Filtern
Dokumenttyp
- Konferenzveröffentlichung (123)
- Artikel (Wissenschaftlicher) (66)
- Dissertation (25)
- Masterarbeit (5)
- Diplomarbeit (1)
Institut
- Professur Informatik im Bauwesen (177)
- Professur Baubetrieb und Bauverfahren (10)
- Professur Grundbau (4)
- Professur Holz- und Mauerwerksbau (4)
- Professur Allgemeine Baustoffkunde (2)
- Professur Entwerfen und Architekturtheorie (2)
- Professur Informatik in der Architektur (2)
- Professur Massivbau I (2)
- Institut für Strukturmechanik (ISM) (1)
- Junior-Professur Computational Architecture (1)
- Junior-Professur Europäische Medienkultur (1)
- Professur Angewandte Mathematik (1)
- Professur Aufbereitung von Baustoffen und Wiederverwertung (1)
- Professur Bauaufnahme und Baudenkmalpflege (1)
- Professur Bauchemie und Polymere Werkstoffe (1)
- Professur Bauformenlehre (1)
- Professur Bauphysik (1)
- Professur Baustatik und Bauteilfestigkeit (1)
- Professur Bodenmechanik (1)
- Professur Darstellungsmethodik (1)
- Professur Entwerfen und Industriebau (1)
- Professur Entwerfen und ländliches Bauen (1)
- Professur Planung von Ingenieurbauten (1)
- Professur Raumplanung und Raumforschung (1)
- Professur Stahlbau (1)
- Professur Verkehrsplanung und Verkehrstechnik (1)
- Professur Wasserbau (1)
Schlagworte
- Verteiltes System (37)
- Bautechnik (30)
- Bauwerk (27)
- Produktmodell (25)
- Simulation (23)
- Architektur (21)
- Modellierung (21)
- Mehragentensystem (19)
- Ingenieurbau (17)
- Planungsprozess (17)
Erscheinungsjahr
- 2004 (220) (entfernen)
This paper presents an evaluation system for steel structures of hydroelectric power stations, including hydraulic gates and penstocks, based on Fault Tree Analyasis (FTA) and performance maps. This system consists of fault tree diagrams of FTA, performance maps, design and analysis systems, and engineerin databases. These four modules are integrated by appropriate hyperlinks so that the user of this system can use it easily and seamlessly. A well developed system was applied to some illustrative example cases, and they showed that the developed methodology and system worked well and the users found the system useful and effective for their maintenance tasks at powerstations.
This paper presents a new design environment based on Multi-Agents and Virtual Reality (VR). In this research, a design system with a virtual reality function was developed. The virtual world was realized by using GL4Java, liquid crystal shutter glasses, sensor systems, etc. And the Multi-Agent CAD system with product models, which had been developed before, was integrated with the VR design system. A prototype system was developed for highway steel plate girder bridges, and was applied to a design problem. The application verified the effectiveness of the developed system.
Information science researchers and developers have spent many years addressing the problem of retrieving the exact information needed and using it for analysis purposes. In informationseeking dialogues, the user, i.e. construction project manager or supplier, often asks questions about specific aspects of the tasks they want to perform. But most of the time it is difficult for the software systems to unambiguously understand their overall intentions. The existence of information tunnels (Tannenbaum 2002) aggravates this phenomenon. This study includes a detailed case study of the material management process in the construction industry. Based on this case study, the structure of a formal user model for information retrieval in construction management is proposed. This prototype user model will be incorporated into the system design for construction information management and retrieval. This information retrieval system is a user-centered product based on the development of a user configurable visitor mechanism for managing and retrieving project information without worrying too much about the underlying data structure of the database system. An executable UML model combined with OODB is used to reduce the ambiguity in the user's intentions and to achieve user satisfaction.
Die Entstehung des Baugrundes ist geprägt durch die Genese und von anthropogenen Einflüssen. In der Arbeit werden auf der Grundlage isotroper Betrachtungen im Halbraum Prognosen für unbeprobte Bereiche eines linienförmigen Bauwerkes erstellt. Aufbauend auf dem bekannten Algorithmus der Geostatistik werden Berechnungen mit deterministischen Eingangsgrößen durchgeführt. Diese sind in einem Datensatz zusammengefasst und gehen ohne Unterteilung bzw. Bildung von (Homogen)Bereichen in die Schätzungen ein. Zur Anwendung kam dabei die an der Professur Grundbau der Bauhaus-Universität Weimar entwickelte Software GeoStat. Nach der Variogrammanalyse folgten geostatistische Berechnungen mit dem Ordinary und dem Universal Kriging. Der genutzte Datensatz unterlag dabei mehrfachen Modifikationen, um Unterschiede in der Ergebnisbildung beobachten zu können. Die Krigingschätzungen wurden für subjektiv ausgewählte Beprobungspunkte erstellt, die mit Referenzprofilen verglichen werden konnten. Im Ergebnis traten für alle durchgeführten Simulationen erhebliche Abweichungen der berechneten Werte zu den Referenzprofilen auf. Die Verwendung von Datensätzen ohne eine vorherige Bearbeitung und Unterteilung in Homogenbereiche erweist sich als nicht ratsam. Vielmehr ist es notwendig kompliziertere Krigingvarianten einzusetzen bzw. die benutzten Methoden mit anderen Verfahren zu kombinieren.
