuellen Marken in Verbindung mit einer semantischen Informationsbewertung dar. Der Beitrag zeigt an einem Beispiel die grundlegenden Möglichkeiten der Petri-Netze auf und stellt die Steuerung der Planungsprozesse aufgrund von Metainformationen dar. Darüber hinaus wird der Ansatz verfolgt, auf der Basis bauteilorientierter Prozessmuster für geotechnische Konstruktionselemente den veränderlichen Prozessablauf zu erfassen. Abschließend wird ein Weg zur Implementierung gezeigt.
In Anbetracht der leistungsstarken Computernetzwerke und der intensiven Globalisierung von Wissenschaft und Technik im Bauwesen ist es das Ziel der Bauinformatik, die Planungsprozesse des Konstruktiven Ingenieurbaus für die Nutzung verteilter Ressourcen zu gestalten, geeignete Kooperationsmodelle für die Fachplanung im Informationsverbund der Projektbeteiligten zu entwickeln und die kooperative Projektbearbeitung unter Nutzung verteilter Fachmodelle in Netzen zu ermöglichen. Dazu werden neue methodische Grundlagen geschaffen, welche die tiefgreifenden Veränderungen der Arbeits- und Organisationsstrukturen berücksichtigen. Vor diesem Hintergrund zeigt der Beitrag aktuelle Forschungsinhalte der Bauinformatik auf, die insbesondere im Rahmen des DFG-Schwerpunktprogramms 1103 'Vernetzt-kooperative Planungsprozesse im Konstruktiven Ingenieurbau' von verschiedenen Projekten arbeitsteilig entwickelt werden. Es wird ein integratives Prozessmodell vorgestellt, das die Grundlage für die Unterstützung der vernetzt-kooperativen Planung mit modernen Methoden der Informationsverarbeitung und Kommunikationstechnik zusammenführt. An einem Beispiel aus dem baulichen Brandschutz werden die methodischen Ansätze der Prozessmodellierung mit Petri-Netzen und der mobilen Softwareagenten zur Unterstützung der Kooperation in der Fachplanung des Bauwesens dargestellt und erläutert.
Der Schwerpunkt von Forschung und Entwicklung auf dem Gebiet der Tragwerksplanungs-Software lag in den letzten Jahren auf der Erweiterung des funktionalen Umfangs. In der Folge ist es notwendig, den gestiegenen Funktionsumfang einem möglichst breiten Anwenderkreis durch ingenieurgemäß gestaltete Arbeitsumgebungen zugänglich zu machen, so dass ein möglichst effizientes und fehlerarmes Arbeiten ermöglicht wird. Aus der Sicht der Tragwerksplaner muss eine ingenieurgemäß gestaltete Software eine dem spezifischen Arbeitsablauf angepasste Nutzer-Software-Interaktion aufweisen. Dabei sind die benötigten Funktionalitäten in ein einheitliches System zu integrieren und eine Anpassbarkeit durch den Anwender sicherzustellen. Die Berücksichtigung dieser Anforderungen mit herkömmlichen Mitteln würde einen unverhältnismäßig hohen Entwicklungsaufwand erfordern. Infolgedessen muss aus der Sicht der Software-Entwickler eine moderne Software-Architektur für die Tragwerksplanung eine Erhöhung des Wiederverwendungsgrades und eine unabhängige Erweiterbarkeit als zusätzliche Anforderungen erfüllen. In diesem Beitrag wird ein auf Verbunddokumenten basierendes Konzept vorgestellt, mit dem eine Zusammenführung von Standard-Software und fachspezifischen Software-Komponenten zu einer ingenieurgemäßen Arbeitsumgebung ermöglicht wird. Damit kann die Analyse und die Dokumentation eines Tragelementes einschließlich der zugehörigen Datenhaltung innerhalb eines Verbunddokumentes erfolgen. Gleichzeitig kann der software-technische Wiederverwendungsgrad durch die Definition eines Component Frameworks als unabhängig erweiterbare Software-Architektur und durch den Einsatz von Software-Komponenten mit eigener Nutzeroberfläche über das bisher erreichte Niveau hinaus gesteigert werden. Die Umsetzbarkeit des Konzeptes wird durch eine Pilotimplementierung demonstriert.
Das Ziel der Arbeit besteht in der Entwicklung von Konzepten zur effizienten Implementierung von ingenieurgemäßer Tragwerksplanungs-Software. Der vorgeschlagene Lösungsansatz basiert auf einer optimalen Anpassung der Nutzeroberfläche an den spezifischen Arbeitsablauf, der Erhöhung des Wiederverwendungsgrades sowie der Möglichkeit der unabhängigen Erweiterbarkeit von Software-Systemen. Verbunddokumente werden als Nutzeroberfläche und Software-Architektur benutzt, um eine Zusammenführung von Standard-Software und fachspezifischen Software-Komponenten zu ingenieurgemäßer Tragwerksplanungs-Software zu ermöglichen. Die Umsetzbarkeit des Konzeptes wird durch eine Pilotimplementierung verifiziert.
