Refine
Has Fulltext
- yes (184) (remove)
Document Type
- Conference Proceeding (158)
- Article (20)
- Doctoral Thesis (6)
Institute
- In Zusammenarbeit mit der Bauhaus-Universität Weimar (92)
- Professur Informatik im Bauwesen (40)
- Institut für Strukturmechanik (ISM) (10)
- Professur Informatik in der Architektur (10)
- Professur Angewandte Mathematik (6)
- Professur Theorie und Geschichte der modernen Architektur (5)
- Institut für Konstruktiven Ingenieurbau (IKI) (4)
- Junior-Professur Computational Architecture (4)
- Institut für Bauinformatik, Mathematik und Bauphysik (IBMB) (2)
- Professur Bodenmechanik (2)
Keywords
- CAD (184) (remove)
Anhand von Ergebnissen aus dem FABEL-Projekt wird gezeigt, welche Beiträge Methoden der Künstlichen Intelligenz, insbesondere der Wissensverarbeitung beim Entwurf komplexer Gebäude leisten können. Exemplarisch werden spezialisierte wissensintensive Methoden, und allgemeine fallbasierte Methoden zum Retrieval und zur Wiederverwendung früherer Entwürfe vorgestellt. Es werden Fragen der Integration von Wissen, Fällen und Daten diskutiert. Der Prototyp des FABEL-Projekts verwendet die Metapher der virtuellen Baustelle, um die verschiedenen Methoden als Planungswerkzeuge in einem CAD-System integriert anzubieten. Ein Planungsmodell dient der zusätzlichen Orientierung des Planers. Die Ergebnisse sind interessant für den Entwurf komplexer Unikate, dürften aber auch als Zusatz zu elektronisch angebotenen Katalogen relevant sein.
This is a paper about knowledge in design and how to elicit knowledge from design processes. The paper is a preparation for an empirical study of interaction in the design process. Reasonings of three authors - Schön, Broadbent and Lundequist - on design processes is presented. They all have a pragmatic perspective in common, and regard the process as an activity without a definite form. Design is seen as an activity of creating models of forms and shapes, by addressing expert knowledge in a dialogic way to problematic situations. Due to the pragmatic approach I find the pragmatist Dewey´s understanding of knowledge and elecitation of knowledge appropiate for studying design processes. According to him it is possible to build up objectified descriptions of experiences, also of such, which are based on experiences of emotional and intuitive nature. There need not be a definite border, which separates tacit knowledge from explicit knowledge - when it comes to the question of the possibility of verbal descriptions. Tacit knowledge is possible to articulate within pragmatic thinking. The conclusion is, that it is possible to study the tacit knowledge of design processes, and get some qualitative insights useful for theory building. A study of design processes can look at three different forms of knowledge. It appears as a precognitive understanding of the design situation, as integrated in the design activity - seeing the situation as something known - and in the process of creating something new.
Die effektive Kooperation aller beteiligten Fachplaner im Bauplanungsprozess ist die Voraussetzung für wirtschaftliches und qualitativ hochwertiges Bauen. Bauprojektorganisationen bestehen in der Regel aus zahlreichen unabhängigen Planungspartnern, die örtlich verteilt spezifische Planungsaufgaben bearbeiten und die Ergebnisse in Teilproduktmodellen ablegen. Da Planungsprozesse im Bauwesen stark arbeitsteilig ablaufen, sind die Teilproduktmodelle der einzelnen Fachplanungen in hohem Maße voneinander abhängig. Ziel des hier vorgestellten Ansatzes ist die Integration der Teilproduktmodelle der Gebäudeplanung in einem netzwerkbasierten Modellverbund am Beispiel der Brandschutzplanung. Im Beitrag werden die Probleme der Verteiltheit und insbesondere der semantischen Heterogenität der involvierten Teilproduktmodelle betrachtet. Der verteilte Zugriff wird mithilfe mobiler Software-Agenten realisiert. Die Agenten können sich dabei frei im netzwerkbasierten Planungsverbund bewegen und agieren als Vertreter der Fachplaner. Das Problem der semantischen Heterogenität der Teilproduktmodelle wird auf der Basis von Ontologien gelöst. Dazu werden erstens Domänenontologien entwickelt, die Objekte der realen Welt einer abgeschlossenen Domäne, hier des Brandschutzes, abbilden. Zweitens werden Applikationsontologien entwickelt, die die einzelnen proprietären Datenhaltungen (im Sinne von Teilproduktmodellen) der jeweiligen Fachplanungen repräsentieren. Beide Ontologien werden mit einem regelbasierten Ansatz verknüpft. Im vorgestellten Anwendungsfall Brandschutz dient die Domänenontologie als einheitliche Schnittstelle für den Zugriff auf die verteilten Modelle und abstrahiert dabei von deren Datenbankspezifika und proprietären Schemata. Mithilfe von mobilen Agenten und semantischen Technologien kann so eine Plattform zur Verfügung gestellt werden, die erstens die dynamische Integration von Ressourcen in den Planungsverbund erlaubt und zweitens auf deren Basis unabhängig von der Verteiltheit und Heterogenität der eingebundenen Ressourcen ingenieurgerechte Verarbeitungsmethoden realisiert werden können.
