Refine
Has Fulltext
- yes (286) (remove)
Document Type
- Conference Proceeding (286) (remove)
Institute
- In Zusammenarbeit mit der Bauhaus-Universität Weimar (174)
- Graduiertenkolleg 1462 (31)
- Institut für Strukturmechanik (ISM) (22)
- Professur Informatik im Bauwesen (21)
- Professur Angewandte Mathematik (18)
- Institut für Konstruktiven Ingenieurbau (IKI) (8)
- Professur Stahlbau (4)
- Institut für Bauinformatik, Mathematik und Bauphysik (IBMB) (3)
- Professur Informatik in der Architektur (3)
- Professur Stochastik und Optimierung (3)
Keywords
- Computerunterstütztes Verfahren (286) (remove)
Due to economical, technical or political reasons all over the world about 100 nuclear power plants have been disconnected until today. All these power stations are still waiting for their complete dismantling which, considering one reactor, causes cost of up to one Bil. Euros and lasts up to 15 years. In our contribution we present a resource-constrained project scheduling approach minimizing the total discounted cost of dismantling a nuclear power plant. A project of dismantling a nuclear power plant can be subdivided into a number of disassembling activities. The execution of these activities requires time and scarce resources like manpower, special equipment or storage facilities for the contaminated material arising from the dismantling. Moreover, we have to regard several minimum and maximum time lags (temporal constraints) between the start times of the different activities. Finally, each disassembling activity can be processed in two alternative execution modes, which lead to different disbursements and determine the resource requirements of the considered activity. The optimization problem is to determine a start time and an execution mode for each activity, such that the discounted cost of the project is minimum, and neither the temporal constraints are violated nor the activities' resource requirements exceed the availability of any scarce resource at any point in time. In our contribution we introduce an appropriate multi-mode project scheduling model with minimum and maximum time lags as well as renewable and cumulative resources for the described optimization problem. Furthermore, we show that the considered optimization problem is NP-hard in the strong sense. For small problem instances, optimal solutions can be gained from a relaxation based enumeration approach which is incorporated into a branch and bound algorithm. In order to be able to solve large problem instances, we also propose a truncated version of the devised branch and bound algorithm.
We investigate aspects of tram-network section reliability, which operates as a part of the model of whole city tram-network reliability. Here, one of the main points of interest is the character of the chronological development of the disturbances (namely the differences between time of departure provided in schedule and real time of departure) on subsequent sections during tram line operation. These developments were observed in comprehensive measurements done in Krakow, during one of the main transportation nodes (Rondo Mogilskie) rebuilding. All taken building activities cause big disturbances in tram lines operation with effects extended to neighboring sections. In a second part, the stochastic character of section running time will be analyzed more detailed. There will be taken into consideration sections with only one beginning stop and also with two or three beginning stops located at different streets at an intersection. Possibility of adding results from sections with two beginning stops to one set will be checked with suitable statistical tests which are used to compare the means of the two samples. Section running time may depend on the value of gap between two following trams and from the value of deviation from schedule. This dependence will be described by a multi regression formula. The main measurements were done in the city center of Krakow in two stages: before and after big changes in tramway infrastructure.
MODEL OF TRAM LINE OPERATION
(2006)
From passenger's perspective punctuality is one of the most important features of trams operations. Unfortunately in most cases this feature is only insufficiently fulfilled. In this paper we present a simulation model for trams operation with special focus on punctuality. The aim is to get a helpful tool for designing time-tables and for analyzing the effects by changing priorities for trams in traffic lights respectively the kind of track separation. A realization of trams operations is assumed to be a sequence of running times between successive stops and times spent by tram at the stops. In this paper the running time is modeled by the sum of its mean value and a zero-mean random variable. With the help of multiple regression we find out that the average running time is a function depending on the length of the sections and the number of intersections. The random component is modeled by a sum of two independent zero-mean random variables. One of these variables describes the disturbance caused by the process of waiting at an intersection and the other the disturbance caused by the process of driving. The time spent at a stop is assumed to be a random variable, too. Its distribution is estimated from given measurements of these stop times for different tram lines in Kraków. Finally a special case of the introduced model is considered and numerical results are presented. This paper is involved with CIVITAS-CARAVEL project: "Clean and better transport in cites". The project has received research funding from the Community's Sixth Framework Programme. The paper reflects only the author's views and the Community is not liable for any use that may be made of the information contained therein.
