Heuristics and applications for Ressource-Constrained Project Scheduling with Minimal and Maximal Time Lags

  • Priority-rule methods for approximately minimizing the duration of a project subject to minimal and maximal time lags between the activities of the project and limited availability of renewable resources are considered. Such a project can be modelled by a cyclic activity-on-node network. Two generation schemes for constructing feasible schedules are discussed: the serial and parallel schemes. TwoPriority-rule methods for approximately minimizing the duration of a project subject to minimal and maximal time lags between the activities of the project and limited availability of renewable resources are considered. Such a project can be modelled by a cyclic activity-on-node network. Two generation schemes for constructing feasible schedules are discussed: the serial and parallel schemes. Two different kinds of heuristic procedures are proposed. The sequential or direct method processes the activities or respectively nodes of the project network one after another without considering the strong components separately. The contraction method uses a bottom-up technique. First, a feasible subschedule is determined for each strong component. Second, each strong component is replaced by a single node and the resulting acyclic network is treated by the direct method. In conclusion, some results from an experimental performance analysis of the heuristics are given using a new network generator.zeige mehrzeige weniger

Volltext Dateien herunterladen

Metadaten exportieren

Weitere Dienste

Teilen auf Twitter Suche bei Google Scholar
Metadaten
Dokumentart:Artikel (Wissenschaftlicher)
Verfasserangaben: K. Neumann
DOI (Zitierlink):https://doi.org/10.25643/bauhaus-universitaet.518Zitierlink
URN (Zitierlink):https://nbn-resolving.org/urn:nbn:de:gbv:wim2-20111215-5186Zitierlink
Sprache:Englisch
Datum der Veröffentlichung (online):11.03.2005
Jahr der Erstveröffentlichung:1997
Datum der Freischaltung:11.03.2005
Institute und Partnereinrichtugen:Fakultät Bauingenieurwesen / Professur Informatik im Bauwesen
GND-Schlagwort:Ablaufplanung; Beschränkung
Quelle:Internationales Kolloquium über Anwendungen der Informatik und Mathematik in Architektur und Bauwesen , IKM , 14 , 1997 , Weimar , Bauhaus-Universität
DDC-Klassifikation:600 Technik, Medizin, angewandte Wissenschaften / 620 Ingenieurwissenschaften / 620 Ingenieurwissenschaften und zugeordnete Tätigkeiten
BKL-Klassifikation:31 Mathematik / 31.80 Angewandte Mathematik
56 Bauwesen / 56.03 Methoden im Bauingenieurwesen
Lizenz (Deutsch):License Logo In Copyright