The management of resources is an essential task in each construction company. Today, ERP systems and e-Business systems are available to assist construction companies to efficiently organise the allocation of their personnel and equipment within the company, but they cannot provide the company with the idle resources for every single task that has to be performed during a construction project. Therefore, companies should have an alternative solution to better exploit expensive resources and compensate their fixed costs, but also have them available at the right time for their own business activities. This paper outlines the approach taken by the EU funded project “e-Sharing” (IST-2001-33325) to support resource management between construction companies. It will describe requirements for the management of construction resources, its core features, and the integration approach. Therefore, we will outline the approach of an integrated resource type model supporting the management and classification of construction equipment, construction tasks and qualification profiles. The development is based on a cross-domain analysis and evaluation of existing models. ...
Cost and Schedule Controlling in Relation to Liquidity Management during Construction Projects
(2004)
The present paper describes a software application which can be used for relating the scheduled events of a construction project with the respective financial parameters, leading to an overall improvement in general controlling and liquidity management. For this purpose, existing construction schedules are taken and details of the assignment are recorded. Thus it becomes possible to assess a future payment status should changes in the designated schedule occur.
The planning of projects in building engineering is a complex process which is characterized by a dynamical composition and many modifications during the definition and execution time of processes. For a computer-aided and network-based cooperation a formal description of the planning process is necessary. In the research project “Relational Process Modelling in Cooperative Building Planning” a process model is described by three parts: an organizational structure with participants, a building structure with states and a process structure with activities. This research project is part of the priority program 1103 “Network-Based Cooperative Planning Processes in Structural Engineering” promoted by the German Research Foundation (DFG). Planning processes in civil engineering can be described by workflow graphs. The process structure describes the logical planning process and can be formally defined by a bipartite graph. This structure consists of activities, transitions and relationships between activities and transitions. In order to minimize errors at execution time of a planning process a consistent and structurally correct process model must be guaranteed. This contribution considers the concept and the algorithms for checking the consistency and the correctness of the process structure.
Die Verfügbarkeit und die sichere Beherrschung moderner und kostengünstiger Informations- und Kommunikationstechnologien gestattet es auch kleinen unternehmerischen Einheiten im Bauwesen sich in betriebsübergreifenden Netzwerken zu organisieren und sich besser in die Wertschöpfungskette am Bau zu integrieren. In sogenannten >Virtuellen Organisationen< (VO) können diese für die Volkswirtschaft wichtigen Unternehmen ihre Wettbewerbsvorteile wie höhere Flexibilität, schnelle Reaktion auf Kundenwünsche und Marktnähe nutzen und somit ihr langfristiges Bestehen in einem liberalen Wettbewerb auf einem erweiterten EU-Markt sichern und ausbauen. Die derzeit existierenden Hindernisse im Informationsfluss zwischen Baustelle und Büro können durch den Einsatz mobiler, funkvernetzter Endgeräte, wie beispielsweise >Smart-Phones<, und einer neu zu gestaltenden Infrastruktur zum Wissensmanagement und zur kontextsensitiven Informationsdarstellung abgebaut werden. Im Rahmen dieser Veröffentlichung werden konzeptionelle Ansätze eines integrierten Informationsmanagements zur Unterstützung von VO, die im Rahmen des BMBF-Projektes >IuK-System Bau< derzeit entwickelt werden, vorgestellt.
In der heutigen Informationsgesellschaft sind alle Geschäftsprozesse in einem Unternehmen geprägt durch die Verwendung der vorhandenen Informations- und Kommunikationstechnologien. Diese haben zur Folge, dass Unternehmen mit einer wahren Flut an Informationen konfrontiert werden, die von extern und intern in das Unternehmen eingetragen wurden. Die erfolgreiche Beherrschung dieser Informationsflut bildet die Basis für das effektive Arbeiten im Unternehmen. Grundvoraussetzung hierfür ist vor allem ein harmonisches Zusammenspiel zwischen Mensch ↔ Organisation ↔ Technik. Dokumentenmanagementsysteme haben sich zur Aufgabe gemacht, den Anwender bei der technologischen Bewältigung dieser Aufgabenstellung zu unterstützen. Der hier vorgestellte Artikel zeigt die Probleme auf, die während der Umsetzung eines Dokumentenmanagementsystems auftreten können und konzentriert sich dabei besonders auf Kleinen und Mittleren Unternehmen (KMU) im Bauwesen. Charakteristisch für diese ist die Schwäche die eigenen Unternehmensstrukturen betriebswirtschaftlich aufzubereiten, woraus später bei einer technologischen Umsetzung schwerwiegende Probleme resultieren. Genau an diesem Punkt setzt der vorgestellte Artikel an und versucht den Zusammenhang zwischen Organisation und Technik herauszuarbeiten, um darauf aufsetzend einen allgemeingültigen Ansatz für die Umsetzung eines Dokumentenmanagementsystems zu liefern.
Integrated Engineering Workflow focused on the Structural Engineering in the Industrial Environment
(2004)
The engineering and construction industry has been slow to exploit the full potential of information technology. The industry is highly fragmented, price sensitive, risk-adverse, and profit margins are small. Each project is unique with a small amount of technological innovation opportunities to capitalise on from one project to the next. Technological innovations that have been taking place are just simulating the old traditional paper workflow. Engineering information in digital form is being conveyed using traditional paper representations, which have to be interpreted by humans before the information can be used in other applications, thereby creating ‘islands of information’. It can be seen that poorly implemented IT strategies are duplicating paperwork, rather than reducing or eliminating it (Crowley et al., 2000). This paper will introduce the Integrated Engineering Workflow (IEW) concept to re-organise a structural discipline working on multi-disciplinary projects so as to maximise the advantages offered by new information technology.