The ride of the tram along the line, defined by a time-table, consists of the travel time between the subsequent sections and the time spent by tram on the stops. In the paper, statistical data collected in the city of Krakow is presented and evaluated. In polish conditions, for trams the time spent on stops makes up the remarkable amount of 30 % of the total time of tram line operation. Moreover, this time is characterized by large variability. The time spent by tram on a stop consists of alighting and boarding time and time lost by tram on stop after alighting and boarding time ending, but before departure. Alighting and boarding time itself usually depends on the random number of alighting and boarding passengers and also on the number of passengers which are inside the vehicle. However, the time spent by tram on stop after alighting and boarding time ending is an effect of certain random events, mainly because of impossibility of departure from stop, caused by lack of priorities for public transport vehicles. The main focus of the talk lies on the description and the modelling of these effects. This paper is involved with CIVITAS-CARAVEL project: "Clean and better transport in cites". The project has received research funding from the Community's Sixth Framework Programme. The paper reflects only the author's views and the Community is not liable for any use that may be made of the information contained therein.
From passenger’s perspective, punctuality is one of the most important features of tram route operation. We present a stochastic simulation model with special focus on determining important factors of influence. The statistical analysis bases on large samples (sample size is nearly 2000) accumulated from comprehensive measurements on eight tram routes in Cracow. For the simulation, we are not only interested in average values but also in stochastic characteristics like the variance and other properties of the distribution. A realization of trams operations is assumed to be a sequence of running times between successive stops and times spent by tram at the stops divided in passengers alighting and boarding times and times waiting for possibility of departure . The running time depends on the kind of track separation including the priorities in traffic lights, the length of the section and the number of intersections. For every type of section, a linear mixed regression model describes the average running time and its variance as functions of the length of the section and the number of intersections. The regression coefficients are estimated by the iterative re-weighted least square method. Alighting and boarding time mainly depends on type of vehicle, number of passengers alighting and boarding and occupancy of vehicle. For the distribution of the time waiting for possibility of departure suitable distributions like Gamma distribution and Lognormal distribution are fitted.
The idea about a simulation program to support urban planning is explained: Four different, clearly defined developing paths can be calculated for the rebuilding of a shrinking town. Aided by self-organization principles, a complex system can be created. The dynamics based on the action patterns of single actors, whose behaviour is cyclically depends on the generated structure. Global influences, which control the development, can be divided at a spatial, socioeconomic, and organizational-juridical level. The simulation model should offer conclusions on new planning strategies, especially in the context of the creation process of rebuilding measures. An example of a transportation system is shown by means of prototypes for the visualisation of the dynamic development process.
Practical examples show that the improvement in cost flow and total amount of money spend in construction and further use may be cut significantly. The calculation is based on spreadsheets calculation, very easy to develop on most PC´s now a days. Construction works, are a field where the evaluation of Cash Flow can be and should be applied. Decisions about cash flow in construction are decisions with long-term impact and long-term memory. Mistakes from the distant past have a massive impact on situations in the present and into the far economic future of economic activities. Two approaches exist. The Just-in-Time (JIT) approach and life cycle costs (LCC) approach. The calculation example shows the dynamic results for the production speed in opposition to stable flow of production in duration of activities. More sophisticated rescheduling in optimal solution might bring in return extra profit. In the technologies and organizational processes for industrial buildings, railways and road reconstruction, public utilities and housing developments there are assembly procedures that are very appropriate for the given purpose, complicated research-, development-, innovation-projects are all very good aspects of these kinds of applications. The investors of large investments and all public invested money may be spent more efficiently if an optimisation speed-strategy can be calculated.