In der Dissertation wurden unterschiedliche Methoden zur Standortidentifizierung mit Oberflächenwellen analysiert. Es wurden neue Methoden zur Parameteridentifikation unter Nutzung von Oberflächenwellen vorgeschlagen. Die Ziele der Arbeit können wie folgt definiert werden: a) Die Entwicklung eines geeigneten theoretischen Modells als Grundlage zur Untersuchung des Standortes hinsichtlich vorhandener Bodensteifigkeiten. b) Die Entwicklung einer neuen Inversionsmethodik unter Berücksichtigung aller auftretenden Moden im Oberflächenwellenfeld. Die Erstellung eines Modells des vertikal heterogenen Untergrundes erfolgte im Frequenz-bereichs für beliebig geschichtete Böden, aufbereitet durch weitestgehend analytische Formulierungen. Durch Nutzung beliebiger horizontaler, elastisch-isotroper Schichten konnte die vertikale Heterogenität approximiert werden. Die Definition der Green'schen Funktionen wurde in Form der Reflexions- und Transmissionskoeffizienten durchgeführt. Die Lösung des formulierten Halbraumproblems erfolgte unter Verwendung der Konturintegration. Dazu wurde die Vorgehensweise der bestehenden Lösung des homogenen Halbraums auf das Problem des geschichteten Mediums übertragen. Die daraus sich ergebende Lösung ist in ein Körperwellen- und ein Oberflächenwellenfeld separiert. Der Vorteil dieser analytischen Betrachtungsweise liegt in der eindeutigen Zuordnungsmöglichkeit der erhaltenen Lösungen zu Wellentypen und in der klaren Dispersionscharakteristik der berechneten Modelle. Im Gegensatz dazu liefern numerische Lösungen, wie FEM, immer ein Wellenfeld, in dem die Wellentypen zugeordnet bzw. interpretiert werden müssen. Mit Hilfe der synthetischen Bodenmodellierung wird das Verhalten von geschichteten Böden bei durchlaufenden Oberflächenwellenfeldern simuliert und untersucht. Für die Untersuchung der Profile wurde hauptsächlich die Modale Superposition von Oberflächenwellen und die Wellenzahl-Integration verwendet. Bei der Analyse von Oberflächenwellenfeldern in vorhandenen Medien sind abweichend von den üblichen seismischen Methoden spezielle Untersuchungsmethoden zur Ermittlung der vorhandenen Dispersion notwendig. Zur Durchführung der Dispersionsanalyse wird in geotechnischen Untersuchungen in der Regel das Phasen-Differenzen-Verfahren (SASW) genutzt. Aufgrund der beschränkten Aussagefähigkeit dieses Verfahrens zu auftretenden höheren Moden werden verbesserte Analysemethoden zur experimentellen Auswertung hinzugezogen. Diese Methoden nutzen zur Informationsgewinnung das räumlich ausgedehnte Wellenfeld. Ausgehend von dem Dispersionsverhalten kann die Bodenstruktur mittels inverser Methoden bestimmt werden. Für die gemeinsame Inversion der in den Messungen vorhandenen Moden wurde ein entsprechendes Inversionsverfahren abgeleitet. Als Grundlage der Inversion wurde ein Verfahren des kleinsten Fehlerquadrates gewählt. Der Vorteil hinsichtlich einer effizienten und stabilen Inversion unter Nutzung dieser Methodik überwiegt den Nachteil der lokalen Suche nach dem Fehlerminimum. Zum Erreichen der stabilen und zielgerichteten Inversion wird der Levenberg-Marquardt Algorithmus, zusammen mit der Wichtung der Dispersionsäste entsprechend ihres Anregungsverhaltens in den Dispersionsspektren, eingesetzt. Von Vorteil hat sich innerhalb der Arbeit die gleichzeitige Behandlung von theoretischen und experimentellen Parameterstudien erwiesen, da sich Ergebnisse und Erkenntnisse beider Seiten ergänzten. Eine Interpretation von Felddaten kann damit weitaus sicherer durchgeführt werden. Zusätzlich konnten die erarbeiteten experimentellen und theoretischen Verfahren gegenseitig überprüft werden.
Das Pionierlager Artek. Realität und Utopie in der sowjetischen Architektur der sechziger Jahre
(2004)
Das in den 1960er Jahren gebaute, internationale Pionierlager Artek an der Schwarzmeerküste der Krim war das größte Kinderferienlager der Sowjetunion. Als Prestigeobjekt und Vorzeigeinstitution steht Artek für die Architektur der Ära Chruschtschows, des sogenannten „Tauwetters“. Anhand des dialektischen Prinzips von Präsentation und Repräsentation werden vier Aspekte des Lagers untersucht: Architektur, städtebauliche Struktur, Erziehung und Gesamtkunstwerk. Durch dieses Prinzip, das sich aus der Widerspiegelungstheorie ableiten läßt, kann jedem dieser Aspekte die Kongruenz zur ideologischen Zielsetzung und damit die gestalterische Kohärenz der Ferienanlage nachgewiesen werden. In Abgrenzung zur modernen Architektur der westlichen Industrienationen wurde in Artek eine spezifisch „sozialistische Moderne“ für die Sowjetunion und die übrigen Staaten des Ostblocks definiert. Diese war eng verbunden mit dem Städtebau auf der Grundlage von Mikrorayons und der Ausgestaltung von Stadt- und Subzentren. Artek ist mit seiner idealtypischen, architektonischen und städtebaulichen Gestaltung ein Denkmal für die frühere Sowjetunion.
Organisational and human issues have been highlighted, among other issues (ICT infrastructures, legal and contractual, etc.), as key elements in enhancing the competitiveness of the construction sector. More specifically, the importance of human resources has been recognised, especially training and professional development, in order to cultivate a stable workforce. The paper provides a review of the key training needs for the construction sector with particular reference to the uptake and exploitation of new technologies and working practices, presents an action plan to address learning and training needs, and proposes an eight-stage iterative learning and training methodology. The results will be of particular interest to managers in stakeholder organisations of all sizes throughout the sector, plus academic and research bodies intending to continue construction ICT research.