Optimum technological solutions must take into account the entire life cycle of structures including design procedures as well as quality assurance, inspection, maintenance, and repair strategies. Unfortunately, current design standards do not provide a satisfactory basis to ensure expected structural lifetimes. The latter may vary from only a few years for temporary structures to over a century for bridges, water dams or nuclear repositories. Consistent scientific concepts are urgently required to cover this wide spectrum of lifetimes in structural design and maintenance. This was a motivation for a group of scientists at the Ruhr-University Bochum (RUB) to start a special research program supported by the German Research Foundation (DFG) within the Cooperative Research Center SFB 398 since 1996. Institutes of the University Wuppertal and of the University Essen-Duisburg joined the research group. The goal of the Center is to study sources of damage and deterioration in materials and structures, to develop consistent models and simulation methods, to predict structural lifetimes and finally to integrate this predictions into new lifetime-oriented design strategies.
Research activities in our center are organised in three Project Groups as follows:
- Modelling of lifetime effects
- Methods for lifetime-oriented structural analyses
- Future lifespan-oriented design strategies.
LIFETIME-ORIENTED OPTIMIZATION OF BRIDGE TIE RODS EXPOSED TO VORTEX-INDUCED ACROSS-WIND VIBRATIONS
(2006)
In recent years, damages in welded connections plates of vertical tie rods of several arched steel bridges have been reported. These damages are due to fatigue caused by wind-induced vibrations. In the present study, such phenomena are examined, and the corresponding lifetime of a reference bridge in Münster-Hiltrup, Germany, is estimated, based on the actual shape of the connection plate. Also, the results obtained are compared to the expected lifetime of a connection plate, whose geometry has been optimized separately. The structural optimization, focussing on the shape of the cut at the hanger ends, has been carried out using evolution strategies. The oscillation amplitudes have been computed by means of the Newmark-Wilson time-step method, using an appropriate load model, which has been validated by on-site experiments on the selected reference bridge. Corresponding stress-amplitudes are evaluated by multiplying the oscillation amplitudes with a stress concentration factor. This factor has been computed on the basis of a finite element model of the system "hanger-welding-connection plate", applying solid elements, according to the notch stress approach. The damage estimation takes into account the stochastics of the exciting wind process, as well as the stochastics of the material parameters (fatigue strength) given in terms of Woehler-curves. The shape optimization results in a substantial increase of the estimated hanger lifetime. The comparison of the lifetimes of the bulk plate and of the welding revealed that, in the optimized structure, the welding, being the most sensitive part in the original structure, shows much more resistance against potential damages than the bulk material.
