Refine
Document Type
- Article (23)
- Conference Proceeding (10)
- Doctoral Thesis (10)
- Master's Thesis (3)
- Book (1)
- Preprint (1)
Institute
- Professur Informatik im Bauwesen (22)
- Professur Baubetrieb und Bauverfahren (7)
- Professur Bauphysik (4)
- Institut für Strukturmechanik (ISM) (3)
- Juniorprofessur Urban Energy Systems (2)
- Professur Modellierung und Simulation - Konstruktion (2)
- Bauhaus-Institut für zukunftsweisende Infrastruktursysteme (b.is) (1)
- Institut für Konstruktiven Ingenieurbau (IKI) (1)
- Junior-Professur Computational Architecture (1)
- Juniorprofessur Simulation und Experiment (1)
- Professur Bauchemie und Polymere Werkstoffe (1)
- Professur Bauformenlehre (1)
- Professur Baustatik und Bauteilfestigkeit (1)
- Professur Darstellungsmethodik (1)
- Professur Holz- und Mauerwerksbau (1)
- Professur Massivbau I (1)
- Professur Stahlbau (1)
- Professur Systeme der Virtuellen Realität (1)
Keywords
- Simulation (48) (remove)
The Bauhaus Summer School series provides an international forum for an exchange of methods and skills related to the interaction between different disciplines of modern engineering science.
The 2012 civil engineering course was held in August over two weeks at Bauhaus-Universität Weimar. The overall aim was the exchange
of research and modern scientific approaches in the field of model validation and simulation between well-known experts acting as lecturers
and active students. Besides these educational intentions the social and cultural component of the meeting has been in the focus. 48 graduate and doctoral students from 20 different countries and 22 lecturers from 12 countries attended this summer school. Among
other aspects, this activity can be considered successful as it raised the
sensitivity towards both the significance of research in civil engineering
and the role of intercultural exchange.
This volume summarizes and publishes some of the results: abstracts
of key note papers presented by the experts and selected student
research works. The overview reflects the quality of this summer school.
Furthermore the individual contributions confirm that for active students
this event has been a research forum and a special opportunity
to learn from the experiences of the researchers in terms of methodology
and strategies for research implementation in their current work.
Der Komplexität einer großen Baumaßnahme steht meist ein relativ unpräzises Termincontrolling gegenüber. Die Gründe dafür liegen in unzureichenden Baufortschrittsinformationen und der Schwierigkeit, eine geeignete Steuerungsmaßnahme auszuwählen. In der Folge kommt es häufig zu Terminverzügen und Mehrkosten.
Ziel der Arbeit war es, die realen Bau-Ist-Zustände eines Bauprojektes so genau zu erfassen, dass es möglich wird, täglich ein zutreffendes Abbild des Baufortschrittes und der Randbedingungen des Bauablaufes zu schaffen und mit Hilfe eines Simulationswerkzeuges nachzubilden. Zu diesem Zweck sollte ein Erfassungskonzept ausgearbeitet werden, mit dessen Hilfe unter Verwendung von Erfassungstechniken aussagekräftige sowie belastbare Daten zu einer auf die Anforderungen der Simulation abgestimmten Datenbasis zusammengeführt werden.
Um der Zielstellung gerecht zu werden, wurde anhand eines Beispiels ein Prozessmodell aufgebaut und definiert, welche Informationen zum Aufbau eines Simulationsmodells, das die reaktive Ablaufplanung unterstützt, erfasst werden müssen. Die einzelnen Prozessgrößen wurden detailliert beschrieben und die Erfassungsgrößen daraus abgeleitet. Weiterhin wurden Aussagen zur Prozessstrukturierung erarbeitet. Somit wurden Informationsstützstellen definiert.
