Refine
Document Type
- Conference Proceeding (123)
- Article (66)
- Doctoral Thesis (25)
- Master's Thesis (5)
- Diploma Thesis (1)
Institute
- Professur Informatik im Bauwesen (177)
- Professur Baubetrieb und Bauverfahren (10)
- Professur Grundbau (4)
- Professur Holz- und Mauerwerksbau (4)
- Professur Allgemeine Baustoffkunde (2)
- Professur Entwerfen und Architekturtheorie (2)
- Professur Informatik in der Architektur (2)
- Professur Massivbau I (2)
- Institut für Strukturmechanik (ISM) (1)
- Junior-Professur Computational Architecture (1)
Keywords
- Verteiltes System (37)
- Bautechnik (30)
- Bauwerk (27)
- Produktmodell (25)
- Simulation (23)
- Architektur (21)
- Modellierung (21)
- Mehragentensystem (19)
- Ingenieurbau (17)
- Planungsprozess (17)
Year of publication
- 2004 (220) (remove)
This paper describes a couple of new truss structures based on fractal geometry. One is the famous Sierpinski Gasket and another is a fractal triangle derived by means of applying a process forming leaves of a cedar tree using M. F. Barnsley’s contraction mapping theory. Therefore a pair of x-y coordinates of an arbitrary nodal point on the structures are generated easily if IFS(Iterated Function System) codes and a scale of them are specified. Structural members are defined similarly. Thus data for frame analysis can be generated automatically, which is significant if the objective structure has complex configuration. Next analytical results under vertical and wind loadings in Japanese Building Code are shown. Here members are assumed to be timber and to have cross section of 15cm×15cm. Finally authors conclude that geometrically new truss structures were developed and automatic data generation for frame analysis was attained using IFS. Analytical results show they contribute to saving material when compared it with King-post truss.
Many problems related to data integration in AEC can be better tackled by an approach that takes into account the heterogeneity of tasks, models and applications but does not require continuous consistency of the evolving design data, at each data management operation. Such an approach must incorporate adequate services that can facilitate reintegration of concurrently modified data at reasonably selected coordination points. In this paper we present a set of methods which, used in combination, can achieve that goal. After a description of the principal envisaged cooperative work scenario each of these methods is discussed in detail and current observations drawn from their software realisation are given. Whilst the suggested approach is valid for any EXPRESS-based data model, the practical focus of work has been on facilitating IFC-driven integration.
As a result of the pilot-project “Grundwasser-Online” the supervision and the active controlling of large monitoring- and catchment-areas are realised by a co-operative integration of all related institutions, a synchronisation-process to combine all distributed data into one central server database, and a high-level eGovernment-Service to provide evaluated information over the internet. Based on this software system the local authorities are able to supervise the groundwater-levels and to find adequate decisions, which finally result in official permissions for the usage of groundwater-reservoirs by the water supply companies.
The highway product model based on the length information of the centerline, and the application system is developed. This paper shows the schema and the modeling process of the product model, which includes geometric elements such as an alignment, lanes, sidewalks, shoulders and sprits, and accessories such as guard fences, plantings and signs. Furthermore, The Highway Sequence Editor (HSE) is developed as an application system to verify the model.
This article discusses how the failures of construction projects could be prevented. The focus is on using IT tools in communication. The article is based on the findings of the PROLABproject. The project seeks to find solutions for how the information can effectively be used in project management, specially in construction projects, what kind of procedures help the management of the knowledge and how the obstacles for efficient ways of administrating the information can be removed. These obstacles can be either related to use of new technology or to organization culture. The paper discusses e-mail as a medium of communication with the media richness framework (Fulk & Boyd 1991) based on the interviews done with the participants of construction projects. We found out that the emails were used in both rich way and not so rich way. Obstacles of rich use of IT communication were partly technical and partly psychological. Technology acceptance model (TAM) is used to study the actual use of emails in communication. Obstacles of the use of emails were mostly individual differences like the skills to use the system or external variables like they did not have proper software to open the attachments. Also people talked about information overload. Emails often push too much information. Keywords: IT tools, Communication, Knowledge management, Construction
Organisational and human issues have been highlighted, among other issues (ICT infrastructures, legal and contractual, etc.), as key elements in enhancing the competitiveness of the construction sector. More specifically, the importance of human resources has been recognised, especially training and professional development, in order to cultivate a stable workforce. The paper provides a review of the key training needs for the construction sector with particular reference to the uptake and exploitation of new technologies and working practices, presents an action plan to address learning and training needs, and proposes an eight-stage iterative learning and training methodology. The results will be of particular interest to managers in stakeholder organisations of all sizes throughout the sector, plus academic and research bodies intending to continue construction ICT research.
