Effective knowledge management is increasingly considered as a cornerstone of sustainable business success. Knowledge management systems are strategically valuable for both ensuring consistency and continuous improvement of various aspects such as quality delivery, productivity and competitiveness. The small and medium enterprises (SMEs) in the construction industry are mostly operating under tighter timeframes, narrower profit margins and more constrained resources. Hence the recently commenced SMILE-SMC (Strategic Management with Information Leveraged Excellece for Small and Medium Contractors) project aims to support the information and knowledge management needs of the small and medium contractors in Hong Kong. This paper presents some snapshots on the SMILE-SMC project, and its conceptualized deliverables with some highlights of recent developments.
A large-scale computer modeling and simulation method is presented for environmental flows in urban area. Several GIS and CAD data were used for the preparation of shape model and an automatic mesh generation method based on Delaunay method was developed. Parallel finite element method based on domain decomposition method was employed for the numerical simulation of natural phenomena. The present method was applied to the simulation of flood flow and wind flow in urban area. The present method is shown to be a useful planning and design tool for the natural disasters and the change of environments.
The influence of vortex-induces vibrations on vertical tie rods has been proved as a determinant load factor in the lifetime-oriented dimensioning of arched steel bridges. Particularly, the welded connection plates between the suspenders and the arches often exhibit cracks induced primarily rods. In this context, the synchronization of the vortex-shedding to the rod motion in a critical wind velocity range, the so-called lock-in effect, is of essential interest.
Modeling of Freeway Traffic
(2004)
An integrated modeling of freeway traffic is developed, whose implementation in an uniform computer –aided simulation model facilitate comparative evaluation and systematic coupling of several traffic simulations, traffic controls, traffic measurements and traffic scenarios. The integrated modeling of freeway traffic is a basic mapping of freeway networks, control methods, measurements and different simulations of traffic flow...
Der Einsatz von CAD-Applikationen hat die Planungsarbeit im Bauwesen entscheidend verändert. In der Entwurfsplanung sind die Änderungen bereits deutlich erkennbar. Seit der Anwendung von dreidimensionalen Planungswerkzeugen kann der Bauherr das Bauwerk in seiner virtuellen Gesamtheit am Computer betrachten und bewerten. Dies bietet viele Vorteile. So ist der Planer gezwungen alle wesentlichen Details a priori exakt zu planen, wodurch viele Fehler vermieden werden können. Dies bietet insbesondere für Planungen in Baubetrieben, z.B. im Rahmen der Arbeitsvorbereitung, neue Einsatzmöglichkeiten.
The presented work focuses on the presentation of a discrete event simulator which can be used for automated sequencing and optimization of building processes. The sequencing is based on the commonly used component–activity–resource relations taking structural and process constraints into account. For the optimization a genetic algorithm approach was developed, implemented and successfully applied to several real life steel constructions. In this contribution we discuss the application of the discrete event simulator including its optimization capabilities on a 4D process model of a steel structure of an automobile recycling facility.
Particle Simulation and Evaluation of Personal Exposure to Contaminant Sources in an Elevation Space
(2004)
An elevator, which figures a small volume, is normally used by everyone for a short period of time and equipped with simple ventilation system..Any contaminant released within it may cause serious problem. This research adapt a fire and smoke simulation software (FDS) into non-fire indoor airflow scario. Differently from previous research, particles are chosen as a risk evalution unit. A personal and multi-personal exposure model is proposed. The model takes the influence of the human thermal boundary, coughing, inhalation, exhalation, standing position, and the fan factor into account. The model is easy-to-use and suitable for the design of elevator system in practice.
Physically Based Modeling and Multi-Physical Simulation System for Wood Structure Fire Performance
(2004)
This research is devoted to promoting the performance-based engineering in wood structure fire. It looks into the characteristic of the material, structural composing and collapse detecting to find out the main factors in the wood structure collapse in fire. The aim of the research is to provide an automatic simulation platform for the complicated circulation. A physically based model for slim member for beams and columns and a frame of multi-physical simulation are provided to implement the system. The physically based model contains material model, structural mechanics model, material mechanics model, as well as geometry model for the compositive simulation. The multi-physical simulation is built on the model and has the capacity to carry out a simulation combining structural, fire (thermal, CFD) and material degradation simulation. The structural and fire simulation rely on two sophisticated software respectively, ANSYS (an FEA software) and FDS (with a core of CFD). Researchers of the paper develop system by themselves to combine the two existing ones. The system has the capability to calculate the wood char to find out the loss of cross-section and to detect the collapse caused in different ways. The paper gives a sample of Chinese traditional house to show how this simulation system works.
