Refine
Has Fulltext
- yes (219) (remove)
Document Type
- Conference Proceeding (123)
- Article (65)
- Doctoral Thesis (25)
- Master's Thesis (5)
- Diploma Thesis (1)
Institute
- Professur Informatik im Bauwesen (177)
- Professur Baubetrieb und Bauverfahren (10)
- Professur Grundbau (4)
- Professur Holz- und Mauerwerksbau (4)
- Professur Allgemeine Baustoffkunde (2)
- Professur Entwerfen und Architekturtheorie (2)
- Professur Informatik in der Architektur (2)
- Professur Massivbau I (2)
- Junior-Professur Computational Architecture (1)
- Junior-Professur Europäische Medienkultur (1)
Keywords
- Verteiltes System (37)
- Bautechnik (30)
- Bauwerk (27)
- Produktmodell (25)
- Simulation (23)
- Architektur (21)
- Modellierung (21)
- Mehragentensystem (19)
- Ingenieurbau (17)
- Planungsprozess (17)
Year of publication
- 2004 (219) (remove)
The contribution describes the didactical integration of wireless access networks for the campus of the University of Karlsruhe in the education of architects and engineers. It focuses on the development of an interdisciplinary communication network to encourage and promote the communication and collaboration between students. The project assumes that significant learning progresses in net-based learning scenarios are based upon the synchronous and asynchronous cooperation between the students themselves. The remote cooperation across borders of disciplines makes high demands on capacity in communicating and cooperating of the involved persons as well as on the supporting tools. Therefore, the collective acquisition of knowledge and cooperation has to be trained intensively during the studies. Based on the design and project oriented cooperation platform netzentwurf.de the authors developed the tools “Jobadmin“ to administrate multidisciplinary workgroups, the “Swarm Knowledge Catalogue“ to collect and store knowledge and “LivingCampus“, an instrument providing basic services for dynamic communication.
The uniqueness and the long life cycle of buildings imply a dynamically modifiable building model. The technological foundation for the management of digital building models, a dynamic model management system (MMS), developed by our research group, allows to explicitly access and to modify the object model of the stored planning data. In this paper, the integration of constraints in digital building models will be shown. Constraints are conditions, which apply to the instances of domain model classes, and are defined by the user at runtime of the information system. For the expression of constraints, the Constraint Modelling Language (CML) has been developed and will be described in this paper. CML is a powerful, intuitively usable object-oriented language, which allows the expression of constraints at a high semantic level. A constrained-enabled MMS can verify, whether an instance fulfils the applying constraints. To ensure flexibility, the evaluation of constraints is not implicitly performed by the systems, but explicitly initiated by the user. A classification of constraint types and example usage scenarios are given.
The increasing demands in building and civil engineering – with regard to the growing amount of legal requirements and the needs of a flexible usage of the building - requires an optimisation of all processes during the planning and construction phases. This aim can be only reached by transferring of innovative information and communication technologies in the field of cooperation of all partners in a building project. In this article the enhancement of the existing planning processes based on an improved information management is introduced. Since the late 90ies the availability of hardware and software infrastructures for a networkbased cooperation, e.g. email, in small and middle-sized companies increased the problems of an unstructured communication in the planning and construction processes. These problems have not been solved by the usage of the upcoming project communication systems either, which are often used as a simple medium for data transfer. Because of the easy way of distributing documents to all planning partners a huge amount of files and subsequent versions can be stored so that the planners often have to scope with an information overflow. The underlying hierarchical structures based on simple files stored in tree views are not sufficient for an adequate representation of the different specific views of the planners and the management of relationships between the three information domains building structure, costs and time schedules. ..
Construction is a conservative industry that over the last twenty ye ars has experienced drastic changes in the way that interdisciplinary teams interact to design and execute a project. In this article we offer a general overview of how the main participants cooperate in the different phases of a construction project, and which are some of the main areas for communication improvement. We also explore the communication tools used in the exchange of information, and identify the main causes of information breakdown. The general framework of this study is of application to both standard and green projects. At the end of the article we discuss the peculiarities of green buildings. Our goal is to offer a series of industry insights derived from the perspective of a general contractor aimed at identifying the areas where contributions in computing and information exchange could have a greater impact on the successful completion of a project.
