Refine
Document Type
- Doctoral Thesis (6)
- Master's Thesis (3)
- Article (2)
- Bachelor Thesis (2)
- Conference Proceeding (1)
- Report (1)
Institute
- Professur Informatik im Bauwesen (5)
- Professur Baubetrieb und Bauverfahren (3)
- Professur Bauphysik (3)
- Professur Modellierung und Simulation - Konstruktion (3)
- Professur Baumanagement und Bauwirtschaft (1)
- Professur Informatik in der Architektur (1)
- Professur Intelligentes Technisches Design (1)
- bauhaus.institut für experimentelle Architektur (1)
Keywords
- BIM (15) (remove)
A Flexible Model for Incorporating Construction Product Data into Building Information Models
(2006)
When considering the integration and interoperability between AEC-FM software applications and construction products' data, it is essential to investigate the state-of-the-art and conduct an extensive review in the literature of both Building Information Models and electronic product catalogues. It was found that there are many reasons and key-barriers that hinder the developed solutions from being implemented. Among the reasons that are attributed to the failure of many previous research projects to achieve this integration aim are the proprietary developments of CAD vendors, the fragmented nature of construction product data i.e. commercial and technical data, the prefabrication versus on-site production, marketing strategies and brand-naming, the referencing of a product to the data of its constituents, availability of life-cycle data in a single point in time where it is needed all over the whole life-cycle of the product itself, taxonomy problems, the inability to extract search parameters from the building information model to participate in the conduction of parametric searches. Finally and most important is keeping the product data in the building information model consistent and up-to-date. Hence, it was found that there is a great potential for construction product data to be integrated to building information models by electronic means in a dynamic and extensible manner that prevents the model from getting obsolete. The study has managed to establish a solution concept that links continually updated and extensible life-cycle product data to a software independent building information model (IFC) all over the life span of the product itself. As a result, the solution concept has managed to reach a reliable building information model that is capable of overcoming the majority of the above mentioned barriers. In the meantime, the solution is capable of referencing, retrieving, updating, and merging product data at any point in time. A distributed network application that represents all the involved parties in the construction product value chain is simulated by real software tools to demonstrate the proof of concept of this research work.
Im Rahmen des sich derzeit vollziehenden Wandels von der segmentierten, zeichnungsorientierten zur integrierten, modellbasierten Arbeitsweise bei der Planung von Bauwerken und ihrer Erstellung werden Computermodelle nicht mehr nur für die physikalische Simulation des Bauwerksverhaltens, sondern auch zur Koordination zwischen den einzelnen Planungsdisziplinen und Projektbeteiligten genutzt. Die gemeinsame Erstellung und Nutzung dieses Modells zur virtuellen Abbildung des Bauwerks und seiner Erstellungsprozesse, das sog. Building Information Modeling (BIM), ist dabei zentraler Bestandteil der Planung. Die Integration der Terminplanung in diese Arbeitsweise erfolgt bisher jedoch nur unzureichend, meist lediglich in der Form einer nachgelagerten 4D-Simulation zur Kommunikation der Planungsergebnisse. Sie weist damit im Verhältnis zum entstehenden Zusatzaufwand einen zu geringen Nutzen für den Terminplaner auf. Gegenstand der vorliegenden Arbeit ist die tiefere Einbettung der Terminplanung in die modellbasierte Arbeitsweise. Auf Basis einer umfassende Analyse der Rahmenbedingungen und des Informationsbedarfs der Terminplanung werden Konzepte zur effizienten Wiederverwendung von im Modell gespeicherten Daten mit Hilfe einer Verknüpfungssprache, zum umfassenden Datenaustausch auf Basis der Industry Foundation Classes (IFC) und für das Änderungsmanagement mittels einer Versionierung auf Objektebene entwickelt.Die für die modellbasierte Terminplanung relevanten Daten und ihre Beziehungen zueinander werden dabei formal beschrieben sowie die Kompatibilität ihrer Granularität durch eine Funktionalität zur Objektteilung sichergestellt. Zur zielgenauen Extraktion von Daten werden zudem Algorithmen für räumliche Anfragen entwickelt. Die vorgestellten Konzepte und ihre Anwendbarkeit werden mittels einer umfangreichen Pilotimplementierung anhand von mehreren Praxisbeispielen demonstriert und somit deren praktische Relevanz und Nutzen nachgewiesen.
