Refine
Document Type
- Conference Proceeding (200)
- Report (1)
Institute
- In Zusammenarbeit mit der Bauhaus-Universität Weimar (141)
- Institut für Strukturmechanik (ISM) (17)
- Graduiertenkolleg 1462 (12)
- Professur Angewandte Mathematik (9)
- Institut für Konstruktiven Ingenieurbau (IKI) (6)
- Professur Informatik in der Architektur (3)
- Professur Stahlbau (3)
- Institut für Bauinformatik, Mathematik und Bauphysik (IBMB) (2)
- Professur Bodenmechanik (2)
- Professur Tragwerkslehre (2)
Keywords
- Architektur <Informatik> (201) (remove)
Due to economical, technical or political reasons all over the world about 100 nuclear power plants have been disconnected until today. All these power stations are still waiting for their complete dismantling which, considering one reactor, causes cost of up to one Bil. Euros and lasts up to 15 years. In our contribution we present a resource-constrained project scheduling approach minimizing the total discounted cost of dismantling a nuclear power plant. A project of dismantling a nuclear power plant can be subdivided into a number of disassembling activities. The execution of these activities requires time and scarce resources like manpower, special equipment or storage facilities for the contaminated material arising from the dismantling. Moreover, we have to regard several minimum and maximum time lags (temporal constraints) between the start times of the different activities. Finally, each disassembling activity can be processed in two alternative execution modes, which lead to different disbursements and determine the resource requirements of the considered activity. The optimization problem is to determine a start time and an execution mode for each activity, such that the discounted cost of the project is minimum, and neither the temporal constraints are violated nor the activities' resource requirements exceed the availability of any scarce resource at any point in time. In our contribution we introduce an appropriate multi-mode project scheduling model with minimum and maximum time lags as well as renewable and cumulative resources for the described optimization problem. Furthermore, we show that the considered optimization problem is NP-hard in the strong sense. For small problem instances, optimal solutions can be gained from a relaxation based enumeration approach which is incorporated into a branch and bound algorithm. In order to be able to solve large problem instances, we also propose a truncated version of the devised branch and bound algorithm.
MICROPLANE MODEL WITH INITIAL AND DAMAGE-INDUCED ANISOTROPY APPLIED TO TEXTILE-REINFORCED CONCRETE
(2010)
The presented material model reproduces the anisotropic characteristics of textile reinforced concrete in a smeared manner. This includes both the initial anisotropy introduced by the textile reinforcement, as well as the anisotropic damage evolution reflecting fine patterns of crack bridges. The model is based on the microplane approach. The direction-dependent representation of the material structure into oriented microplanes provides a flexible way to introduce the initial anisotropy. The microplanes oriented in a yarn direction are associated with modified damage laws that reflect the tension-stiffening effect due to the multiple cracking of the matrix along the yarn.
The paper is a proposal of calculation of internal forces and dislocations in the reinforced concrete beams before and after cracking. For the ideally elastic bars transfer matrix proposed by Rakowski was applied. The effects associated with cracking were introduced by means of the Borcz's theory in the spectrally way. Numerical example was shown. The presented attitude also enables to calculate dynamic problems and those connected with the stability of the compressed and bending cracked beams and columns.
The paper contains a description of dynamic effects in the silo wall during the outflow of a stored material. The work allows for determining the danger of construction damage due to resonant vibrations and is of practical importance by determining the influence of cyclic pressures and vibro–creeping during prolonged use of a silo. The paper was devised as a result of tests on silo walls in semi-technical scale. The model is generally applicable and allows for identification of parameters in real- size silos as well.
At the 16th IKM Bock, Falcão and Gürlebeck presented examples of the application of some specially developed Maple-Software in hypercomplex analysis. Other papers of those authors continued this work and showed the efficiency of such tools for concrete numerical calculations as well as for numerical experiments, supporting the detection of new relationships and even theorems in a highly technical theoretical work. The mentioned software has been developed mainly for the use on mapping problems in the Euclidean spaces of dimension 3 and 4 by means of Bergman kernel methods (BKM), which are related to monogenic functions as solutions of generalized Cauchy-Riemann equations with respect to the Euclidean metric (Riesz system). The developed procedures concerning generalized powers of totally regular variables and the corresponding homogeneous polynomials basically rely on results and conventions introduced in the paper "Power series representation for monogenic functions in Rm+1 based on a permutational product", Complex Variables, 15, No.3, 181-191 (1990) by H. Malonek. Since 1992 H. Leutwiler, S. L. Eriksson and others developed in a number of papers a modified Clifford analysis and, particularly, a modified quaternionic analysis. The modification mainly consists in considering generalized Cauchy-Riemann equations with respect to a hyperbolic metric in a half space. The aim of this contribution is to show how through a change of the basic combinatorial relations used in the modified quaternionic analysis the aforementioned Maple-software (that has been recently published on CD-Rom as integrated part of the text book "Funktionentheorie in der Ebene und im Raum" by K. Gürlebeck, K. Habetha, and W. Sprössig, in the series "Grundstudium Mathematik" of Birkhäuser Verlag, 2006) can directly be used for numerical calculations in the modified theory.