This paper presents a generic methodology for measurement system configuration when the goal is to identify behaviour models that reasonably explain observations. For such tasks, the best measurement system provides maximum separation between candidate models. In this work, the degree of separation between models is measured using Shannon’s Entropy Function. The location and type of measurement devices are chosen such that the entropy of candidate models is greatest. This methodology is tested on a laboratory structure and, to demonstrate generality, an existing fresh water supply network in a city in Switzerland. In both cases, the methodology suggests an appropriate set of sensors for identifying the state of the system.
The paper describes further developments of the interactive evolutionary design concept relating to the emergence of mutually inclusive regions of high performance design solutions. These solutions are generated from cluster-oriented genetic algorithm (COGAs) output and relate to a number of objectives introduced during the preliminary design of military airframes. The data-mining of multi-objective COGA (moCOGA) output further defines these regions through the application of clustering algorithms, data reduction and variable attribute relevance analyses. A number of visual representations of the COGA output projected onto both variable and objective space are presented. The multi-objective output of the COGA is compared to output from a Strength Pareto Evolutionary Algorithm (SPEA-II) to illustrate the manner in which moCOGAs can generate good approximations to Pareto frontiers.
Efforts to define standards for representing AEC/FM data have been fairly successful. However defining a standard reference process model has not met with the same success. Yet almost every conceptual modelling or software development project starts by defining the business processes to be supported and the related requirements to be satisfied. This paper describes a new process-centred methodology for user requirements capture developed in the ICCI project (IST-2001-33022). Its essence is in recognising user requirements and use cases in the context of the real construction process, identifying the actors and roles for each individual activity and associating these activities with information, communication and standardisation requirements on the basis of a formalised specification, named the Process Matrix. In the paper we outline the history of process matrix development, introduce the basic structure of the matrix and show how it can be further extended and refined. We present also a web-based software implementation of the developed approach, describe how it has been used in ICCI and outline further perspectives.
At present time neuronet's technologies have got a wide application in a different fields of technique. At the same time they give insufficient consideration to using neuron nets in the field of building. Use of approximating neuron nets will allow to definite the deflected mode of constructions elements using noticeably less computing facilities then by using universal methods, finite-element method for instance. Today neuron nets are used for calculation separate elements of building constructions. In this work use of neuron nets for calculation deflected mode of construction which consists of many elements is consider. The main idea of suggested analysis is using neuron nets for calculation internal intensities and transferences pieces of model which are selected by there functional destination. For example, a plate is destine for adoption intensity distributed among area, the purpose of core is taking up surface distributed intensity. Elements involved as intensity converter. Plate serve for intensities dispersion and their transfer. A template is associated with functional destination. A template regards as composition of model elements which has define functional destinations. A single template can incarnate several functional destinations. On receipt values of components transference the estimation of their permissibility is put into practice. In the case of detection a violation of permissible limit, in the component database is making a search for component with analogous functional destination, according to the type of violation. If such component is found than a change a previous component into new one is realized. Thus besides control a condition of construction by components there is a possibility to make a search for decisions of revealed problem....
Im Stahlbeton- und Spannbetonbau kommen in zunehmendem Maße Verbundkonstruktionen aus Betonfertigteilen und Ortbetonergänzungen zum Einsatz. Die Fertigteile werden je nach Spannweite, Belastung und speziellen Anforderungen mit schlaffer oder vorgespannter Be-wehrung ausgeführt. Aufgrund der im Allgemeinen unterschiedlichen Betone der einzelnen Querschnittsanteile sowie bedingt durch den zeitlichen Versatz in der Herstellung der Fertig-teile und der Ortbetonergänzungen ergeben sich Unterschiede im Langzeitverhalten, die bei der Bemessung und Nachweisführung zu berücksichtigen sind. Das Kriechen und Schwinden der Betone als Folge des zeitabhängigen Materialverhaltens und die Spezifik des Verbund-querschnitts können für die Gebrauchstauglichkeit relevant sein, insbesondere wenn die Fer-tigteile vorgespannt sind. Eine hinreichend wirklichkeitsnahe Beschreibung des Langzeitverhaltens von Beton gestattet die Theorie des elastisch-kriechenden Körpers, wobei sich im Allgemeinen keine geschlosse-ne Lösung für bewehrte Betonverbundquerschnitte angeben lässt. Eine Alternative hierzu ergibt sich, wenn für die einzelnen Kriechintervalle ein vereinfachter Ansatz für den Verlauf der Kriechfunktion entsprechend der Theorie des Alterns getroffen wird. Dabei werden die im Zeitintervall (tj-1,tj) umgelagerten Schnittgrößen als neue Belastung der einzelnen Querschnittsanteile im Zeitintervall (tj,tj+1) mit der Kriech-funktion f(tj+1,tj) berücksichtigt. Bei hinreichend kleinen Zeitschritten können die Nachteile der getroffenen Vereinfachung vernachlässigt werden.
