Refine
Has Fulltext
- yes (219) (remove)
Document Type
- Conference Proceeding (123)
- Article (65)
- Doctoral Thesis (25)
- Master's Thesis (5)
- Diploma Thesis (1)
Institute
- Professur Informatik im Bauwesen (177)
- Professur Baubetrieb und Bauverfahren (10)
- Professur Grundbau (4)
- Professur Holz- und Mauerwerksbau (4)
- Professur Allgemeine Baustoffkunde (2)
- Professur Entwerfen und Architekturtheorie (2)
- Professur Informatik in der Architektur (2)
- Professur Massivbau I (2)
- Junior-Professur Computational Architecture (1)
- Junior-Professur Europäische Medienkultur (1)
Keywords
- Verteiltes System (37)
- Bautechnik (30)
- Bauwerk (27)
- Produktmodell (25)
- Simulation (23)
- Architektur (21)
- Modellierung (21)
- Mehragentensystem (19)
- Ingenieurbau (17)
- Planungsprozess (17)
Year of publication
- 2004 (219) (remove)
The main objective of the present work is to establish a link between the scientific fields of engineering seismology and structural engineering. Substantially it deals with the application and enhancements of methods coming from engineering seismology as well as their junctions to the fields of structural engineering respectively earthquake engineering. Based on real occurred earthquake damage inflicted to multistoried reinforced-concrete frame buildings, the influence of local site effects on the grade of structural damage is worked out. This relying on comprehensive investigations conducted during numerous field missions of German TaskForce after damaging earthquakes in Venezuela and Türkiye. Instrumental investigations on both the structure and its local subsoil in order to identify the damage potential of seismic ground motion take center stage of the thesis. Thereby it is examined whether or not an estimated seismic demand representative in amplitude level and frequency characteristics is able to cause structural damage considering the vulnerability of the structure itself as well as the local site and subsoil conditions. Investigations are concentrated on selected RC frame structures with or without masonry infill walls.
How does it come to particular structure formations in the cities and which strengths play a role in this process? On which elements can the phenomena be reduced to find the respective combination rules? How do general principles have to be formulated to be able to describe the urban processes so that different structural qualities can be produced? With the aid of mathematic methods, models based on four basic levels are generated in the computer, through which the connections between the elements and the rules of their interaction can be examined. Conclusions on the function of developing processes and the further urban origin can be derived.
The planning of projects in building engineering is a complex process which is characterized by a dynamical composition and many modifications during the definition and execution time of processes. For a computer-aided and network-based cooperation a formal description of the planning process is necessary. In the research project “Relational Process Modelling in Cooperative Building Planning” a process model is described by three parts: an organizational structure with participants, a building structure with states and a process structure with activities. This research project is part of the priority program 1103 “Network-Based Cooperative Planning Processes in Structural Engineering” promoted by the German Research Foundation (DFG). Planning processes in civil engineering can be described by workflow graphs. The process structure describes the logical planning process and can be formally defined by a bipartite graph. This structure consists of activities, transitions and relationships between activities and transitions. In order to minimize errors at execution time of a planning process a consistent and structurally correct process model must be guaranteed. This contribution considers the concept and the algorithms for checking the consistency and the correctness of the process structure.
In this paper, systematic analyses for the shoring systems installed to support the applied loads during construction are performed on the basis of the numerical approach. On the basis of a rigorous time-dependent analysis, structural behaviors of reinforced concrete (RC) frame structures according to the changes in design variables such as the types of shoring systems, shore stiffness and shore spacing are analyzed and discussed. The time-dependent deformations of concrete such as creep and shrinkage and construction sequences of frame structures are also taken into account to minimize the structural instability and to reach to an improved design of shoring system because these effects may increase the axial forces delivered to the shores. In advance, the influence of the column shortening effect, generally mentioned in a tall building structure, is analyzed. From many parametric studies, it has been finally concluded that the most effective shoring system in RC frame structures is 2S1R (two shores and one reshore) regardless of the changes in design variables.