Der inhaltlichen Qualitätssicherung von Bauwerksinformationsmodellen (BIM) kommt im Zuge einer stetig wachsenden Nutzung der verwendeten BIM für unterschiedliche Anwen-dungsfälle eine große Bedeutung zu. Diese ist für jede am Datenaustausch beteiligte Software dem Projektziel entsprechend durchzuführen. Mit den Industry Foundation Classes (IFC) steht ein etabliertes Format für die Beschreibung und den Austausch eines solchen Modells zur Verfügung. Für den Prozess der Qualitätssicherung wird eine serverbasierte Testumgebung Bestandteil des neuen Zertifizierungsverfahrens der IFC sein. Zu diesem Zweck wurde durch das „iabi - Institut für angewandte Bauinformatik” in Zusammenarbeit mit „buildingSMART e.V.“ (http://www.buildingsmart.de) ein Global Testing Documentation Server (GTDS) implementiert. Der GTDS ist eine, auf einer Datenbank basierte, Web-Applikation, die folgende Intentionen verfolgt:
• Bereitstellung eines Werkzeugs für das qualitative Testen IFC-basierter Modelle
• Unterstützung der Kommunikation zwischen IFC Entwicklern und Anwendern
• Dokumentation der Qualität von IFC-basierten Softwareanwendungen
• Bereitstellung einer Plattform für die Zertifizierung von IFC Anwendungen
Gegenstand der Arbeit ist die Planung und exemplarische Umsetzung eines Werkzeugs zur interaktiven Visualisierung von Qualitätsdefiziten, die vom GTDS im Modell erkannt wurden. Die exemplarische Umsetzung soll dabei aufbauend auf den OPEN IFC TOOLS (http://www.openifctools.org) erfolgen.
Vom Bauwerksinformationsmodell zur Terminplanung - Ein Modell zur Generierung von Bauablaufplänen
(2011)
Die effiziente und zielgerichtete Ausführung von Bauvorhaben wird in hohem Maße von der zugrunde liegenden Bauablaufplanung beeinflusst. Dabei ist unter Verwendung herkömmlicher Methoden und Modelle die Planung des Bauablaufs ein zumeist aufwändiger und fehlerträchtiger Prozess. Am Ende der gegenwärtig üblichen Vorgehensweise für die Planung eines Bauablaufs erfolgt lediglich die Dokumentation des Endergebnisses. Mögliche Ablaufalternativen, die im Verlauf der Planung betrachtet wurden, sind im resultierenden Bauablaufplan nicht enthalten und gehen verloren. Eine formale Kontrolle des geplanten Bauablaufs hinsichtlich seiner Vollständigkeit ist nur begrenzt möglich, da beispielsweise existierende Methoden der 4D-Visualisierung derzeit nicht ausreichend in den Prozess der Planung von Bauabläufen integriert sind. Gegenstand der vorliegenden Arbeit ist die Entwicklung eines neuen Modells für die Unterstützung der Bauablaufplanung. Dafür wird der größtenteils manuelle Vorgang der Bauablaufplanung auf Basis verfügbarer Bauwerksinformationsmodelle (BIM) weitestgehend automatisiert und die Methodik der 4D-Animation in den Prozess der Bauablaufplanung integriert. Ausgehend von in einer Erfahrungsdatenbank gespeicherten Informationen werden auf Basis einer Ähnlichkeitsermittlung Bauteilen des betrachteten BIM geeignete Vorgänge zugeordnet und mittels Algorithmen der Graphentheorie ein Workflowgraph aller mög\-lichen Bauablaufvarianten generiert. Aufgrund der vorgenommenen Kopplung des Bauablaufplans mit Bauteilen eines BIM und der visuellen Darstellung des Bauablaufs kann vom Planer im Rahmen der Modellierungsgenauigkeit des BIM auf die Vollständigkeit des Bauablaufplans geschlossen werden. Dies ermöglicht dem Anwender ein hohes Maß an Kontrolle des geplanten Bauablaufs bereits innerhalb der Planungsphase. Weiterhin unterstützt das entwickelte Modell die Integration von Ablaufvarianten, was deren Gegenüberstellung ermöglicht und die Wiederverwendbarkeit bereits geplanter Bauabläufe durch eine entsprechend ausgerichtete Abbildung des Modells. Die Anwendbarkeit des erarbeiteten Modells wird anhand einer prototypischen Implementierung nachgewiesen und anhand eines Praxisbeispiels verifiziert.
