Refine
Document Type
- Conference Proceeding (336) (remove)
Institute
- Professur Informatik im Bauwesen (336) (remove)
Keywords
- Modellierung (49)
- Bauwerk (39)
- Verteiltes System (36)
- CAD (31)
- Finite-Elemente-Methode (24)
- Architektur (21)
- Computerunterstütztes Verfahren (21)
- Baubetrieb (17)
- Ingenieurbau (17)
- Internet (17)
Recent research shows that current learning strategies in construction industry have not been effective in implementing lean principles in construction. With that in mind the researchers set to investigate an alternative learning strategy in order to promote learning at the international level. A web-based environment, was developed for this project with the intent of promoting learning and knowledge exchange on the theory and practice of "process transparency" across different countries.
The promise of lower costs for sensors that can be used for construction inspection means that inspectors will continue to have new choices to consider in creating inspection plans. However, these emerging inspection methods can require different activities, resources, and decisions such that it can be difficult to compare the emerging methods with other methods that satisfy the same inspection needs. Furthermore, the context in which inspection is performed can significantly influence how well certain inspection methods are suited for a given set of goals for inspection. Context information, such as weather, security, and the regulatory environment, can be used to understand what information about a component should be collected and how an inspection should be performed. The research described in this paper is aimed at developing an approach for comparing and selecting inspection plans. This approach consists of (1) refinement of given goals for inspection, if necessary, in order to address any additional information needs due to a given context and in order to reach a level of detail that can be addressed by an inspection activity; (2) development of constraints to describe how an inspection should be achieved; (3) matching of goals to available inspection methods, and generation of activities and resource plans in order to address the goals; and (4) selection of an inspection plan from among the possible plans that have been identified. The authors illustrate this approach with observations made at a local construction site.
The conceptual structure of an application that can support the structural analysis task in a distributed collaboratory is described in (van Rooyen and Olivier 2004). The application described there has a standalone component for executing the finite element method on a local workstation in the absence of network access. This application is comparable to current, local workstation based finite element packages. However, it differs fundamentally from standard packages since the application itself, and its objects, are adapted to support distributed execution of the analysis task. Basic aspects of an object-oriented framework for the development of applications which can be used in similar distributed collaboratories are described in this paper. An important feature of this framework is its application-centred design. This means that an application can contain any number of engineering models, where the models are formed by the collection of objects according to semantic views within the application. This is achieved through very flexible classes Application and Model, which are described in detail. The advantages of the application-centred design approach is demonstrated with reference to the design of steel structures, where the finite element analysis model, member design model and connection design model interact to provide the required functionality.
Im Rahmen des Sonderforschungsbereiches 524 <Werkstoffe und Konstruktionen für die Revitalisierung von Bauwerken 1> ist das primäre Anliegen des Teilprojektes D2 <Bauplanungsrelevantes digitales Gebäudeaufnahme- und Informationssystem> die Entwicklung von Methoden und Techniken zur Aufnahme von Bestandsdaten vor Ort oder durch Auswertung vorhandener Dokumentationen und deren direkte Integration in ein Bauwerksmodell. [15] Das Vorhaben erarbeitet Grundlagen zu Aspekten der fachplanerischen Nutzung und der wissenschaftlichen Auswertungen arbeitsmethodischer Vorgehensweisen in der Bestandsaufnahme unter Einbeziehung softwaretechnischer Methoden. Dabei finden Sachverhalte der Strukturierung, die Herausarbeitung von Systematiken der wesentlichen Informations-/Datenmengen, die Ableitung von Methoden zur zerstörungsfreien Erfassung und die Darstellung planungsrelevanter Gebäudeinformationen in digitalen Systemen Berücksichtigung. Beim Bauaufmaß werden neben traditionellen Methoden und Techniken längst geodätische Verfahren wie die Tachymetrie, die Photogrammetrie und die Handlaserentfernungsmessung einbezogen. In der Praxis des Bestandsaufmaßes repräsentiert gegenwärtig die Tachymetrie, das am häufigsten zur Innen- und Außenaufnahme von Gebäuden eingesetzte geodätische Vermessungsverfahren. [9] [3] Ausgehend von der heutigen Situation in der Bestandsaufnahme wird aufgezeigt, inwieweit es nach dem gegenwärtigen Stand der Technik möglich ist, die in der Geodäsie verwendeten Tachymeter direkt in der Bestandsaufnahme einzusetzen. In einem weiteren Schwerpunkt wird die Konzeption eines rechnergestützten Bauaufnahmesystems basierend auf reflektorlos messenden tachymetrischen Geräten beschrieben. Das Konzept berücksichtigt nicht nur das Bauaufmaß, sondern unterstützt adäquat den gesamten Prozeß der Bauaufnahme – von der Erstbegehung bis hin zur konstruktiven Gliederung. Abschließend werden tendenzielle Möglichkeiten in der Bauaufnahme diskutiert.
