Refine
Document Type
- Conference Proceeding (50)
- Article (20)
- Doctoral Thesis (10)
- Book (1)
- Master's Thesis (1)
Institute
- Professur Informatik im Bauwesen (62)
- Institut für Strukturmechanik (ISM) (4)
- Professur Angewandte Mathematik (3)
- Professur Informations- und Wissensverarbeitung (2)
- Erdbebenzentrum (1)
- Graduiertenkolleg 1462 (1)
- In Zusammenarbeit mit der Bauhaus-Universität Weimar (1)
- Juniorprofessur Simulation und Experiment (1)
- Professur Baubetrieb und Bauverfahren (1)
- Professur Bauchemie und Polymere Werkstoffe (1)
- Professur Bauphysik (1)
- Professur Grundbau (1)
- Professur Holz- und Mauerwerksbau (1)
- Professur Massivbau II (1)
- Professur Modellierung und Simulation - Mechanik (1)
- Professur Stahlbau (1)
Keywords
- Modellierung (82) (remove)
The failure mechanisms of textile reinforced concrete (TRC), which is a composite of bundles of long fibers and fine concrete, are complex. Most important for the ductility is the successive debonding of the fibers from the surrounding matrix when the brittle matrix is cracking. Therefore, one of the main issues is the simulation of the bond behavior between the reinforcement and the matrix. By introducing a hierarchical material model for TRC the mechanical behavior is simulated by means of representative volume elements modelled on the meso scale. Finite element analysis is used to determine the effective properties of TRC within a periodic homogenization framework. Further, a multiscale finite element technique is suggested, where constitutive equation are formulated only on the meso level.
Bei der Gründung von schweren Bauwerken (z.B. Hochhäusern auf Gründungsplatten und pfählen) wird der Lastabtrag in den Baugrund durch eine starke Interaktion zwischen Bauwerk und Baugrund bestimmt. Der Baugrund kann phänomenologisch als Mehrphasenkontinuum beschrieben werden, bei dem die Phasen Feststoff, Flüssigkeit und Gas in mechanische Wechselwirkung treten. Die Wechselwirkung zwischen der Deformation des Feststoffes und der Strömung des Porenwassers spielt unter der Lasteinwirkung des Bauwerks und unter dynamischer Erregung eine zentrale Rolle. Bei komplexen Gründungsverhältnissen können die Deformations- und Spannungszustände realitätsnah nur durch dreidimensionale Modelle erfasst werden. Je nach Baufortschritt stellen sich die Probleme dabei unterschiedlich dar. Der vorliegende Beitrag beschäftigt sich mit der für die mit der Simulation mit der Methode der finiten Elemente notwendigen Modellierung und der rechnergestützten Netzgenerierung für die Baugrund-Tragwerk-Strukturen. Bei komplexen dreidimensionalen Gründungskonstruktionen ist eine solche rechnergestützte Diskretisierung mit finiten Elementen zweckmäßig, die das geotechnische System und dessen Randbedingungen und Lasten umfassend beschreiben und verwalten kann. Dafür werden geeignete Software-Werkzeuge vorgestellt, mit denen sich dreidimensionale, zeitabhängige Systeme modellieren und diskretisieren lassen. Die Kontaktproblematik zwischen Baugrund und Tragwerk und die Besonderheiten des Mehrphasenkontinuums stellen besondere Ansprüche an die Diskretisierung. Zudem werden Methoden vorgestellt, die das akkumulierte Gründungsmodell, das sich über den Bauablauf ergibt, verwalten und die verschiedenen Bauzustände in einem dynamischen Modell bereitstellen.