Nutzerorientierte Bausanierung bedeutet eine gegenüber dem konventionellen Vorgehen deutlich verstärkte Ausrichtung des Planungs- und Sanierungsprozesses auf die Anforderungen und Bedürfnisse des zukünftigen Nutzers eines Gebäudes. Dies hat einerseits ein hochwertigeres Produkt zum Ergebnis, erfordert andererseits aber auch den Einsatz neuer Methoden und Baustoffe sowie ein vernetztes Zusammenarbeiten aller am Bauprozess Beteiligten. Der Fokus der Publikation liegt dabei auf den Bereichen, die eine hohe Relevanz für die nutzerorientierte Bausanierung aufweisen. Dabei handelt es sich insbesondere um: Computergestütztes Bauaufmaß und digitale Bauwerksmodellierung (BIM), bauphysikalische Methoden zur Optimierung von Energieeffizienz und Behaglichkeit bei der Sanierung von Bestandsgebäuden, zerstörungsfreie Untersuchungsmethoden im Rahmen einer substanzschonenden Bauzustandsanalyse und Entwicklung von Ergänzungsbaustoffen.
Das Projekt nuBau ist eine Kooperation zwischen den Fakultäten Bauingenieurwesen und Architektur der Bauhaus-Universität Weimar. Die beteiligten Professuren sind: Bauphysik, Informatik in der Architektur, Polymere Werkstoffe und Werkstoffe des Bauens.
The increasing success of BIM (Building Information Model) and the emergence of its implementation in 3D construction models have paved a way for improving scheduling process. The recent research on application of BIM in scheduling has focused on quantity take-off, duration estimation for individual trades, schedule visualization, and clash detection.
Several experiments indicated that the lack of detailed planning causes about 30% non-productive time and stacking of trades. However, detailed planning still has not been implemented in practice despite receiving a lot of interest from researchers. The reason is associated with the huge amount and complexity of input data. In order to create a detailed planning, it is time consuming to manually decompose activities, collect and calculate the detailed information in relevant. Moreover, the coordination of detailed activities requires much effort for dealing with their complex constraints.
This dissertation aims to support the generation of detailed schedules from a rough schedule. It proposes a model for automated detailing of 4D schedules by integrating BIM, simulation and Pareto-based optimization.
Jede Baumaßnahme ist durch einen Unikatcharakter geprägt. Individuelle Planung, Vergabe und Bauvorgänge stellen immer wieder aufs Neue eine große Herausforderung dar. Durch die sich teilweise sehr schnell ändernden Randbedingungen, müssen erarbeitete Abläufe häufig schnell geändert werden. Dies geschieht heutzutage meist auf Grundlage von Erfahrungen der am Bau Beteiligten. Auch bei bester Planung und Vorbereitung können Unwägbarkeiten den Bauprozess aufhalten. Das können ungeeigneter Baugrund, verschiedenste Hinderungen im Baufeld, schlechte Witterungsverhältnisse, Ausfälle von Maschinen, veränderte Zielsetzungen des Auftraggebers und vieles mehr sein. Dies führt zu Bauzeitverlängerungen und damit zu Kostensteigerungen.
Um diesen Problemen besser begegnen zu können und diesen komplexen und fehler-anfälligen Prozess zu unterstützen, sind ein verbesserter Informationsfluss, genauere Boden-aufschlüsse und eine exaktere Dimensionierung des einzusetzenden Gerätes notwendig.
Aus diesen Gründen ist der Einsatz von Building Information Modeling (BIM) sinnvoll. BIM bietet die Möglichkeit den Informationsfluss zu verbessern, die Datengenauigkeit zu erhöhen und Abläufe zu optimieren. Außerdem ermöglicht die Anwendung Planungsschritte miteinander zu verknüpfen, Kalkulationen zu vereinfachen und das Erstellen eines intelligenten Modells, das über den gesamten Lebenszyklus erweitert werden kann.