The processes in the life cycle of buildings are characterised by highly distinct teamwork. The integration of all the distributed working participants, by providing an environment, which especially supports the communication and collaboration between the actors, is a fundamental step to improve the efficiency of the involved processes and to reduce the total costs. In this article, a link based modelling approach and its “intelligent” link management is introduced (1). This approach realises an integration environment based on a special building model that acts as a decision support system. The link-based modelling is characterised by the definition and specialisation of links between partial models. These intelligent managed links enable a very flexible and task specific data access and exchange between all the different views and partial models of the participants.
Preparation and provision of building information for planning within existing built contexts
(2004)
A prerequisite for planning within existing built contexts is precise information regarding the building substance, its construction and materials, possible damages and any modifications and additions that may have occurred during its lifetime. Using the information collected in a building survey the user should be able to “explore” the building in virtual form, as well as to assess the information contained with regard to a specific planning aspect. The functionality provided by an information module should cover several levels of information provision ranging from ‘simple retrieval’ of relevant information to the analysis and assessment of stored information with regard to particular question sets. Through the provision of basic functionality at an elementary level and the ability to extend this using plug-ins, the system concept of an open extendable system is upheld. Using this modular approach, different levels of information provision can be provided as required during the planning process.
In this contribution the software design and implementation of an analysis server for the computation of failure probabilities in structural engineering is presented. The structures considered are described in terms of an equivalent Finite Element model, the stochastic properties, like e.g. the scatter of the material behavior or the incoming load, are represented using suitable random variables. Within the software framework, a Client-Server-Architecture has been implemented, employing the middleware CORBA for the communication between the distributed modules. The analysis server offers the possibility to compute failure probabilities for stochastically defined structures. Therefore, several different approximation (FORM, SORM) and simulation methods (Monte Carlo Simulation and Importance Sampling) have been implemented. This paper closes in showing several examples computed on the analysis server.
Many problems related to data integration in AEC can be better tackled by an approach that takes into account the heterogeneity of tasks, models and applications but does not require continuous consistency of the evolving design data, at each data management operation. Such an approach must incorporate adequate services that can facilitate reintegration of concurrently modified data at reasonably selected coordination points. In this paper we present a set of methods which, used in combination, can achieve that goal. After a description of the principal envisaged cooperative work scenario each of these methods is discussed in detail and current observations drawn from their software realisation are given. Whilst the suggested approach is valid for any EXPRESS-based data model, the practical focus of work has been on facilitating IFC-driven integration.
The increased implementation of site data capture technologies invariably results in an increase in data warehousing and database technologies to store captured data. However, restricted use of data beyond the initial application could potentially result in a loss of understanding of site processes. This could in turn lead to poor decision making at production, tactical and strategic levels. Concrete usage data have been collected from two piling processes. These data have been analysed and the results highlighted potential improvements that could be made to existing site management and estimating processes. A cost benefit analysis has been used to support decision making at the strategic level where the identified improvements require capital expenditure.
Diese erste umfassende Monographie über den Architekten, Professor und Museumsmann Manfred Lehmbruck (Paris 1913 – Stuttgart 1992) konzentriert sich neben dem Lebensweg und den theoretischen Arbeiten Lehmbrucks zum Museumsbau auf die drei realisierten Museumsbauten: das Reuchlinhaus Pforzheim, das Wilhelm-Lehmbruck-Museum Duisburg und das Federseemuseum Bad Buchau. Aber auch die drei anderen bedeutenden Gebäudeensembles, die Pausa AG Mössingen, die Berufsschule und das Stadtbad Stuttgart-Feuerbach und der Solitär der Mittelschule in Mössingen, alle fertiggestellt in den Sechziger Jahren des letzten Jahrhunderts, werden ausführlich besprochen. Das umfassende Werkverzeichnis im Anhang zeigt deutlich den Einfluß, den seine Lehrer, allen voran Ludwig Mies van der Rohe, aber auch Heinrich Tessenow, Paul Bonatz und Auguste Perret, auf die Architektursprache Lehmbrucks gehabt haben.
Pre-stressed structural elements are widely used in large-span structures. As a rule, they have higher stiffness characteristics. Pre-stressed rods can be applied as girders of different purpose, and as their separate parts, e.g. rods of trusses and frames. Among numerous ways of prestressing the compression of girders, trusses, and frames by tightenings from high-strength materials is under common application.
The presented work focuses on the presentation of a discrete event simulator which can be used for automated sequencing and optimization of building processes. The sequencing is based on the commonly used component–activity–resource relations taking structural and process constraints into account. For the optimization a genetic algorithm approach was developed, implemented and successfully applied to several real life steel constructions. In this contribution we discuss the application of the discrete event simulator including its optimization capabilities on a 4D process model of a steel structure of an automobile recycling facility.
Individual views on a building product of people involved in the design process imply different models for planning and calculation. In order to interpret these geometrical, topological and semantical data of a building model we identify a structural component graph, a graph of room faces, a room graph and a relational object graph as aids and we explain algorithms to derive these relations. The application of the technique presented is demonstrated by the analysis and discretization of a sample model in the scope of building energy simulation.
The worldwide growth of communication networks and associated technologies provide the basic infrastructure for new ways of executing the engineering process. Collaboration amongst team members seperated in time and location is of particular importance. Two broad themes can be recognized in research pertaining to distributed collaboration. One theme focusses on the technical and technological aspects of distributed work, while the other emphasises human aspects thereof. The case of finite element structural analysis in a distributed collaboratory is examined in this paper. An approach is taken which has its roots in human aspects of the structural analysis task. Based on experience of how structural engineers currently approach and execute this task while utilising standard software designed for use on local workstations only, criteria are stated for a software architechture that could support collaborative structural analysis. Aspects of a pilot application and the results of qualitative performance measurements are discussed.