Die Liquiditätsplanung von Bauunternehmen XE "Liquiditätsplanung" gilt als ein wesentliches Steuerungs-, Kontroll- sowie Informationsinstrument für interne und externe Adressaten und übt eine Entscheidungsunterstützungsfunktion aus. Da die einzelnen Bauprojekte einen wesentlichen Anteil an den Gesamtkosten des Unternehmens ausmachen, besitzen diese auch einen erheblichen Einfluß auf die Liquidität und die Zahlungsfähigkeit der Bauunternehmung. Dem folgend ist es in der Baupraxis eine übliche Verfahrensweise, die Liquiditätsplanung zuerst projektbezogen zu erstellen und anschließend auf Unternehmensebene zu verdichten. Ziel der Ausführungen ist es, die Zusammenhänge von Arbeitskalkulation XE "Arbeitskalkulation" , Ergebnisrechnung XE "Ergebnisrechnung" und Finanzrechnung XE "Finanzrechnung" in Form eines deterministischen XE "Erklärungsmodells" Planungsmodells auf Projektebene darzustellen. Hierbei soll das Verständnis und die Bedeutung der Verknüpfungen zwischen dem technisch-orientierten Bauablauf und dessen Darstellung im Rechnungs- und Finanzwesen herausgestellt werden. Die Vorgänge aus der Bauabwicklung, das heißt die Abarbeitung der Bauleistungsverzeichnispositionen und deren zeitliche Darstellung in einem Bauzeitenplan sind periodisiert in Größen der Betriebsbuchhaltung (Leistung, Kosten) zu transformieren und anschließend in der Finanzrechnung (Einzahlungen., Auszahlungen) nach Kreditoren und Debitoren aufzuschlüsseln.
This paper presents results of applying Fuzzy Inference System for estimation of the number of potential Park and Ride users. Usually it is difficult to evaluate the number of users because it depends on human factor and data in the considered system are uncertain. In such situation the traditional mathematical approaches can not take into consideration rough data. Therefore a fuzzy approach can be applied in this case. A fuzzy methodology is treated as a proper way to describe choice of mode of transport, and especially that uncertainty accompanied of choosing process has rather fuzzy character. The proposed approach is based on the Mamdani Fuzzy Inference System and for calculation there is used Matlab software with Fuzzy Logic Toolbox. Mamdani model requires, as an input data, knowledge of the shape of membership function. These functions can be calibrated taking into consideration results of questionnaires conducted among users of Park and Ride system. Due to lack of representative sample of users, one has decided to use results of experts' questionnaires as a input data for calibration the shape of membership functions. Describing factor will be generalized cost of the trip for different modes of transport. Proposed approach consists of two main stages: modeling of share of public/private transport trips and Multimodal model estimating number of Park and Ride users. Verification of presented methodology is treated as an indirect proof. Proposed approach can be applied for estimation of bi-modal split. Then the results are compared with traditional approaches based on logit functions. Comparable results of proposed fuzzy approach with traditional logit models can be treated as a confirmation of chosen methodology.
At the 16th IKM Bock, Falcão and Gürlebeck presented examples of the application of some specially developed Maple-Software in hypercomplex analysis. Other papers of those authors continued this work and showed the efficiency of such tools for concrete numerical calculations as well as for numerical experiments, supporting the detection of new relationships and even theorems in a highly technical theoretical work. The mentioned software has been developed mainly for the use on mapping problems in the Euclidean spaces of dimension 3 and 4 by means of Bergman kernel methods (BKM), which are related to monogenic functions as solutions of generalized Cauchy-Riemann equations with respect to the Euclidean metric (Riesz system). The developed procedures concerning generalized powers of totally regular variables and the corresponding homogeneous polynomials basically rely on results and conventions introduced in the paper "Power series representation for monogenic functions in Rm+1 based on a permutational product", Complex Variables, 15, No.3, 181-191 (1990) by H. Malonek. Since 1992 H. Leutwiler, S. L. Eriksson and others developed in a number of papers a modified Clifford analysis and, particularly, a modified quaternionic analysis. The modification mainly consists in considering generalized Cauchy-Riemann equations with respect to a hyperbolic metric in a half space. The aim of this contribution is to show how through a change of the basic combinatorial relations used in the modified quaternionic analysis the aforementioned Maple-software (that has been recently published on CD-Rom as integrated part of the text book "Funktionentheorie in der Ebene und im Raum" by K. Gürlebeck, K. Habetha, and W. Sprössig, in the series "Grundstudium Mathematik" of Birkhäuser Verlag, 2006) can directly be used for numerical calculations in the modified theory.
The paper contains a description of dynamic effects in the silo wall during the outflow of a stored material. The work allows for determining the danger of construction damage due to resonant vibrations and is of practical importance by determining the influence of cyclic pressures and vibro–creeping during prolonged use of a silo. The paper was devised as a result of tests on silo walls in semi-technical scale. The model is generally applicable and allows for identification of parameters in real- size silos as well.
