Refine
Document Type
- Conference Proceeding (336)
- Article (130)
- Doctoral Thesis (12)
- Master's Thesis (2)
- Working Paper (2)
- Preprint (1)
- Study Thesis (1)
Institute
- Professur Informatik im Bauwesen (484) (remove)
Keywords
- Modellierung (62)
- Bauwerk (48)
- Finite-Elemente-Methode (41)
- CAD (40)
- Verteiltes System (38)
- Bautechnik (30)
- Computerunterstütztes Verfahren (24)
- Produktmodell (24)
- Architektur (23)
- Simulation (22)
An einem Teil der Topologie architektonischer Räume, dem Volumenadjazenzgraphen (VAG), wird gezeigt wie topologisches Modellieren Anwendungen der Bauplanung integrieren kann. Dazu wird ein Prototyp vorgestellt, der im wesentlichen aus drei Komponenten besteht: Mit dem Anforderungsmanager werden Anforderungen eigegeben, die formal gut handhabbar sind. Mit dem Topologiemanager werden diese Anforderungen mit gezeichneten Räumen kombiniert. Die topologischen Relationen in den Zeichnungen werden mit den entsprechenden Mitteln des GIS berechnet und in eine Datenbank exportiert. Der Anforderungsprüfer vergleicht dann die Anforderungsdaten, die mit Hilfe des Anforderungsmanagers erzeugt wurden, mit den Topologiedaten. Dieser Ansatz soll zeigen, wie topologische Modelle eine Formalisierung semantisch hochstehender Informationen ermöglichen, indem sie als Eigenschaften von Graphen dargestellt werden
Das studentische Projekt Umweltorientiertes Projektmanagement (UWoPM) eröffnet eine neue Generation von Arbeitsweisen im Projektmanagement. Umweltbelange wirken über Rechtsvorschriften immer stärker in das Projektgeschäft hinein. Durch Einbeziehung von rechtsrelevanten Daten in die Projektdatenbasis sowie von Rechtsbestimmungen in die Wissensbasis wird eine Softwareunterstützung für (wenn auch zunächst nur elementare) Rechtsfragen geboten. Eine spezielle Präsentation von Rechtswissen und eine komfortable Unterstützung der Antragstellung sollen dies in die Selbstverständlichkeiten des Projektmanagements einbringen. Gleichzeitig bietet der UWoPM-Prototyp zeitgemäße Systemlösungen für die Kommunikation Antragsteller - Behörde sowie für den Workflow innerhalb der Genehmigungsbehörde. Dieser Vortrag gibt Einführung und Übersicht zu insgesamt 18 Diplomarbeiten, in denen die Einzelkomponenten des UWoPM entwickelt wurden. Zentrales Problem war die Überführung gesetzlicher Vorschriften in Wissensbasen. Durch Beschränkung auf >Kernbestimmungen< und Ausweis von Interpretationsbedarf wurde ein prinzipieller Lösungsweg realisiert. Die technische Realisierung konnte zwar über einen Prototyp noch nicht hinausgehen, weist aber die Realisierbarkeit des Gesamtansatzes nach.
Die Lage oder der Standort eines Bauwerkes ist zweifellos charakteristisch mit diesem verbunden. Die räumliche Einordnung eines exponierten architektonischen Werkes, die Erschließung eines Gebäudes im innerstädtischen Umfeld oder die Verwaltung eines Bestands ist im Bauwesen oder der Architektur immer visuell. Die Interaktion mit Zeichnungen, die Orientierung anhand eines Lageplans oder die Dokumentation mit Fotos sind nur einige Beispiele. Die wirtschaftliche Optimierung unter Nutzung solcher Daten und deren nachfolgende Visualisierung soll hier mittels geeigneter Systeme gezeigt werden. Aber auch die Bewertung durch und Interaktion mit dem Benutzer unterstützt werden. So soll dieser Artikel beispielhaft den Transport und Verkehr fokussieren. Mathematik Graphen und Netze formen dabei Modelle zur Optimierung der zugrundeliegenden Logistikprozesse: Die Baustoffbedarfsplanung mit Bestellwesen, (Ab-)Transport und Lieferung von Material, Tourenzusammenstellung oder Standortauswahl. Informatik Weiterhin wird deren softwaretechnische Umsetzung und Einordung in begleitende Projekte der >Mathematischen Optimierung< vorgestellt.
Thin elastic plates are the basic constructional elements and are very often subjected to dynamic effects especially in the machine-building structures. Their saving design of resonance conditions of operation is an extremely complicated task which cannot be solved analytically. In the present report an efficient and sufficiently general method for optimal design of thin plates is worked out on the basis of energy resonance method of Wilder, the method of the finite elements for dynamic research and the methods of parameter optimization. By means of these methods various limitations and requirements put by the designer to the plates can be taken into account. A programme module for numerical investigation of the weight variation of the plate depending on the taken variable of the designed thickness at different supporting conditions is developed. The reasons for the considerable quantity and quality difference between the obtained optimal designs are also analysed.