In this research project we intend to transfer the whole AEC-Bidding process to an agent-based virtual marketplace. Hereby, the existing legal regulations have to be considered. Important aspects in developing the virtual marketplace are to provide the possibility to realize an agentbased bidding consortium as well as to integrate subcontractors.
This paper introduces the current development of electronic catalogues of construction products. The common system architecture of Web-based electronic products catalogues are discussed, followed by a discussion on construction products information standardization and latest distributed-systems technologies for communicating construction products information. Finally, this paper presents an implementation of Web service in e-commerce systems to enable sharing of construction products information.
Re-examination of the behaviour of structures can be necessary due to deterioration or changes in the traffic situation during their lifetime. The Finite Element Method (FEM) is widely used in order to accomplish numerical analysis. Considering the development of computer performance, more detailed FEM models can be analyzed, even on site, with mobile computers. To compensate the increasing amount of data needed for the model input, measures need to be taken to save time, by distributing the work. In order to provide consistency to the model, fedback data must be checked upon reception. A local wireless computer network of ultra-portable devices linked together with a computer can provide the coordination necessary for efficient parallel working. Based on a digital model consisting of all data gathered, structural modelling and numerical analysis are performed automatically. Thus, the user is released from the work that can be automatized and the time needed for the overall analysis of a structure is decreased.
Construction is a conservative industry that over the last twenty ye ars has experienced drastic changes in the way that interdisciplinary teams interact to design and execute a project. In this article we offer a general overview of how the main participants cooperate in the different phases of a construction project, and which are some of the main areas for communication improvement. We also explore the communication tools used in the exchange of information, and identify the main causes of information breakdown. The general framework of this study is of application to both standard and green projects. At the end of the article we discuss the peculiarities of green buildings. Our goal is to offer a series of industry insights derived from the perspective of a general contractor aimed at identifying the areas where contributions in computing and information exchange could have a greater impact on the successful completion of a project.
With the speedy development of transportation of China, especially construction of many high-grade highways, some information technology successes have been achieved in the highway and bridge engineering, such as survey, design, construction and maintenance etc. In this paper, some applications about information technology in the highway engineering were introduced and some bridge professional software developed by RIOH (Research Institute Of Highways) in recent years was also introduced.
Integrated Engineering Workflow focused on the Structural Engineering in the Industrial Environment
(2004)
The engineering and construction industry has been slow to exploit the full potential of information technology. The industry is highly fragmented, price sensitive, risk-adverse, and profit margins are small. Each project is unique with a small amount of technological innovation opportunities to capitalise on from one project to the next. Technological innovations that have been taking place are just simulating the old traditional paper workflow. Engineering information in digital form is being conveyed using traditional paper representations, which have to be interpreted by humans before the information can be used in other applications, thereby creating ‘islands of information’. It can be seen that poorly implemented IT strategies are duplicating paperwork, rather than reducing or eliminating it (Crowley et al., 2000). This paper will introduce the Integrated Engineering Workflow (IEW) concept to re-organise a structural discipline working on multi-disciplinary projects so as to maximise the advantages offered by new information technology.
Buildings require both for construction and, due to their comparatively long life cycle for maintenance, significant raw material and energy resources. So far available knowledge about resource consumption during an entire life cycle of a building is still quite rare, because various criteria affect each other and/or overlay mutually. In this contribution a model based software concept is presented using an integrated approach for life cycle simulation and assessment of buildings. The essential point of the development consists of connecting an IFC compliant product model of a building via the Internet with data bases for the resource and energy requirement of building materials. Furthermore, numerical simulations allow calculating and minimizing the energy consumption, the resource requirement, the waste streams and also the noxious emissions. In the context of this paper we present the first release of software programs for architects and engineers, which help them to evaluate their design decisions objectively in early planning steps. Additionally the usage of the software is demonstrated by a test case study for a real world building. By applying this software in practice a substantial contribution for saving energy and natural resources can be provided in the sense of sustainable and ecological building design.
The increasing demands in building and civil engineering – with regard to the growing amount of legal requirements and the needs of a flexible usage of the building - requires an optimisation of all processes during the planning and construction phases. This aim can be only reached by transferring of innovative information and communication technologies in the field of cooperation of all partners in a building project. In this article the enhancement of the existing planning processes based on an improved information management is introduced. Since the late 90ies the availability of hardware and software infrastructures for a networkbased cooperation, e.g. email, in small and middle-sized companies increased the problems of an unstructured communication in the planning and construction processes. These problems have not been solved by the usage of the upcoming project communication systems either, which are often used as a simple medium for data transfer. Because of the easy way of distributing documents to all planning partners a huge amount of files and subsequent versions can be stored so that the planners often have to scope with an information overflow. The underlying hierarchical structures based on simple files stored in tree views are not sufficient for an adequate representation of the different specific views of the planners and the management of relationships between the three information domains building structure, costs and time schedules. ..
