Refine
Document Type
- Conference Proceeding (286) (remove)
Institute
- In Zusammenarbeit mit der Bauhaus-Universität Weimar (174)
- Graduiertenkolleg 1462 (31)
- Institut für Strukturmechanik (ISM) (22)
- Professur Informatik im Bauwesen (21)
- Professur Angewandte Mathematik (18)
- Institut für Konstruktiven Ingenieurbau (IKI) (8)
- Professur Stahlbau (4)
- Institut für Bauinformatik, Mathematik und Bauphysik (IBMB) (3)
- Professur Informatik in der Architektur (3)
- Professur Stochastik und Optimierung (3)
Keywords
- Computerunterstütztes Verfahren (286) (remove)
This paper presents a specific modeling technique that is focused on preparing planning processes in civil engineering. Planning processes in civil engineering are characterized by some peculiarities so that the sequence of planning tasks needs to be determined for each planning project. Neither the use of optimized partial processes nor the use of lower detailed and optimized processes guarantee an optimal overall planning process. The modeling technique considers these peculiarities. In a first step, it is focused on the logic of the planning process. Algorithms based on the graph theory determine that logic. This approach ensures consistency and logical correctness of the description of a planning process at the early beginning in its preparation phase. Sets of data – the products of engineers like technical drawings, technical models, reports, or specifications – form the core of the presented modeling technique. The production of these sets of data requires time and money. This is expressed by a specific weighting of each set of data in the presented modeling technique. The introduction of these weights allows an efficient progress measurement and controlling of a planning project. For this purpose, a link between the modeling technique used in the preparation phase and the execution phase is necessary so that target and actual values are available for controlling purposes. The present paper covers the description of this link. An example is given to illustrate the use of the modeling technique for planning processes in civil engineering projects.
Available construction time-cost trade-off analysis models can be used to generate trade-offs between these two important objectives, however, their application is limited in large-scale construction projects due to their impractical computational requirements. This paper presents the development of a scalable and multi-objective genetic algorithm that provides the capability of simultaneously optimizing construction time and cost large-scale construction projects. The genetic algorithm was implemented in a distributed computing environment that utilizes a recent standard for parallel and distributed programming called the message passing interface (MPI). The performance of the model is evaluated using a set of measures of performance and the results demonstrate the capability of the present model in significantly reducing the computational time required to optimize large-scale construction projects.
The growing competition pressure in the building industry increases the demands on the design and construction processes in respect to economical, technical and time aspects. These demands require efficient improvements of the value-added chain, which can be realized mainly with the usage of innovative information- and communication-technologies. To support the collaboration of all participants involved in a certain building project the Workflow-Management-System “BauKom-Online” has been developed. In the focus of the system is to support the coordination of the participants and their information exchange. Such a software-method is well suited to ensure a high quality planning process. The modelling of business-processes enables a better self-comprehension of the participants work and helps to enhance the project performance. The system architecture of BauKom-Online contains two basic components: the processmodelling tool and the workflow-engine. The process-model contains of activities and states of the planning and construction processes and their relations. These connected processes compose the workflow. Such a process-model for engineering purposes has to satisfy several needs, e.g., the consideration of planning and building alternatives, dynamic changes of the model during execution of the project and the linkage to further technical objects like costs, building structure, specifications and documentmanagement. Furthermore, the scheduling of the project can be done within the process-model and can be visualized as a Gantt-diagram. ...
As a result of the pilot-project “Grundwasser-Online” the supervision and the active controlling of large monitoring- and catchment-areas are realised by a co-operative integration of all related institutions, a synchronisation-process to combine all distributed data into one central server database, and a high-level eGovernment-Service to provide evaluated information over the internet. Based on this software system the local authorities are able to supervise the groundwater-levels and to find adequate decisions, which finally result in official permissions for the usage of groundwater-reservoirs by the water supply companies.
The methods currently used for scheduling building processes have some major advantages as well as disadvantages. The main advantages are the arrangement of the tasks of a project in a clear, easily readable form and the calculation of valuable information like critical paths. The main disadvantage on the other hand is the inflexibility of the model caused by the modeling paradigms. Small changes of the modeled information strongly influence the whole model and lead to the need to change many more details in the plan. In this article an approach is introduced allowing the creation of more flexible schedules. It aims towards a more robust model that lowers the need to change more than a few information while being able to calculate the important propositions of the known models and leading to further valuable conclusions.