The process of matching data represented in two different data models is a longstanding issue in the exchange of data between different software systems. While the traditional manual matching approach cannot meet today’s demands on data exchange, research shows that a fully automated generic approach for model matching is not likely, and generic semi-automated approaches are not easy to implement. In this paper, we present an approach that focuses on matching data models in a specific domain. The approach combines a basic model matching approach and a version matching approach to deduce new matching rules to enable data transfer between two evolving data models.
This paper describes an ongoing research on the representation and reasoning about construction specifications, which is part of a bigger research project that aims at developing a formalism for automating the identification of deviations and defects on construction sites. We specifically describe the requirements on product and process models and an approach for representing and reasoning about construction specifications to enable automated detection and assessment of construction deviations and defects. This research builds on the previous research on modeling design specifications and extends and elaborates concept of contexts developed in that domain. The paper provides an overview of how the construction specifications are being modele d in this research and points out future steps that need to be accomplished to develop the envisioned automated deviation and defect detection system.
Current disaster management procedures rely primarily on heuristics which result in their strategies being very cautious and sub-optimum in terms of saving life, minimising damage and returning the building to its normal function. Also effective disaster management demands decentralized, dynamic, flexible, short term and across domain resource sharing, which is not well supported by existing distributing computing infrastructres. The paper proposes a conceptual framework for emergency management in the built environment, using Semantic Grid as an integrating platform for different technologies. The framework supports a distributed network of specialists in built environment, including structural engineers, building technologists, decision analysts etc. It brings together the necessary technology threads, including the Semantic Web (to provide a framework for shared definitions of terms, resources and relationships), Web Services (to provide dynamic discovery and integration) and Grid Computing (for enhanced computational power, high speed access, collaboration and security control) to support rapid formation of virtual teams for disaster management. The proposed framework also make an extensive use of modelling and simulation (both numerical and using visualisations), data mining (to find resources in legacy data sets) and visualisation. It also include a variety of hardware instruments with access to real time data. Furthermore the whole framework is centred on collaborative working by the virtual team. Although focus of this paper is on disaster management, many aspects of the discussed Grid and Visualisation technologies will be useful for any other forms of collaboration. Conclusions are drawn about the possible future impact on the built environment.
Toplogical Houses
(2003)
Many properties of houses are of topological nature. The problem of three-dimensional encoding is solved here by first giving an axiomatic description of a simplified concept of >house< as a certain generalisation of a cw-complex and, secondly, by generalising local observation structures of embedded unconnected planar graphs to the three-dimensional case and proving that they allow retrieving all topological properties of these simplified houses. In the more general case of an architectural complex (a certain generalisation of a >house<) still much topolgical information is kept in these structures still making them a useful approach to encoding topological spaces. Finally, a lossless representation of observation structures in a relational database scheme which we call PLAV (Points, Lines, Areas, Volumes) is given. We expect PLAV to be useful for encoding higher dimensional (architectural) space-time complexes.
A realistic and reliable model is an important precondition for the simulation of revitalization tasks and the estimation of system properties of existing buildings. Thereby, the main focus lies on the parameter identification, the optimization strategies and the preparation of experiments. As usual structures are modeled by the finite element method. This as well as other techniques are based on idealizations and empiric material properties. Within one theory the parameters of the model should be approximated by gradually performed experiments and their analysis. This approximation method is performed by solving an optimization problem, which is usually non-convex, of high dimension and possesses a non-differentiable objective function. Therefore we use an optimization procedure based on genetic algorithms which was implemented by using the program package SLang...
For analysis and planing of transport networks detailed information concerning travel sequences is required. The paper examines an activity chain model to determine stochastic travel demand which individual generates in order to participate in activity or sequence of activities over the day. The transition from one activity to another depends on the activity participation decision, which is made sequentially and is constrained in space and time. Activity chains derived from travel survey data are used as a base to develop a more realistic model than conventional discrete trip models. Probabilistic concepts and statistical procedures are used to estimate characteristics of travel demand such as the number of daily out-of-home activities and transition probability from one activity to another participated by homogeneous behavioural groups. In addition, the paper compares the model for two different sized towns.
