The development of 3D technologies during the last decades in many different areas, leads us towards the complete 3D representation of planet earth on a high level of detail. On the lowest level we have geographical information systems (GIS) representing the outer layer of our planet as a 3D model. In the meantime these systems do not only give a geographical model but also present additional information like ownership, infrastructure and others that might be of interest for the construction business. In future these systems will serve as basis for virtual environments for planning and simulation of construction sites. In addition to this work is done on the integration of GIS systems with 3D city models in the area of urban planning and thus integration of different levels of detail. This article presents research work on the use of 3D models in construction on the next level of detail below the level of urban planning. The 3D city model is taken as basis for the 3D model of the construction site. In this virtual nD-world a contractor can organize and plan his resources, simulate different variants of construction processes and thus find out the most effective solution for the consideration of costs and time. On the basis of former researches the authors present a new approach for cost estimation and simulation using development technologies from game software.
Available construction time-cost trade-off analysis models can be used to generate trade-offs between these two important objectives, however, their application is limited in large-scale construction projects due to their impractical computational requirements. This paper presents the development of a scalable and multi-objective genetic algorithm that provides the capability of simultaneously optimizing construction time and cost large-scale construction projects. The genetic algorithm was implemented in a distributed computing environment that utilizes a recent standard for parallel and distributed programming called the message passing interface (MPI). The performance of the model is evaluated using a set of measures of performance and the results demonstrate the capability of the present model in significantly reducing the computational time required to optimize large-scale construction projects.
Cost and Schedule Controlling in Relation to Liquidity Management during Construction Projects
(2004)
The present paper describes a software application which can be used for relating the scheduled events of a construction project with the respective financial parameters, leading to an overall improvement in general controlling and liquidity management. For this purpose, existing construction schedules are taken and details of the assignment are recorded. Thus it becomes possible to assess a future payment status should changes in the designated schedule occur.
To support research in the building sector and in order to help it move towards a new digital economy, the European Commission under the 5th Framework initiative, especially the IST programme, funded various RTD projects. The opportunity to bring these IST projects together was acknowledged so that stronger links can be created under a clustering umbrella and that, moreover, links of those projects with their RTD environment could be facilitated. This has been the objective of work carried out within the ICCI (IST-2001-33022) Cluster project. This paper introduces the main aims and objectives of the project, and then presents its principal outcomes. In a second part, it synthesises the underlying concepts, technology and tools that will make ICT-based Construction a reality in a near future, and gives recommended actions for the industry, the EC and the Construction ICT R&D in Europe, giving some benefit of this project experience to the three communities.
The methods currently used for scheduling building processes have some major advantages as well as disadvantages. The main advantages are the arrangement of the tasks of a project in a clear, easily readable form and the calculation of valuable information like critical paths. The main disadvantage on the other hand is the inflexibility of the model caused by the modeling paradigms. Small changes of the modeled information strongly influence the whole model and lead to the need to change many more details in the plan. In this article an approach is introduced allowing the creation of more flexible schedules. It aims towards a more robust model that lowers the need to change more than a few information while being able to calculate the important propositions of the known models and leading to further valuable conclusions.