The contribution presents a model that is able to simulate construction duration and cost for a building project. This model predicts set of expected project costs and duration schedule depending on input parameters such as production speed, scope of work, time schedule, bonding conditions and maximum and minimum deviations from scope of work and production speed. The simulation model is able to calculate, on the basis of input level of probability, the adequate construction cost and time duration of a project. The reciprocal view attends to finding out the adequate level of probability for construction cost and activity durations. Among interpretive outputs of the application software belongs the compilation of a presumed dynamic progress chart. This progress chart represents the expected scenario of development of a building project with the mapping of potential time dislocations for particular activities. The calculation of a presumed dynamic progress chart is based on an algorithm, which calculates mean values as a partial result of the simulated building project. Construction cost and time models are, in many ways, useful tools in project management. Clients are able to make proper decisions about the time and cost schedules of their investments. Consequently, building contractors are able to schedule predicted project cost and duration before any decision is finalized.
Die Sicherung der Wettbewerbsfähigkeit im Bereich des Bauwesens, insbesondere kleinerer und mittelständischer Betriebe erfordert ein aktives Handeln als Antwort auf die sich ändernde Wettbewerbssituation. Einen wesentlichen Wettbewerbsvorteil können kleine unternehmerische Einheiten durch höhere Flexibilität, schnelle Reaktion auf Kundenwünsche oder aktuelle Situationen auf der Baustelle und Marktnähe erreichen. Dazu ist es nötig, die Informations- und Kommunikationsströme durch Einsatz standardisierter und kostengünstiger Hard- und Software wie z.B. Handhelds zu unterstützen und insbesondere die existierenden Hindernisse im Informationsfluss zwischen Baustelle und Büro zu beseitigen. Am Beispiel der Projekte >IuK - SystemBau< und >eSharing< wird eine Einführungsstrategie für >Mobile Computing< in kleinen unternehmerischen Einheiten des Bauwesens (KMU) basierend auf einer umfangreichen Anforderungsanalyse vorgestellt. Folgende Aspekte sollen beschrieben werden: durchgängiger Einsatz der Technik unter Beachtung der verschiedenen Qualifikationsniveaus, Einführungsunterstützung durch Schulungen, Prozessanalyse und mögliche Integration in bestehende Software-Umgebungen sowie Feldtests.
Models in the context of engineering can be classified in process based and data based models. Whereas the process based model describes the problem by an explicit formulation, the data based model is often used, where no such mapping can be found due to the high complexity of the problem. Artificial Neuronal Networks (ANN) is a data based model, which is able to “learn“ a mapping from a set of training patterns. This paper deals with the application of ANN in time dependent bathymetric models. A bathymetric model is a geometric representation of the sea bed. Typically, a bathymetry is been measured and afterwards described by a finite set of measured data. Measuring at different time steps leads to a time dependent bathymetric model. To obtain a continuous surface, the measured data has to be interpolated by some interpolation method. Unlike the explicitly given interpolation methods, the presented time dependent bathymetric model using an ANN trains the approximated surface in space and time in an implicit way. The ANN is trained by topographic measured data, which consists of the location (x,y) and time t. In other words the ANN is trained to reproduce the mapping h = f(x,y,t) and afterwards it is able to approximate the topographic height for a given location and date. In a further step, this model is extended to take meteorological parameters into account. This leads to a model of more predictive character.