Ein simultanes Lösungsverfahren für Fluid-Struktur-Wechselwirkungen aus dem Bereich des Bauingenieurwesens wird vorgestellt. Die Modellierung der Tragwerksdynamik erfolgt mit der geometrisch nichtlinearen Elastizitätstheorie in total Lagrangescher Formulierung. Die Strömung wird mit den inkompressiblen Navier-Stokes-Gleichungen beschrieben. Wenn Turbulenzeffekte massgeblich sind, kommen die Reynolds-Gleichungen in Verbindung mit dem k-omega-Turbulenzmodell von Wilcox zum Einsatz. Zur Beschreibung von komplexen freien Oberflächen wird die Level-Set-Methode eingesetzt. Die einheitliche Diskretisierung von Fluid und Struktur mit der Raum-Zeit-Finite-Element-Methode führt zu einem konsistenten Berechnungsmodell für das gekoppelte System. Da die isoparametrischen Raum-Zeit-Elemente ihre Geometrie in Zeitrichtung ändern können, erlaubt die Methode eine natürliche Beschreibung des infolge der Strukturbewegung zeitveränderlichen Strömungsgebiets. Die gewichtete Integralformulierung der Kopplungsbedingungen mit globalen Freiwerten für die Interface-Spannungen sichert eine konservative Kopplung von Fluid und Struktur. Ausgewählte Anwendungsbeispiele zeigen die Leistungsfähigkeit der entwickelten Methodik und belegen die guten Konvergenzeigenschaften des simultanen Lösungsverfahrens.
Prädiktive Wärmeflussregelung solaroptimierter Wohngebäude - Thermische Simulation komplexer Gebäude
(2003)
Moderne Wohngebäude heute, besonders aber die der Zukunft, werden sich zu einem großen Teil selbst mit Wärme versorgen. Hierbei spielen Entwicklungen im Bereich der Fassadenkonstruktionen eine zentrale Rolle. Zum erhöhten solaren Wärmeeintrag kommen die Eigenschaften der Wärmespeicherung und verzögerten Wärmeabgabe hinzu. Aufgrund dieser Eigenschaften definiert sich das Gebäudeverhalten neu und komplexer. Im Rahmen der Entwicklungen von Wärmeflussregelungen in solarthermisch beheizten Wohngebäuden mit neuartigen Fassaden wird in diesem Beitrag auf die Modellentwicklung moderner Fassadenkonstruktionen hinsichtlich Transparenter Wärmedämmung und Phasenwechselmaterialien im Wandverbund, kombiniert mit der regelungstechnisch interessanten Neuentwicklung von Verschattungseinrichtungen über schaltbare Schichten am Fenster, eingegangen. Der Beitrag beschreibt den Entwurf eines Regelungskonzeptes für die thermische Raumklimaregelung. Diese Untersuchungen basieren auf komplexen Simulationsmodellen, wobei bei der Modellentwicklung der neuartigen Fassadenelemente auf reale Messwerte zurückgegriffen werden konnte.
Bei der Untersuchung hybrider Strukturen kann eine Kopplung von Modellen unterschiedlicher Modellebenen vorteilhaft sein. Durch selektive Kopplung von Tragwerks- und Querschnittsmodellen in ausgewählten Bereichen der Konstruktion kann z.B. eine Verbesserung der Abbildungsgenauigkeit erzielt werden. Dadurch werden erweiterte Aussagen über das Querschnittstragverhalten in extrem beanspruchten Teilen des Tragwerks bei optionaler Skalierbarkeit des Modellumfangs möglich. Im Beitrag werden ausgewählte Varianten der Modellbildung gegenübergestellt und bewertet. Hierbei werden Aspekte der physikalischen Nichtlinearität von hybriden Konstruktionen insbesondere von Stahlbetonkonstruktionen berücksichtigt. Die Einbeziehung von Verfahren der mathematischen Optimierung in die Berechnungsstrategie ermöglicht die Lösung der zugrunde liegenden nichtlinearen Problemstellungen unter Vorgabe von Bemessungszielen und unter Beachtung von Grenzzustandsbedingungen.