In our project, we develop new tools for the conceptual design phase. During conceptual design, the coarse functionality and organization of a building is more important than a detailed worked out construction. We identify two roles, first the knowledge engineer who is responsible for knowledge definition and maintenance; second the architect who elaborates the conceptual design. The tool for the knowledge engineer is based on graph technology, it is specified using PROGRES and the UPGRADE framework. The tools for the architect are integrated to the industrial CAD tool ArchiCAD. Consistency between knowledge and conceptual design is ensured by the constraint checker, another extension to ArchiCAD.
Cost and Schedule Controlling in Relation to Liquidity Management during Construction Projects
(2004)
The present paper describes a software application which can be used for relating the scheduled events of a construction project with the respective financial parameters, leading to an overall improvement in general controlling and liquidity management. For this purpose, existing construction schedules are taken and details of the assignment are recorded. Thus it becomes possible to assess a future payment status should changes in the designated schedule occur.
This paper introduces the current development of electronic catalogues of construction products. The common system architecture of Web-based electronic products catalogues are discussed, followed by a discussion on construction products information standardization and latest distributed-systems technologies for communicating construction products information. Finally, this paper presents an implementation of Web service in e-commerce systems to enable sharing of construction products information.
Development of Urban Land Use Model to Compare Transit-Oriented and Automobile-Oriented Cities
(2004)
This study is an attempt to develop a simple simulation model that can compare the differences between automobile-oriented and transit-oriented cities, and clarify the difference between city forms by transportation modes. Following a theoretical model development, a series of simulation runs are tried. The model allocates people who commute to CBD from residential zones along a transportation corridor. As a result of many simulation analyses, it is shown that automobiles need much more traffic space in comparison with the transit as is shown by the proposed traffic space ratio both in CBD and along the corridor.
In this Paper, we explored the relation between the electricity consumption in residential sector and the automobile energy consumption in transportation sector in accordance with the location of city by employing Geographic Information System (GIS). We found in the study that the electricity consumption per capita has a tendency that is higher in city center and lower in suburbs in Utsunomiya city. It is also noted that there is little difference among total consumption between city center and suburbs, despite the fact that the density of electric appliances tends to increase in a small size house of city center and the amount of automobile energy consumption from residence is lower in city center than in suburbs.
In current AEC practice client requirements are typically recorded in a building program, which, depending on the building type, covers various aspects from the overall goals, activities and spatial needs to very detailed material and condition requirements. This documentation is used as the starting point of the design process, but as the design progresses, it is usually left aside and changes are made incrementally based on the previous design solution. These incremental small changes can lead to a solution that may no longer meet the original requirements. In addition, design is by nature an iterative process and the proposed solutions often also cause evolution in the client requirements. However, the requirements documentation is usually not updated accordingly. Finding the latest updates and evolution of the requirements from the documentation is very difficult, if not impossible. This process can lead to an end result, which is significantly different from the documented requirements. Some important requirements may not be satisfied, and even if the design process was based on agreed-upon changes in the scope and requirements, differences in the requirements documents and in the completed building can lead to well-justified doubts about the quality of the design and construction process...
In recent years, the survey is performed for repair, such as a bridge and a building built in past, spending great expense. And it is anxious for the survey technique that doesn’t need cost and time more. Then, we made an idea of the technique of precise 3D model creation by 2D pictures. However, the technique of performing the improvement in accuracy of convergent photographing and automatic acquisition of corresponding points was not established. Therefore, in this research, we try to obtain a semi-automation of corresponding points acquisition from initial corresponding points and the improvement in accuracy of convergent photographing. Moreover, we applied the research to the used house of Japanese real estate, and the applicable field was selected as the high needs of the residence of 3D model. And we developed the system that everyone could create Web / 3D model house by VRML easily without requiring expensive apparatuses or expertise.