The paper is a proposal of calculation of internal forces and dislocations in the reinforced concrete beams before and after cracking. For the ideally elastic bars transfer matrix proposed by Rakowski was applied. The effects associated with cracking were introduced by means of the Borcz's theory in the spectrally way. Numerical example was shown. The presented attitude also enables to calculate dynamic problems and those connected with the stability of the compressed and bending cracked beams and columns.
Due to economical, technical or political reasons all over the world about 100 nuclear power plants have been disconnected until today. All these power stations are still waiting for their complete dismantling which, considering one reactor, causes cost of up to one Bil. Euros and lasts up to 15 years. In our contribution we present a resource-constrained project scheduling approach minimizing the total discounted cost of dismantling a nuclear power plant. A project of dismantling a nuclear power plant can be subdivided into a number of disassembling activities. The execution of these activities requires time and scarce resources like manpower, special equipment or storage facilities for the contaminated material arising from the dismantling. Moreover, we have to regard several minimum and maximum time lags (temporal constraints) between the start times of the different activities. Finally, each disassembling activity can be processed in two alternative execution modes, which lead to different disbursements and determine the resource requirements of the considered activity. The optimization problem is to determine a start time and an execution mode for each activity, such that the discounted cost of the project is minimum, and neither the temporal constraints are violated nor the activities' resource requirements exceed the availability of any scarce resource at any point in time. In our contribution we introduce an appropriate multi-mode project scheduling model with minimum and maximum time lags as well as renewable and cumulative resources for the described optimization problem. Furthermore, we show that the considered optimization problem is NP-hard in the strong sense. For small problem instances, optimal solutions can be gained from a relaxation based enumeration approach which is incorporated into a branch and bound algorithm. In order to be able to solve large problem instances, we also propose a truncated version of the devised branch and bound algorithm.
In diesem Beitrag wird eine mobile Software-Komponente zur Vor-Ort-Unterstützung von Bauwerksprüfungen gemäß DIN 1076 „Ingenieurbauwerke im Zuge von Strassen und Wegen, Überwachung und Prüfung“ vorgestellt, welche sich im praktischen Einsatz bei der Hochbahn AG Hamburg befindet. Mit Hilfe dieses Werkzeugs kann die Aktivität am Bauwerk in den gesamten softwaregestützten Geschäftsprozess der auwerksinstandhaltung integriert und somit die Bearbeitungszeit einer Bauwerksprüfung von der Vorbereitung bis zur Prüfbericht-Erstellung reduziert werden. Die Technologie des Mobile Computing wird unter Berücksichtigung spezieller fachlicher Randbedingungen, wie z.B. dem Einsatzort unter freiem Himmel, erläutert und es werden Methoden zur effizienten Datenerfassung mit Stift und Sprache vorgestellt und bewertet. Ferner wird die Einschränkung der Hardware durch die geringere Größe der Endgeräte, die sich durch die Bedingung der Mobilität ergibt, untersucht.
MODEL OF TRAM LINE OPERATION
(2006)
From passenger's perspective punctuality is one of the most important features of trams operations. Unfortunately in most cases this feature is only insufficiently fulfilled. In this paper we present a simulation model for trams operation with special focus on punctuality. The aim is to get a helpful tool for designing time-tables and for analyzing the effects by changing priorities for trams in traffic lights respectively the kind of track separation. A realization of trams operations is assumed to be a sequence of running times between successive stops and times spent by tram at the stops. In this paper the running time is modeled by the sum of its mean value and a zero-mean random variable. With the help of multiple regression we find out that the average running time is a function depending on the length of the sections and the number of intersections. The random component is modeled by a sum of two independent zero-mean random variables. One of these variables describes the disturbance caused by the process of waiting at an intersection and the other the disturbance caused by the process of driving. The time spent at a stop is assumed to be a random variable, too. Its distribution is estimated from given measurements of these stop times for different tram lines in Kraków. Finally a special case of the introduced model is considered and numerical results are presented. This paper is involved with CIVITAS-CARAVEL project: "Clean and better transport in cites". The project has received research funding from the Community's Sixth Framework Programme. The paper reflects only the author's views and the Community is not liable for any use that may be made of the information contained therein.