Poland is not situated in any seismic region of the earth, however there are still areas were underground mining is being conducted. In these areas, so-called 'paraseismic tremors', are very frequent phenomena. In the situation when a building examination is realized in order to define its safety, it is necessary to make a complete analysis, in which an influence of tremors should be included. To decide if a building is able to carry out any dynamic loads or not, it is necessary to compute its dynamic characteristics, i.e. natural frequencies. It is not possible using any standard techniques. After diagnosis a building in situ by an expert, computer techniques together with specialized software for dynamic, static, and strength analyses become a suitable tool. In this paper a special attention was paid to a typical twelve-store WGP (Wroclaw Great Plate) prefabricated building, concerning special type of joints. During dynamic actions these joints have a decisive influence on building's behavior. Paraseismic tremors are especially dangerous for these buildings and can be the reason of pre-failure states. It can be difficult and very expensive to prepare laboratory investigations of the part of a building or of a separate joint; therefore the computer modeling suitable to investigate behavior of such elements and whole buildings under different kinds of loads was used.
The vibration control of complicated mechanical structures is impossible without proper mathematical models that allow to have a true apprehension of events occurring in structural member before the starting of the experiment and correct the diagnostic experiment in case of need. An approach that implies using of a discrete model reflecting all required features of a prototype system and permitting of an effective analytical and numerical investigation is proposed in the work. At first a discrete model of a bladed disk with flaw is considered. Taking into account the symmetry of the structure by utilization of mathematical tools of group presentation theory the number of degrees of freedom of the system is diminished. Small damage of the disk is regarded as perturbation of structure symmetry. The distinction of vibration characteristics such as natural frequencies and mode shapes of damaged and undamaged systems is determined theoretically with the help of perturbation theory and can be used as an effective diagnostic criterion of a small-scale damage of the structure. In the second part of the work a non-linear two-mass model of an acoustic emission in a damaged structure is proposed. On basis of the numerical integration of the nonlinear differential equations and expansion of the derived solution into a Fourier series free and forced vibrations of the model are investigated. It is shown that proposed model reflects all characteristic properties of vibrations of damaged structures: reduction of natural frequency, sub- and super-resonances, acoustic effects.
We present a model derived to describe tunnel fires. The model originates in a compressible description of the air in the tunnel. It takes into account the strong buoyancy forces and at the same time the small Mach-number of the airflow. We comment on the derivation, on analytical results and on numerical simulations of the model. The model has been validated using data from real tunnel fire experiments. It shows good agreement with the real situation.
In current AEC practice client requirements are typically recorded in a building program, which, depending on the building type, covers various aspects from the overall goals, activities and spatial needs to very detailed material and condition requirements. This documentation is used as the starting point of the design process, but as the design progresses, it is usually left aside and changes are made incrementally based on the previous design solution. These incremental small changes can lead to a solution that may no longer meet the original requirements. In addition, design is by nature an iterative process and the proposed solutions often also cause evolution in the client requirements. However, the requirements documentation is usually not updated accordingly. Finding the latest updates and evolution of the requirements from the documentation is very difficult, if not impossible. This process can lead to an end result, which is significantly different from the documented requirements. Some important requirements may not be satisfied, and even if the design process was based on agreed-upon changes in the scope and requirements, differences in the requirements documents and in the completed building can lead to well-justified doubts about the quality of the design and construction process...
Current building product models explicitly represent components, attributes of components, and relationships between components. These designer-focused product models, however, do not represent many of the design conditions that are important for construction, such as component similarity, uniformity, and penetrations. Current design and construction tools offer limited support for detecting these construction-specific design conditions. This paper describes the ontology we developed using the manufacturing concept of features to represent the design conditions that are important for construction. The feature ontology provides the blueprint for the additions and changes needed to transform a standard product model into a constructionspecific product model. The ontology formalizes three classes of features, defines the attributes and functions of each feature type, and represents the relationships between features explicitly. The descriptive semantics of the ontology allows practitioners to represent their varied preferences for naming features, specifying features that result from component intersections and the similarity of components, and grouping features that affect a specific construction domain. A software prototype that implements the ontology enables practitioners to transform designer-focused product models into feature-based product models that represent the construction perspective.