In der heutigen Informationsgesellschaft sind alle Geschäftsprozesse in einem Unternehmen geprägt durch die Verwendung der vorhandenen Informations- und Kommunikationstechnologien. Diese haben zur Folge, dass Unternehmen mit einer wahren Flut an Informationen konfrontiert werden, die von extern und intern in das Unternehmen eingetragen wurden. Die erfolgreiche Beherrschung dieser Informationsflut bildet die Basis für das effektive Arbeiten im Unternehmen. Grundvoraussetzung hierfür ist vor allem ein harmonisches Zusammenspiel zwischen Mensch ↔ Organisation ↔ Technik. Dokumentenmanagementsysteme haben sich zur Aufgabe gemacht, den Anwender bei der technologischen Bewältigung dieser Aufgabenstellung zu unterstützen. Der hier vorgestellte Artikel zeigt die Probleme auf, die während der Umsetzung eines Dokumentenmanagementsystems auftreten können und konzentriert sich dabei besonders auf Kleinen und Mittleren Unternehmen (KMU) im Bauwesen. Charakteristisch für diese ist die Schwäche die eigenen Unternehmensstrukturen betriebswirtschaftlich aufzubereiten, woraus später bei einer technologischen Umsetzung schwerwiegende Probleme resultieren. Genau an diesem Punkt setzt der vorgestellte Artikel an und versucht den Zusammenhang zwischen Organisation und Technik herauszuarbeiten, um darauf aufsetzend einen allgemeingültigen Ansatz für die Umsetzung eines Dokumentenmanagementsystems zu liefern.
An einem Teil der Topologie architektonischer Räume, dem Volumenadjazenzgraphen (VAG), wird gezeigt wie topologisches Modellieren Anwendungen der Bauplanung integrieren kann. Dazu wird ein Prototyp vorgestellt, der im wesentlichen aus drei Komponenten besteht: Mit dem Anforderungsmanager werden Anforderungen eigegeben, die formal gut handhabbar sind. Mit dem Topologiemanager werden diese Anforderungen mit gezeichneten Räumen kombiniert. Die topologischen Relationen in den Zeichnungen werden mit den entsprechenden Mitteln des GIS berechnet und in eine Datenbank exportiert. Der Anforderungsprüfer vergleicht dann die Anforderungsdaten, die mit Hilfe des Anforderungsmanagers erzeugt wurden, mit den Topologiedaten. Dieser Ansatz soll zeigen, wie topologische Modelle eine Formalisierung semantisch hochstehender Informationen ermöglichen, indem sie als Eigenschaften von Graphen dargestellt werden
Das studentische Projekt Umweltorientiertes Projektmanagement (UWoPM) eröffnet eine neue Generation von Arbeitsweisen im Projektmanagement. Umweltbelange wirken über Rechtsvorschriften immer stärker in das Projektgeschäft hinein. Durch Einbeziehung von rechtsrelevanten Daten in die Projektdatenbasis sowie von Rechtsbestimmungen in die Wissensbasis wird eine Softwareunterstützung für (wenn auch zunächst nur elementare) Rechtsfragen geboten. Eine spezielle Präsentation von Rechtswissen und eine komfortable Unterstützung der Antragstellung sollen dies in die Selbstverständlichkeiten des Projektmanagements einbringen. Gleichzeitig bietet der UWoPM-Prototyp zeitgemäße Systemlösungen für die Kommunikation Antragsteller - Behörde sowie für den Workflow innerhalb der Genehmigungsbehörde. Dieser Vortrag gibt Einführung und Übersicht zu insgesamt 18 Diplomarbeiten, in denen die Einzelkomponenten des UWoPM entwickelt wurden. Zentrales Problem war die Überführung gesetzlicher Vorschriften in Wissensbasen. Durch Beschränkung auf >Kernbestimmungen< und Ausweis von Interpretationsbedarf wurde ein prinzipieller Lösungsweg realisiert. Die technische Realisierung konnte zwar über einen Prototyp noch nicht hinausgehen, weist aber die Realisierbarkeit des Gesamtansatzes nach.
Die Lage oder der Standort eines Bauwerkes ist zweifellos charakteristisch mit diesem verbunden. Die räumliche Einordnung eines exponierten architektonischen Werkes, die Erschließung eines Gebäudes im innerstädtischen Umfeld oder die Verwaltung eines Bestands ist im Bauwesen oder der Architektur immer visuell. Die Interaktion mit Zeichnungen, die Orientierung anhand eines Lageplans oder die Dokumentation mit Fotos sind nur einige Beispiele. Die wirtschaftliche Optimierung unter Nutzung solcher Daten und deren nachfolgende Visualisierung soll hier mittels geeigneter Systeme gezeigt werden. Aber auch die Bewertung durch und Interaktion mit dem Benutzer unterstützt werden. So soll dieser Artikel beispielhaft den Transport und Verkehr fokussieren. Mathematik Graphen und Netze formen dabei Modelle zur Optimierung der zugrundeliegenden Logistikprozesse: Die Baustoffbedarfsplanung mit Bestellwesen, (Ab-)Transport und Lieferung von Material, Tourenzusammenstellung oder Standortauswahl. Informatik Weiterhin wird deren softwaretechnische Umsetzung und Einordung in begleitende Projekte der >Mathematischen Optimierung< vorgestellt.