Subject of the paper is the realisation of a model based efficiency control system for PV generators using a simulation model. A standard 2-diodes model of PV generator is base of the ColSim model, which is implemented in ANSI C code for flexible code exporting. The algorithm is based on discretisized U-I characteristics, which allows the calculation of string topologies witch parallel and serial PV cells and modules. Shadowing effects can be modelled down to cell configuration using polar horizon definitions. The simulation model was ported to a real time environment, to calculate the efficiency of a PV system. Embedded System technology allows the networked operation and the integration of standard I/O devices. Futher work focus on the adaption of shadowing routine, which will be adapted to get the environment conditions from the real operation.
Modellbildung und computergestütztes Modellieren in frühen Phasen des architektonischen Entwurfs
(1997)
Die Arbeit befaßt sich mit der Konzeption und exemplarischen Realisierung von CAD-Tools zur Unterstützung des konzeptionellen Entwurfs von Gebäuden. Die Spezifik des Bauentwurfs macht eine Analyse des Arbeitsfelds "früher architektonischer Entwurf" aus Sicht der Informationsverarbeitung nichtig. Auf der Grundlage einer Untersuchung des Entwurfsprozesses aus pragmatischer und kognitiver Sicht wird ein generisches Prozeßmodell "Entwurf" abgeleitet und mit Beispielen belegt. Ausgehend von der Auffassung, daß Entwerfen der Prozesse das Vorausdenken von Bauwerken in Modellen ist, wird die "objektorientierte Modellierungstechnologie" einer eingehenden Bewertung unterzogen. Ihre methodische Eignung zur modellhaften Abbildung von Bauwerken wird grundsätzlich nachgewiesen. Mit Blick auf die spezifischen Gegebenheiten der frühen Entwurfsphasen, wie Unschärfe und nicht formalisiert darstellbarer Informationen, werden einige Erweiterungen vorgeschlagen und experimentiert. Ziel der Arbeit ist es, ein multipel und über lange Zeiträume auswertbares Bauwerksmodell zu schaffen, um Planungsprozesse über den gesamten Bauwerkslebenszyklus durchgängig zu unterstützen. Grundlage des Entwerfens mittels der objektorientierten Methodik sind generalisierte Domänenmodelle. Es wird gezeigt, daß für eine Interpretation konkreter Bauwerksmodelle die generalisierten Domänenmodelle entweder zu normieren sind oder aber daß sie explizit verfügbar sein müssen. Die Objektorientierung bietet die Möglichkeit, sowohl konkrete als auch generalisierte Modelle in einem einheitlichen Metamodell zu beschreiben...
MODELLING THE PLASTIC HINGE IN THE STATICALLY INDETERMINABLE REINFORCED CONCRETE BAR ELEMENTS
(2006)
The paper presents the example numerical model to calculate the reinforced concrete bar structures. Usually applied methods of structure dimensioning do not include the case of plastic hinges occurrence under the limit load of construction. The model represented by A. Borcz is based on the differential equation of deflection line of the beam and it includes the effects of rearrangement of the internal forces and reological effects. The experimental parameters obtained in earlier investigations describe effects resulting from the rise of plastic hinges in the proposed equation.
The mathematical and technical foundations of optimization have been developed to a large extent. In the design of buildings, however, optimization is rarely applied because of insufficient adaptation of this method to the needs of building design. The use of design optimization requires the consideration of all relevant objectives in an interactive and multidisciplinary process. Disciplines such as structural, light, and thermal engineering, architecture, and economics impose various objectives on the design. A good solution calls for a compromise between these often contradictory objectives. This presentation outlines a method for the application of Multidisciplinary Design Optimization (MDO) as a tool for the designing of buildings. An optimization model is established considering the fact that in building design the non-numerical aspects are of major importance than in other engineering disciplines. A component-based decomposition enables the designer to manage the non-numerical aspects in an interactive design optimization process. A façade example demonstrates a way how the different disciplines interact and how the components integrate the disciplines in one optimization model. In this grid-based façade example, the materials switch between a discrete number of materials and construction types. For light and thermal engineering, architecture, and economics, analysis functions calculate the performance; utility functions serve as an important means for the evaluation since not every increase or decrease of a physical value improves the design. For experimental purposes, a genetic algorithm applied to the exemplary model demonstrates the use of optimization in this design case. A component-based representation first serves to manage non-numerical characteristics such as aesthetics. Furthermore, it complies with usual fabrication methods in building design and with object-oriented data handling in CAD. Therefore, components provide an important basis for an interactive MDO process in building design.