Numerische Berechnung von Mauerwerkstrukturen in homogenen und diskreten Modellierungsstrategien
(2004)
Im Zentrum der Arbeit stehen die Entwicklung, Verifikation, Implementierung und Leistungsfähigkeit numerischer Berechnungsmodelle für Mauerwerk im Rahmen der Kontinuums- und Diskontinuumsmechanik. Makromodelle beschreiben das Mauerwerk als verschmiertes Ersatzkontinuum. Mikromodelle berücksichtigen durch die Modellierung der einzelnen Steine und Fugen die Struktur des Mauerwerkverbandes. Soll darüber hinaus der durch die Querdehnungsinteraktion zwischen Stein und Mörtel hervorgerufene heterogene Spannungszustand im Mauerwerk abgebildet werden, so ist ein detailliertes Mikromodell, welches Steine und Fugen in ihren exakten geometrischen Dimensionen berücksichtigt, erforderlich. Demgegenüber steht die vereinfachte Mikromodellierung, bei der die Fugen mit Hilfe von Kontaktalgorithmen beschrieben werden. Im Rahmen der Makromodellierung werden neue räumliche Materialmodelle für verschiedene ein- und mehrschalige Mauerwerkarten hergeleitet. Die vorgestellten Modelle berücksichtigen die Anisotropie der Steifigkeiten, der Festigkeiten sowie des Ver- und Entfestigungsverhaltens. Die numerische Implementation erfolgt mit Hilfe moderner elastoplastischer Algorithmen im Rahmen der impliziten Finite Element Methode in das Programm ANSYS. Innerhalb der detaillierten Mikromodellierung wird ein neues, aus Materialbeschreibungen für Stein, Mörtel sowie deren Verbund bestehendes nichtlineares Berechnungsmodell entwickelt und in das Programm ANSYS implementiert. Die diskontinuumsmechanische Beschreibung von Mauerwerk im Rahmen der vereinfachten Mikromodellierung erfolgt unter Verwendung der expliziten Distinkt Element Methode mit Hilfe der Programme UDEC und 3DEC. An praktischen Beispielen werden Probleme der Tragfähigkeitsbewertung gemauerter Bogenbrücken, Möglichkeiten zur Bewertung vorhandener Rissbildungen und Schädigungen an historischen Mauerwerkstrukturen und Traglastberechnungen an gemauerten Stützen ausgewertet und analysiert.
The uniqueness and the long life cycle of buildings imply a dynamically modifiable building model. The technological foundation for the management of digital building models, a dynamic model management system (MMS), developed by our research group, allows to explicitly access and to modify the object model of the stored planning data. In this paper, the integration of constraints in digital building models will be shown. Constraints are conditions, which apply to the instances of domain model classes, and are defined by the user at runtime of the information system. For the expression of constraints, the Constraint Modelling Language (CML) has been developed and will be described in this paper. CML is a powerful, intuitively usable object-oriented language, which allows the expression of constraints at a high semantic level. A constrained-enabled MMS can verify, whether an instance fulfils the applying constraints. To ensure flexibility, the evaluation of constraints is not implicitly performed by the systems, but explicitly initiated by the user. A classification of constraint types and example usage scenarios are given.
Structural engineering projects are increasingly organized in networked cooperations due to a permanently enlarged competition pressure and a high degree of complexity while performing the concurrent design activities. Software that intends to support such collaborative structural design processes implicates enormous requirements. In the course of our common research work, we analyzed the pros and cons of the application of both the peer-to-peer (University of Bonn) and multiagent architecture style (University of Bochum) within the field of collaborative structural design. In this paper, we join the benefits of both architecture styles in an integrated conceptual approach. We demonstrate the surplus value of the integrated multiagent–peer-to-peer approach by means of an example scenario in which several structural engineers are co-operatively designing the basic structural elements of an arched bridge, applying heterogeneous CAD systems.
Although there are some good reasons to design engineering software as a stand-alone application for a single computer, there are also numerous possibilities for creating distributed engineering applications, in particular using the Internet. This paper presents some typical scenarios how engineering applications can benefit from including network capabilities. Also, some examples of Internet-based engineering applications are discussed to show how the concepts presented can be implemented.