The purpose of this research is to develop the method to retrieve a building name from the impression of the building. First, the images of the building are registered as database by the questionnaire. Next, the images of the objective building are compared with the degree of matching in image databases, and the building with high synthetic matching degree is retrieved. This system could get a good retrieval result. Moreover, image processing was done, and image databases are trained by neural network from the amount of characteristics of the image, and the retrieval system by image processing was examined.
An important feature of the 2003 SARS outbreak in Canada, Singapore, and Hong Kong was that many health care workers (HCWs) developed SARS after caring for patients with SARS. This has been ascribed to inadequate or ineffective patient isolation. However, it is difficult for dense cities to provide sufficient isolation facilities within a short period of time. This has raised concerns from the public for new strategies in the planning and design of isolation facilities. Considering that SARS or other infectious diseases could seriously damage our society’s development, isolation facilities that could be rapidly and economically constructed with appropriate environmental controls are essential. For this reason, the design team of the Department of Architecture collaborated with a special task force from the Faculty of Medicine, who are the frontline medical officers treating the SARS patients, to design Rapidly Assembled Isolation Patient Wards. Both architecture and medicine are well established disciplines, but they have little in common in terms of the mode of knowledge construction and practice. This induced much intellectual exploration and research interest in conducting this study. The process has provided an important reference for cross disciplinary studies between the architectural and medical domains.
Complex gridshell structures used in architecturally ambitious constructions remain as appealing as ever in the public realm. This paper describes the theory and approach behind the software realisation of a tool which helps in finding the affine self-weight geometry of gridshell structures. The software tool DOMEdesign supports the formal design process of lattice and grid shell structures based upon the laws of physics. The computer-aided simulation of suspension models is used to derive structurally favourable forms for domes and arches subject to compression load, based upon the input of simple architectonic parameters. Irregular plans, three-dimensional topography, a choice different kinds of shell lattice structures and the desired height of the dome are examples of design parameters which can be used to modify the architectural design. The provision of data export formats for structural dimensioning and visualisation software enables engineers and planners to use the data in future planning and to communicate the design to the client.
The paper describes a concept for the step-by-step computer-aided capture and representation of geometric building data in the context of planning-oriented building surveying. Selected aspects of the concept have been implemented and tested as prototypes. The process of step-by-step capture and representation is determined by the order in which the user experiences the building. Only the information that the user knows (can see) or can reasonably deduce is represented. In addition approaches to the flexible combination of different measuring techniques and geometric abstractions are described which are based upon geodetic computational adjustment.
Die Arbeit beschreibt ein Konzept zur computergestützten, schrittweisen Erfassung und Abbildung der Geometrie von Gebäuden im Kontext der planungsrelevanten Bauaufnahme. Zunächst wird die Bauaufnahme als Erstellung eines verwendungsspezifischen Modells betrachtet. Anschließend wird der Fokus auf das geometrische Abbild gelegt. Es werden u.a. die Aufmaßtechniken Handaufmaß, Tachymetrie und Photogrammetrie bewertet und gebäudetypische geometrische Abstraktionen aufgelistet. Danach erfolgt eine Aufstellung von Anforderungen an ein computergestütztes Aufmaßsystem, welche mit kommerziellen Lösungen aus dem nichtgeodätischen Bereich verglichen wird. Im Hauptteil wird das zu Beginn genannte Konzept beschrieben. Betrachtet wird die skizzenbasierte Erstellung eines nichtmaßlichen geometrischen Abbildes des Gebäudes in den Frühphasen der Bauaufnahme, seine anschließende schrittweise maßliche Anpassung an das Original und topologische Detaillierung im Zuge des Bauaufmaßes, sowie die Extraktion von Bauteilen und ihren geometrischen Parametern. Zur Vereinfachung der maßlichen Anpassung des geometrischen Abbildes im Aufmaßprozeß werden geometrische Abstraktionen wie Parallelitäten, rechte Winkel usw. genutzt, aber nicht erzwungen. Mit Hilfe der Ausgleichungsrechnung erfolgt eine Zusammenführung der geometrischen Abstraktionen und verschiedener Aufmaßtechniken. Es werden die nötigen Beobachtungsgleichungen und andere relevante Aspekte beschrieben. Gezeigt wird weiter ein Konzept, wie ein nutzerseitig veränderbares Bauwerksmodell mit dem geometrischen Abbild in Bezug gebracht werden kann, wobei aus dem geometrischen Abbild geometrische Parameter des nutzerseitig veränderbaren Bauwerkmodells gewonnen werden können. Ausgesuchte Problematiken der Arbeit wurden prototypisch implementiert und getestet. Hierbei stand die Verbindung der Aufmaßtechniken und geometrischen Abstraktionen im Mittelpunkt. Die geometrischen Ansätze der Arbeit beschränken sich auf planare Oberflächen.
