- search hit 1 of 1
Implementation and Improvement of Design and Authorisation Procedures for proposed Tailings Facilities
- The report is part of the research project 'TAILSAFE'. The project is supported by the european union. Basics of design and investigation procedures are presented within the report. Furthermore possible applications of design and investigation procedures are evaluated concerning to a smooth work during all using phases of a tailings facility, that is the planning and execution. FinallyThe report is part of the research project 'TAILSAFE'. The project is supported by the european union. Basics of design and investigation procedures are presented within the report. Furthermore possible applications of design and investigation procedures are evaluated concerning to a smooth work during all using phases of a tailings facility, that is the planning and execution. Finally recomendations are given to optimise the handling with significant standards.…
- Der Bericht ist Teil des von der Europäischen Gemeinschaft geförderten Forschungsprojektes 'Tailsafe'. Im Bericht werden Grundlagen der von Bemessungs- und Erkundungsprozeduren übersichtlich dargestellt und im Hinblick auf einen möglichst reibunglosen Ablauf zu allen Nutzungsphasen einer Tailings-Anlage ausgewertet. Schließlich werden Empfehlungen zur Optimierung der durch öffizielle Stellen zuDer Bericht ist Teil des von der Europäischen Gemeinschaft geförderten Forschungsprojektes 'Tailsafe'. Im Bericht werden Grundlagen der von Bemessungs- und Erkundungsprozeduren übersichtlich dargestellt und im Hinblick auf einen möglichst reibunglosen Ablauf zu allen Nutzungsphasen einer Tailings-Anlage ausgewertet. Schließlich werden Empfehlungen zur Optimierung der durch öffizielle Stellen zu verwendenden Regelwerke gegeben.…
Document Type: | Preprint |
---|---|
Author: | Prof. Dr.-Ing. Karl Josef WittGND, Robert-Balthasar Wudtke |
DOI (Cite-Link): | https://doi.org/10.25643/bauhaus-universitaet.796Cite-Link |
URN (Cite-Link): | https://nbn-resolving.org/urn:nbn:de:gbv:wim2-20111215-7964Cite-Link |
Language: | English |
Date of Publication (online): | 2006/11/14 |
Year of first Publication: | 2005 |
Release Date: | 2006/11/14 |
Contributing Corporation: | University of Leeds |
Institutes and partner institutions: | Fakultät Bauingenieurwesen / Professur Grundbau |
Tag: | tailings dam; tailings facility |
GND Keyword: | Bergeteich; Feldversuch; Experiment; Geotechnik; Hydrologie; Management; Arbeitsablauf; Reststoff; Bergbau |
Contributor: | Engels, Jonathan |
Dewey Decimal Classification: | 600 Technik, Medizin, angewandte Wissenschaften / 620 Ingenieurwissenschaften / 620 Ingenieurwissenschaften und zugeordnete Tätigkeiten |
BKL-Classification: | 56 Bauwesen |
57 Bergbau | |
Licence (German): | In Copyright |