The method of difference potentials can be used to solve discrete elliptic boundary value problems, where all derivatives are approximated by finite differences. Considering the classical potential theory, an integral equation on the boundary will be investigated, which is solved approximately by the help of a quadrature formula. The advantage of the discrete method consists in the establishment of a linear equation system on the boundary, which can be immediately solved on the computer. The described method of difference potentials is based on the discrete Laplace equation in the three-dimensional case. In the first step the integral representation of the discrete fundamental solution is presented and the convergence behaviour with respect to the continuous fundamental solution is discussed. Because the method can be used to solve boundary value problems in interior as well as in exterior domains, it is necessary to explain some geometrical aspects in relation with the discrete domain and the double-layer boundary. A discrete analogue of the integral representation for functions in will be presented. The main result consists in splitting the difference potential on the boundary into a discrete single- and double-layer potential, respectively. The discrete potentials are used to establish and solve a linear equation system on the boundary. The actual form of this equation systems and the conditions for solvability are presented for Dirichlet and Neumann problems in interior as well as in exterior domains
The increased implementation of site data capture technologies invariably results in an increase in data warehousing and database technologies to store captured data. However, restricted use of data beyond the initial application could potentially result in a loss of understanding of site processes. This could in turn lead to poor decision making at production, tactical and strategic levels. Concrete usage data have been collected from two piling processes. These data have been analysed and the results highlighted potential improvements that could be made to existing site management and estimating processes. A cost benefit analysis has been used to support decision making at the strategic level where the identified improvements require capital expenditure.
The preliminary design of a wearable computer for supporting Construction Progress Monitoring
(2000)
Progress monitoring has become more and more important as owners have increasingly demanded shorter times for the delivery of their projects. This trend is even more evident in high technology industries, such as the computer industry and the chemical industry. Fast changing markets, such as the computer industry, force companies to have to build new facilities quickly. To make a statement about construction progress, the status of a building has to be determined and monitored over a period of time. Depicting the construction progress in a diagram over time, statements can be made about the anticipated completion of the project and delays and problems in certain areas. Having this information, measures can be taken to efficiently >catch up< on the schedule of the project. New technologies, such as wearable computers, speech recognition, touch screens and wireless networks could help to move electronic data processing to the construction site. Progress monitoring could very much take advantage of this move, as several intermediate steps of processing progress data can be made unnecessary. The processing of progress data could be entirely done by computers, which means that data for supporting decisions can be made available at the moment the construction progress is measured. This paper describes a project, that investigates how these new technologies can be linked to create a system that enhances the efficiency of progress monitoring. During the project a first prototype of a progress monitoring system was developed that allows construction companies and site supervisors to measure construction progress on site using wearable computers that are speech controlled and connected to a central database via a wireless network.
The purpose of this paper is to review model for finite element techniques for non-linear crack analysis of reinforced concrete beams and slabs. The non-linear behaviour of concrete and steel were described. Some calculations of >self-stress< for concrete and reinforced concrete beam was made. Current computational aspects are discussed. Several remarks for future studies are also given. The numerical model of the concrete and reinforced concrete was described. The paper shows the results of calculations on a reinforced concrete plane stress panel with cracks. The non-linear, numerical model of calculations of reinforced concrete was assumed. Using finite elements method some calculations were made. The results of calculations like displacements, stresses and cracking are shown on diagrams. They were compared with experimental results and other finding. Some conclusions about the described model and results of calculation are shown.
In the abstract proposed is the Instrumental System of mechanics problems analysis of the deformed solid body. It supplies the researcher with the possibility to describe the input data on the object under analyses and the problem scheme based upon the variational principles within one task. The particular feature of System is possibility to describe the information concerning the object of any geometrical shape and the computation sheme according to the program defined for purpose. The Methods allow to compute the tasks with indefinite functional and indefinite geometry of the object (or the set of objects). The System provides the possibility to compute the tasks with indefinite sheme based upon the Finite Element Method (FEM). The restrictions of the System usage are therefore determined by the restrictions of the FEM itself. It contrast to other known programms using FEM (ANSYS, LS-DYNA and etc) described system possesses more universality in defining input data and choosing computational scheme. Builtin is an original Subsytem of Numerical Result Analuses. It possesses the possibility to visualise all numerical results, build the epures of the unknown variables, etc. The Subsystem is approved while solving two- and three-dimensional problems of Elasticiti and Plasticity, under the conditions of Geometrical Unlinearity. Discused are Contact Problems of Statics and Dynamics.
The conventional way of describing an image is in terms of its canonical pixel-based representation. Other image description techniques are based on image transformations. Such an image transformation converts a canonical image representation into a representation in which specific properties of an image are described more explicitly. In most transformations, images are locally approximated within a window by a linear combination of a number of a priori selected patterns. The coefficients of such a decomposition then provide the desired image representation. The Hermite transform is an image transformation technique introduced by Martens. It uses overlapping Gaussian windows and projects images locally onto a basis of orthogonal polynomials. As the analysis filters needed for the Hermite transform are derivatives of Gaussians, Hermite analysis is in close agreement with the information analysis carried out by the human visual system. In this paper we construct a new higher dimensional Hermite transform within the framework of Quaternionic Analysis. The building blocks for this construction are the Clifford-Hermite polynomials rewritten in terms of Quaternionic analysis. Furthermore, we compare this newly introduced Hermite transform with the Quaternionic-Hermite Continuous Wavelet transform. The Continuous Wavelet transform is a signal analysis technique suitable for non-stationary, inhomogeneous signals for which Fourier analysis is inadequate. Finally the developed three dimensional filter functions of the Quaternionic-Hermite transform are tested with traditional scalar benchmark signals upon their selectivity at detecting pointwise singularities.
