Refine
Has Fulltext
- yes (484) (remove)
Document Type
- Conference Proceeding (336)
- Article (130)
- Doctoral Thesis (12)
- Master's Thesis (2)
- Working Paper (2)
- Preprint (1)
- Study Thesis (1)
Institute
- Professur Informatik im Bauwesen (484) (remove)
Keywords
- Modellierung (62)
- Bauwerk (48)
- Finite-Elemente-Methode (41)
- CAD (40)
- Verteiltes System (38)
- Bautechnik (30)
- Computerunterstütztes Verfahren (24)
- Produktmodell (24)
- Architektur (23)
- Simulation (22)
The construction industry is a supportive industry in China. IT (information technolgy), including computer technology and communication technology, as a whole is regarded as the most important means to upgrade the construction industry so that research projects were organized by Chinese government to further the application of IT in the construction industry. This study originated from one of the projects and is aimed at grasping the general situation on the application of IT in the construction industry. A questionnaire was designed for the survey, which used stratified proportional sampling method, and was carried out under the help of a government agency. This study can not only provide sound foundation for the government to make relative policies, but also reveal references for the firms in construction industry to apply IT in their business. This paper presents the preliminary result of the survey.
In this Paper, we explored the relation between the electricity consumption in residential sector and the automobile energy consumption in transportation sector in accordance with the location of city by employing Geographic Information System (GIS). We found in the study that the electricity consumption per capita has a tendency that is higher in city center and lower in suburbs in Utsunomiya city. It is also noted that there is little difference among total consumption between city center and suburbs, despite the fact that the density of electric appliances tends to increase in a small size house of city center and the amount of automobile energy consumption from residence is lower in city center than in suburbs.
This paper presents a new design environment based on Multi-Agents and Virtual Reality (VR). In this research, a design system with a virtual reality function was developed. The virtual world was realized by using GL4Java, liquid crystal shutter glasses, sensor systems, etc. And the Multi-Agent CAD system with product models, which had been developed before, was integrated with the VR design system. A prototype system was developed for highway steel plate girder bridges, and was applied to a design problem. The application verified the effectiveness of the developed system.
As computer programs become ever more complex, software development has shifted from focusing on programming towards focusing on integration. This paper describes a simulation access language (SimAL) that can be used to access and compose software applications over the Internet. Specifically, the framework is developed for the integration of tools for project management applications. The infrastructure allows users to specify and to use existing heterogeneous tools (e.g., Microsoft Project, Microsoft Excel, Primavera Project Planner, and AutoCAD) for simulation of project scenarios. This paper describes the components of the SimAL language and the implementation efforts required in the development of the SimAL framework. An illustration example bringing on-line weather forecasting service for project scheduling and management applications is provided to demonstrate the use of the simulation language and the infrastructure framework.
To fulfil safety requirements the changes in the static and/or dynamic behaviour of the structure must be analysed with great care. These changes are often caused by local reduction of the stiffness of the structure caused by the irregularities in the structure, as for example cracks. In simple structures such analysis can be performed directly, by solving equations of motion, but for more complex structures a different approach, usually numerical, must be applied. The problem of crack implementation into the structure behaviour has been studied by many authors who have usually modelled the crack as a massless rotational spring of suitable stiffness placed at the beam at the location where the crack occurs. Recently, the numerical procedure for the computation of the stiffness matrix for a beam element with a single transverse crack has been replaced with the element stiffness matrix written in fully symbolic form. A detailed comparison of the results obtained by using 200 2D finite elements with those obtained with a single cracked beam element has confirmed the usefulness of such element.
In recent years, the survey is performed for repair, such as a bridge and a building built in past, spending great expense. And it is anxious for the survey technique that doesn’t need cost and time more. Then, we made an idea of the technique of precise 3D model creation by 2D pictures. However, the technique of performing the improvement in accuracy of convergent photographing and automatic acquisition of corresponding points was not established. Therefore, in this research, we try to obtain a semi-automation of corresponding points acquisition from initial corresponding points and the improvement in accuracy of convergent photographing. Moreover, we applied the research to the used house of Japanese real estate, and the applicable field was selected as the high needs of the residence of 3D model. And we developed the system that everyone could create Web / 3D model house by VRML easily without requiring expensive apparatuses or expertise.
A Product Model of a Road
(1997)
Many errors and delays frequently appear when data is exchanged between particular tasks in the lifecycle of the road. Inter-task connections are therefore of great importance for the quality of the final product. The article describes a product model of a road wich is the kernel of an integrated information system intended to support all important stages of the road lifecycle: design, evaluation (through different analysis procedures), construction, and maintainance. Since particular tasks are often executed at different places and in different companies, the interconnections are supported by a special metafile which contains all specific data of the product model. The concept of the integrated system is object and component oriented. Additionally, existing conventional program packages are included to support some common tasks (methods). A conventional relational database system as well as an open spatial database system with the relevant GIS functionality are included to support the data structures of the model.
We present a software prototype for fluid flow problems in civil engineering, which combines essential features of Computational Steering approaches with efficient methods for model transfer and high performance computing. The main components of the system are described: - The modeler with a focus on the data management of the product model - The pre-processing and the post-processing toolkit - The simulation kernel based on the Lattice Boltzmann method - The required hardware for real-time computing
The displacements and stresses in arch dams and their abutments are frequently determined with 20-node brick elements. The elements are distorted near the contact plane between the wall and the abutment. A cantilever beam testbed has been developed to investigate the consequences of this distortion. It is shown that the deterioration of the accuracy in the computed stresses is significant. A compatible 18-node wedge element with linear stress variation is developed as an alternative to the brick element. The shape of this element type is readily adapted to the shape of the contact plane. It is shown that the accuracy of the computed stresses in the vicinity of the contact plane is improved significantly by the use of wedge elements.
Increasing complexity of today's buildings requires a high level of integration in the planning process. Common planning strategies, where individual project partners cooperate mainly to exchange results, are not suitable to jointly develop project goals and objectives. Integrated planning, a more holistic approach to deal with complex problems, is based on a high degree of communication amoung team members and leads to a goal oriented cooperation. Current approaches in the reasearch area of Computer Supported Cooperative Work (CSCW) poorly meet the requirements in planning. A planning process model, based on the principles of integrated planning will be introduced, aimed to provide the background for the implementation of a CSCW-platform.