The goal of the research is to increase the understanding of dynamic behaviors during the crane operation, and develops computer-aided methods to improve the training of crane operators. There are approximately 125,000 cranes in operation today in the construction industry, responsible for major portion of erection activities. Unfortunately, many accidents occur every year in the U.S. and other countries related to the operation of cranes in construction sites. For example on November 28, 1989 a tower crane collapse during the construction of a building in San Francisco killing four construction workers, one civilian and injuring 28. According to the statistics from Occupational Safety Health Administration (OSHA), there were 137 crane-related fatalities from 1992 to 2001 in the US. A well-known internet website that keeps track of crane-related accidents (craneaccidents.com), reports 516 accidents and 277 fatalities from 2000 to 2002. These statistics show that even though many measures have been taken to decrease the number of crane-related accidents (Braam, 2002), the number of crane related accidents is still very large. It is important to recognize that each construction related fatality is not only a great human loss but also increases the costs of insurance, lawsuits, and the construction budget due to delay of a project (Paulson 1992)...
The complexity of the relationships between the actors of a building project requires high efficiency in communication. Among other things, data sharing is crucial. The exchange of data is made possible by interfaces between expert programs, which rely on product models. The latter are neutral standards with formal definitions of building objects and their attributes. This paper deals with the state of the art and the research activities concerning product models in the steel construction domain and the advantages provided by this technology for the sector.
The Priority Programme ‘Network Based Co-operation in Structural Engineering’ of the ‘German Research Foundation’ (DFG) has been established in the year 2000. This paper describes and discusses the main research directions and first results of the workgroup ‘Distributed Product Models’. The five projects of the workgroup have developed completely different solutions for specific application domains. Each solution concept deals with a consistent product modeling and knowledge processing in a distributed environment in the planning process. The individual solution approaches of the projects are described and the underlying basic assumptions are discussed. A unified system architecture is described for all projects of the workgroup. Two different approaches (object-oriented and graph-based models) have been introduced for product and knowledge modeling. The common structure of these models will be explained to fully understand the differences of these modeling approaches. Finally the concepts for co-operative work and conflict management in a distributed environment are described: The solution approaches will be distinguished by classifying the supported co-operation according to time. A final scientific summary describes the state-of-the-art in network based co-operation in structural engineering: The role of research directions like knowledge modeling, standard product modeling and versioning in the distributed planning process will be explained.
In current AEC practice client requirements are typically recorded in a building program, which, depending on the building type, covers various aspects from the overall goals, activities and spatial needs to very detailed material and condition requirements. This documentation is used as the starting point of the design process, but as the design progresses, it is usually left aside and changes are made incrementally based on the previous design solution. These incremental small changes can lead to a solution that may no longer meet the original requirements. In addition, design is by nature an iterative process and the proposed solutions often also cause evolution in the client requirements. However, the requirements documentation is usually not updated accordingly. Finding the latest updates and evolution of the requirements from the documentation is very difficult, if not impossible. This process can lead to an end result, which is significantly different from the documented requirements. Some important requirements may not be satisfied, and even if the design process was based on agreed-upon changes in the scope and requirements, differences in the requirements documents and in the completed building can lead to well-justified doubts about the quality of the design and construction process...
The paper introduced the research and application of the highway construction management information integrated system. Explained the development and application of highway survey applet run on mobile telephone supporting Java and the technique of transmitting engineering data by GPRS wireless network technology. And expounded the development and application of highway engineering construction field data collecting software run on Pocket-PC. Recommended the technique of engineering long distance data transmitting based on C/S structure adopting VPN (Virtual Private Networks) technology. Especially expatiated on the research on the platform of highway construction management information integrated system adopting geography information system (GIS) technique, database technique and network technique. And said all to subsystem about bid manage, contract management, engineering design drawing, engineering survey calculation, measure and pay, data processing on engineering experiment, quantity assessing, project plan and progress, engineering document management etc. Besides? proposed highway construction project visual analysis and inquiry system based on Web-GIS; Explained the research and application of highway engineering construction OA based on B/S structure; real-time workflow and information processing such as the management of administration, business and procedure of authorization and information distribution. At last, the author described the prospect of the application of C/S and B/S structure in trade software development in the highway construction management.