Thin elastic plates are the basic constructional elements and are very often subjected to dynamic effects especially in the machine-building structures. Their saving design of resonance conditions of operation is an extremely complicated task which cannot be solved analytically. In the present report an efficient and sufficiently general method for optimal design of thin plates is worked out on the basis of energy resonance method of Wilder, the method of the finite elements for dynamic research and the methods of parameter optimization. By means of these methods various limitations and requirements put by the designer to the plates can be taken into account. A programme module for numerical investigation of the weight variation of the plate depending on the taken variable of the designed thickness at different supporting conditions is developed. The reasons for the considerable quantity and quality difference between the obtained optimal designs are also analysed.
The process of matching data represented in two different data models is a longstanding issue in the exchange of data between different software systems. While the traditional manual matching approach cannot meet today’s demands on data exchange, research shows that a fully automated generic approach for model matching is not likely, and generic semi-automated approaches are not easy to implement. In this paper, we present an approach that focuses on matching data models in a specific domain. The approach combines a basic model matching approach and a version matching approach to deduce new matching rules to enable data transfer between two evolving data models.
This paper describes an ongoing research on the representation and reasoning about construction specifications, which is part of a bigger research project that aims at developing a formalism for automating the identification of deviations and defects on construction sites. We specifically describe the requirements on product and process models and an approach for representing and reasoning about construction specifications to enable automated detection and assessment of construction deviations and defects. This research builds on the previous research on modeling design specifications and extends and elaborates concept of contexts developed in that domain. The paper provides an overview of how the construction specifications are being modele d in this research and points out future steps that need to be accomplished to develop the envisioned automated deviation and defect detection system.
Current disaster management procedures rely primarily on heuristics which result in their strategies being very cautious and sub-optimum in terms of saving life, minimising damage and returning the building to its normal function. Also effective disaster management demands decentralized, dynamic, flexible, short term and across domain resource sharing, which is not well supported by existing distributing computing infrastructres. The paper proposes a conceptual framework for emergency management in the built environment, using Semantic Grid as an integrating platform for different technologies. The framework supports a distributed network of specialists in built environment, including structural engineers, building technologists, decision analysts etc. It brings together the necessary technology threads, including the Semantic Web (to provide a framework for shared definitions of terms, resources and relationships), Web Services (to provide dynamic discovery and integration) and Grid Computing (for enhanced computational power, high speed access, collaboration and security control) to support rapid formation of virtual teams for disaster management. The proposed framework also make an extensive use of modelling and simulation (both numerical and using visualisations), data mining (to find resources in legacy data sets) and visualisation. It also include a variety of hardware instruments with access to real time data. Furthermore the whole framework is centred on collaborative working by the virtual team. Although focus of this paper is on disaster management, many aspects of the discussed Grid and Visualisation technologies will be useful for any other forms of collaboration. Conclusions are drawn about the possible future impact on the built environment.
Toplogical Houses
(2003)
Many properties of houses are of topological nature. The problem of three-dimensional encoding is solved here by first giving an axiomatic description of a simplified concept of >house< as a certain generalisation of a cw-complex and, secondly, by generalising local observation structures of embedded unconnected planar graphs to the three-dimensional case and proving that they allow retrieving all topological properties of these simplified houses. In the more general case of an architectural complex (a certain generalisation of a >house<) still much topolgical information is kept in these structures still making them a useful approach to encoding topological spaces. Finally, a lossless representation of observation structures in a relational database scheme which we call PLAV (Points, Lines, Areas, Volumes) is given. We expect PLAV to be useful for encoding higher dimensional (architectural) space-time complexes.
A realistic and reliable model is an important precondition for the simulation of revitalization tasks and the estimation of system properties of existing buildings. Thereby, the main focus lies on the parameter identification, the optimization strategies and the preparation of experiments. As usual structures are modeled by the finite element method. This as well as other techniques are based on idealizations and empiric material properties. Within one theory the parameters of the model should be approximated by gradually performed experiments and their analysis. This approximation method is performed by solving an optimization problem, which is usually non-convex, of high dimension and possesses a non-differentiable objective function. Therefore we use an optimization procedure based on genetic algorithms which was implemented by using the program package SLang...
For analysis and planing of transport networks detailed information concerning travel sequences is required. The paper examines an activity chain model to determine stochastic travel demand which individual generates in order to participate in activity or sequence of activities over the day. The transition from one activity to another depends on the activity participation decision, which is made sequentially and is constrained in space and time. Activity chains derived from travel survey data are used as a base to develop a more realistic model than conventional discrete trip models. Probabilistic concepts and statistical procedures are used to estimate characteristics of travel demand such as the number of daily out-of-home activities and transition probability from one activity to another participated by homogeneous behavioural groups. In addition, the paper compares the model for two different sized towns.