Monitoring und Bewertung sind Hauptaufgaben im Management bzw. der Revitalisierung von Bauwerken. Unterschiedliche Verfahren können bei der Akquisition der erforderlichen geometrischen Information, wie z. B. Größe oder Verformung eines Gebäudes, eingesetzt werden. Da das Potenzial der digitalen Fotografie kontinuierlich wächst, stellt die Industriephotogrammetrie heute eine bedeutende Alternative zu den klassischen Verfahren wie Dehnmessstreifen oder anderen taktilen Sensoren dar. Moderne Industriephotogrammetrie erfasst die Bilder mittels digitaler Systeme. Dies bedeutet, dass die Information digitaler Bilder mit Hilfe der digitalen Bildverarbeitung untersucht werden muss, um die Bildkoordinaten der Messpunkte zu erhalten. Eine der Aufgaben der Bildverarbeitung für photogrammetrische Zwecke besteht somit darin, den Mittelpunkt von kreisförmigen Marken zu lokalisieren. Die modernen Operatoren liefern Subpixelgenauigkeit für die Koordinaten des Punktes. Das optische Messverfahren der Industriephotogrammetrie erfordert hinsichtlich der Hardware in erster Linie hochauflösende digitale Kameras. Dabei lassen sich die Kameras in Videokameras, HighSpeed-Kameras, intelligente Kameras sowie so genannte Consumer und Professionelle Kameras unterscheiden. Die geometrische Auflösung digitaler HighEnd-Kameras liegt heute bei über 10 Megapixel. In punkto Datentransfer zum Rechner sind verschiedene Standards am Markt verfügbar, z. B. USB2.0, GigE-Vision, CameraLink oder Firewire. Die Wahl des Standards hängt immer von der spezifischen Aufgabenstellung ab, da keine der Techniken eine führende Position einnimmt. Die moderne Photogrammetrie bietet viele neue Möglichkeiten für das Monitoring und die Bewertung von Bauwerken. Sie kann ein-, zwei-, drei- oder vierdimensionale Informationen liefern, falls erforderlich auch in Echtzeit. Als berührungsloses Messverfahren ist der Einsatz der Photogrammetrie noch möglich, wenn die taktilen Sensoren z. B. aufgrund ihres Platzbedarfes nicht mehr eingesetzt werden können. Hochauflösende Videokameras erlauben es, selbst dynamische Untersuchungen mit großer Präzision durchzuführen.
A fast solver method called the multigrid preconditioned conjugate gradient method is proposed for the mechanical analysis of heterogeneous materials on the mesoscale. Even small samples of a heterogeneous material such as concrete show a complex geometry of different phases. These materials can be modelled by projection onto a uniform, orthogonal grid of elements. As one major problem the possible resolution of the concrete specimen is generally restricted due to (a) computation times and even more critical (b) memory demand. Iterative solvers can be based on a local element-based formulation while orthogonal grids consist of geometrical identical elements. The element-based formulation is short and transparent, and therefore efficient in implementation. A variation of the material properties in elements or integration points is possible. The multigrid method is a fast iterative solver method, where ideally the computational effort only increases linear with problem size. This is an optimal property which is almost reached in the implementation presented here. In fact no other method is known which scales better than linear. Therefore the multigrid method gains in importance the larger the problem becomes. But for heterogeneous models with very large ratios of Young's moduli the multigrid method considerably slows down by a constant factor. Such large ratios occur in certain heterogeneous solids, as well as in the damage analysis of solids. As solution to this problem the multigrid preconditioned conjugate gradient method is proposed. A benchmark highlights the multigrid preconditioned conjugate gradient method as the method of choice for very large ratio's of Young's modulus. A proposed modified multigrid cycle shows good results, in the application as stand-alone solver or as preconditioner.