Assuring global consistency in a cooperative working environment is the main focus of many nowaday research projects in the field of civil engineering and others. In this paper, a new approach based on octrees will be discussed. It will be shown that by the usage of octrees not only the management and control of processes in a network-based working environment can be optimised but also an efficient integration platform for processes from various disciplines – such as architecture and civil engineering – can be provided. By means of an octree-based collision detection resp. consistency assurance a client-server-architecture will be described as well as sophisticated information services for a further support of cooperative work.
The worldwide growth of communication networks and associated technologies provide the basic infrastructure for new ways of executing the engineering process. Collaboration amongst team members seperated in time and location is of particular importance. Two broad themes can be recognized in research pertaining to distributed collaboration. One theme focusses on the technical and technological aspects of distributed work, while the other emphasises human aspects thereof. The case of finite element structural analysis in a distributed collaboratory is examined in this paper. An approach is taken which has its roots in human aspects of the structural analysis task. Based on experience of how structural engineers currently approach and execute this task while utilising standard software designed for use on local workstations only, criteria are stated for a software architechture that could support collaborative structural analysis. Aspects of a pilot application and the results of qualitative performance measurements are discussed.
Building design in Civil Engineering is characterized by the cooperation of experts in multiple disciplines. Close cooperation of engineers in different fields is the basis of high product quality, short development periods and a minimum of investment costs. For each building the engineers have to create a new fire engineering model. The consistent realization of the fire engineering model in all details has high demands on communication, collaboration and building models. Thereby, to preserve the related design models consistent to each other and compatible with the rules of fire engineering is a complex task. In addition, regulations and guidelines vary according to the building location, so the knowledge base must be integrated dynamically into the planning process. This contribution covers the integration of engineers and design models into a cooperation network on the basis of mobile agents. The distributed models of architectural design, structural planning and fire engineering are supported. These models are implemented as XML-based models which can be accessed by mobile agents for information retrieval and for processing tasks. Agents are provided to all planners, they are enabled to check up the distributed design models with the knowledge base of the fire protection regulations,. With the use of such an agent each planner is supported to check up his planning for accordance with the fire protection requirements. The fire-engineering-agent analyzes the design and detects inconsistencies by processing fire protection requirements and design model facts in a rule-based expert system. The possibility to check the planning information at an early state in the sense of compatibility to the fire protection regulations enables a comprehensive diagnosis of the design and the reduction of planning errors.
This paper describes an approach to support co-operation of experts in heterogeneous geotechnical engineering project environments during both regular execution and handling of exceptional situations. A co-operation platform is introduced which is based on a generalized information model mapping key information about the construction project, the construction process as well as the organization structure. Several tools are provided to operate the information model in a network based environment.
The scientific transfer of key technology features to developing countries, together with adequate competence, localisation and adaptation, is the primary purpose of the proposed investigation. It is evident that introducing high-level CAD design and detailing will improve the planning process in developing countries. Successful utilization of applied information technology for the planning process, however, depends on the user-interface of individual software. Therefore, to open the great opportunity embedded in CAD software for clients globally, the language and character-set barrier of traditional user-interfaces must be overcome. A proposal for a research program is given here to address such issue in favour of global civil engineering.
This paper deals with two different agent-based approaches aimed at the incorporation of complex design information into multi-agent planning systems. The first system facilitates collaborative structural design processes, the second one supports fire engineering in buildings. Both approaches are part of two different research projects that belong to the DFG1 priority program 1103 entitled “Network-based Co-operative Planning Processes in Structural Engineering“ (DFG 2000). The two approaches provide similar database wrapper agents to integrate relevant design information into two multi-agent systems: Database wrapper agents make the relevant product model data usable for further agents in the multi-agent system, independent on their physical location. Thus, database wrapper agents act as an interface between multi-agent system and heterogeneous database systems. The communication between the database wrapper agents and other requesting agents presumes a common vocabulary: a specific database ontology that maps database related message contents into database objects. Hereby, the software-wrapping technology enables the various design experts to plug in existing database systems and data resources into a specific multi-agent system easily. As a consequence, dynamic changes in the design information of large collaborative engineering projects are adequately supported. The flexible architecture of the database wrapper agent concept is demonstrated by the integration of an XML and a relational database system.