Es wurden Methoden zur Erfassung des Bau-Ist-Zustandes hinsichtlich ihrer Eignung sowie Anwendungsmöglichkeiten analysiert und ausgewählte Anwendungsbeispiele für RFID, Barcodes und Bautagebücher dargestellt. Außerdem wurde betrachtet, welche Daten der baustelleneigenen Bauablaufdokumentation zur Belegung der Informationsstützstellen genutzt werden können. Diese Betrachtung stellte Dokumente in den Fokus, welche aufgrund von Vorschriften oder Vertragsbedingungen ohnehin auf Baustellen erfasst werden müssen.
Schließlich wurden die vorangegangenen Betrachtungen hinsichtlich der Erfassungsgrößen und der Erfassungsmethoden in einem Erfassungskonzept zusammengeführt und eine geeignete Kombination von Erfassungsmethoden entwickelt.
Der Baufortschritt soll anhand der Beschreibung, welchen Status die einzelnen Vorgänge angenommen haben, mit Hilfe eines digitalen Bautagebuchs erfasst werden. Die Randbedingungen, wie die Verfügbarkeit von Personal-, Material- und Geräteressourcen, werden mit Hilfe von RFID-Tags identifiziert, auf denen alle weiteren benötigten Informationen hinterlegt sind. Informationen über Ressourcen, welche geplante Termine wiedergeben, müssen ebenfalls im digitalen Bautagebuch hinterlegt und aktuell gehalten werden. Traditionelle Lieferscheine in Papierform müssen durch digitale Lieferscheine ersetzt werden.
Abgeschlossen wurde die Ausarbeitung des Erfassungskonzeptes durch Ansätze, mit deren Hilfe der Erfassungsaufwand reduziert werden kann. Zu diesem Zweck wurde eine hierarchische Ordnung des Erfassungskonzeptes eingeführt.
Im Ergebnis ist somit ein Erfassungskonzept entstanden, mit dessen Hilfe die realen Bau-Ist-Zustände einer Baumaßnahme so genau erfasst werden können, dass täglich ein zutreffendes Abbild des Baufortschrittes und der Randbedingungen des Bauablaufes in einer Simulations¬umgebung generiert werden kann. Die Erfassungskonzeption liefert eine Datenbasis, die auf die Anforderungen der Simulation abgestimmt ist.
This dataset consists mainly of two subsets. The first subset includes measurements and simulation data conducted to validate the simulation tool ENVI-met. The measurements were conducted at the campus of the Bauhaus-University Weimar in Weimar, Germany and consisted of recording exterior air temperature, globe temperature, relative humidity, and wind velocity at 1.5 m at four points on four different days. After the measurements, the geometry of the campus was modelled and meshed; the simulations were conducted using the weather data of the measurements days with the aim of investigating the accuracy of the model.
The second data subset consists of ENVI-met simulation data of the potential of facade greening in improving the outdoor environment and the indoor air temperature during heatwaves in Central European cities. The data consist of the boundary conditions and the simulation output of two simulation models: with and without facade greening. The geometry of the models corresponded to a residential buildings district in Stuttgart, Germany. The simulation output consisted of exterior air temperature, mean radiant temperature, relative humidity, and wind velocity at 12 different probe points in the model in addition to the indoor air temperature of an exemplary building. The dataset presents both vertical profiles of the probed parameters as well as the time series output of the five-day simulation duration. Both data subsets correspond to the investigations presented in the co-submitted article [1].
Personalisierte Lüftung (PL) kann die thermische Behaglichkeit sowie die Qualität der eingeatmeten Atemluft verbessern, in dem jedem Arbeitsplatz Frischluft separat zugeführt wird. In diesem Beitrag wird die Wirkung der PL auf die thermische Behaglichkeit der Nutzer unter sommerlichen Randbedingungen untersucht. Hierfür wurden zwei Ansätze zur Bewertung des Kühlungseffekts der PL untersucht: basierend auf (1) der äquivalenten Temperatur und (2) dem thermischen Empfinden. Grundlage der Auswertung sind in einer Klimakammer gemessene sowie numerisch simulierte Daten. Vor der Durchführung der Simulationen wurde das numerische Modell zunächst anhand der gemessenen Daten validiert. Die Ergebnisse zeigen, dass der Ansatz basierend auf dem thermischen Empfinden zur Evaluierung des Kühlungseffekts der PL sinnvoller sein kann, da bei diesem die komplexen physiologischen Faktoren besser berücksichtigt werden.
