Refine
Has Fulltext
- yes (13) (remove)
Document Type
- Conference Proceeding (13) (remove)
Keywords
- Baubetrieb (13) (remove)
Year of publication
- 2004 (13) (remove)
Let the information of a civil engineering application be decomposed into objects of a given set of classes. Then the set of objects forms the data base of the application. The objects contain attributes and methods. Properties of the objects are stored in the attributes. Algorithms which the objects perform are implemented in the methods of the objects. If objects are modified by a user, the consistency of data in the base is destroyed. The data base must be modified in an update to restore its consistency. The sequence of the update operations is not arbitrary, but is governed by dependence between the objects. The situation can be described mathematically with graph theory. The available algorithms for the determination of the update sequence are not suitable when the data base is large. A new update algorithm for large data bases has been developed and is presented in this paper.
To support research in the building sector and in order to help it move towards a new digital economy, the European Commission under the 5th Framework initiative, especially the IST programme, funded various RTD projects. The opportunity to bring these IST projects together was acknowledged so that stronger links can be created under a clustering umbrella and that, moreover, links of those projects with their RTD environment could be facilitated. This has been the objective of work carried out within the ICCI (IST-2001-33022) Cluster project. This paper introduces the main aims and objectives of the project, and then presents its principal outcomes. In a second part, it synthesises the underlying concepts, technology and tools that will make ICT-based Construction a reality in a near future, and gives recommended actions for the industry, the EC and the Construction ICT R&D in Europe, giving some benefit of this project experience to the three communities.
Cost and Schedule Controlling in Relation to Liquidity Management during Construction Projects
(2004)
The present paper describes a software application which can be used for relating the scheduled events of a construction project with the respective financial parameters, leading to an overall improvement in general controlling and liquidity management. For this purpose, existing construction schedules are taken and details of the assignment are recorded. Thus it becomes possible to assess a future payment status should changes in the designated schedule occur.