Die heutige Situation in der Tragwerksplanung ist durch das kooperative Zusammenwirken einer größeren Anzahl von Fachleuten verschiedener Disziplinen (Architektur, Tragwerksplanung, etc.) in zeitlich befristeten Projektgemeinschaften gekennzeichnet. Bei der Abstimmung der hierdurch bedingten komplexen, dynamischen und vernetzten Planungsprozesse kommt es dabei häufig zu Planungsmängeln und Qualitätseinbußen. Dieser Artikel zeigt auf, wie mit Hilfe der Agententechnologie Lösungsansätze zur Verbesserung der Planungssituation erreicht werden können. Hierzu wird ein Agentenmodell für die vernetzt-kooperative Tragwerksplanung vorgestellt und anhand der Planung einer Fußgängerbogenbrücke anschaulich demonstriert. Das Agentenmodell erfasst (1) die beteiligten Fachplaner und Organisationen, (2) die tragwerksspezifischen Planungsprozesse, (3) die zugehörigen (Teil-)Produktmodelle und (4) die genutzte (Ingenieur-)Software. Hieraus leiten sich die drei Teilmodelle (1) agentenbasiertes Kooperationsmodell, (2) agentenbasierte Produktmodellintegration und (3) Modell zur agentenbasierten Software-Integration ab. Der Fokus des Artikels liegt auf der Darstellung des agentenbasierten Kooperationsmodells.
This ethnographic study reports on emerging work processes and practices observed in the AEC (Architecture/Engineering/Construction) Global Teamwork program, i.e., what people experience when interacting with and through collaboration technologies, why people practice in the way they do, how the practice fits into the environment and changes the work patterns. It presents the experience of two high-performance typical but extreme AEC teamwork cases adopting and adapting to collaboration technologies and how these technologies in practice impact their work processes. The findings illustrate the importance of collaboration technologies in cross-disciplinary, global teamwork. Observations indicate that high performance teams that use the collaboration technologies effectively exhibit collaboration readiness at an early stage and manage to define a “third way” to meet the demands of the cross-disciplinary, multi cultural and geographically distributed AEC workspace. The observations and implications represent the blueprint for yearly innovations and improvements to the design of the AEC Global Teamwork program.
Seit die Datenverarbeitung in ihrer Komplexität sich der Thematik des Computer Integrated Manufacturing widmet gehört die Produktionsplanung und Steuerung zu jenen Bereichen, in denen eine Computerunterstützung am vordringlichsten erschien. Später sind betriebswirtschaftliche Gesamtlösungen entstanden, die (bis heute recht unpräzise) als Enterprise Resource Planning (ERP)-Systeme bezeichnet werden und in ihren Logistik-Modulen auch Funktionen der Produktionsplanung abdecken. Alle bekannten MRP-, PPS- und auch ERP-Systeme beruhen auf einer Sukzessivplanung. Advanced Planning and Scheduling (APS) Systems finden seit etwa 1995 zunehmend Interesse. Neben Demand Planning, Production Planning and Scheduling, Distribution Planning, Transportation Planning und Supply Chain Planning werden Lösungen für Anzahl und Standorte von Produktionsstätten und Auslieferungslagern, Zuordnung zu Produktionsstätten, Kapazitätsbestimmung für Arbeitskräfte und Betriebsmittel je Standort, Lagerhaltung je Teil und Lager, Bestimmung benötigter Transportmittel und Häufigkeit ihres Einsatzes, Zuordnung von Lagern zu Produktionsstätten von Märkten zu Lagern u.a.m. von APS-Systemen erwartet. D.h. APS-Systeme ergänzen ERP-Lösungen, nutzen die bereits durch das ERP-System vorhandenen Daten und benötigen neuartige Algorithmen und (Meta-) Heuristiken. Im Rahmen des Vortrages werden Modelle und Echtzeitalgorithmen zur Optimierung der Logistik für Prozesse mit kurzfristigen Anforderungen, geographisch verteilter Produktion, Lagerhaltung der Ausgangs-, Zwischen- und Endprodukte und wechselnden Transport-Bedingungen aus der Sicht der praktischen Umsetzung und Anwendung in Form einer ASP-Lösung aufgezeigt und diskutiert.