This paper presents results of applying Fuzzy Inference System for estimation of the number of potential Park and Ride users. Usually it is difficult to evaluate the number of users because it depends on human factor and data in the considered system are uncertain. In such situation the traditional mathematical approaches can not take into consideration rough data. Therefore a fuzzy approach can be applied in this case. A fuzzy methodology is treated as a proper way to describe choice of mode of transport, and especially that uncertainty accompanied of choosing process has rather fuzzy character. The proposed approach is based on the Mamdani Fuzzy Inference System and for calculation there is used Matlab software with Fuzzy Logic Toolbox. Mamdani model requires, as an input data, knowledge of the shape of membership function. These functions can be calibrated taking into consideration results of questionnaires conducted among users of Park and Ride system. Due to lack of representative sample of users, one has decided to use results of experts' questionnaires as a input data for calibration the shape of membership functions. Describing factor will be generalized cost of the trip for different modes of transport. Proposed approach consists of two main stages: modeling of share of public/private transport trips and Multimodal model estimating number of Park and Ride users. Verification of presented methodology is treated as an indirect proof. Proposed approach can be applied for estimation of bi-modal split. Then the results are compared with traditional approaches based on logit functions. Comparable results of proposed fuzzy approach with traditional logit models can be treated as a confirmation of chosen methodology.
Die Liquiditätsplanung von Bauunternehmen XE "Liquiditätsplanung" gilt als ein wesentliches Steuerungs-, Kontroll- sowie Informationsinstrument für interne und externe Adressaten und übt eine Entscheidungsunterstützungsfunktion aus. Da die einzelnen Bauprojekte einen wesentlichen Anteil an den Gesamtkosten des Unternehmens ausmachen, besitzen diese auch einen erheblichen Einfluß auf die Liquidität und die Zahlungsfähigkeit der Bauunternehmung. Dem folgend ist es in der Baupraxis eine übliche Verfahrensweise, die Liquiditätsplanung zuerst projektbezogen zu erstellen und anschließend auf Unternehmensebene zu verdichten. Ziel der Ausführungen ist es, die Zusammenhänge von Arbeitskalkulation XE "Arbeitskalkulation" , Ergebnisrechnung XE "Ergebnisrechnung" und Finanzrechnung XE "Finanzrechnung" in Form eines deterministischen XE "Erklärungsmodells" Planungsmodells auf Projektebene darzustellen. Hierbei soll das Verständnis und die Bedeutung der Verknüpfungen zwischen dem technisch-orientierten Bauablauf und dessen Darstellung im Rechnungs- und Finanzwesen herausgestellt werden. Die Vorgänge aus der Bauabwicklung, das heißt die Abarbeitung der Bauleistungsverzeichnispositionen und deren zeitliche Darstellung in einem Bauzeitenplan sind periodisiert in Größen der Betriebsbuchhaltung (Leistung, Kosten) zu transformieren und anschließend in der Finanzrechnung (Einzahlungen., Auszahlungen) nach Kreditoren und Debitoren aufzuschlüsseln.
LIFETIME-ORIENTED OPTIMIZATION OF BRIDGE TIE RODS EXPOSED TO VORTEX-INDUCED ACROSS-WIND VIBRATIONS
(2006)
In recent years, damages in welded connections plates of vertical tie rods of several arched steel bridges have been reported. These damages are due to fatigue caused by wind-induced vibrations. In the present study, such phenomena are examined, and the corresponding lifetime of a reference bridge in Münster-Hiltrup, Germany, is estimated, based on the actual shape of the connection plate. Also, the results obtained are compared to the expected lifetime of a connection plate, whose geometry has been optimized separately. The structural optimization, focussing on the shape of the cut at the hanger ends, has been carried out using evolution strategies. The oscillation amplitudes have been computed by means of the Newmark-Wilson time-step method, using an appropriate load model, which has been validated by on-site experiments on the selected reference bridge. Corresponding stress-amplitudes are evaluated by multiplying the oscillation amplitudes with a stress concentration factor. This factor has been computed on the basis of a finite element model of the system "hanger-welding-connection plate", applying solid elements, according to the notch stress approach. The damage estimation takes into account the stochastics of the exciting wind process, as well as the stochastics of the material parameters (fatigue strength) given in terms of Woehler-curves. The shape optimization results in a substantial increase of the estimated hanger lifetime. The comparison of the lifetimes of the bulk plate and of the welding revealed that, in the optimized structure, the welding, being the most sensitive part in the original structure, shows much more resistance against potential damages than the bulk material.
Optimum technological solutions must take into account the entire life cycle of structures including design procedures as well as quality assurance, inspection, maintenance, and repair strategies. Unfortunately, current design standards do not provide a satisfactory basis to ensure expected structural lifetimes. The latter may vary from only a few years for temporary structures to over a century for bridges, water dams or nuclear repositories. Consistent scientific concepts are urgently required to cover this wide spectrum of lifetimes in structural design and maintenance. This was a motivation for a group of scientists at the Ruhr-University Bochum (RUB) to start a special research program supported by the German Research Foundation (DFG) within the Cooperative Research Center SFB 398 since 1996. Institutes of the University Wuppertal and of the University Essen-Duisburg joined the research group. The goal of the Center is to study sources of damage and deterioration in materials and structures, to develop consistent models and simulation methods, to predict structural lifetimes and finally to integrate this predictions into new lifetime-oriented design strategies.
Research activities in our center are organised in three Project Groups as follows:
- Modelling of lifetime effects
- Methods for lifetime-oriented structural analyses
- Future lifespan-oriented design strategies.
We present a system that applies a custom-built pan-tilt-zoom camera for laser-pointer tracking in arbitrary real environments. Once placed in a building environment, it carries out a fully automatic self-registration, registrations of projectors, and sampling of surface parameters, such as geometry and reflectivity. After these steps, it can be used for tracking a laser spot on the surface as well as an LED marker in 3D space, using inter-playing fisheye context and controllable detail cameras. The captured surface information can be used for masking out areas that are critical to laser-pointer tracking, and for guiding geometric and radiometric image correction techniques that enable a projector-based augmentation on arbitrary surfaces. We describe a distributed software framework that couples laser-pointer tracking for interaction, projector-based AR as well as video see-through AR for visualizations with the domain specific functionality of existing desktop tools for architectural planning, simulation and building surveying.