Let the information of a civil engineering application be decomposed into objects of a given set of classes. Then the set of objects forms the data base of the application. The objects contain attributes and methods. Properties of the objects are stored in the attributes. Algorithms which the objects perform are implemented in the methods of the objects. If objects are modified by a user, the consistency of data in the base is destroyed. The data base must be modified in an update to restore its consistency. The sequence of the update operations is not arbitrary, but is governed by dependence between the objects. The situation can be described mathematically with graph theory. The available algorithms for the determination of the update sequence are not suitable when the data base is large. A new update algorithm for large data bases has been developed and is presented in this paper.
Cost and Schedule Controlling in Relation to Liquidity Management during Construction Projects
(2004)
The present paper describes a software application which can be used for relating the scheduled events of a construction project with the respective financial parameters, leading to an overall improvement in general controlling and liquidity management. For this purpose, existing construction schedules are taken and details of the assignment are recorded. Thus it becomes possible to assess a future payment status should changes in the designated schedule occur.
Interactive visualization based on 3D computer graphics nowadays is an indispensable part of any simulation software used in engineering. Nevertheless, the implementation of such visualization software components is often avoided in research projects because it is a challenging and potentially time consuming task. In this contribution, a novel Java framework for the interactive visualization of engineering models is introduced. It supports the task of implementing engineering visualization software by providing adequate program logic as well as high level classes for the visual representation of entities typical for engineering models. The presented framework is built on top of the open source visualization toolkit VTK. In VTK, a visualization model is established by connecting several filter objects in a so called visualization pipeline. Although designing and implementing a good pipeline layout is demanding, VTK does not support the reuse of pipeline layouts directly. Our framework tailors VTK to engineering applications on two levels. On the first level it adds new – engineering model specific – filter classes to VTK. On the second level, ready made pipeline layouts for certain aspects of engineering models are provided. For instance there is a pipeline class for one-dimensional elements like trusses and beams that is capable of showing the elements along with deformations and member forces. In order to facilitate the implementation of a graphical user interface (GUI) for each pipeline class, there exists a reusable Java Swing GUI component that allows the user to configure the appearance of the visualization model. Because of the flexible structure, the framework can be easily adapted and extended to new problem domains. Currently it is used in (i) an object-oriented p-version finite element code for design optimization, (ii) an agent based monitoring system for dam structures and (iii) the simulation of destruction processes by controlled explosives based on multibody dynamics. Application examples from all three domains illustrates that the approach presented is powerful as well as versatile.
Die Liquiditätsplanung von Bauunternehmen XE "Liquiditätsplanung" gilt als ein wesentliches Steuerungs-, Kontroll- sowie Informationsinstrument für interne und externe Adressaten und übt eine Entscheidungsunterstützungsfunktion aus. Da die einzelnen Bauprojekte einen wesentlichen Anteil an den Gesamtkosten des Unternehmens ausmachen, besitzen diese auch einen erheblichen Einfluß auf die Liquidität und die Zahlungsfähigkeit der Bauunternehmung. Dem folgend ist es in der Baupraxis eine übliche Verfahrensweise, die Liquiditätsplanung zuerst projektbezogen zu erstellen und anschließend auf Unternehmensebene zu verdichten. Ziel der Ausführungen ist es, die Zusammenhänge von Arbeitskalkulation XE "Arbeitskalkulation" , Ergebnisrechnung XE "Ergebnisrechnung" und Finanzrechnung XE "Finanzrechnung" in Form eines deterministischen XE "Erklärungsmodells" Planungsmodells auf Projektebene darzustellen. Hierbei soll das Verständnis und die Bedeutung der Verknüpfungen zwischen dem technisch-orientierten Bauablauf und dessen Darstellung im Rechnungs- und Finanzwesen herausgestellt werden. Die Vorgänge aus der Bauabwicklung, das heißt die Abarbeitung der Bauleistungsverzeichnispositionen und deren zeitliche Darstellung in einem Bauzeitenplan sind periodisiert in Größen der Betriebsbuchhaltung (Leistung, Kosten) zu transformieren und anschließend in der Finanzrechnung (Einzahlungen., Auszahlungen) nach Kreditoren und Debitoren aufzuschlüsseln.
In this paper we evaluate 2D models for soil-water characteristic curve (SWCC), that incorporate the hysteretic nature of the relationship between volumetric water content θ and suction ψ. The models are based on nonlinear least squares estimation of the experimental data for sand. To estimate the dependent variable θ the proposed models include two independent variables, suction and sensors reading position (depth d in the column test). The variable d represents not only the position where suction and water content are measured but also the initial suction distribution before each of the hydraulic loading test phases. Due to this the proposed 2D regression models acquire the advantage that they: (a) can be applied for prediction of θ for any position along the column and (b) give the functional form for the scanning curves.