Der Beitrag basiert auf den Ansätzen und Ergebnissen des Forschungsprojekts >Prozessorientierte Vernetzung von Ingenieurplanungen am Beispiel der Geotechnik<, das im Rahmen des Schwerpunktprogramms 1103 >Vernetzt-kooperative Planungsprozesse im Konstruktiven Ingenieurbau< von der DFG gefördert wird. Ziel des gemeinsam mit dem Institut für Numerische Methoden und Informatik im Bauwesen an der TU Darmstadt durchgeführten Forschungsprojekts ist die Entwicklung einer netzwerkbasierten Kooperationsplattform zur Unterstützung von geotechnischen Ingenieurplanungen. Daher konzentriert sich das Forschungsprojekt auf die Abbildung und Koordination der Planungsprozesse für Projekte des Konstruktiven Ingenieurbaus vor dem Hintergrund der stark arbeitsteiligen Projektbearbeitung in einer verteilten Rechnerumgebung. Der Beitrag stellt die Abstraktion von Prozessmustern im Bauplanungsprozess als Basis für die dynamische Prozessmodellierung in einem Kooperationsmodell dar. Ziel ist es, durch die Identifikation der mit dem Entwurf und der Dimensionierung eines Bauteils verbundenen Planungs- und Abstimmungsprozesse einen bauteilbezogenen Katalog von Prozessmustern zu abstrahieren. Die einzelnen Prozessmuster werden in jedem Bauplanungsprozess dynamisch über geeignete Kopplungsmechanismen in das aktuelle Prozessmodell integriert, so dass die für den Bauplanungsprozess typischen Veränderungen der Konstruktion und der Zusammensetzung des Planungsteams im Prozessmodell berücksichtigt werden können. Dazu werden im Beitrag die bisherigen Ergebnisse der Analyse des Planungsprozesses eines großen innerstädtischen Bauvorhabens, das als Referenzobjekt dient, sowie typischer Planungsszenarien in der Geotechnik vorgestellt. Anschließend werden Grundlagen und methodische Ansätze zur Modellierung von Prozessen mit der Methode der farbigen Petri-Netze mit individuellen Marken vorgestellt. Anhand von Beispielen für bauteilorientierte Prozessmuster wird die Funktionalität der Prozessmuster in sich und im gegenseitigen Zusammenspiel erläutert
The paper presents the abstraction of process relevant information in order to enable the workflow management based on semantic data. It is shown for three examples, how the standards define the information needed to perform a certain planning activity. Abstraction of process relevant information is discussed for different granularities of the underlying processmodel. As one possible application ProMiSE is introduced, which uses process relevant data in individual tokens in a petri-net based process-model.
The AEC industry is conscious of the potentials arising from the usage of mobile computer systems to increase productivity by streamlining their business processes. Discussions are no longer on whether or not to use a mobile computer solution, but rather, on how it should be used. However, the implantation process of this new technology in Architecture, Engineering and Construction (AEC) and Facility Management (FM) practise is very slow and should be improved. One way to encourage and ease the usage of mobile computer systems in AEC is a more process-oriented usability and context appropriateness of mobile computer solutions. Context-sensitivity is defined as a crucial feature to be taken into account for further research in the area of Mobile Computing. Context-sensitive, mobile IT-solutions depend on two features: (1) flexible definitions of (construction) processes describing the context and (2) tools for flexible, multi-dimensional information management representing the context. It is on this premise that the authors propose the n-dimensional data management approach for the implementation of mobile computing solutions. In this paper, we analyse working scenarios in the AEC and FM sector, defining context aspects which are transformed and formalized as dimension hierarchies of the envisaged context model.