Recently, many reseraches on active control systems of building structures are preformed based on modern control theory and are installed real buildings. The authors have already proposed intelligent fuzzy optimal active control (IFOAC) systems. IFOAC systems imitate intelligent activities of human brains such as prediction, adaptation, decision-kaking and so on. In IFOAC systems, objective and subjective judgements on the active control can be taken into account. However, IFOAC systems are considered to be suitable for far-field erathquake and control effect becomes small in case of near-field earthqaukes which include a few velosity pules with large amplitudes. To improve control effect in case of near-souece earthquakes, the authors have also proposed hybrid control (HC) systems, in which IFOAC systems and fuzzy control system are combined. In HC systems, the fuzzy control systems are introduced as a reflective fuzzy active control (RFAC) system and imitates spinal reflection of human. In HC systems, active control forces are activated to buildings in accordance with switching rules on active control forces. In this paper, optimizations on fuzzy control rules in RFAC system and switching rules of active control forces in HC system are performed by Parameter-Free Genetic Algorithms (PfGAs). Here, the optimization is performed by using different earthquake inputs. The results of digital simulations show that the HC system can reduce maximal response displacements under restrictions on strokes of the actuator effectively in case of a near-source earthquake and the effectiveness of the proposed HC system is discussed and clarified.
The truss model for predicting shear resistance of reinforced concrete beams has usually been criticized because of its underestimation of the concrete shear strength especially for beams with low shear reinforcement. Two challengers are commonly encountered in any truss model and are responsible for its inaccurate shear strength prediction. First: the cracking angle is usually assumed empirically and second the shear contribution of the arching action is usually neglected. This research introduces a nouvelle approach, by using Artificial Neural Network (ANN) for accurately evaluating the shear cracking angle of reinforced and prestressed concrete beams. The model inputs include the beam geometry, concrete strength, the shear reinforcement ratio and the prestressing stress if any. ...
Indentation experiments have been carried out over the past century to determine hardness of materials. Modern indentation machines have the capability to continuously monitor load and displacement to high precision and accuracy. In recent years, research interests have focussed on methods to extract material properties from indentation load-displacement curves. Analytical methods to interpret the indentation load-displacement curves are difficult to formulate due to material and geometric nonlinearities as well as complex contact interactions. In the present study, an artificial neural network model was constructed for interpretation of indentation load-displacement curves. Large strain-large deformation finite element analyses were first carried out to simulate indentation experiments. The data from finite element analyses were then used to train the artificial neural network model. The artificial neural network model was able to accurately determine the material properties when presented with load-displacement curves which were not used in the training process. The proposed artificial neural network model is robust and directly relates the characteristics of the indentation loaddisplacement curve to the elasto-plastic material properties.
This paper describes monitoring of the in-valley discharge and underground water level at the place where the tunnel will be constructed and also, the numerical analysis for prediction applying the Tank Model and Linear Filter Method to calculate the prediction. The application of these analyses has actually allowed the change of underground water level to be grasped and more effective information system to be established by comparing the real-time monitoring data with the real-time calculation of prediction.
Current building product models explicitly represent components, attributes of components, and relationships between components. These designer-focused product models, however, do not represent many of the design conditions that are important for construction, such as component similarity, uniformity, and penetrations. Current design and construction tools offer limited support for detecting these construction-specific design conditions. This paper describes the ontology we developed using the manufacturing concept of features to represent the design conditions that are important for construction. The feature ontology provides the blueprint for the additions and changes needed to transform a standard product model into a constructionspecific product model. The ontology formalizes three classes of features, defines the attributes and functions of each feature type, and represents the relationships between features explicitly. The descriptive semantics of the ontology allows practitioners to represent their varied preferences for naming features, specifying features that result from component intersections and the similarity of components, and grouping features that affect a specific construction domain. A software prototype that implements the ontology enables practitioners to transform designer-focused product models into feature-based product models that represent the construction perspective.
Collaborative Design Processes: A Class on Concurrent Collaboration in Multidisciplinary Design
(2004)
The rise of concurrent engineering in construction demands early team formation and constant communication throughout the project life cycle, but educational models in architecture, engineering and construction have been slow to adjust to this shift in project organization. Most students in these fields spend the majority of their college years working on individual projects that do not build teamwork or communication skills. Collaborative Design Processes (CDP) is a capstone design course where students from the University of Illinois at Urbana-Champaign and the University of Florida learn methods of collaborative design enhanced by the use of information technology. Students work in multidisciplinary teams to collaborate from remote locations via the Internet on the design of a facility. An innovation of this course compared to previous efforts is that students also develop process designs for the integration of technology into the work of multidisciplinary design teams. The course thus combines both active and reflective learning about collaborative design and methods. The course is designed to provide students the experience, tools, and methods needed to improve design processes and better integrate the use of technology into AEC industry work practices. This paper describes the goals, outcomes and significance of this new, interdisciplinary course for distributed AEC education. Differences from existing efforts and lessons learned to promote collaborative practices are discussed. Principal conclusions are that the course presents effective pedagogy to promote collaborative design methods, but faces challenges in both technology and in traditional intra-disciplinary training of students.
Particle Simulation and Evaluation of Personal Exposure to Contaminant Sources in an Elevation Space
(2004)
An elevator, which figures a small volume, is normally used by everyone for a short period of time and equipped with simple ventilation system..Any contaminant released within it may cause serious problem. This research adapt a fire and smoke simulation software (FDS) into non-fire indoor airflow scario. Differently from previous research, particles are chosen as a risk evalution unit. A personal and multi-personal exposure model is proposed. The model takes the influence of the human thermal boundary, coughing, inhalation, exhalation, standing position, and the fan factor into account. The model is easy-to-use and suitable for the design of elevator system in practice.
This paper presents an innovative software platform OpenSTEP intended to build advanced distributed integrated systems and to conduct multidisciplinary collaborative projects in both academy and industry. The paper discusses an open system architecture, methodology, component library and CASE toolkit enabling the developers to build a wide range of interoperable applications and systems compliant with STEP and, particularly, with IFC becoming the increasingly important standard for information integration in architecture, engineering and construction.