Re-examination of the behaviour of structures can be necessary due to deterioration or changes in the traffic situation during their lifetime. The Finite Element Method (FEM) is widely used in order to accomplish numerical analysis. Considering the development of computer performance, more detailed FEM models can be analyzed, even on site, with mobile computers. To compensate the increasing amount of data needed for the model input, measures need to be taken to save time, by distributing the work. In order to provide consistency to the model, fedback data must be checked upon reception. A local wireless computer network of ultra-portable devices linked together with a computer can provide the coordination necessary for efficient parallel working. Based on a digital model consisting of all data gathered, structural modelling and numerical analysis are performed automatically. Thus, the user is released from the work that can be automatized and the time needed for the overall analysis of a structure is decreased.
Collaboration in AEC Design : Web-enabling Applications using Peer-to-Peer Office Communicator
(2004)
A market analysis conducted by Gartner Dataquest in August 2001 has shown the typical characteristics of the AEC design process. High volatility in membership of AEC design groups and members dispersed over several external offices is the common collaboration scenario. Membership is most times short lived, compared to the overall duration of the process. A technical solution has to take that into account by making joining and leaving a collaborative work group very easy. The modelling of roles of collaboration between group members must be based on a commonly understood principle like the publisher / subscriber model, where the individual that is responsible for the distribution of vital information is clear. Security issues and trust in the confidentiality of the system is a central concern for the acceptance of the system. Therefore, keeping the subset of data that will be published under the absolute control of the publisher is a must. This is not the case with server-based scenarios, sometimes even due to psychological reasons. A loosely bound Peer-to-Peer network offers advantages over a server-based solution, because of less administrative overhead and simple installation procedures. In a peer-to-peer environment, a publish/subscribe role model can be more easily implemented. The publish/subscribe model matches the way AEC processes are modelled in real world scenarios today, where legal proof of information exchange between external offices is of high importance. Workflow management systems for small to midsize companies of the AEC industry may adopt the peer-to-peer approach to collaboration in the future. Further investigations are being made on the research level (WINDS) by integrating the viewer and redlining application Collaborate! into a collaborative environment.
In this contribution, the design of an analysis environment is presented, that supports an analyst to come to a decision within a gradual collaborative planning process. An analyst represents a project manager, planner or any other person, involved in the planning process. Today, planning processes are managed by several geographically distributed planners and project managers. Thus, complexity of such a process rises even more. Prediction of consequences of many planning decisions is not possible, in particular since assessment of a planning advance is not trivial. There have to be considered several viewpoints, that depend on individual perceptions. In the following, methods are presented to realize planning decision support.
In the AEC (Architecture / Engineering / Construction) industry a number of individuals and organisations collaborate and work jointly on a construction project. The resulting consortium has large pool of expertise and experience and can be defined as a Virtual Organisation (VO) formed for the duration of the project. VOs are electronically networked organisations where IT and web based communication technology play an important role in coordinating various activities of these organisations. This paper describes the design, development and implementation of a Grid enabled application called the Product Supplier Catalogue Database (PSCD) which supports collaborative working in consortia. As part of the Grid-enabling process, specialised metadata is being developed to enable PSCD to effectively utilise Grid middleware such as Globus and Java CoG toolkits. We also describe our experience whilst designing, developing and deploying the security service of the application using the Globus Security Interface (GSI).
The conceptual structure of an application that can support the structural analysis task in a distributed collaboratory is described in (van Rooyen and Olivier 2004). The application described there has a standalone component for executing the finite element method on a local workstation in the absence of network access. This application is comparable to current, local workstation based finite element packages. However, it differs fundamentally from standard packages since the application itself, and its objects, are adapted to support distributed execution of the analysis task. Basic aspects of an object-oriented framework for the development of applications which can be used in similar distributed collaboratories are described in this paper. An important feature of this framework is its application-centred design. This means that an application can contain any number of engineering models, where the models are formed by the collection of objects according to semantic views within the application. This is achieved through very flexible classes Application and Model, which are described in detail. The advantages of the application-centred design approach is demonstrated with reference to the design of steel structures, where the finite element analysis model, member design model and connection design model interact to provide the required functionality.
