Due to economical, technical or political reasons all over the world about 100 nuclear power plants have been disconnected until today. All these power stations are still waiting for their complete dismantling which, considering one reactor, causes cost of up to one Bil. Euros and lasts up to 15 years. In our contribution we present a resource-constrained project scheduling approach minimizing the total discounted cost of dismantling a nuclear power plant. A project of dismantling a nuclear power plant can be subdivided into a number of disassembling activities. The execution of these activities requires time and scarce resources like manpower, special equipment or storage facilities for the contaminated material arising from the dismantling. Moreover, we have to regard several minimum and maximum time lags (temporal constraints) between the start times of the different activities. Finally, each disassembling activity can be processed in two alternative execution modes, which lead to different disbursements and determine the resource requirements of the considered activity. The optimization problem is to determine a start time and an execution mode for each activity, such that the discounted cost of the project is minimum, and neither the temporal constraints are violated nor the activities' resource requirements exceed the availability of any scarce resource at any point in time. In our contribution we introduce an appropriate multi-mode project scheduling model with minimum and maximum time lags as well as renewable and cumulative resources for the described optimization problem. Furthermore, we show that the considered optimization problem is NP-hard in the strong sense. For small problem instances, optimal solutions can be gained from a relaxation based enumeration approach which is incorporated into a branch and bound algorithm. In order to be able to solve large problem instances, we also propose a truncated version of the devised branch and bound algorithm.
We consider efficient numerical methods for the solution of partial differential equations with stochastic coefficients or right hand side. The discretization is performed by the stochastic finite element method (SFEM). Separation of spatial and stochastic variables in the random input data is achieved via a Karhunen-Loève expansion or Wiener's polynomial chaos expansion. We discuss solution strategies for the Galerkin system that take advantage of the special structure of the system matrix. For stochastic coefficients linear in a set of independent random variables we employ Krylov subspace recycling techniques after having decoupled the large SFEM stiffness matrix.
The contribution presents a model that is able to simulate construction duration and cost for a building project. This model predicts set of expected project costs and duration schedule depending on input parameters such as production speed, scope of work, time schedule, bonding conditions and maximum and minimum deviations from scope of work and production speed. The simulation model is able to calculate, on the basis of input level of probability, the adequate construction cost and time duration of a project. The reciprocal view attends to finding out the adequate level of probability for construction cost and activity durations. Among interpretive outputs of the application software belongs the compilation of a presumed dynamic progress chart. This progress chart represents the expected scenario of development of a building project with the mapping of potential time dislocations for particular activities. The calculation of a presumed dynamic progress chart is based on an algorithm, which calculates mean values as a partial result of the simulated building project. Construction cost and time models are, in many ways, useful tools in project management. Clients are able to make proper decisions about the time and cost schedules of their investments. Consequently, building contractors are able to schedule predicted project cost and duration before any decision is finalized.
We propose a new approach to the numerical solution of quasi-static elastic-plastic problems based on the Moreau-Yosida theorem. After the time discretization, the problem is expressed as an energy minimization problem for unknown displacement and plastic strain fields. The dependency of the minimization functional on the displacement is smooth whereas the dependency on the plastic strain is non-smooth. Besides, there exists an explicit formula, how to calculate the plastic strain from a given displacement field. This allows us to reformulate the original problem as a minimization problem in the displacement only. Using the Moreau-Yosida theorem from the convex analysis, the minimization functional in the displacements turns out to be Frechet-differentiable, although the hidden dependency on the plastic strain is non-differentiable. The seconds derivative exists everywhere apart from the elastic-plastic interface dividing elastic and plastic zones of the continuum. This motivates to implement a Newton-like method, which converges super-linearly as can be observed in our numerical experiments.
Adopting the European laws concerning environmental protection will require sustained efforts of the authorities and communities from Romania; implementing modern solutions will become a fast and effective option for the improvement of the functioning systems, in order to prevent disasters. As a part of the urban infrastructure, the drainage networks of pluvial and residual waters are included in the plan of promoting the systems which protect the environmental quality, with the purpose of integrated and adaptive management. The paper presents a distributed control system for sewer network of Iasi town. Unsatisfactory technical state of the actual sewer system is exposed, focusing on objectives related to implementation of the control system. The proposed distributed control system of Iasi drainage network is based on the implementation of the hierarchic control theory for diagnose, sewer planning and management. There are proposed two control levels: coordinating and local execution. Configuration of the distributed control system, including data acquisition and conversion equipment, interface characteristics, local data bus, data communication network, station configuration are widely described. The project wish to be an useful instrument for the local authorities in the preventing and reducing the impact of future natural disasters over the urban areas by means of modern technologies.
The execution of project activities generally requires the use of (renewable) resources like machines, equipment or manpower. The resource allocation problem consists in assigning time intervals to the execution of the project activities while taking into account temporal constraints between activities emanating from technological or organizational requirements and costs incurred by the resource allocation. If the total procurement cost of the different renewable resources has to be minimized we speak of a resource investment problem. If the cost depends on the smoothness of the resource utilization over time the underlying problem is called a resource levelling problem. In this paper we consider a new tree-based enumeration method for solving resource investment and resource levelling problems exploiting some fundamental properties of spanning trees. The enumeration scheme is embedded in a branch-and-bound procedure using a workload-based lower bound and a depth first search. Preliminary computational results show that the proposed procedure is promising for instances with up to 30 activities.