The method of difference potentials can be used to solve discrete elliptic boundary value problems, where all derivatives are approximated by finite differences. Considering the classical potential theory, an integral equation on the boundary will be investigated, which is solved approximately by the help of a quadrature formula. The advantage of the discrete method consists in the establishment of a linear equation system on the boundary, which can be immediately solved on the computer. The described method of difference potentials is based on the discrete Laplace equation in the three-dimensional case. In the first step the integral representation of the discrete fundamental solution is presented and the convergence behaviour with respect to the continuous fundamental solution is discussed. Because the method can be used to solve boundary value problems in interior as well as in exterior domains, it is necessary to explain some geometrical aspects in relation with the discrete domain and the double-layer boundary. A discrete analogue of the integral representation for functions in will be presented. The main result consists in splitting the difference potential on the boundary into a discrete single- and double-layer potential, respectively. The discrete potentials are used to establish and solve a linear equation system on the boundary. The actual form of this equation systems and the conditions for solvability are presented for Dirichlet and Neumann problems in interior as well as in exterior domains
The increased implementation of site data capture technologies invariably results in an increase in data warehousing and database technologies to store captured data. However, restricted use of data beyond the initial application could potentially result in a loss of understanding of site processes. This could in turn lead to poor decision making at production, tactical and strategic levels. Concrete usage data have been collected from two piling processes. These data have been analysed and the results highlighted potential improvements that could be made to existing site management and estimating processes. A cost benefit analysis has been used to support decision making at the strategic level where the identified improvements require capital expenditure.
The preliminary design of a wearable computer for supporting Construction Progress Monitoring
(2000)
Progress monitoring has become more and more important as owners have increasingly demanded shorter times for the delivery of their projects. This trend is even more evident in high technology industries, such as the computer industry and the chemical industry. Fast changing markets, such as the computer industry, force companies to have to build new facilities quickly. To make a statement about construction progress, the status of a building has to be determined and monitored over a period of time. Depicting the construction progress in a diagram over time, statements can be made about the anticipated completion of the project and delays and problems in certain areas. Having this information, measures can be taken to efficiently >catch up< on the schedule of the project. New technologies, such as wearable computers, speech recognition, touch screens and wireless networks could help to move electronic data processing to the construction site. Progress monitoring could very much take advantage of this move, as several intermediate steps of processing progress data can be made unnecessary. The processing of progress data could be entirely done by computers, which means that data for supporting decisions can be made available at the moment the construction progress is measured. This paper describes a project, that investigates how these new technologies can be linked to create a system that enhances the efficiency of progress monitoring. During the project a first prototype of a progress monitoring system was developed that allows construction companies and site supervisors to measure construction progress on site using wearable computers that are speech controlled and connected to a central database via a wireless network.
The purpose of this paper is to review model for finite element techniques for non-linear crack analysis of reinforced concrete beams and slabs. The non-linear behaviour of concrete and steel were described. Some calculations of >self-stress< for concrete and reinforced concrete beam was made. Current computational aspects are discussed. Several remarks for future studies are also given. The numerical model of the concrete and reinforced concrete was described. The paper shows the results of calculations on a reinforced concrete plane stress panel with cracks. The non-linear, numerical model of calculations of reinforced concrete was assumed. Using finite elements method some calculations were made. The results of calculations like displacements, stresses and cracking are shown on diagrams. They were compared with experimental results and other finding. Some conclusions about the described model and results of calculation are shown.
In the abstract proposed is the Instrumental System of mechanics problems analysis of the deformed solid body. It supplies the researcher with the possibility to describe the input data on the object under analyses and the problem scheme based upon the variational principles within one task. The particular feature of System is possibility to describe the information concerning the object of any geometrical shape and the computation sheme according to the program defined for purpose. The Methods allow to compute the tasks with indefinite functional and indefinite geometry of the object (or the set of objects). The System provides the possibility to compute the tasks with indefinite sheme based upon the Finite Element Method (FEM). The restrictions of the System usage are therefore determined by the restrictions of the FEM itself. It contrast to other known programms using FEM (ANSYS, LS-DYNA and etc) described system possesses more universality in defining input data and choosing computational scheme. Builtin is an original Subsytem of Numerical Result Analuses. It possesses the possibility to visualise all numerical results, build the epures of the unknown variables, etc. The Subsystem is approved while solving two- and three-dimensional problems of Elasticiti and Plasticity, under the conditions of Geometrical Unlinearity. Discused are Contact Problems of Statics and Dynamics.
The conventional way of describing an image is in terms of its canonical pixel-based representation. Other image description techniques are based on image transformations. Such an image transformation converts a canonical image representation into a representation in which specific properties of an image are described more explicitly. In most transformations, images are locally approximated within a window by a linear combination of a number of a priori selected patterns. The coefficients of such a decomposition then provide the desired image representation. The Hermite transform is an image transformation technique introduced by Martens. It uses overlapping Gaussian windows and projects images locally onto a basis of orthogonal polynomials. As the analysis filters needed for the Hermite transform are derivatives of Gaussians, Hermite analysis is in close agreement with the information analysis carried out by the human visual system. In this paper we construct a new higher dimensional Hermite transform within the framework of Quaternionic Analysis. The building blocks for this construction are the Clifford-Hermite polynomials rewritten in terms of Quaternionic analysis. Furthermore, we compare this newly introduced Hermite transform with the Quaternionic-Hermite Continuous Wavelet transform. The Continuous Wavelet transform is a signal analysis technique suitable for non-stationary, inhomogeneous signals for which Fourier analysis is inadequate. Finally the developed three dimensional filter functions of the Quaternionic-Hermite transform are tested with traditional scalar benchmark signals upon their selectivity at detecting pointwise singularities.
