Stability of an optimal schedule for a flow-shop problem with two jobs

  • The problem F|n=2|F is to minimize the given objective function F(C1,m, C2,m) of completion times Ci,m of two jobs i Î J={1, 2} processed on m machines M={1, 2, …, m}. Both jobs have the same technological route through m machines. Processing time ti,k of job iÎ J on machine kÎ M is known. Operation preemptions are not allowed. Let R2m be space of non-negative 2m-dimensional real vectorsThe problem F|n=2|F is to minimize the given objective function F(C1,m, C2,m) of completion times Ci,m of two jobs i Î J={1, 2} processed on m machines M={1, 2, …, m}. Both jobs have the same technological route through m machines. Processing time ti,k of job iÎ J on machine kÎ M is known. Operation preemptions are not allowed. Let R2m be space of non-negative 2m-dimensional real vectors t=(t1,1,…, t1,m, t2,1,…, t2,m) with Chebyshev’s distance d(t, t*). To solve problem F|n=2|F, we can use the geometric algorithm, which includes the following steps: 1) construct digraph (V, A) for problem F|n=2|F and find so-called border vertices in (V, A); 2) construct the set of trajectories corresponding to the shortest paths Rt in digraph (V, A) from the origin vertex to each of the border vertices; 3) find an optimal path in the set Rt that represents a schedule with minimal value of the objective function F. Let path tu Î Rt be optimal for the problem F|n=2|F with operation processing times defined by vector t. If for any small positive real number e > 0 there exists vector t*Î R2m such that d(t, t*) = e and path tu is not optimal for the problem F|n=2|F with operation processing times defined by vector t*, then optimality of path tu is not stable. The main result of the paper is the proof of necessary and sufficient conditions for optimality stability of path tu. If objective function F is continuous non-decreasing (e.g., makespan, total completion time, maximal lateness or total tardiness), then to test whether optimality of the path tu Î Rt is stable takes O(m log m) time.show moreshow less

Download full text files

Export metadata

Additional Services

Share in Twitter Search Google Scholar
Metadaten
Document Type:Conference Proceeding
Author: Yuri N. Sotskov
DOI (Cite-Link):https://doi.org/10.25643/bauhaus-universitaet.369Cite-Link
URN (Cite-Link):https://nbn-resolving.org/urn:nbn:de:gbv:wim2-20111215-3690Cite-Link
Language:English
Date of Publication (online):2005/01/12
Year of first Publication:2003
Release Date:2005/01/12
Institutes and partner institutions:Fakultät Bauingenieurwesen / Professur Informatik im Bauwesen
GND Keyword:Ablaufplanung; Reihenfolgeproblem
Source:Internationales Kolloquium über Anwendungen der Informatik und Mathematik in Architektur und Bauwesen , IKM , 16 , 2003 , Weimar , Bauhaus-Universität
Dewey Decimal Classification:600 Technik, Medizin, angewandte Wissenschaften / 620 Ingenieurwissenschaften / 620 Ingenieurwissenschaften und zugeordnete Tätigkeiten
BKL-Classification:31 Mathematik / 31.80 Angewandte Mathematik
56 Bauwesen / 56.03 Methoden im Bauingenieurwesen
Collections:Bauhaus-Universität Weimar / Internationales Kolloquium über Anwendungen der Informatik und Mathematik in Architektur und Bauwesen, IKM, Weimar / Internationales Kolloquium über Anwendungen der Informatik und Mathematik in Architektur und Bauwesen, IKM, Weimar, 16. 2003
Licence (German):License Logo In Copyright