Communication software and distributed applications for control and building performance simulation software must be reliable, efficient, flexible, and reusable. This paper reports on progress of a project, which aims to achieve better integrated building and systems control modeling in building performance simulation by run-time coupling of distributed computer programs. These requirements motivate the use of the Common Object Request Broker Architecture (CORBA), which offers sufficient advantage than communication within simple abstraction. However, set up highly available applications with CORBA is hard. Neither control modeling software nor building performance environments have simple interface with CORBA objects. Therefore, this paper describes an architectural solution to distributed control and building performance software tools with CORBA objects. Then, it explains how much the developement of CORBA based distributed building control simulation applications is difficult. The paper finishes by giving some recommendations.
The contribution introduces a method for the distributed process modelling in order to support the process orientation in Structural Engineering, i.e., the modelling, analysis and management of planning processes. The approach is based on the Petri Net theory for the modelling of planning processes and workflows in Structural Engineering. Firstly, a central and coarse process model serves as a pre-structuring system for the detailed modelling of the technical planning activities. Secondly, the involved planning participants generate distributed process models with detailed technical workflow information. Finally, these distributed process models will be combined in the central workflow net. The final net is of great importance for the process orientation in Structural Engineering, i.e., the identification, publication, analysis, optimization and finally the management of planning processes.
This paper describes an ongoing research on the representation and reasoning about construction specifications, which is part of a bigger research project that aims at developing a formalism for automating the identification of deviations and defects on construction sites. We specifically describe the requirements on product and process models and an approach for representing and reasoning about construction specifications to enable automated detection and assessment of construction deviations and defects. This research builds on the previous research on modeling design specifications and extends and elaborates concept of contexts developed in that domain. The paper provides an overview of how the construction specifications are being modele d in this research and points out future steps that need to be accomplished to develop the envisioned automated deviation and defect detection system.
Gegenstand der vorliegenden Arbeit ist die Konzeption und prototypische Umsetzung von Techniken des Computer Supported Cooperative Work (CSCW) im Rahmen einer integrierten objektorientierten und dynamischen Bauwerksmodellverwaltung zur Unterstützung der Bauwerksplanung. Die Planung von Bauwerken ist durch einen hohen Grad an Arbeitsteiligkeit, aber auch durch eine schwache Strukturierung der ablaufenden Prozesse gekennzeichnet. Besonders durch den Unikatcharakter des Planungsgegenstands \'Bauwerk\' ergeben sich signifikante Unterschiede zum Entwurf anderer, durch Serienfertigung produzierter Industriegüter. Zunehmend wird die Planung von Bauwerken in Virtual Enterprises ausgeführt, die sich durch eine dynamische Organisationsstruktur, geographische Verteilung der Partner, schwer normierbare Informationsflüsse und eine häufig stark heterogene informationstechnische Infrastruktur auszeichnen. Zur rechnerinternen Repräsent! ation des Planungsgegenstands haben sich objektorientierte Bauwerksmodelle bewährt. Aufgrund der Veränderlichkeit der Bauwerke und deren rechnerinterner Repräsentation im Laufe des Bauwerkslebenszyklus ist eine dynamische Anpassung der Modelle unumgänglich. Derartige in Form von Taxonomien dargestellte dynamische Bauwerksmodellstrukturen können gemeinsam mit den in Instanzform vorliegenden konkreten Projektinformationen in entsprechenden Modellverwaltungssystemen (MVS) gehandhabt werden. Dabei wird aufgrund der Spezialisierung