Refine
Document Type
- Conference Proceeding (286) (remove)
Institute
- In Zusammenarbeit mit der Bauhaus-Universität Weimar (174)
- Graduiertenkolleg 1462 (31)
- Institut für Strukturmechanik (ISM) (22)
- Professur Informatik im Bauwesen (21)
- Professur Angewandte Mathematik (18)
- Institut für Konstruktiven Ingenieurbau (IKI) (8)
- Professur Stahlbau (4)
- Institut für Bauinformatik, Mathematik und Bauphysik (IBMB) (3)
- Professur Informatik in der Architektur (3)
- Professur Stochastik und Optimierung (3)
Keywords
- Computerunterstütztes Verfahren (286) (remove)
Applications for civil engineering tasks usually contain graphical user interfaces for the engineering processes. Persistent objects of the applications are stored to data bases. The influence of the interaction between a graphical user interface and a data base for the development of an civil engineering application is investigated in this paper. A graphic application for the linear elastic analysis of plane frames, which was previously developed with standard tools of the Java platform, is compared to a redesigned implementation using a generalized data base for persistent objects. The investigation leads to the following results : - A strict distinction between persistent and transient objects influences the class structure of an application, in particular the class structure of a graphical user interface. - The structure of an application depends on the logic for updating of references to persistent and transient graphical objects after an application is read from a file. - The complexity of the reference management can usually be handled better by just in time referencing associated with String - identifiers rather than by automated referencing associated with Name - identifiers.
Integrated Engineering Workflow focused on the Structural Engineering in the Industrial Environment
(2004)
The engineering and construction industry has been slow to exploit the full potential of information technology. The industry is highly fragmented, price sensitive, risk-adverse, and profit margins are small. Each project is unique with a small amount of technological innovation opportunities to capitalise on from one project to the next. Technological innovations that have been taking place are just simulating the old traditional paper workflow. Engineering information in digital form is being conveyed using traditional paper representations, which have to be interpreted by humans before the information can be used in other applications, thereby creating ‘islands of information’. It can be seen that poorly implemented IT strategies are duplicating paperwork, rather than reducing or eliminating it (Crowley et al., 2000). This paper will introduce the Integrated Engineering Workflow (IEW) concept to re-organise a structural discipline working on multi-disciplinary projects so as to maximise the advantages offered by new information technology.
As a result of the pilot-project “Grundwasser-Online” the supervision and the active controlling of large monitoring- and catchment-areas are realised by a co-operative integration of all related institutions, a synchronisation-process to combine all distributed data into one central server database, and a high-level eGovernment-Service to provide evaluated information over the internet. Based on this software system the local authorities are able to supervise the groundwater-levels and to find adequate decisions, which finally result in official permissions for the usage of groundwater-reservoirs by the water supply companies.
Available construction time-cost trade-off analysis models can be used to generate trade-offs between these two important objectives, however, their application is limited in large-scale construction projects due to their impractical computational requirements. This paper presents the development of a scalable and multi-objective genetic algorithm that provides the capability of simultaneously optimizing construction time and cost large-scale construction projects. The genetic algorithm was implemented in a distributed computing environment that utilizes a recent standard for parallel and distributed programming called the message passing interface (MPI). The performance of the model is evaluated using a set of measures of performance and the results demonstrate the capability of the present model in significantly reducing the computational time required to optimize large-scale construction projects.
Cost and Schedule Controlling in Relation to Liquidity Management during Construction Projects
(2004)
The present paper describes a software application which can be used for relating the scheduled events of a construction project with the respective financial parameters, leading to an overall improvement in general controlling and liquidity management. For this purpose, existing construction schedules are taken and details of the assignment are recorded. Thus it becomes possible to assess a future payment status should changes in the designated schedule occur.
The methods currently used for scheduling building processes have some major advantages as well as disadvantages. The main advantages are the arrangement of the tasks of a project in a clear, easily readable form and the calculation of valuable information like critical paths. The main disadvantage on the other hand is the inflexibility of the model caused by the modeling paradigms. Small changes of the modeled information strongly influence the whole model and lead to the need to change many more details in the plan. In this article an approach is introduced allowing the creation of more flexible schedules. It aims towards a more robust model that lowers the need to change more than a few information while being able to calculate the important propositions of the known models and leading to further valuable conclusions.