In this paper the results of the investigations of the free oscillations of the pre-stressed flexible structure elements are presented . Two cases of the central preliminary stress are investigated : without intermediate fastening of the tie to the flexible element and with the intermediate fastening in the middle of the element length. The given physical model can be applied to the flexible sloping shells and arches, membranes, large space antenna fields (besides flexible elements). The peculiarity of these systems is the possibility of the non-adjacent equilibrium form existence at the definite relations of the physical parameters . The transition from one stable equilibrium form to another, non-adjacent form, may be treated as jump. In this case they are called systems with buckling or the systems with two potential «gaps». These systems commenced the new section of the mathematical physics - the theory of chaos and strange attractors. The analysis of the solutions confirms the received for the first time by the author and given in effect of the oscillation period doubling of the system during the transition from the «small» oscillations relatively center to the >large< relatively all three equilibrium conditions. The character of the frequency (period) dependence on the free oscillation amplitudes of the non-linear system also confirms the received earlier result of the duality of the system behaviour : >small< oscillations possess the qualities of soft system; >large< oscillations possess the qualities of rigid system. The >small< oscillation natural frequency changing, depending on the oscillation amplitudes, is in the internal . Here the frequency takes zero value at the amplitude values Aa and Ad (or Aa and Ae ); the frequency takes maximum value at the amplitude value near point b .The >large< oscillation natural frequency changes in the interval . Here is also observed . The influence of the tie intermediate fastening doesn't introduce qualitative changes in the behaviour of the investigated system. It only increases ( four times ) the critical value of the preliminary tension force
In the design of a structure, the implementation of reliable soil-foundation-structure interaction into the analysis process plays a very important role. The paper presents a determination of parameters of a suitably chosen soil-foundation model and their influence on the structure response. Since the mechanical data for the structure can be determined with satisfactory accuracy, the properties of the soil-foundation model were identified using measured dynamic response of the real structure. A simple model describing soil-foundation structure was incorporated into the classical 3-D finite element analysis of the structure with commercial software. Results obtained from the measured data on the pier were afterwards compared with those obtained with the finite model of the pier-foundation-soil structure. On the basis of this comparison the coefficients describing the properties in the soil-foundation model were adjusted until the calculated dynamic response coincided with the measured ones. In this way, the difference between both results was reduced to 1%. Full-scale tests measuring eigenmotion of the bridge were performed through all erection stages of the new bridge in Maribor. In this way an effective and experimentally verified 3-D model for a complex dynamic analysis of the bridge under the earthquake loading was obtained. The significant advantage of the obtained model is that it was updated on the basis of the dynamic measurements thus improving the model on the basis of in-situ geomechanical measurements. The model is very accurate in describing the upper structure and economical in describing the soil mass thus representing an optimal solution regarding computational efforts.
In the given paper the generalized formulation of the problem of computer modelling of the complex-composite structure interaction with different types of dynamic loads and effects is discussed. Here the analysis is given as for the usage of some universal computing systems for the solution of such problems. Also if is shown that the quantification of the dynamic models of the complex-composite systems with the variable structure, depending on the character and intensivity of the effects, is necessary. The different variants of the joint and the space structure element modelling are gested. It allows to consider the complex modes of the joint bending-torsional oscillations of such structures as bridges, towers, high-rise buildings. The peculiarities of the modelling and testing of some problems of the objects aerodynamics and the interaction of the frameworks constructions with shock and movable loads are considered. In this paper the examples of the complex-composite structure dynamic analysis are shown. It is achieved by means of some special methods of the input of the real inducements and loads of the exploitated analog-object into the computing model. The suggested models found a wide use both at the design of new structures and the dynamic monitoring of the exploitated structures.
For planning in existing built contexts, the building survey is the starting point for initial planning proposals, for the diagnosis and documentation of building damages, for the creation of objectives catalogues, for the detailed design of renovation and conversion measures and for ensuring fulfilment of building legislation, particularly by change of use and refitting. An examination of currently available IT-tools shows insufficient support for planning within existing contexts, most notably a deficit with regard to information capture and administration. This paper discusses the concept for a modular surveying system (basic concept, separation of geometry from semantic data, and separation into sub-systems) and the prototypical realisation of a system for the complete support of the entire building surveying process for existing buildings. The project aims to contribute to the development of a planning system for existing buildings. ...