An important feature of the 2003 SARS outbreak in Canada, Singapore, and Hong Kong was that many health care workers (HCWs) developed SARS after caring for patients with SARS. This has been ascribed to inadequate or ineffective patient isolation. However, it is difficult for dense cities to provide sufficient isolation facilities within a short period of time. This has raised concerns from the public for new strategies in the planning and design of isolation facilities. Considering that SARS or other infectious diseases could seriously damage our society’s development, isolation facilities that could be rapidly and economically constructed with appropriate environmental controls are essential. For this reason, the design team of the Department of Architecture collaborated with a special task force from the Faculty of Medicine, who are the frontline medical officers treating the SARS patients, to design Rapidly Assembled Isolation Patient Wards. Both architecture and medicine are well established disciplines, but they have little in common in terms of the mode of knowledge construction and practice. This induced much intellectual exploration and research interest in conducting this study. The process has provided an important reference for cross disciplinary studies between the architectural and medical domains.
This paper examines the impact of information technology (IT) utilization on construction firm performance. Based on empirical data collected from 74 US construction firms, the analyses provide evidence that IT has a positive impact on overall firm performance, schedule performance, and cost performance. Firm performance is a composite score of several metrics of performance: schedule performance, cost performance, customer satisfaction, safety performance, and profit. No relationship is found between IT utilization and customer satisfaction, safety, or profit, although this may be due to limitations of the study given strong correlations between IT utilization and cost and schedule performnance. The empirical evidence of positive association between performance and IT use provided by this research is significant to both construction practice and research literature. This evidence should encourage firms to adopt and invest in IT tools.
The paper describes a concept for the step-by-step computer-aided capture and representation of geometric building data in the context of planning-oriented building surveying. Selected aspects of the concept have been implemented and tested as prototypes. The process of step-by-step capture and representation is determined by the order in which the user experiences the building. Only the information that the user knows (can see) or can reasonably deduce is represented. In addition approaches to the flexible combination of different measuring techniques and geometric abstractions are described which are based upon geodetic computational adjustment.
The construction industry is a supportive industry in China. IT (information technolgy), including computer technology and communication technology, as a whole is regarded as the most important means to upgrade the construction industry so that research projects were organized by Chinese government to further the application of IT in the construction industry. This study originated from one of the projects and is aimed at grasping the general situation on the application of IT in the construction industry. A questionnaire was designed for the survey, which used stratified proportional sampling method, and was carried out under the help of a government agency. This study can not only provide sound foundation for the government to make relative policies, but also reveal references for the firms in construction industry to apply IT in their business. This paper presents the preliminary result of the survey.
In recent years, the survey is performed for repair, such as a bridge and a building built in past, spending great expense. And it is anxious for the survey technique that doesn’t need cost and time more. Then, we made an idea of the technique of precise 3D model creation by 2D pictures. However, the technique of performing the improvement in accuracy of convergent photographing and automatic acquisition of corresponding points was not established. Therefore, in this research, we try to obtain a semi-automation of corresponding points acquisition from initial corresponding points and the improvement in accuracy of convergent photographing. Moreover, we applied the research to the used house of Japanese real estate, and the applicable field was selected as the high needs of the residence of 3D model. And we developed the system that everyone could create Web / 3D model house by VRML easily without requiring expensive apparatuses or expertise.
The planning of projects in building engineering is a complex process which is characterized by a dynamical composition and many modifications during the definition and execution time of processes. For a computer-aided and network-based cooperation a formal description of the planning process is necessary. In the research project “Relational Process Modelling in Cooperative Building Planning” a process model is described by three parts: an organizational structure with participants, a building structure with states and a process structure with activities. This research project is part of the priority program 1103 “Network-Based Cooperative Planning Processes in Structural Engineering” promoted by the German Research Foundation (DFG). Planning processes in civil engineering can be described by workflow graphs. The process structure describes the logical planning process and can be formally defined by a bipartite graph. This structure consists of activities, transitions and relationships between activities and transitions. In order to minimize errors at execution time of a planning process a consistent and structurally correct process model must be guaranteed. This contribution considers the concept and the algorithms for checking the consistency and the correctness of the process structure.