Objects for civil engineering applications can be identified with their reference in memory, their alpha-numeric name or their geometric location. Particularly in graphic user interfaces, it is common to identify objects geometrically by selection with the mouse. As the number of geometric objects in a graphic user interface grows, it becomes increasingly more important to treat the basic operations add, search and remove for geometric objects with great efficiency. Guttmann has proposed the Region-Tree (R-tree) for geometric identification in an environment which uses pages on disc as data structure. Minimal bounding rectangles are used to structure the data in such a way that neighborhood relations can be described effectively. The literature shows that the parameters which influence the efficiency of the R-trees have been studied extensively, but without conclusive results. The goal of the research which is reported in this paper is to determine reliably the parameters which significantly influence the efficiency of R-trees for geometric identification in technical drawings. In order to make this investigation conclusive, it must be performed with the best available software technology. Therefore an object-oriented software for the method is developed. This implementation is tested with technical drawings containing many thousands of geometric objects. These drawings are created automatically by a stochastic generator which is incorporated into a test bed consisting of an editor and a visualisor. This test bed is used to obtain statistics for the main factors which affect the efficiency of R-trees. The investigation shows that the following main factors which affect the efficiency can be identified reliably : number of geometric objects on the drawing the minimum und maximum number of children of a node of the tree the maximum width and height of the minimal bounding rectangles of the geometric objects relative to the size of the drawing.
Die heutige Situation in der Tragwerksplanung ist durch das kooperative Zusammenwirken einer größeren Anzahl von Fachleuten verschiedener Disziplinen (Architektur, Tragwerksplanung, etc.) in zeitlich befristeten Projektgemeinschaften gekennzeichnet. Bei der Abstimmung der hierdurch bedingten komplexen, dynamischen und vernetzten Planungsprozesse kommt es dabei häufig zu Planungsmängeln und Qualitätseinbußen. Dieser Artikel zeigt auf, wie mit Hilfe der Agententechnologie Lösungsansätze zur Verbesserung der Planungssituation erreicht werden können. Hierzu wird ein Agentenmodell für die vernetzt-kooperative Tragwerksplanung vorgestellt und anhand der Planung einer Fußgängerbogenbrücke anschaulich demonstriert. Das Agentenmodell erfasst (1) die beteiligten Fachplaner und Organisationen, (2) die tragwerksspezifischen Planungsprozesse, (3) die zugehörigen (Teil-)Produktmodelle und (4) die genutzte (Ingenieur-)Software. Hieraus leiten sich die drei Teilmodelle (1) agentenbasiertes Kooperationsmodell, (2) agentenbasierte Produktmodellintegration und (3) Modell zur agentenbasierten Software-Integration ab. Der Fokus des Artikels liegt auf der Darstellung des agentenbasierten Kooperationsmodells.
Applications for civil engineering tasks usually contain graphical user interfaces for the engineering processes. Persistent objects of the applications are stored to data bases. The influence of the interaction between a graphical user interface and a data base for the development of an civil engineering application is investigated in this paper. A graphic application for the linear elastic analysis of plane frames, which was previously developed with standard tools of the Java platform, is compared to a redesigned implementation using a generalized data base for persistent objects. The investigation leads to the following results : - A strict distinction between persistent and transient objects influences the class structure of an application, in particular the class structure of a graphical user interface. - The structure of an application depends on the logic for updating of references to persistent and transient graphical objects after an application is read from a file. - The complexity of the reference management can usually be handled better by just in time referencing associated with String - identifiers rather than by automated referencing associated with Name - identifiers.
The contribution focuses on the development of a basic computational scheme that provides a suitable calculation environment for the coupling of analytical near-field solutions with numerical standard procedures in the far-field of the singularity. The proposed calculation scheme uses classical methods of complex function theory, which can be generalized to 3-dimensional problems by using the framework of hypercomplex analysis. The adapted approach is mainly based on the factorization of the Laplace operator EMBED Equation.3 by the Cauchy-Riemann operator EMBED Equation.3 , where exact solutions of the respective differential equation are constructed by using an orthonormal basis of holomorphic and anti-holomorphic functions.