The uniqueness and the long life cycle of buildings imply a dynamically modifiable building model. The technological foundation for the management of digital building models, a dynamic model management system (MMS), developed by our research group, allows to explicitly access and to modify the object model of the stored planning data. In this paper, the integration of constraints in digital building models will be shown. Constraints are conditions, which apply to the instances of domain model classes, and are defined by the user at runtime of the information system. For the expression of constraints, the Constraint Modelling Language (CML) has been developed and will be described in this paper. CML is a powerful, intuitively usable object-oriented language, which allows the expression of constraints at a high semantic level. A constrained-enabled MMS can verify, whether an instance fulfils the applying constraints. To ensure flexibility, the evaluation of constraints is not implicitly performed by the systems, but explicitly initiated by the user. A classification of constraint types and example usage scenarios are given.
This paper deals with two different agent-based approaches aimed at the incorporation of complex design information into multi-agent planning systems. The first system facilitates collaborative structural design processes, the second one supports fire engineering in buildings. Both approaches are part of two different research projects that belong to the DFG1 priority program 1103 entitled “Network-based Co-operative Planning Processes in Structural Engineering“ (DFG 2000). The two approaches provide similar database wrapper agents to integrate relevant design information into two multi-agent systems: Database wrapper agents make the relevant product model data usable for further agents in the multi-agent system, independent on their physical location. Thus, database wrapper agents act as an interface between multi-agent system and heterogeneous database systems. The communication between the database wrapper agents and other requesting agents presumes a common vocabulary: a specific database ontology that maps database related message contents into database objects. Hereby, the software-wrapping technology enables the various design experts to plug in existing database systems and data resources into a specific multi-agent system easily. As a consequence, dynamic changes in the design information of large collaborative engineering projects are adequately supported. The flexible architecture of the database wrapper agent concept is demonstrated by the integration of an XML and a relational database system.
The processes in the life cycle of buildings are characterised by highly distinct teamwork. The integration of all the distributed working participants, by providing an environment, which especially supports the communication and collaboration between the actors, is a fundamental step to improve the efficiency of the involved processes and to reduce the total costs. In this article, a link based modelling approach and its “intelligent” link management is introduced (1). This approach realises an integration environment based on a special building model that acts as a decision support system. The link-based modelling is characterised by the definition and specialisation of links between partial models. These intelligent managed links enable a very flexible and task specific data access and exchange between all the different views and partial models of the participants.
Applications for civil engineering tasks usually contain graphical user interfaces for the engineering processes. Persistent objects of the applications are stored to data bases. The influence of the interaction between a graphical user interface and a data base for the development of an civil engineering application is investigated in this paper. A graphic application for the linear elastic analysis of plane frames, which was previously developed with standard tools of the Java platform, is compared to a redesigned implementation using a generalized data base for persistent objects. The investigation leads to the following results : - A strict distinction between persistent and transient objects influences the class structure of an application, in particular the class structure of a graphical user interface. - The structure of an application depends on the logic for updating of references to persistent and transient graphical objects after an application is read from a file. - The complexity of the reference management can usually be handled better by just in time referencing associated with String - identifiers rather than by automated referencing associated with Name - identifiers.
In our project, we develop new tools for the conceptual design phase. During conceptual design, the coarse functionality and organization of a building is more important than a detailed worked out construction. We identify two roles, first the knowledge engineer who is responsible for knowledge definition and maintenance; second the architect who elaborates the conceptual design. The tool for the knowledge engineer is based on graph technology, it is specified using PROGRES and the UPGRADE framework. The tools for the architect are integrated to the industrial CAD tool ArchiCAD. Consistency between knowledge and conceptual design is ensured by the constraint checker, another extension to ArchiCAD.
The contribution describes the didactical integration of wireless access networks for the campus of the University of Karlsruhe in the education of architects and engineers. It focuses on the development of an interdisciplinary communication network to encourage and promote the communication and collaboration between students. The project assumes that significant learning progresses in net-based learning scenarios are based upon the synchronous and asynchronous cooperation between the students themselves. The remote cooperation across borders of disciplines makes high demands on capacity in communicating and cooperating of the involved persons as well as on the supporting tools. Therefore, the collective acquisition of knowledge and cooperation has to be trained intensively during the studies. Based on the design and project oriented cooperation platform netzentwurf.de the authors developed the tools “Jobadmin“ to administrate multidisciplinary workgroups, the “Swarm Knowledge Catalogue“ to collect and store knowledge and “LivingCampus“, an instrument providing basic services for dynamic communication.