The paper presents a general map-based approach to prototyping of products in virtual reality environments. Virtual prototyping of products is considered as a consistent simulation and visualization process mapping the source product model into its target visual representations. The approach enables to interrelate formally the product and visual information models with each other by defining mapping rules, to specify a prototyping scenario as a composition of map instances, and then to explore particular product models in virtual reality environments by interpreting the composed scenario. Having been realized, the proposed approach provides for the strongly formalized method and the common software framework to build virtual prototyping applications. As a result, the applications gain in expressiveness, reusability and reliability, as well as take on additional runtime flexibility...
Möglichkeiten der Projektrealisierung: Einzelvergabe der Planungs- und Bauaufgaben, Vergabe aller Planungs- und Bauaufgaben an einen Generalunternehmer. Die frühzeitige Einbindung eines erfahrenen und fachkundigen Generalunternehmers gibt dem Auftraggeber die Möglichkeit, bei minimiertem Risiko zu einer wirtschaftlich und bautechnisch optimalen Lösung seiner Bauaufgabe zu kommen.
Als Folge des hohen Termindrucks während des Bauablaufes, ist es besonders wichtig den Fortschritt eines Bauvorhabens zeitnah zu überwachen. Auf Großbaustellen kann die effektive Kontrolle nicht mehr ohne technische Hilfsmittel durchgeführt werden. Die Arbeit stellt verschiedene Szenarien für die verteilte Fortschrittserfassung vor und untersucht welche Anforderungen an ein System für die verteilte Erfassung gestellt werden. Dazu wird zuerst das bestehende CVS-System analysiert, um anschließend daraus ein Konzept für die Versionierung von Objekten und den automatischen Abgleich von Objektversionen zu entwickeln. Später wird gezeigt, wie dieses Konzept mit Hilfe von C# und dem Microsoft®-.NET-Framework umgesetzt werden kann.
Gegenstand der Arbeit ist die Untersuchung der bei der Herstellung von Branntkalk-Boden-Säulen auftretenden thermischen Effekte und ihres Einflusses auf Wasser- und Wasserdampftransporte im Boden. Die Erwärmung beruht vorrangig auf einer chemischen Reaktion, bei der das dem Boden zugemischte Calciumoxid mit Bodenwasser unter Freisetzung von Wärmeenergie zu Calciumhydroxid reagiert. Hierzu wurden zunächst die thermischen Eigenschaften feinkörniger Böden und ihre Beeinflussung durch das Herstellen des Bindemittel-Boden-Gemisches in situ untersucht. Weiterhin wurden Untersuchungen zum zeitlichen Verlauf der chemischen Reaktion und zur Größe der dabei freigesetzten Reaktionswärme vorgenommen. Mit dem Vorhaben, die mit der Säulenherstellung einhergehenden Temperaturfeldänderungen zu erfassen, wurden danach die thermischen Anfangs- und Randbedingungen des Bodens und der Bodenoberfläche untersucht und festgelegt. Anschließend wurden die zeitabhängigen Temperaturfeldänderungen auf der Grundlage der Wärmeübertragung durch Wärmeleitung mit Hilfe des Finite-Elemente-Methode Programms Ansys® 6.1 numerisch simuliert. Das Finite-Elemente-Modell wurde durch die Nachrechnung von Feldversuchen verifiziert. Im Rahmen der Finite-Elemente-Berechnungen wurde die infolge der Hydratation des Branntkalkes stattfindende Erwärmung des Bindemittel-Boden-Gemisches und des angrenzenden Bodens simuliert und hinsichtlich relevanter Einflussgrößen überprüft. Untersucht wurde der Einfluss herstellungsbedingter Faktoren wie Bindemittelkonzentration, Säulendurchmesser und Säulenanordnung sowie der Einfluss natürlicher Faktoren wie Trockendichte und Sättigungsgrad des Bodens. Die mit Hilfe der Finite-Elemente-Methode ermittelten zeitabhängigen, im Boden auftretenden Temperaturgefälle bilden die Grundlage für die Untersuchung der thermisch bedingten Wassertransportvorgänge in der Stabilisierungssäule und deren Umfeld. Zu diesem Zweck wurde die durch die Temperaturfeldbeeinflussung geänderte energetische Situation des Bodenwassers analysiert. Auch nicht-thermische, infolge der Säulenherstellung auftretende Effekte wie die durch den >Stopfeffekt< bedingte lokale Sättigungsänderung und die Beeinflussung des osmotischen Potentials einschließlich der daraus resultierenden Wasserbewegungen wurden berücksichtigt. Alle thermisch verursachten Wasser- und Dampfflüsse bewirken ein Abströmen von Porenwasser aus dem stabilisierten Erdkörper in den umliegenden Boden. Baupraktisch bleiben die durch thermische Einflüsse hervorgerufenen Wassertransportvorgänge aufgrund ihres geringen Betrages jedoch unbedeutend. In abschließenden Temperaturfeldberechnungen wurden die thermischen Bodenkennwerte an die sich zeitlich verändernde Wassersättigung des Bodens angepasst. Anhand der ermittelten Temperaturverläufe wurde aufgezeigt, dass der Einfluss der Sättigungsänderung auf die Berechnungsergebnisse sehr gering ist, und damit die Voraussetzung für die vorangegangene entkoppelte Betrachtung des Wärme- und Massestromes erfüllt ist. Aufgrund dieser Ergebnisse muss der mehrfach in der Literatur zitierte, auch mit der tiefgründigen Bodenstabilisierung in Zusammenhang gebrachte, Einfluss der Erwärmung auf die Verdunstung des Bodenwassers kritisch betrachtet und in Frage gestellt werden. Voraussetzung hierfür ist der Transport von Wasser an die Bodenoberfläche. Nennenswerte, auf Temperatureinflüssen beruhende Wasserbewegungen sind, wie die Berechnungsergebnisse gezeigt haben, nicht zu erwarten. Weitere Untersuchungen zur Festigkeitsentwicklung von Branntkalk-Boden-Säulen und deren Vorhersage sollten sich daher auf die mechanischen Effekte und auf die mineralogisch-chemischen Prozesse, wie die puzzolanischen Reaktionen, und die Möglichkeiten ihrer Prognose konzentrieren. Die Berechnungen haben gezeigt, dass die Temperaturentwicklung in der Stabilisierungssäule im Wesentlichen durch die Bindemittelkonzentration, und ihr Auskühlungsverhalten vorrangig durch ihre geometrischen Abmessungen bestimmt wird. Diese Sachverhalte sind von den Bodenparametern, der für die Stabilisierung in Frage kommenden Böden, weitestgehend unabhängig. Temperaturmessungen stellen daher ein geeignetes Mittel zur Qualitätssicherung bei der Herstellung von Branntkalk-Boden-Säulen dar, mit deren Hilfe sich Inhomogenitäten bei der Bindemittelverteilung oder Störungen beim Hydratationsvorgang (Ablöschen des Branntkalkes) nachweisen lassen. Entsprechende Hilfsmittel wurden angegeben.