In this paper the results of the investigations of the free oscillations of the pre-stressed flexible structure elements are presented . Two cases of the central preliminary stress are investigated : without intermediate fastening of the tie to the flexible element and with the intermediate fastening in the middle of the element length. The given physical model can be applied to the flexible sloping shells and arches, membranes, large space antenna fields (besides flexible elements). The peculiarity of these systems is the possibility of the non-adjacent equilibrium form existence at the definite relations of the physical parameters . The transition from one stable equilibrium form to another, non-adjacent form, may be treated as jump. In this case they are called systems with buckling or the systems with two potential «gaps». These systems commenced the new section of the mathematical physics - the theory of chaos and strange attractors. The analysis of the solutions confirms the received for the first time by the author and given in effect of the oscillation period doubling of the system during the transition from the «small» oscillations relatively center to the >large< relatively all three equilibrium conditions. The character of the frequency (period) dependence on the free oscillation amplitudes of the non-linear system also confirms the received earlier result of the duality of the system behaviour : >small< oscillations possess the qualities of soft system; >large< oscillations possess the qualities of rigid system. The >small< oscillation natural frequency changing, depending on the oscillation amplitudes, is in the internal . Here the frequency takes zero value at the amplitude values Aa and Ad (or Aa and Ae ); the frequency takes maximum value at the amplitude value near point b .The >large< oscillation natural frequency changes in the interval . Here is also observed . The influence of the tie intermediate fastening doesn't introduce qualitative changes in the behaviour of the investigated system. It only increases ( four times ) the critical value of the preliminary tension force
In the design of a structure, the implementation of reliable soil-foundation-structure interaction into the analysis process plays a very important role. The paper presents a determination of parameters of a suitably chosen soil-foundation model and their influence on the structure response. Since the mechanical data for the structure can be determined with satisfactory accuracy, the properties of the soil-foundation model were identified using measured dynamic response of the real structure. A simple model describing soil-foundation structure was incorporated into the classical 3-D finite element analysis of the structure with commercial software. Results obtained from the measured data on the pier were afterwards compared with those obtained with the finite model of the pier-foundation-soil structure. On the basis of this comparison the coefficients describing the properties in the soil-foundation model were adjusted until the calculated dynamic response coincided with the measured ones. In this way, the difference between both results was reduced to 1%. Full-scale tests measuring eigenmotion of the bridge were performed through all erection stages of the new bridge in Maribor. In this way an effective and experimentally verified 3-D model for a complex dynamic analysis of the bridge under the earthquake loading was obtained. The significant advantage of the obtained model is that it was updated on the basis of the dynamic measurements thus improving the model on the basis of in-situ geomechanical measurements. The model is very accurate in describing the upper structure and economical in describing the soil mass thus representing an optimal solution regarding computational efforts.
In the given paper the generalized formulation of the problem of computer modelling of the complex-composite structure interaction with different types of dynamic loads and effects is discussed. Here the analysis is given as for the usage of some universal computing systems for the solution of such problems. Also if is shown that the quantification of the dynamic models of the complex-composite systems with the variable structure, depending on the character and intensivity of the effects, is necessary. The different variants of the joint and the space structure element modelling are gested. It allows to consider the complex modes of the joint bending-torsional oscillations of such structures as bridges, towers, high-rise buildings. The peculiarities of the modelling and testing of some problems of the objects aerodynamics and the interaction of the frameworks constructions with shock and movable loads are considered. In this paper the examples of the complex-composite structure dynamic analysis are shown. It is achieved by means of some special methods of the input of the real inducements and loads of the exploitated analog-object into the computing model. The suggested models found a wide use both at the design of new structures and the dynamic monitoring of the exploitated structures.
For planning in existing built contexts, the building survey is the starting point for initial planning proposals, for the diagnosis and documentation of building damages, for the creation of objectives catalogues, for the detailed design of renovation and conversion measures and for ensuring fulfilment of building legislation, particularly by change of use and refitting. An examination of currently available IT-tools shows insufficient support for planning within existing contexts, most notably a deficit with regard to information capture and administration. This paper discusses the concept for a modular surveying system (basic concept, separation of geometry from semantic data, and separation into sub-systems) and the prototypical realisation of a system for the complete support of the entire building surveying process for existing buildings. The project aims to contribute to the development of a planning system for existing buildings. ...