This paper presents results of a study on distributed, or parallel, evolutionary computation in the topological design of steel structural systems in tall buildings. It describes results of extensive experimental research on various parallel evolutionary architectures applied to a complex structural design problem. The experiments were conducted using Inventor 2003, a networkbased evolutionary design support tool developed at George Mason University. First, a general introduction to evolutionary computation is provided with an emphasis on recent developments in parallel evolutionary architectures. Next, a discussion of conceptual design of steel structural systems in tall buildings is presented. Further, Inventor 2003 is briefly introduced as well as its design representation and evolutionary computation characteristics. Next, the results obtained from systematic design experiments conducted with Inventor 2003 are discussed. The objective of these experiments was to qualitatively and quantitatively investigate evolution of steel structural systems in tall buildings during a distributed evolutionary design process as well as to compare efficiency and effectiveness of various parallel evolutionary architectures with the traditional evolutionary design approaches. Two connectivity topologies (ring topology and fully-connected topology) have been investigated for four populations of structural designs evolving in parallel and using various migration strategies. Also, results of the initial sensitivity studies are reported in which two ways of initializing distributed evolutionary design processes were investigated, using either arbitrarily selected designs as initial parents or randomly generated ones. Finally, initial research conclusions are presented.
The management of resources is an essential task in each construction company. Today, ERP systems and e-Business systems are available to assist construction companies to efficiently organise the allocation of their personnel and equipment within the company, but they cannot provide the company with the idle resources for every single task that has to be performed during a construction project. Therefore, companies should have an alternative solution to better exploit expensive resources and compensate their fixed costs, but also have them available at the right time for their own business activities. This paper outlines the approach taken by the EU funded project “e-Sharing” (IST-2001-33325) to support resource management between construction companies. It will describe requirements for the management of construction resources, its core features, and the integration approach. Therefore, we will outline the approach of an integrated resource type model supporting the management and classification of construction equipment, construction tasks and qualification profiles. The development is based on a cross-domain analysis and evaluation of existing models. ...
Analysis System for Bridge Test (Chinese name abbr.: QLJC) is an application software specially designed for bridge test to analyze the static and dynamic character of bridge structures, calculate efficiency ratio of load test, pick up the results of observation points and so on. In this paper, research content, system design, calculation theory, characteristics and practical application of QLJC is introduced in detail.
Some key facts about the economic environment of construction industry are explained. It is shown that construction industry is very heterogeneous and has changed drastically during the recent years due to a rapidly moving commercial environment. Two examples of todays’s use of virtual construction tools in construction projects are presented. The first example is the document control for a large international project. The second is the application of 4D modelling in the preconstruction phase of a dam project. It is shown that virtual construction, is a major international trend that currently takes up speed. Some generic industry needs for Research and Development which aims at short and medium term results are presented.
The paper presents the abstraction of process relevant information in order to enable the workflow management based on semantic data. It is shown for three examples, how the standards define the information needed to perform a certain planning activity. Abstraction of process relevant information is discussed for different granularities of the underlying processmodel. As one possible application ProMiSE is introduced, which uses process relevant data in individual tokens in a petri-net based process-model.
The contribution introduces an adaptable process model to meet the special requirements of the coordination of planning activities in AEC (Architecture, Engineering, Construction). The process model is based on the concept of Coloured Petri-Nets and uses metainformation to characterize process-relevant information and to enable process-control based on the actual results of the planning.
Efforts to define standards for representing AEC/FM data have been fairly successful. However defining a standard reference process model has not met with the same success. Yet almost every conceptual modelling or software development project starts by defining the business processes to be supported and the related requirements to be satisfied. This paper describes a new process-centred methodology for user requirements capture developed in the ICCI project (IST-2001-33022). Its essence is in recognising user requirements and use cases in the context of the real construction process, identifying the actors and roles for each individual activity and associating these activities with information, communication and standardisation requirements on the basis of a formalised specification, named the Process Matrix. In the paper we outline the history of process matrix development, introduce the basic structure of the matrix and show how it can be further extended and refined. We present also a web-based software implementation of the developed approach, describe how it has been used in ICCI and outline further perspectives.
A large-scale computer modeling and simulation method is presented for environmental flows in urban area. Several GIS and CAD data were used for the preparation of shape model and an automatic mesh generation method based on Delaunay method was developed. Parallel finite element method based on domain decomposition method was employed for the numerical simulation of natural phenomena. The present method was applied to the simulation of flood flow and wind flow in urban area. The present method is shown to be a useful planning and design tool for the natural disasters and the change of environments.