Today’s building industry not only demands more and more reduced construction time on building site, but also an advanced and mostly construction attendant design phase. Even though there is software available to support design processes in distributed environments, most applications only support simple document based exchange of information. In this paper a knowledge based system is presented to support cooperative, comprehensive design processes in distributed environments. The presented research project is financially supported by the German Research Community (DFG – Deutsche Forschungsgemeinschaft).
This paper is a report of Radio Frequency Identification (RFID) technology and its potential applications in the commercial construction industry. RFID technology offers wireless communication between RFID tags and readers with non line-of-sight readability. These fundamental properties eliminate manual data entry and introduce the potential for automated processes to increase project productivity, construction safety, and project cost efficiency. Construction contractors, owners, and material suppliers that believe technology can further develop methods and processes in construction should feel obligated to participate in RFID studies for the advancement of the construction industry as a whole.
This paper describes an approach to support co-operation of experts in heterogeneous geotechnical engineering project environments during both regular execution and handling of exceptional situations. A co-operation platform is introduced which is based on a generalized information model mapping key information about the construction project, the construction process as well as the organization structure. Several tools are provided to operate the information model in a network based environment.
Numerische Berechnung von Mauerwerkstrukturen in homogenen und diskreten Modellierungsstrategien
(2004)
Im Zentrum der Arbeit stehen die Entwicklung, Verifikation, Implementierung und Leistungsfähigkeit numerischer Berechnungsmodelle für Mauerwerk im Rahmen der Kontinuums- und Diskontinuumsmechanik. Makromodelle beschreiben das Mauerwerk als verschmiertes Ersatzkontinuum. Mikromodelle berücksichtigen durch die Modellierung der einzelnen Steine und Fugen die Struktur des Mauerwerkverbandes. Soll darüber hinaus der durch die Querdehnungsinteraktion zwischen Stein und Mörtel hervorgerufene heterogene Spannungszustand im Mauerwerk abgebildet werden, so ist ein detailliertes Mikromodell, welches Steine und Fugen in ihren exakten geometrischen Dimensionen berücksichtigt, erforderlich. Demgegenüber steht die vereinfachte Mikromodellierung, bei der die Fugen mit Hilfe von Kontaktalgorithmen beschrieben werden. Im Rahmen der Makromodellierung werden neue räumliche Materialmodelle für verschiedene ein- und mehrschalige Mauerwerkarten hergeleitet. Die vorgestellten Modelle berücksichtigen die Anisotropie der Steifigkeiten, der Festigkeiten sowie des Ver- und Entfestigungsverhaltens. Die numerische Implementation erfolgt mit Hilfe moderner elastoplastischer Algorithmen im Rahmen der impliziten Finite Element Methode in das Programm ANSYS. Innerhalb der detaillierten Mikromodellierung wird ein neues, aus Materialbeschreibungen für Stein, Mörtel sowie deren Verbund bestehendes nichtlineares Berechnungsmodell entwickelt und in das Programm ANSYS implementiert. Die diskontinuumsmechanische Beschreibung von Mauerwerk im Rahmen der vereinfachten Mikromodellierung erfolgt unter Verwendung der expliziten Distinkt Element Methode mit Hilfe der Programme UDEC und 3DEC. An praktischen Beispielen werden Probleme der Tragfähigkeitsbewertung gemauerter Bogenbrücken, Möglichkeiten zur Bewertung vorhandener Rissbildungen und Schädigungen an historischen Mauerwerkstrukturen und Traglastberechnungen an gemauerten Stützen ausgewertet und analysiert.
The contribution describes the didactical integration of wireless access networks for the campus of the University of Karlsruhe in the education of architects and engineers. It focuses on the development of an interdisciplinary communication network to encourage and promote the communication and collaboration between students. The project assumes that significant learning progresses in net-based learning scenarios are based upon the synchronous and asynchronous cooperation between the students themselves. The remote cooperation across borders of disciplines makes high demands on capacity in communicating and cooperating of the involved persons as well as on the supporting tools. Therefore, the collective acquisition of knowledge and cooperation has to be trained intensively during the studies. Based on the design and project oriented cooperation platform netzentwurf.de the authors developed the tools “Jobadmin“ to administrate multidisciplinary workgroups, the “Swarm Knowledge Catalogue“ to collect and store knowledge and “LivingCampus“, an instrument providing basic services for dynamic communication.