In this thesis, a generic model for the post-failure behavior of concrete in tension is proposed. A mesoscale model of concrete representing the heterogeneous nature of concrete is formulated. The mesoscale model is composed of three phases: aggregate, mortar matrix, and the Interfacial Transition Zone between them. Both local and non-local formulations of the damage are implemented and the results are compared. Three homogenization schemes from the literature are employed to obtain the homogenized constitutive relationship for the macroscale model. Three groups of numerical examples are provided.
The development of 3D technologies during the last decades in many different areas, leads us towards the complete 3D representation of planet earth on a high level of detail. On the lowest level we have geographical information systems (GIS) representing the outer layer of our planet as a 3D model. In the meantime these systems do not only give a geographical model but also present additional information like ownership, infrastructure and others that might be of interest for the construction business. In future these systems will serve as basis for virtual environments for planning and simulation of construction sites. In addition to this work is done on the integration of GIS systems with 3D city models in the area of urban planning and thus integration of different levels of detail. This article presents research work on the use of 3D models in construction on the next level of detail below the level of urban planning. The 3D city model is taken as basis for the 3D model of the construction site. In this virtual nD-world a contractor can organize and plan his resources, simulate different variants of construction processes and thus find out the most effective solution for the consideration of costs and time. On the basis of former researches the authors present a new approach for cost estimation and simulation using development technologies from game software.
Für eine Abschätzung des Heizwärmebedarfs von Gebäuden und Quartieren können thermisch-energetische Simulationen eingesetzt werden. Grundlage dieser Simulationen sind geometrische und physikalische Gebäudemodelle. Die Erstellung des geometrischen Modells erfolgt in der Regel auf Basis von Bauplänen oder Vor-Ort-Begehungen, was mit einem großen Recherche- und Modellierungsaufwand verbunden ist. Spätere bauliche Veränderungen des Gebäudes müssen häufig manuell in das Modell eingearbeitet werden, was den Arbeitsaufwand zusätzlich erhöht. Das physikalische Modell stellt die Menge an Parametern und Randbedingungen dar, welche durch Materialeigenschaften, Lage und Umgebungs-einflüsse gegeben sind. Die Verknüpfung beider Modelle wird innerhalb der entsprechenden Simulations-software realisiert und ist meist nicht in andere Softwareprodukte überführbar. Mithilfe des Building Information Modeling (BIM) können Simulationsdaten sowohl konsistent gespeichert als auch über Schnittstellen mit entsprechenden Anwendungen ausgetauscht werden. Hierfür wird eine Methode vorgestellt, die thermisch-energetische Simulationen auf Basis des standardisierten Übergabe-formats Industry Foundation Classes (IFC) inklusive anschließender Auswertungen ermöglicht. Dabei werden geometrische und physikalische Parameter direkt aus einem über den gesamten Lebenszyklus aktuellen Gebäudemodell extrahiert und an die Simulation übergeben. Dies beschleunigt den Simulations-prozess hinsichtlich der Gebäudemodellierung und nach späteren baulichen Veränderungen. Die erarbeite-te Methode beruht hierbei auf einfachen Modellierungskonventionen bei der Erstellung des Bauwerksinformationsmodells und stellt eine vollständige Übertragbarkeit der Eingangs- und Ausgangswerte sicher.