Die Maßnahmen des Spezialtiefbaus zählen zu den kostenintensivsten auf einer Baustelle. Großes Gerät und spezialisierte Firmen sind für eine erfolgreiche Durchführung unerlässlich. Da der Baugrund immer einen großen Unsicherheitsfaktor bildet, müssen geeignete, unterstützende Anwendungen zum Einsatz kommen. Hierfür bildet BIM eine geeignete Plattform. Protokolle, Maschinendaten und Kontrolldaten können hier webbasiert analysiert und für alle zugänglich gemacht werden, um zum einen die Transparenz zu steigern und zum anderen den Überblick, selbst bei hochkomplexen Bauvorhaben zu behalten.
In dieser Arbeit soll ein Überblick über die aktuelle Forschungssituation im Bereich Building Information Modeling im Erdbau, speziell im Spezialtiefbau, gegeben werden. Die Ergebnisse die mit Hilfe vorhandener Publikationen und Forschungsarbeiten verschiedener Universitäten und namhafter Forschungsgruppen zusammengetragen wurden sollen eine Grundlage für die weitere Forschung in diesem Bereich bilden. Über die Aufgabenstellung hinaus wird zusätzlich mit dem Softwareprogramm Revit 2014 ein Modell erstellt. Es wird versucht eine überschnittene Bohrpfahlwand zu modellieren und sie mit Parametern auszustatten. Zusammenfassend wird das Programm für den Einsatz bewertet.
Die meisten Baustellen bieten Optimierungspotential. Vor allem der Erdbau fordert durch seine hohe Dynamik und großen Unsicherheiten eine hohe Planungsleistung für jedes neue Projekt. Doch auch bei bester Planung und Vorbereitung kann der Bauprozess durch nicht vorhersehbare Einwirkungen aufgehalten werden. Dazu zählen Witterungseinflüsse, Baumaschinenausfälle, unvorhergesehene Bodenschichten und veränderte Zielsetzungen des Auftraggebers. Dies kann zu Störungen im Bauablauf führen, die eine Bauzeitverzögerung und eine Kostensteigerung nach sich ziehen. Um diese Probleme zu umgehen, sind ein verbesserter Informationsfluss, genaue Bodenaufschlüsse und eine exakte Dimensionierung des einzusetzenden Gerätes notwendig.
Hier kann Building Information Modeling (BIM) zum Einsatz kommen. Diese Anwendung bietet die Möglichkeit, die Datengenauigkeit zu erhöhen, den Informationsfluss auf der Baustelle zu verbessern, eine Informationsplattform für alle Beteiligten zu schaffen und die Abläufe transparent zu gestalten. Außerdem ermöglicht die Anwendung Planungsschritte miteinander zu verknüpfen, Kalkulationen zu vereinfachen und das Erstellen eines intelligenten Modells, das über den gesamten Lebenszyklus erweitert werden kann.
Die Grundlagen dieser Arbeit bilden die Begriffsdefinitionen zu Erdbau, Tiefbau und Building Information Modeling. Diese Arbeit setzt sich speziell mit Erdbauwerken und deren Sicherungsmaßnahmen auseinander. Darauf aufbauend wird im Rahmen einer Recherche der Forschungsstand im Bereich Building Information Modeling und Tiefbau zusammengefasst. Mit Hilfe einiger Forschungsbeiträge, -projekte, -verbände, Dissertationen und Anwendungsprogrammen wird ein Überblick geschaffen. Die Übersicht soll eine Grundlage für die weitere Forschung auf diesem Gebiet bilden. Abschließend findet eine Bewertung statt.
Über die Aufgabenstellung hinaus wird zusätzlich mit dem Softwareprogramm Revit 2014 ein Modell erstellt, um aufzuzeigen, dass das Potential auf Erdbaustellen mit BIM-Anwendungen besser ausgeschöpft werden kann. Es wird versucht eine Gabionenwand, eine Sicherungsmaßnahme von Erdbauwerken zu modellieren und sie mit Parametern auszustatten. Zusammenfassend wird das Programm für den Einsatz im Tiefbau bewertet.