und Arbeitsteilung im Planungsprozess von einer inhaltlich verknüpften Partialmodellstruktur, die räumlich verteilt sein kann, ausgegangen. Die vorgeschlagenen Methoden zur Koordinierung der Teamarbeit in der Bauwerksplanung beruhen auf der Nutzung von CSCW–Techniken für \'Gemeinsame Informationsräume\' und \'Workgroup Computing\', die im Kontext der als Integrationsbasis fungierenden Modellverwaltungssysteme umgesetzt werden. Dazu werden die zur d! ynamischen Bauwerksmodellierung erforderlichen Metaebenenfunk! tionalitäten sowie Ansätze zur Implementierung von Modellverwaltungskernen systematisiert. Ebenso werden notwendige Basistechniken für die Realisierung von MVS untersucht und eine Architektur zur rollenspezifischen Präsentation dynamischer Modellinhalte vorgestellt. Da klassische Schichtenmodelle nicht auf die Verhältnisse in Virtual Enterprises angewendet werden können, wird eine physische Systemarchitektur mit einem zentralen Projektserver, Domänenservern und Domänenclients vorgestellt. Ebenso werden Techniken zur Sicherung des autorisierten Zugriffs sowie des Dokumentencharakters beschrieben. Zur Unterstützung der asynchronen Phasen der Kooperation wird der gemeinsame Informationsraum durch Mappingtechniken zur Propagation und Notifikation von Änderungsdaten bezüglich relevanter Modellinformationen ergänzt. Zur Unterstützung synchroner Phasen werden Techniken zur Schaffung eines gemeinsamen Kontexts durch relaxierte WYSIWIS–Präsentationen auf Basis der Modellinformationen! verbunden mit Telepresence–Techniken vorgestellt. Weiterhin werden Methoden zur Sicherung der Group–Awareness für alle Kooperationsphasen betrachtet.
Den Gegenstand der Dissertation bilden die Konzeption und die exemplarische Realisierung eines verknüpfungsbasierten Bauwerksmodellierungsansatzes zur Schaffung einer integrierenden Arbeits- und Planungsumgebung für den Lebenszyklus von Bauwerken. Die Basis der Integration bildet ein deklarativ ausgerichteter Bauwerksmodellverbund bestehend aus abstrahierten, domänenspezifischen Partialmodellen. Auf Grund der de facto existierenden Dynamik im Bauwerkslebenszyklus werden sowohl der Bauwerksmodellverbund als auch die einzelnen Partialmodelle dynamisch modifizierbar konzipiert und auf Basis spezieller Modellverwaltungssysteme technisch realisiert. Die Verständigung innerhalb der vorgeschlagenen Gesamtbauwerksmodellarchitektur basiert auf anwenderspezifisch zu erstellenden Verknüpfungen zwischen den Partialmodellen und wird im Sinne einer hybriden Modellarchitektur durch eine zentrale, die Verknüpfungen verwaltende Komponente koordiniert. Zur Verwaltung und Abarbeitung der Verknüpfungen wird der Einsatz von Softwareagenten im Rahmen eines Multiagentensystems vorgeschlagen und diskutiert.
Limit state design of hybrid structures with meshless methods using mathematical optimization
(2003)
The revitalization of existing structures belongs to the frequently tasks in urban reconstruction processes. The adaptation for new requirements will commonly affect substantial changes in the general configuration of structures. The resulting revitalized structures are characterized by a hybrid design, where old and new, identical or diverse materials and members will be coupled in different ways. In the planning stage the treatment of these systems leads to application of complex and hybrid mechanical models respectively. High performance numerical instruments have to be applied for solving not only analysis but also targeted design problems. Because of the hybrid character of mechanical models in revitalization planning processes the use of hybrid technologies is advantageous. In this paper mixed domain technique will be used for connecting EFG and FE. The models derived will be adopted for design purposes of non-linear loaded hybrid structures. The investigations show a good adaptability of the meshless methods to the design of hybrid structures by using optimization strategies. With this method the advantages of both finite element and meshless methods can be utilized most suitable. With the property of a minimum amount of unknowns by maintaining an adequate quality of the results the application of mixed finite element and meshless methods is a promising alternative to traditional methods in structural analysis and optimization.