In this paper the influence of changes in the mean wind velocity, the wind profile power-law coefficient, the drag coefficient of the terrain and the structural stiffness are investigated on different complex structural models. This paper gives a short introduction to wind profile models and to the approach by Davenport A. G. to compute the structural reaction of wind induced vibrations. Firstly with help of a simple example (a skyscraper) this approach is shown. Using this simple example gives the reader the possibility to study the variance differences when changing one of the above mentioned parameters on this very easy example and see the influence of different complex structural models on the result. Furthermore an approach for estimation of the needed discretization level is given. With the help of this knowledge the structural model design methodology can be base on deeper understanding of the different behavior of the single models.
In earlier research, generalized multidimensional Hilbert transforms have been constructed in m-dimensional Euclidean space, in the framework of Clifford analysis. Clifford analysis, centred around the notion of monogenic functions, may be regarded as a direct and elegant generalization to higher dimension of the theory of the holomorphic functions in the complex plane. The considered Hilbert transforms, usually obtained as a part of the boundary value of an associated Cauchy transform in m+1 dimensions, might be characterized as isotropic, since the metric in the underlying space is the standard Euclidean one. In this paper we adopt the idea of a so-called anisotropic Clifford setting, which leads to the introduction of a metric dependent m-dimensional Hilbert transform, showing, at least formally, the same properties as the isotropic one. The Hilbert transform being an important tool in signal analysis, this metric dependent setting has the advantage of allowing the adjustment of the co-ordinate system to possible preferential directions in the signals to be analyzed. A striking result to be mentioned is that the associated anisotropic (m+1)-dimensional Cauchy transform is no longer uniquely determined, but may stem from a diversity of (m+1)-dimensional "mother" metrics.
The one-dimensional continuous wavelet transform is a successful tool for signal and image analysis, with applications in physics and engineering. Clifford analysis offers an appropriate framework for taking wavelets to higher dimension. In the usual orthogonal case Clifford analysis focusses on monogenic functions, i.e. null solutions of the rotation invariant vector valued Dirac operator ∂, defined in terms of an orthogonal basis for the quadratic space Rm underlying the construction of the Clifford algebra R0,m. An intrinsic feature of this function theory is that it encompasses all dimensions at once, as opposed to a tensorial approach with products of one-dimensional phenomena. This has allowed for a very specific construction of higher dimensional wavelets and the development of the corresponding theory, based on generalizations of classical orthogonal polynomials on the real line, such as the radial Clifford-Hermite polynomials introduced by Sommen. In this paper, we pass to the Hermitian Clifford setting, i.e. we let the same set of generators produce the complex Clifford algebra C2n (with even dimension), which we equip with a Hermitian conjugation and a Hermitian inner product. Hermitian Clifford analysis then focusses on the null solutions of two mutually conjugate Hermitian Dirac operators which are invariant under the action of the unitary group. In this setting we construct new Clifford-Hermite polynomials, starting in a natural way from a Rodrigues formula which now involves both Dirac operators mentioned. Due to the specific features of the Hermitian setting, four different types of polynomials are obtained, two types of even degree and two types of odd degree. These polynomials are used to introduce a new continuous wavelet transform, after thorough investigation of all necessary properties of the involved polynomials, the mother wavelet and the associated family of wavelet kernels.
Euclidean Clifford analysis is a higher dimensional function theory offering a refinement of classical harmonic analysis. The theory is centered around the concept of monogenic functions, i.e. null solutions of a first order vector valued rotation invariant differential operator called the Dirac operator, which factorizes the Laplacian. More recently, Hermitean Clifford analysis has emerged as a new and successful branch of Clifford analysis, offering yet a refinement of the Euclidean case; it focusses on the simultaneous null solutions, called Hermitean (or h-) monogenic functions, of two Hermitean Dirac operators which are invariant under the action of the unitary group. In Euclidean Clifford analysis, the Clifford-Cauchy integral formula has proven to be a corner stone of the function theory, as is the case for the traditional Cauchy formula for holomorphic functions in the complex plane. Previously, a Hermitean Clifford-Cauchy integral formula has been established by means of a matrix approach. This formula reduces to the traditional Martinelli-Bochner formula for holomorphic functions of several complex variables when taking functions with values in an appropriate part of complex spinor space. This means that the theory of Hermitean monogenic functions should encompass also other results of several variable complex analysis as special cases. At present we will elaborate further on the obtained results and refine them, considering fundamental solutions, Borel-Pompeiu representations and the Teoderescu inversion, each of them being developed at different levels, including the global level, handling vector variables, vector differential operators and the Clifford geometric product as well as the blade level were variables and differential operators act by means of the dot and wedge products. A rich world of results reveals itself, indeed including well-known formulae from the theory of several complex variables.