Research on Establishment of a Standard of Traffic Impact Assessment with Integrated Database System
(2004)
Planning support systems, such as geographical information system (GIS) and traffic flow simulation models, are widely in use in recent urban planning research. In this paper we propose a method to apply traffic impact assessment (TIA) to large-scale, commercial developments. In TIA research we often encounter the problem of increasing amount of data that is necessary for detailed investigation and analysis, as the scale of commercial developments become larger and more complex. As a result, TIA presents two problems. The first problem is the difficulty of data acquisition. The second problem is the reliability of data. As a solution, we developed an integrated database system.
Recently, many reseraches on active control systems of building structures are preformed based on modern control theory and are installed real buildings. The authors have already proposed intelligent fuzzy optimal active control (IFOAC) systems. IFOAC systems imitate intelligent activities of human brains such as prediction, adaptation, decision-kaking and so on. In IFOAC systems, objective and subjective judgements on the active control can be taken into account. However, IFOAC systems are considered to be suitable for far-field erathquake and control effect becomes small in case of near-field earthqaukes which include a few velosity pules with large amplitudes. To improve control effect in case of near-souece earthquakes, the authors have also proposed hybrid control (HC) systems, in which IFOAC systems and fuzzy control system are combined. In HC systems, the fuzzy control systems are introduced as a reflective fuzzy active control (RFAC) system and imitates spinal reflection of human. In HC systems, active control forces are activated to buildings in accordance with switching rules on active control forces. In this paper, optimizations on fuzzy control rules in RFAC system and switching rules of active control forces in HC system are performed by Parameter-Free Genetic Algorithms (PfGAs). Here, the optimization is performed by using different earthquake inputs. The results of digital simulations show that the HC system can reduce maximal response displacements under restrictions on strokes of the actuator effectively in case of a near-source earthquake and the effectiveness of the proposed HC system is discussed and clarified.
This paper presents an application of dynamic decision making under uncertainty in planning and estimating underground construction. The application of the proposed methodology is illustrated by its application to an actual tunneling project—The Hanging Lake Tunnel Project in Colorado, USA. To encompass the typical risks in underground construction, tunneling decisions are structured as a risk-sensitive Markov decision process that reflects the decision process faced by a contractor in each tunneling round. This decision process consists of five basic components: (1) decision stages (locations), (2) system states (ground classes and tunneling methods), (3) alternatives (tunneling methods), (4) ground class transition probabilities, and (5) tunneling cost structure. The paper also presents concepts related to risk preference that are necessary to model the contractor’s risk attitude, including the lottery concept, utility theory, and the delta property. The optimality equation is formulated, the model components are defined, and the model is solved by stochastic dynamic programming. The main results are the optimal construction plans and risk-adjusted project costs, both of which reflect the dynamics of subsurface construction, the uncertainty about geologic variability as a function of available information, and the contractor’s risk preference.
In this paper we present a computer aided method supporting co-operation between different project partners, such as architects and engineers, on the basis of strictly three-dimensional models. The center of our software architecture is a product model, described by the Industry Foundation Classes (IFC) of the International Alliance for Interoperability (IAI). From this a geometrical model is extracted and automatically transferred to a computational model serving as a basis for various simulation tasks. In this paper the focus is set on the advantage of the fully three-dimensional structural analysis performed by p-version of the finite element analysis. Other simulation methods are discussed in a separate contribution of this Volume (Treeck 2004). The validity of this approach will be shown in a complex example.
Analysis System for Bridge Test (Chinese name abbr.: QLJC) is an application software specially designed for bridge test to analyze the static and dynamic character of bridge structures, calculate efficiency ratio of load test, pick up the results of observation points and so on. In this paper, research content, system design, calculation theory, characteristics and practical application of QLJC is introduced in detail.
Pre-stressed structural elements are widely used in large-span structures. As a rule, they have higher stiffness characteristics. Pre-stressed rods can be applied as girders of different purpose, and as their separate parts, e.g. rods of trusses and frames. Among numerous ways of prestressing the compression of girders, trusses, and frames by tightenings from high-strength materials is under common application.