Eine integrierte Gesamtplanung, ein konzentriertes Planungs- und Freigabesystem, ein konsequentes Baustellenmanagement sowie die Einbeziehung und Bündelung des Know how und der Leistungsfähigkeit solventer Partner sind Grundlage für die Optimierung der Kommunikations- und Entscheidungswege für die systemgeführte Prozesslenkung. Das wird am Beispiel der Errichtung des Innerstädtischen Einkaufszentrums Anger 1 belegt.
Vorwort zur Tagungsbroschüre
(1999)
The increased implementation of site data capture technologies invariably results in an increase in data warehousing and database technologies to store captured data. However, restricted use of data beyond the initial application could potentially result in a loss of understanding of site processes. This could in turn lead to poor decision making at production, tactical and strategic levels. Concrete usage data have been collected from two piling processes. These data have been analysed and the results highlighted potential improvements that could be made to existing site management and estimating processes. A cost benefit analysis has been used to support decision making at the strategic level where the identified improvements require capital expenditure.
Technologischer Ablauf in einer Bauschuttaufbereitungsanlage; Gefährdungen und Belastungen bei der Bauschuttaufbereitung, Schwerpunktaktion zur messtechnischen Aufklärung der Staubbelastung der Beschäftigten bei der Bauschuttaufbereitung, Durchführung der Messungen, Auswertung. Die dargestellten Untersuchungsergebnisse belegen, dass durch gezielte Maßnahmen die Staubkonzentrationen unter die vom Gesetzgeber vorgegebenen Grenzwerte gesenkt werden können. Bauschuttaufbereitungsanlagen ohne jegliche Einrichtungen zur Staubminimierung sind aus der Sicht des Arbeitsschutzes nicht tolerierbar.
Site superintendents performing project management tasks on construction sites need to access project documents and need to collect information that they observe while inspecting the site. Often, information that is observed on a construction site needs to be integrated into electronic documents or project control systems. In the future, we expect integrated product and process models to be the medium for storing and handling construction project management information. Even though mobile computing devices today are already capable of storing and handling such integrated product and process data models, the user interaction with such large and complex models is difficult and not adequately addressed in the existing research. In this paper, we introduce a system that supports project management tasks on construction sites effectively and efficiently by making integrated product and process models accessible. In order to effectively and efficiently enter or access information, site superintendents need visual representations of the project data that are flexible with respect to the level of detail, the decomposition structure, and the type of visual representation. Based on this understanding of the information and data collection needs, we developed the navigational model framework and the application Site Data Collection System (SiDaCoS), which implements that framework. The navigational model framework allows site superintendents to create customized representations of information contained in a product and process model that correspond to their data access and data collection needs on site.