Pre-stressed structural elements are widely used in large-span structures. As a rule, they have higher stiffness characteristics. Pre-stressed rods can be applied as girders of different purpose, and as their separate parts, e.g. rods of trusses and frames. Among numerous ways of prestressing the compression of girders, trusses, and frames by tightenings from high-strength materials is under common application.
The development of a consistent material model for textile reinforced concrete requires the formulation and calibration of several sub-models on different resolution scales. Each of these models represents the material structure at the corresponding scale. While the models at the micro-level are able to capture the fundamental failure and damage mechanisms of the material components (e.g. filament rupture and debonding from the matrix) their computational costs limit their application to the small size representative unit cells of the material structure. On the other hand, the macro-level models provide a sufficient performance at the expense of limited range of applicability. Due to the complex structuring of the textile reinforced concrete at several levels (filament - yarn - textile - matrix) it is a non-trivial task to develop a multiscale model from scratch. It is rather more effective to develop a set of conceptually related sub-models for each structural level covering the selected phenomena of the material behavior. The homogenized effective material properties obtained at the lower level may be verified and validated using experiments and models at the higher level(s). In this paper the development of a consistent material model for textile reinforced concrete is presented. Load carrying and failure mechanisms at the micro, meso and macro scales are described and models with the focus on the specified scales are introduced. The models currently being developed in the framework of the collaborative research center are classified and evaluated with respect to the failure mechanisms being captured. The micromechanical modeling of the yarn and bonding behavior is discussed in detail and the correspondence with the experiments focused on the selected failure and interaction mechanisms is shown. The example of modeling the bond layer demonstrates the application of the presented strategy.
The goal of the collaborative research center (SFB 532) >Textile reinforced concrete (TRC): the basis for the development of a new material technology< installed in 1998 at the Aachen University is a complex assessment of mechanical, chemical, economical and productional aspects in an interdisciplinary environment. The research project involves 10 institutes performing parallel research in 17 projects. The coordination of such a research process requires effective software support for information sharing in form of data exchange, data analysis and data archival. Furthermore, the processes of experiment planning and design, modification of material compositions and design parameters and development of new material models in such an environment call for systematic coordination applying the concepts of operational research. Flexible organization of the data coming from several sources is a crucial premise for a transparent accumulation of knowledge and, thus, for a successful research in a long run. The technical information system (TRC-TIS) developed in the SFB 532 has been implemented as a database-powered web server with a transparent definition of the product and process model. It serves as an intranet server with access domains devoted to the involved research groups. At the same time, it allows the presentation of selected results just by granting a data object an access from the public area of the server via internet.
Modellverwaltungssysteme sind eine geeignete technologische Basis zum Management digitaler Bauwerksmodelle bei Planungstätigkeiten für den Neubau als auch für die Revitalisierung von Bauwerken. Die Unterstützung von Revitalisierungsprozessen impliziert für den Entwurf integrierter Planungsumgebungen spezifische Anforderungen wie die Repräsentation von Informationen, die mit verschiedenen Typen von Vagheit behaftet sind, die Notwendigkeit, den Soll- sowie den Ist- Zustand des Bauwerks abzubilden und die Fähigkeit des Umgangs mit temporal inkonsistenten Modellzuständen. Die erforderliche Dynamik der Domänenmodelle und die erforderliche Nutzbarkeit in Virtual Enterprises stellen weitere Ansprüche an die Realisierungsbasis der Modellverwaltungssysteme. Zur Implementierung derartiger Systeme erweist es sich als vorteilhaft, Eigenschaften objektorientierter Programmiersprachen mit nichtstatischen Typsystemen auszunutzen, da diese durch die vorhandene Metaebene sowie Introspektions- und Reflektionsmechanismen eine effiziente Realisierungsbasis bereitstellen. Zur effektiven Unterstützung synchroner kooperativer Planungstätigkeiten innerhalb einzelner Fachdisziplinen wurde ein Benachrichtigungsmechanismus realisiert, der an das Modellverwaltungssystem angekoppelte Fachapplikationen über nebenläufig vorgenommene Modifikationen am zugehörigen Domänenmodell oder an Projektinformationen informiert. Weiterhin existiert ein Mechanismus zur vereinfachten Anbindung von existierenden Applikationen, die auf statischen Partialmodellen beruhen oder standardisierte, modellbasierte Austauschformate unterstützen. Abschließend wird eine aus einem zentralen Projektserver, Domänenservern und Domänenclients bestehende hybride Systemarchitektur vorgestellt, die geeignet ist, unter den Randbedingungen kooperativer und geographisch verteilter Arbeit bei Revitalisierungsvorhaben in Virtual Enterprises eingesetzt zu werden.