In this study we introduce a concept of discrete Laplacian on the plane lattice and consider its iteration dynamical system. At first we discuss some basic properties on the dynamical system to be proved. Next making their computer simulations, we show that we can realize the following phenomena quite well:(1) The crystal of waters (2) The designs of carpets, embroideries (3) The time change of the numbers of families of extinct animals, and (4) The echo systems of life things. Hence we may expect that we can understand the evolutions and self organizations by use of the dynamical systems. Here we want to make a stress on the following fact: Although several well known chaotic dynamical systems can describe chaotic phenomena, they have difficulties in the descriptions of the evolutions and self organizations.
Reasonably accurate cost estimation of the structural system is quite desirable at the early stages of the design process of a construction project. However, the numerous interactions among the many cost-variables make the prediction difficult. Artificial neural networks (ANN) and case-based reasoning (CBR) are reported to overcome this difficulty. This paper presents a comparison of CBR and ANN augmented by genetic algorithms (GA) conducted by using spreadsheet simulations. GA was used to determine the optimum weights for the ANN and CBR models. The cost data of twenty-nine actual cases of residential building projects were used as an example application. Two different sets of cases were randomly selected from the data set for training and testing purposes. Prediction rates of 84% in the GA/CBR study and 89% in the GA/ANN study were obtained. The advantages and disadvantages of the two approaches are discussed in the light of the experiments and the findings. It appears that GA/ANN is a more suitable model for this example of cost estimation where the prediction of numerical values is required and only a limited number of cases exist. The integration of GA into CBR and ANN in a spreadsheet format is likely to improve the prediction rates.
The ride of the tram along the line, defined by a time-table, consists of the travel time between the subsequent sections and the time spent by tram on the stops. In the paper, statistical data collected in the city of Krakow is presented and evaluated. In polish conditions, for trams the time spent on stops makes up the remarkable amount of 30 % of the total time of tram line operation. Moreover, this time is characterized by large variability. The time spent by tram on a stop consists of alighting and boarding time and time lost by tram on stop after alighting and boarding time ending, but before departure. Alighting and boarding time itself usually depends on the random number of alighting and boarding passengers and also on the number of passengers which are inside the vehicle. However, the time spent by tram on stop after alighting and boarding time ending is an effect of certain random events, mainly because of impossibility of departure from stop, caused by lack of priorities for public transport vehicles. The main focus of the talk lies on the description and the modelling of these effects. This paper is involved with CIVITAS-CARAVEL project: "Clean and better transport in cites". The project has received research funding from the Community's Sixth Framework Programme. The paper reflects only the author's views and the Community is not liable for any use that may be made of the information contained therein.
Mit diesen Ausführungen wird ein Beitrag zum weiteren Erhalt der historischen Bausubstanz in Mecklenburg aus der Sicht der Tragwerksanalyse geleistet. Dabei bestätigt es sich immer mehr, dass mit dem Modell der Geometrie, der Belastung und des Materials gleichberechtigte Modelle für eine wirklichkeitsnahe Einschätzung des Tragverhaltens eines Tragwerks vorliegen müssen. Es zeigt sich, dass dabei die besten Berechnungsprogramme nur die Ergebnisse liefern können, die mit den Eingabedaten zu erzielen sind. So hat sich der Forschungsschwerpunkt im Lehrgebiet Tragwerkslehre des FB Architektur an der Hochschule Wismar in den letzten Jahren auf die realistische Abbildung der Wechselwirkung zwischen der Bauaufnahme und der geometrischen Modellierung konzentriert. In diesem Bereich zeigen sich als Schwerpunkte die Wechselwirkung zwischen Schäden und Tragwerksanalyse und die Wechselwirkung zwischen der aufgenommenen Geometrie und dem geometrischen Modell für die Tragwerksanalyse. Die Fülle der aufgenommenen Daten sind dabei in der Regel mehr hinderlich als ein Segen für die Tragwerksanalyse. Hier wurde gezeigt, welche und wie viele geometrische Daten für das geometrische Modell für die Tragwerksanalyse sinnvoll sind. Da die eigene Datenaufnahme relativ viel Zeit beansprucht, wurde eine "geistige" Bauaufnahme durchgeführt. Dazu wird der historische Planungsprozess in den einzelnen Formfindungsschritten nachvollzogen und in die virtuelle Realität überführt. Mit dieser Methode ergeben sich unterschiedliche Bauzustände und es lassen sich auch mögliche Bauphasen abbilden. Die Tragwerksanalyse dieser virtuellen Realität zeigt dann mögliche Schwächen der Tragwerke und/oder die Notwendigkeit konstruktiver Veränderungen. Ein Vergleich der Ergebnisse der Tragwerksanalyse mit der Realität anhand des vorliegenden Datenbestands liefert die Grundlage für den aktuellen Handlungsbedarf. Da der Bauzustand eines Bauwerkes unter einer zeitlichen Veränderung steht, werden Methoden überprüft, die es ermöglichen, einen einmal vorgelegten Datenbestand aufzubereiten und weiter zu verwalten.