The building sector is responsible for a large share of human environmental impacts. Architects and planners are the key players for reducing the environmental impacts of buildings, as they define them to a large extent. Life Cycle Assessment (LCA) allows for the holistic environmental analysis of a building. However, it is currently not employed to improve the environmental performance of buildings during the design process, although the potential for optimization is greatest there. One main reason is the lack of an adequate means of applying LCA in the architectural design process. As such, the main objective of this thesis is to develop a method for environmental building design optimization that is applicable in the design process. The key concept proposed in this thesis is to combine LCA with parametric design, because it proved to have a high potential for design optimization.
The research approach includes the analysis of the characteristics of LCA for buildings and the architectural design stages to identify the research gap, the establishment of a requirement catalogue, the development of a method based on a digital, parametric model, and an evaluation of the method.
An analysis of currently available approaches for LCA of buildings indicates that they are either holistic but very complex or simple but not holistic. Furthermore, none of them provide the opportunity for optimization in the architectural design process, which is the main research gap. The requirements derived from the analysis have been summarized in the form of a catalogue. This catalogue can be used to evaluate both existing approaches and potential methods developed in the future. In this thesis, it served as guideline for the development of the parametric method – Parametric Life Cycle Assessment (PLCA). The unique main feature of PLCA is that embodied and operational environmental impact are calculated together. In combination with the self-contained workflow of the method, this provides the basis for holistic, time-efficient environmental design optimization. The application of PLCA to three examples indicated that all established mandatory requirements are met. In all cases, environmental impact could be significantly reduced. In comparison to conventional approaches, PLCA was shown to be much more time-efficient.
PLCA allows architects to focus on their main task of designing the building, and finally makes LCA practically useful as one of several criteria for design optimization. With PLCA, the building design can be time-efficiently optimized from the beginning of the most influential early design stages, which has not been possible until now. PLCA provides a good starting point for further research. In the future, it could be extended by integrating the social and economic aspects of sustainability.
30. Forum Bauinformatik
(2018)
Die Bauhaus-Universität Weimar ist seit langer Zeit mit dem Forum Bauinformatik eng verbunden. So wurde die Veranstaltung 1989 hier durch den Arbeitskreis Bauinformatik ins Leben gerufen und auch das 10. und 18. Forum Bauinformatik (1998 bzw. 2006) fand in Weimar statt. In diesem Jahr freuen wir uns daher besonders, das 30. Jubiläum an der Bauhaus-Universität Weimar ausrichten zu dürfen und viele interessierte Wissenschaftler und Wissenschaftlerinnen aus dem Bereich der Bauinformatik in Weimar willkommen zu heißen.
Das Forum Bauinformatik hat sich längst zu einem festen Bestandteil der Bauinformatik im deutschsprachigen Raum entwickelt. Dabei steht es traditionsgemäß unter dem Motto „von jungen Forschenden für junge Forschende“, wodurch insbesondere Nachwuchswissenschaftlerinnen und ‑wissenschaftlern die Möglichkeit geboten wird, ihre Forschungsarbeiten zu präsentieren, Problemstellungen fachspezifisch zu diskutieren und sich über den neuesten Stand der Forschung zu informieren. Zudem wird eine ausgezeichnete Gelegenheit geboten, in die wissenschaftliche Gemeinschaft im Bereich der Bauinformatik einzusteigen und Kontakte mit anderen Forschenden zu knüpfen.
In diesem Jahr erhielten wir 49 interessante und qualitativ hochwertige Beiträge vor allem in den Themenbereichen Simulation, Modellierung, Informationsverwaltung, Geoinformatik, Structural Health Monitoring, Visualisierung, Verkehrssimulation und Optimierung. Dafür möchten wir uns ganz besonders bei allen Autoren, Co-Autoren und Reviewern bedanken, die durch ihr Engagement das diesjährige Forum Bauinformatik erst möglich gemacht haben. Wir danken zudem Professor Große und Professor Díaz für die Unterstützung bei der Auswahl der Beiträge für die Best Paper Awards.
Ein herzliches Dankeschön geht an die Kollegen an der Professur Informatik im Bauwesen der Bauhaus-Universität Weimar für die organisatorische, technische und beratende Unterstützung während der Planung der Veranstaltung.