Thermal building simulation based on BIM-models. Thermal energetic simulations are used for the estimation of the heating demand of buildings and districts. These simulations are based on building models containing geometrical and physical information. The creation of geometrical models is usually based on existing construction plans or in situ assessments which demand a comparatively big effort of investigation and modeling. Alterations, which are later applied to the structure, request manual changes of the related model, which increases the effort additionally. The physical model represents the total amount of parameters and boundary conditions that are influenced by material properties, location and environmental influences on the building. The link between both models is realized within the correspondent simulation soft-ware and is usually not transferable to other software products. By Applying Building Information Modeling (BIM) simulation data is stored consistently and an exchange to other software is enabled. Therefore, a method which allows a thermal energetic simulation based on the exchange format Industry Foundation Classes (IFC) including an evaluation is presented. All geometrical and physical information are extracted directly from the building model that is kept up-to-date during its life cycle and transferred to the simulation. This accelerates the simulation process regarding the geometrical modeling and adjustments after later changes of the building. The developed method is based on simple conventions for the creation of the building model and ensures a complete transfer of all simulation data.
Für eine Abschätzung des Heizwärmebedarfs von Gebäuden und Quartieren können thermisch-energetische Simulationen eingesetzt werden. Grundlage dieser Simulationen sind geometrische und physikalische Gebäudemodelle. Die Erstellung des geometrischen Modells erfolgt in der Regel auf Basis von Bauplänen oder Vor-Ort-Begehungen, was mit einem großen Recherche- und Modellierungsaufwand verbunden ist. Spätere bauliche Veränderungen des Gebäudes müssen häufig manuell in das Modell eingearbeitet werden, was den Arbeitsaufwand zusätzlich erhöht. Das physikalische Modell stellt die Menge an Parametern und Randbedingungen dar, welche durch Materialeigenschaften, Lage und Umgebungs-einflüsse gegeben sind. Die Verknüpfung beider Modelle wird innerhalb der entsprechenden Simulations-software realisiert und ist meist nicht in andere Softwareprodukte überführbar.
Mithilfe des Building Information Modeling (BIM) können Simulationsdaten sowohl konsistent gespeichert als auch über Schnittstellen mit entsprechenden Anwendungen ausgetauscht werden. Hierfür wird eine Methode vorgestellt, die thermisch-energetische Simulationen auf Basis des standardisierten Übergabe-formats Industry Foundation Classes (IFC) inklusive anschließender Auswertungen ermöglicht. Dabei werden geometrische und physikalische Parameter direkt aus einem über den gesamten Lebenszyklus aktuellen Gebäudemodell extrahiert und an die Simulation übergeben. Dies beschleunigt den Simulations-prozess hinsichtlich der Gebäudemodellierung und nach späteren baulichen Veränderungen. Die erarbeite-te Methode beruht hierbei auf einfachen Modellierungskonventionen bei der Erstellung des Bauwerksinformationsmodells und stellt eine vollständige Übertragbarkeit der Eingangs- und Ausgangswerte sicher.
Thermal building simulation based on BIM-models. Thermal energetic simulations are used for the estimation of the heating demand of buildings and districts. These simulations are based on building models containing geometrical and physical information. The creation of geometrical models is usually based on existing construction plans or in situ assessments which demand a comparatively big effort of investigation and modeling. Alterations, which are later applied to the structure, request manual changes of the related model, which increases the effort additionally. The physical model represents the total amount of parameters and boundary conditions that are influenced by material properties, location and environmental influences on the building. The link between both models is realized within the correspondent simulation soft-ware and is usually not transferable to other software products.
By Applying Building Information Modeling (BIM) simulation data is stored consistently and an exchange to other software is enabled. Therefore, a method which allows a thermal energetic simulation based on the exchange format Industry Foundation Classes (IFC) including an evaluation is presented. All geometrical and physical information are extracted directly from the building model that is kept up-to-date during its life cycle and transferred to the simulation. This accelerates the simulation process regarding the geometrical modeling and adjustments after later changes of the building. The developed method is based on simple conventions for the creation of the building model and ensures a complete transfer of all simulation data.