Image processing has been much inspired by the human vision, in particular with regard to early vision. The latter refers to the earliest stage of visual processing responsible for the measurement of local structures such as points, lines, edges and textures in order to facilitate subsequent interpretation of these structures in higher stages (known as high level vision) of the human visual system. This low level visual computation is carried out by cells of the primary visual cortex. The receptive field profiles of these cells can be interpreted as the impulse responses of the cells, which are then considered as filters. According to the Gaussian derivative theory, the receptive field profiles of the human visual system can be approximated quite well by derivatives of Gaussians. Two mathematical models suggested for these receptive field profiles are on the one hand the Gabor model and on the other hand the Hermite model which is based on analysis filters of the Hermite transform. The Hermite filters are derivatives of Gaussians, while Gabor filters, which are defined as harmonic modulations of Gaussians, provide a good approximation to these derivatives. It is important to note that, even if the Gabor model is more widely used than the Hermite model, the latter offers some advantages like being an orthogonal basis and having better match to experimental physiological data. In our earlier research both filter models, Gabor and Hermite, have been developed in the framework of Clifford analysis. Clifford analysis offers a direct, elegant and powerful generalization to higher dimension of the theory of holomorphic functions in the complex plane. In this paper we expose the construction of the Hermite and Gabor filters, both in the classical and in the Clifford analysis framework. We also generalize the concept of complex Gaussian derivative filters to the Clifford analysis setting. Moreover, we present further properties of the Clifford-Gabor filters, such as their relationship with other types of Gabor filters and their localization in the spatial and in the frequency domain formalized by the uncertainty principle.
Für eine gesicherte Planung im Bestand, sind eine Fülle verschiedenster Informationen zu berücksichtigen, welche oft erst während des Planungs- oder Bauprozesses gewonnen werden. Voraussetzung hierfür bildet immer eine Bestandserfassung. Zwar existieren Computerprogramme zur Unterstützung der Bestandserfassung, allerdings handelt es sich hierbei ausschließlich um Insellösungen. Der Export der aufgenommenen Daten in ein Planungssystem bedingt Informationsverluste. Trotz der potentiellen Möglichkeit aktueller CAAD/BIM Systeme zur Verwaltung von Bestandsdaten, sind diese vorrangig für die Neubauplanung konzipiert. Die durchgängige Bearbeitung von Sanierungsprojekten von der Erfassung des Bestandes über die Entwurfs- und Genehmigungsplanung bis zur Ausführungsplanung innerhalb eines CAAD/BIM Systems wird derzeit nicht adäquat unterstützt. An der Professur Informatik in der Architektur (InfAR) der Fakultät Architektur der Bauhaus-Universität Weimar entstanden im Rahmen des DFG Sonderforschungsbereich 524 "Werkzeuge und Konstruktionen für die Revitalisierung von Bauwerken" in den letzten Jahren Konzepte und Prototypen zur fachlich orientierten Unterstützung der Planung im Bestand. Der Fokus lag dabei in der Erfassung aller planungsrelevanter Bestandsdaten und der Abbildung dieser in einem dynamischen Bauwerksmodell. Aufbauend auf diesen Forschungsarbeiten befasst sich der Artikel mit der kontextbezogenen Weiterverwendung und gezielten Bereitstellung von Bestandsdaten im Prozess des Planens im Bestand und der Integration von Konzepten der planungsrelevanten Bestandserfassung in marktübliche CAAD/BIM Systeme.