Der Planungsprozess im Konstruktiven Ingenieurbau ist gekennzeichnet durch drei sich zyklisch wiederholende Phasen: die Phase der Aufgabenverteilung, die Phase der parallelen Bearbeitung mit entsprechenden Abstimmungen und die Phase der Zusammenführung der Ergebnisse. Die verfügbare Planungssoftware unterstützt überwiegend nur die Bearbeitung in der zweiten Phase und den Austausch der Datenbestände durch Dokumente. Gegenstand der Arbeit ist die Entwicklung einer Systemarchitektur, die in ihrem Grundsatz alle Phasen der verteilten Bearbeitung und unterschiedliche Arten der Kooperation (asynchron, parallel, wechselseitig) berücksichtigt und bestehende Anwendungen integriert. Das gemeinsame Arbeitsmaterial der Beteiligten wird nicht als Dokumentmenge, sondern als Menge von Objekt- und Elementversionen und deren Beziehungen abstrahiert. Elemente erweitern Objekte um applikationsunabhängige Eigenschaften (Features). Für die Bearbeitung einer Aufgabe werden Teilmengen auf Basis der Features gebildet, für deren Elemente neue Versionen abgeleitet und in einen privaten Arbeitsbereich geladen werden. Die Bearbeitung wird auf Operationen zurückgeführt, mit denen das gemeinsame Arbeitsmaterial konsistent zu halten ist. Die Systemarchitektur wird formal mit Mitteln der Mathematik beschrieben, verfügbare Technologie beschrieben und deren Einsatz in einem Umsetzungskonzept dargestellt. Das Umsetzungskonzept wird pilothaft implementiert. Dies erfolgt in der Umgebung des Internet in der Sprache Java unter Verwendung eines Versionsverwaltungswerkzeuges und relationalen Datenbanken.
SYSBAT - An Application to the Building ProductionBased on Computer Supported Cooperative Work
(2003)
Our proposed solution is to enable partners of a construction project to share all the technical data produced and handled during the building production process by building a system through the use of internet technology. The system links distributed databases and allows building partners to access remotely and manipulate specific information. It provides an updated building representation that is being enriched and refined all along the building production process. A recent collaboration with Nemetschek France (subsidiary company of Nemetschek AG, AEC CAD software leader) focus on a building product repository available in a web context. The aim is to help building project actors to choose a technical solution that fits its professional needs, and maintain our information system with up to date information. It starts with the possibility to build on line building product catalogs, in order to link Allplan CAD entities with building technical features. This paper presents the conceptual approaches on which our information system is built. Starting from a general organization diagram organization, we focus on the product and the description branches of construction works (including last IFC model specifications). Our aim is to add decisional support to the construction works selection process. To do so, we consider the actor's role upon the system and the pieces of information each one needs to achieve a given task.
The subject of this talk is the problem of surface design based upon a mesh that may contain both triangular and quadrangular domains. We investigate the cases when such a combined mesh occurs more preferable for bivariate data interpolation than a pure triangulation. First we describe a modification of the well-known flipping algorithm that constructs a locally optimal combined mesh with a predefined quality criterion. Then we introduce two quality measures for triangular and quadrangular domains and present the results of a computational experiment that compares integral interpolation errors and errors in gradients caused by the piecewise surface models produced by the flipping algorithm with the introduced quality measures. The experiment shows that triangular meshes with the Delaunay quality measure provide better interpolation accuracy only if the interpolated function is strictly convex, as well as a saddle-shaped function is better interpolated by bilinear patches within a combined mesh. For a randomly shaped function combined meshes demonstrate smaller error values and better stability in compare with pure triangulations. At the end we consider other resources for mesh improvement, such as excluding >bad< points from the input set for the mesh generating procedure. Because the function values at these points should not be lost, some linear or bilinear patches are replaced by nonlinear patches that pass through the excluded points.
The design of mobile IT systems, especially the design of wearable computer systems, is a complex task that requires computer science knowledge, such as that related to hardware configuration and software development, in addition to knowledge of the domain in which the system is intended to be used. Particularly in the AEC sector, it is necessary that the support from mobile information technology fit the work situation at hand. Ideally, the domain expert alone can adjust the wearable computer system to achieve this fit without having to consult IT experts. In this paper, we describe a model that helps in transferring existing design knowledge from non-AEC domains to new projects in the construction area. The base for this is a model and a methodology that describes the usage scenarios of said computer systems in an application-neutral and domain-independent way. Thus, the actual design information and experience will be transferable between different applications and domains.
Structural engineering projects are increasingly organized in networked cooperations due to a permanently enlarged competition pressure and a high degree of complexity while performing the concurrent design activities. Software that intends to support such collaborative structural design processes implicates enormous requirements. In the course of our common research work, we analyzed the pros and cons of the application of both the peer-to-peer (University of Bonn) and multiagent architecture style (University of Bochum) within the field of collaborative structural design. In this paper, we join the benefits of both architecture styles in an integrated conceptual approach. We demonstrate the surplus value of the integrated multiagent–peer-to-peer approach by means of an example scenario in which several structural engineers are co-operatively designing the basic structural elements of an arched bridge, applying heterogeneous CAD systems.
In the superelliptic shell joined to a circular cylinder bending stresses are absent when it is subjected to uniform pressure.Some geometrical characteristics have been found. Expressions for determining stresses in the shell crest(in the singular point of plane type) are suggested. The problem of a theoretical critical buckling load of an elongated shell supported by frames is studied. A critical buckling load for two shells with different specifications was found experimentally.