Das Suchergebnis hat sich seit Ihrer Suchanfrage verändert. Eventuell werden Dokumente in anderer Reihenfolge angezeigt.
  • Treffer 7 von 8
Zurück zur Trefferliste

The preliminary design of a wearable computer for supporting Construction Progress Monitoring

  • Progress monitoring has become more and more important as owners have increasingly demanded shorter times for the delivery of their projects. This trend is even more evident in high technology industries, such as the computer industry and the chemical industry. Fast changing markets, such as the computer industry, force companies to have to build new facilities quickly. To make a statement aboutProgress monitoring has become more and more important as owners have increasingly demanded shorter times for the delivery of their projects. This trend is even more evident in high technology industries, such as the computer industry and the chemical industry. Fast changing markets, such as the computer industry, force companies to have to build new facilities quickly. To make a statement about construction progress, the status of a building has to be determined and monitored over a period of time. Depicting the construction progress in a diagram over time, statements can be made about the anticipated completion of the project and delays and problems in certain areas. Having this information, measures can be taken to efficiently >catch up< on the schedule of the project. New technologies, such as wearable computers, speech recognition, touch screens and wireless networks could help to move electronic data processing to the construction site. Progress monitoring could very much take advantage of this move, as several intermediate steps of processing progress data can be made unnecessary. The processing of progress data could be entirely done by computers, which means that data for supporting decisions can be made available at the moment the construction progress is measured. This paper describes a project, that investigates how these new technologies can be linked to create a system that enhances the efficiency of progress monitoring. During the project a first prototype of a progress monitoring system was developed that allows construction companies and site supervisors to measure construction progress on site using wearable computers that are speech controlled and connected to a central database via a wireless network.zeige mehrzeige weniger

Volltext Dateien herunterladen

Metadaten exportieren

Weitere Dienste

Teilen auf Twitter Suche bei Google Scholar
Metadaten
Dokumentart:Konferenzveröffentlichung
Verfasserangaben: Jan Reinhardt, James H. Garrett, Raimar J. Scherer
DOI (Zitierlink):https://doi.org/10.25643/bauhaus-universitaet.590Zitierlink
URN (Zitierlink):https://nbn-resolving.org/urn:nbn:de:gbv:wim2-20111215-5901Zitierlink
Sprache:Englisch
Datum der Veröffentlichung (online):13.04.2005
Jahr der Erstveröffentlichung:2000
Datum der Freischaltung:13.04.2005
Institute und Partnereinrichtugen:Fakultät Bauingenieurwesen / Professur Informatik im Bauwesen
GND-Schlagwort:Bauablauf; Überwachung; Transportables Gerät
Quelle:Internationales Kolloquium über Anwendungen der Informatik und Mathematik in Architektur und Bauwesen , IKM , 15 , 2000 , Weimar , Bauhaus-Universität
DDC-Klassifikation:600 Technik, Medizin, angewandte Wissenschaften / 620 Ingenieurwissenschaften / 620 Ingenieurwissenschaften und zugeordnete Tätigkeiten
BKL-Klassifikation:31 Mathematik / 31.80 Angewandte Mathematik
56 Bauwesen / 56.03 Methoden im Bauingenieurwesen
Sammlungen:Bauhaus-Universität Weimar / Internationales Kolloquium über Anwendungen der Informatik und Mathematik in Architektur und Bauwesen, IKM, Weimar / Internationales Kolloquium über Anwendungen der Informatik und Mathematik in Architektur und Bauwesen, IKM, Weimar, 15. 2000
Lizenz (Deutsch):License Logo In Copyright