Let the information of a civil engineering application be decomposed into objects of a given set of classes. Then the set of objects forms the data base of the application. The objects contain attributes and methods. Properties of the objects are stored in the attributes. Algorithms which the objects perform are implemented in the methods of the objects. If objects are modified by a user, the consistency of data in the base is destroyed. The data base must be modified in an update to restore its consistency. The sequence of the update operations is not arbitrary, but is governed by dependence between the objects. The situation can be described mathematically with graph theory. The available algorithms for the determination of the update sequence are not suitable when the data base is large. A new update algorithm for large data bases has been developed and is presented in this paper.
As a result of the pilot-project “Grundwasser-Online” the supervision and the active controlling of large monitoring- and catchment-areas are realised by a co-operative integration of all related institutions, a synchronisation-process to combine all distributed data into one central server database, and a high-level eGovernment-Service to provide evaluated information over the internet. Based on this software system the local authorities are able to supervise the groundwater-levels and to find adequate decisions, which finally result in official permissions for the usage of groundwater-reservoirs by the water supply companies.
The growing competition pressure in the building industry increases the demands on the design and construction processes in respect to economical, technical and time aspects. These demands require efficient improvements of the value-added chain, which can be realized mainly with the usage of innovative information- and communication-technologies. To support the collaboration of all participants involved in a certain building project the Workflow-Management-System “BauKom-Online” has been developed. In the focus of the system is to support the coordination of the participants and their information exchange. Such a software-method is well suited to ensure a high quality planning process. The modelling of business-processes enables a better self-comprehension of the participants work and helps to enhance the project performance. The system architecture of BauKom-Online contains two basic components: the processmodelling tool and the workflow-engine. The process-model contains of activities and states of the planning and construction processes and their relations. These connected processes compose the workflow. Such a process-model for engineering purposes has to satisfy several needs, e.g., the consideration of planning and building alternatives, dynamic changes of the model during execution of the project and the linkage to further technical objects like costs, building structure, specifications and documentmanagement. Furthermore, the scheduling of the project can be done within the process-model and can be visualized as a Gantt-diagram. ...
Das Wissen um den realen Zustand eines Bauprojektes stellt eine entscheidende Kernkompetenz eines steuernden bauausführenden Unternehmens dar. Der bewusste Umgang mit Informationen und deren effiziente Nutzung sind entscheidende Erfolgsfaktoren für die zeit-, kosten- und qualitätsgerechte Realisierung von Bauprojekten.
Obwohl die erforderlichen Erfolgsfaktoren bekannt sind, sind Kosten- und Terminüberschreitungen von Bauprojekten keine Seltenheit – eher das Gegenteil ist der Fall.
Zukunftsweisende Digitalisierungsprojekte aber geben Anlass zu Hoffnung. Ein Beispiel ist der bereits im Dezember 2015 vom Bundesministerium für Verkehr und digitale Infrastruktur ins Leben gerufene Stufenplan Digitales Planen und Bauen. Dieser hat die Aufgabe flächendeckend die Methodik des Building Information Modeling (BIM) im Infrastrukturbereich einzuführen und somit die Digitalisierung in Deutschland zukunftsweisend voranzutreiben,
indem erfolgreiche Bauprojekte mit durchgängigen Informationsflüssen arbeiten. Seither existiert eine Vielzahl an Digitalisierungsprojekten, alle mit gleichen Zielen. Nachweislich
lassen sich hinsichtlich dessen allerdings auch vermehrt Defizite aufzeigen. So ist der
Fortschritt sehr heterogen verteilt und lässt sich für die Branche nicht allgemeingültig festlegen.
Mit einer internationalen Literaturrecherche sowie einer empirischen Studie als Untersuchungsmethode wurde in Form von Interviews mit Fachkundigen der tatsächliche Zustand der Digitalisierungs- und der BIM-Anwendungen im Straßenbau für den
Controllingprozess der Bauleistungsfeststellung untersucht. Die erhobenen Daten wurden
aufbereitet und anschließend softwaregestützt einer inhaltlichen Analyse unterzogen. In
Kombination mit den Ergebnissen der Literaturrecherche wurden notwendige Anforderungen
für den Controllingprozess der Bauleistungsfeststellung erhoben. Auf dieser Grundlage wurde
ein Modell im Sinne der Systemtheorie zur Optimierung der Bauleistungsfeststellung
entwickelt. Gegenstand der vorliegenden Arbeit ist die Integration der modellbasierten Arbeitsweise in die Prozesse der Bauleistungsfeststellung eines Bauunternehmens. Grundlage ist die objektive Auswertung des Fertigstellungsgrades (Baufortschrittes) mittels Luftbildaufnahmen. Deren Auswertung auf Basis eines Algorithmus und die systematische Identifikation des Baufortschrittes integriert in den Prozess der Bauleistungsfeststellung werden zu einem neu entwickelten Gesamtsystem mit dem Ergebnis eines optimierten Modells.
Das entwickelte Modell wurde hinsichtlich Anwendbarkeit und praktischer Relevanz an
ausgewählten Beispielszenarien untersucht und nachgewiesen.