Der Einsatz von Lehmbaustoffen stößt an Grenzen, wenn das Material Feuchtigkeit ausgesetzt ist. Die vorliegende Arbeit enthält Untersuchungen zur Verbesserung der Wasserbständigkeit von Lehmbaustoffen. Es konnte gezeigt werden, dass mittels alumosilikatischer Polymerbinder der Widerstand von Lehmbaustoffen gegen Feuchteeinwirkung erheblich verbessert werden kann. Die positiven bauklimatischen Eigenschaften werden dabei nicht negativ beeinflusst.
Information and Communication Technologies (ITC) in education have been extensively discussed nowadays. In this e-learning scenario, the construction and use of environments that support teaching and learning is a reality. Therefore, for time and general resource savings it is crucial the access to hypermedia contents with great interactivity and with high reusability. Substantial efforts have been centered in the search for a metadata proposal (metadata is a generic term used to describe data that can be used to identify and to describe common characteristics among different documents) that can be standardized and is system independent for the so called learning objects.
Recent research shows that current learning strategies in construction industry have not been effective in implementing lean principles in construction. With that in mind the researchers set to investigate an alternative learning strategy in order to promote learning at the international level. A web-based environment, was developed for this project with the intent of promoting learning and knowledge exchange on the theory and practice of "process transparency" across different countries.
Business and engineering knowledge in AEC/FM is captured mainly implicitly in project and corporate document repositories. Even with the increasing integration of model-based systems with project information spaces, a large percentage of the information exchange will further on rely on isolated and rather poorly structured text documents. In this paper we propose an approach enabling the use of product model data as a primary source of engineering knowledge to support information externalisation from relevant construction documents, to provide for domain-specific information retrieval, and to help in re-organising and re-contextualising documents in accordance to the user’s discipline-specific tasks and information needs. Suggested is a retrieval and mining framework combining methods for analysing text documents, filtering product models and reasoning on Bayesian networks to explicitly represent the content of text repositories in personalisable semantic content networks. We describe the proposed basic network that can be realised on short-term using minimal product model information as well as various extensions towards a full-fledged added value integration of document-based and model-based information.
The contribution introduces a method for the distributed process modelling in order to support the process orientation in Structural Engineering, i.e., the modelling, analysis and management of planning processes. The approach is based on the Petri Net theory for the modelling of planning processes and workflows in Structural Engineering. Firstly, a central and coarse process model serves as a pre-structuring system for the detailed modelling of the technical planning activities. Secondly, the involved planning participants generate distributed process models with detailed technical workflow information. Finally, these distributed process models will be combined in the central workflow net. The final net is of great importance for the process orientation in Structural Engineering, i.e., the identification, publication, analysis, optimization and finally the management of planning processes.
The growing competition pressure in the building industry increases the demands on the design and construction processes in respect to economical, technical and time aspects. These demands require efficient improvements of the value-added chain, which can be realized mainly with the usage of innovative information- and communication-technologies. To support the collaboration of all participants involved in a certain building project the Workflow-Management-System “BauKom-Online” has been developed. In the focus of the system is to support the coordination of the participants and their information exchange. Such a software-method is well suited to ensure a high quality planning process. The modelling of business-processes enables a better self-comprehension of the participants work and helps to enhance the project performance. The system architecture of BauKom-Online contains two basic components: the processmodelling tool and the workflow-engine. The process-model contains of activities and states of the planning and construction processes and their relations. These connected processes compose the workflow. Such a process-model for engineering purposes has to satisfy several needs, e.g., the consideration of planning and building alternatives, dynamic changes of the model during execution of the project and the linkage to further technical objects like costs, building structure, specifications and documentmanagement. Furthermore, the scheduling of the project can be done within the process-model and can be visualized as a Gantt-diagram. ...
As a result of the pilot-project “Grundwasser-Online” the supervision and the active controlling of large monitoring- and catchment-areas are realised by a co-operative integration of all related institutions, a synchronisation-process to combine all distributed data into one central server database, and a high-level eGovernment-Service to provide evaluated information over the internet. Based on this software system the local authorities are able to supervise the groundwater-levels and to find adequate decisions, which finally result in official permissions for the usage of groundwater-reservoirs by the water supply companies.
Modeling of Freeway Traffic
(2004)
An integrated modeling of freeway traffic is developed, whose implementation in an uniform computer –aided simulation model facilitate comparative evaluation and systematic coupling of several traffic simulations, traffic controls, traffic measurements and traffic scenarios. The integrated modeling of freeway traffic is a basic mapping of freeway networks, control methods, measurements and different simulations of traffic flow...
In this paper we present a computer aided method supporting co-operation between different project partners, such as architects and engineers, on the basis of strictly three-dimensional models. The center of our software architecture is a product model, described by the Industry Foundation Classes (IFC) of the International Alliance for Interoperability (IAI). From this a geometrical model is extracted and automatically transferred to a computational model serving as a basis for various simulation tasks. In this paper the focus is set on the advantage of the fully three-dimensional structural analysis performed by p-version of the finite element analysis. Other simulation methods are discussed in a separate contribution of this Volume (Treeck 2004). The validity of this approach will be shown in a complex example.
Construction is a conservative industry that over the last twenty ye ars has experienced drastic changes in the way that interdisciplinary teams interact to design and execute a project. In this article we offer a general overview of how the main participants cooperate in the different phases of a construction project, and which are some of the main areas for communication improvement. We also explore the communication tools used in the exchange of information, and identify the main causes of information breakdown. The general framework of this study is of application to both standard and green projects. At the end of the article we discuss the peculiarities of green buildings. Our goal is to offer a series of industry insights derived from the perspective of a general contractor aimed at identifying the areas where contributions in computing and information exchange could have a greater impact on the successful completion of a project.